This Statement of Work outlines requirements for assembly and installation of a Vindicator Core Network Switch and Intrusion Detection System/Access Control System at Building 7320, Network Control Center, Dyess Air Force Base, Texas, effective June 12, 2025. The work is governed by the base Vindicator Alarm Systems IDIQ Statement of Work unless specifically deviated. The contractor must provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, and materials to complete the installation.

Project 1 requires installation of tamper-proof IT cabinets, a dedicated power circuit for IT equipment, fiber optic patch cables linking to existing network infrastructure in coordination with base Communications Squadron, programming and configuration of the Vindicator system locally and at BDOC, access control badging equipment installation, IDS devices including door sensors and keypads, card readers with and without pin pads for entry and exit control points, and a main ACS badging and enrollment workstation. Project 2 contains similar requirements with the additional installation of a 24-port network switch and cabinet with UPS in the Communications Room. Phase 2 requires end-user training for up to 20 personnel from 7 CS in no more than four sessions of four hours each, covering system operation, troubleshooting, and badge management. Phase 3 mandates 30-day continuous monitoring with 1-year warranty coverage. The contractor must conduct a 95% design review with Government Program Office participation, establish an IDS baseline that cannot be changed without written Contracting Officer approval, and perform operational testing per manufacturer standards. Phase 2 testing must achieve zero alarms during a 72-hour period per DAFI 31-101.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

12 June 2025

ASSEMBLY AND INSTALLATION OF VINDICATOR CORE NETWORK SWITCH,

AND INSTALATION OF INTRUSION DETECTION SYSTEM FOR BLDG 7320

AT DYESS AFB, TEXAS

1. Description of Work. This Task Order Statement of Work outlines the requirement to provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, and materials for the installation of a Vindicator Core Network Switch and an Intrusion Detection System (IDS)/Access Control System (ACS) at 7 CS Building 7320, Network Control Center, Dyess AFB, TX.

Note: This Task Order is governed by the terms, conditions, standard safety guidelines, general base access, warranties, and regulatory requirements set forth in the base Vindicator Alarm Systems IDIQ Statement of Work, unless specifically deviated or added below.

2. Project 1. Vindicator Core Network Switch Installation Phase 1.

2.1 Install IT cabinets of appropriate size for the facility. The cabinet must account for limited space within involved rooms and should not be overly obstructive. The cabinets will be tampered proof and will house the Vindicator equipment, core network switch and Uninterruptible Power Supply (UPS) devices.

2.2 Install a dedicated power circuit to serve the IT equipment cabinets.

2.3 Install a fiber optic patch cable to link the IT equipment cabinet with the existing fiber optic network patch panel. Contractor shall work closely with the base Communications Squadron in locating and identifying the available fiber pair and location.

2.4 Program and configure Vindicator system both locally and at BDOC.

2.5 Ensuring that all installation work is in accordance with DAFI 31-101_DAFGM2022.01, DoDM 5100.76 AFMAN 31-101Volume 2. This includes conduit, wiring and tampering work.

2.6 Program, ensure connectivity with and configure the alarm system both locally and at BDOC.

2.7 Fiber connectivity with the BDOC is limited. For this install, it will help alleviate fiber usage to BDOC and from the Core network switch to the Switch at BDOC shall only need one pair of fiber.

2.8 Installing the access control badging equipment in the secure area.

2.9 Installing IDS devices in the actual space which includes a BMS for the main door, a motion sensor/sensors for the spaces, IDS keypad and pin pad reader for securing and accessing the IDS.

2.10 Card reader with pin pad for non-secure side Entry Control Point (ECP), card reader without pin pad on the secure side of ECP for exit, BMS, and installation of the door controller, dedicated AC power to the enclosure and communication wiring to the Vindicator panel. Connect the Government’s existing electronic locks/door striker to the Vindicator system.

2.11 Main ACS badging and enrollment workstation. Install comm lines from this workstation back to the cabinet in.

3. Project 2: Intrusion Detection System (IDS) & Access Control System (ACS) Installation Phase 1.

3.1 Install IT cabinets of appropriate size for the facility. The cabinet must account for limited space within the involved room and should not be overly obstructive. The cabinet will house the Vindicator equipment, network switch and UPS devices.

3.2 Installing the access control badging equipment in and around the rack.

3.3 Installing a fiber optic patch cable to link the IT equipment cabinet with the existing fiber optic network patch panel. Contractor will work closely with the base Communications Squadron on locating and identifying the available fiber pair and location. One strand of Single mode fiber.

