This document outlines construction testing and inspection requirements for a retrofit project at the White City VA campus in Oregon. The contractor will be required to conduct material testing, including testing for asbestos, earthwork compaction, concrete, asphalt, utilities backfill and pressure testing. Specific testing frequencies are defined for items like aggregate base maximum density, concrete slump and air content, asphalt density and temperature, backfill compaction. The project scope includes asbestos pipe removal, earthwork, cement and concrete work, asphalt paving, utilities installation and associated testing. This competitive set-aside opportunity from the Department of Veterans Affairs has a magnitude of $10-20 million for retrofitting campus-wide infrastructure systems at the Southern Oregon Rehabilitation Center and Clinics in White City, Oregon.

View the file

Other files

File Type Posted
Technical Questions - White City Retrofit 1 VA SORCC.docx DOCX document
36E77620R0042 0005.docx DOCX document
692-16-101 Access Map.pdf PDF
Technical Questions - White City Retrofit 1_VA SORCC.docx DOCX document
36E77620R0042 0004.docx DOCX document
692-16-101 List of Notes 27 28 and 29 on Sheets C102 through C201.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.20.pdf PDF
692-16-101 Job Yard and laydown area.pdf PDF
White City Technical Question.docx DOCX document
36E77620R0042 0003.docx DOCX document
692-16-101 Retrofit Infrastructure - Sign in sheets 2020-08-10.pdf PDF
36E77620R0042 0002.docx DOCX document
C301 Sanitary Sewer - Drawing 4 of 8.pdf PDF
S06 - White City Technical Question.docx DOCX document
C101 Potable Water - Drawing 3 of 8.pdf PDF
C502 Surface Restoration Plan - Drawing 6 0f 8.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 85 thru 90.pdf PDF
Amendment 0001.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 80 thru 84.pdf PDF
Attachment 3 - Drawings 7 of 8.pdf PDF
Attachment 3 - Drawings 4 of 8.pdf PDF
Attachemnt 12 - VA Southern Oregon Rehabilitation Center and Clinics - Site Map.pdf PDF
Attachment 1 - Summary of Work.pdf PDF
S02 - Attachment 4 - Aerial-V1 of 9.pdf PDF
Attachment 3 - Drawings 1 of 8.pdf PDF
Attachment 3 - Drawings 3 of 8.pdf PDF
Attachment 8 - WhiteCityVA_Stormwater Facility Design.pdf PDF
Attachment 5 - Geotechnical Report - 04-21-17.pdf PDF
Attachment 10 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 3 - Drawings 2 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V7 of 9.pdf PDF
Attachment 3 - Drawings 5 of 8.pdf PDF
36E77620R0042.docx DOCX document
S02 - Attachment 4 - Aerial-V8 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V9 of 9.pdf PDF
Attachment 6 - Geo Infiltration Testing - 2019-12-05 - FNL.pdf PDF
Attachment 9 - ECPDC 692-16-101 - FY20.pdf PDF
Attachment 2 - Final Specifications Revised - 06-29-20.pdf PDF
S02 - Attachment 4 - Aerial-V4 of 9.pdf PDF
Attachment 3 - Drawings 6 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V2 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V5 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V6 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V3 of 9.pdf PDF
Attachment 11 - Construction Wage Rates - 7.3.20.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Retrofit Campus-Wide Infrastructure Systems

VA Project No. 692-16-101

White City, Oregon

Phase: Final Construction Documents

Construction Testing and Inspections List See technical specifications for complete submittal and testing requirements

ASBESTOS PIPE REMOVAL AND DISPOSAL Test Frequency

Test concrete pipe and structures to be removed for asbestos 1 test per continuous run of pipe

Test utility tunnels receiving work for asbestos contaning materials and soil 1 test per tunnel

Division 31 - Earthwork

31 20 11 EARTHWORK (SHORT FORM)

Provide backfill and subgrade material test results prior to construction

Once prior to work and

1 additional test per each 3,000 tons

Test density of aggregate subgrade beneath slabs and curb/gutter 1 test per 300 feet

31 23 23.33 FLOWABLE FILL

Provide mix design with test results prior to construction Once prior to work

Division 32 - Exterior Improvements

32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

Determine maximum density and optimum moisture content for aggregate base material Once prior to work

Certify material delivered matches approved mix Each truck

Test slump First truck each day

Test air content

First truck each day and

1 test per each additional 25 cubic yards when air entrained. 1 test per additional 100 cubic yards when not air entrained

32 12 16 ASPHALT PAVING

Determine maximum density and optimum moisture content for aggregate base material Once prior to work

Certify material delivered matches approved mix Each truck

Verify temperature of each load as asphalt at arrival onsite Each truck

Test density of aggregate subgrade beneath asphalt

1 test per 400 square yards, no fewer than 2

Test density of asphalt 2 tests each day per lift

32 90 00 PLANTING

Provide topsoil checmical anaysis Once prior to work

Division 33 - Utilities

33 10 00 WATER UTILITIES

Determine maximum density and optimum moisture content for backfill materials Once prior to work

Test backfill density

1 test per 100 lineal feet for each 4 feet of vertical lift, no fewer than 2

Hydrostatic pressure testing Per specifications

Disinfection Per specifications

33 30 00 SANITARY SEWER FACILITIES

Determine maximum density and optimum moisture content for backfill materials Once prior to work

Test backfill density

1 test per 100 lineal feet for each 4 feet of vertical lift, no fewer than 2

Pressure testing (air) Per specifications

Lamp testing Per specifications

Mandrel testing Per specifications

33 40 00 STORM SEWER UTILITIES

Determine maximum density and optimum moisture content for backfill materials Once prior to work

Test backfill density

1 test per 100 lineal feet for each 4 feet of vertical lift, no fewer than 2

Pressure testing (air) Per specifications

Lamp testing Per specifications

Mandrel testing Per specifications