3.4 Install additional 24 port network switch, cabinet, and the required UPS to support in the Comm Room.

3.5 Installing IDS devices in the actual space which includes a BMS for the main door, a motion sensor/sensors for the spaces, IDS keypad and pin pad reader for securing and accessing the IDS.

3.6 Installing card reader with pin pad on the non-secure side of the main door and a card reader sans pin pad on the secure side of the door. Install and connect electronic lock to the Vindicator access control system.

3.7 Program and configure Vindicator system both locally and at BDOC.

3.8 Installing ACS to include:

3.8.1 Card reader with pin pad for non-secure side Entry Control Point (ECP), card reader without pin pad on the secure side of ECP for exit, BMS, and installation of the door controller, dedicated AC power to the enclosure and communication wiring to the Vindicator panel in Bldg 7320. Connect the Government’s existing electronic locks/door striker to the Vindicator system.

3.8.2 Main ACS badging and enrollment workstation in Bldg 7320. Install comm lines from this workstation back to the cabinet in Bldg 7320.

3.9 Program, ensure connectivity with and configure the alarm system both locally and at BDOC.

3.10 Fiber connectivity with the BDOC is limited. For this reason the contract should

3.11 account for a minimum fiber optic line requirement to link with BDOC.

4. Phase 2: Training & Maintenance (both projects)

4.1 Contractor will provide end user training to 7 CS personnel who will operate the Vindicator alarm system at

Building 7320. Each training session, if multiple sessions (no more than four) are required, should not take longer than four (4) hours. Contractor will coordinate closely with the Government on scheduling for various shifts if any. Total personnel to be trained will be less than 20.

4.2 Ensure users are trained in how to secure/disarm the system for those with access/secure authority: ensure users are trained in how to secure/disarm the system and troubleshoot and manage the IDS and ACS systems respectively. For the building security manager/s; train how to create/add/remove badges from the badging system.

4.3 Maintenance: maintenance of system should be accounted for prior to installation. The government cannot accept the use of a company owned laptop to update the system over the long term. This should be accounted when considering what will be required for system software updates and information transfer.

4.4 Perform phase 2 testing as prescribed in DAFI 31-101_DAFGM2022-01. Contractor will coordinate with the

Government Test director to ensure phase 2 was completed with zero (0) alarms were annunciated during the 72-hour period.

5. Phase 3: Testing (both projects)

5.1 After successful completion of phases 1-2. Phase 3 will be initiated with a continuous 30-day monitoring of the

Vindicator alarm system installed as prescribed in the Base IDIQ SOW. If any system/equipment malfunctions are identified contractor will be made available for troubleshooting with a 1-year warranty provided by the contractor.

6. Design.

6.1 The contractor shall conduct a 95% design review with participation by the Government Program Office (PO) and other Government representatives to review proposed designs for compliance with specified requirements and to validate that requirements have been captured and are traceable in the design documentation. The contractor shall also present a summary of up-to-date configuration status accounting information and address information assurance compliance status at each design review. The site design reviews shall be conducted at the site location to allow maximum participation by base personnel. The contractor shall submit design review documentation; the design reviews will not be considered complete until all issues are resolved. The contractor shall identify a complete listing of proposed long lead items (if applicable), requiring purchase in advance of the 95% design review approval, to meet the contractor’s planned installation schedule. The Government PO will review proposed long lead purchases and the Procuring Contracting Officer (PCO) may provide authorization to purchase, if justified. The 95% Design Review will not be considered complete until all issues are resolved and the contractor has received Government PCO approval to proceed with procurement of equipment and installation. The contractor shall prepare an agenda for the design review and also record the minutes of the review. The contractor shall provide a recommended spares parts list.

6.2 Design reviews are intended as a tool to mitigate the risk that the contractor’s design will not meet the contractual effort’s performance requirements. Design reviews do not waive or otherwise release the contractor from its contractual obligation to satisfy all performance requirements of this contractual effort. Any comments or questions communicated to the contractor as a result of design reviews are suggestions to help the contractor mitigate risk.

6.3 The contractor shall conduct an Intrusion Detection System (IDS) baseline review for the Government as part of the 95% design review. Once the baseline is established at the 95% design review, the contractor shall not change the baseline milestones or delivery dates without written Government approval from the Contracting Officer.

7. Operational Test.

7.1 The contractor shall conduct operation test in accordance with manufacturer’s standard to meet commercial practice and to ensure the system is functional Testing procedures are outlined in base SOW.

ASSEMBLY AND INSTALLATION OF VINDICATOR CORE NETWORK SWITCH, AND INSTALATION OF INTRUSION DETECTION SYSTEM FOR BLDG 7320