S06 - White City Technical Question.docx

DOCX document 125 KB Posted

Attached to
Z2NZ--Retrofit Campus Wide Infrastructure Systems - White City VA Southern Oregon Rehabilitation Center and Clinics (SORCC)
Solicitation number
36E77620R0042
Issued by

About this file

This document contains a technical questions and response tracking sheet for the White City Retrofit Infrastructure Design-Bid-Build Project solicitation number 36E77620R0042 from the Department of Veterans Affairs. The project involves retrofitting campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics. The contractor will provide all labor, project management, materials, tools, supplies, and equipment to complete upgrades to potable water, sanitary sewer, and surface restoration per the drawings and specifications. The magnitude of construction is between $10-20 million. The solicitation is a competitive Service-Disabled Veteran-Owned Small Business set-aside to be completed at the White City VA facility location. The tracking sheet addresses questions received from contractors regarding proposal submission instructions and replacement of corrupted drawings within the solicitation amendments.

View the file

Other files

File Type Posted
Technical Questions - White City Retrofit 1 VA SORCC.docx DOCX document
36E77620R0042 0005.docx DOCX document
692-16-101 Access Map.pdf PDF
Technical Questions - White City Retrofit 1_VA SORCC.docx DOCX document
36E77620R0042 0004.docx DOCX document
692-16-101 List of Notes 27 28 and 29 on Sheets C102 through C201.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.20.pdf PDF
692-16-101 Job Yard and laydown area.pdf PDF
White City Technical Question.docx DOCX document
36E77620R0042 0003.docx DOCX document
692-16-101 Retrofit Infrastructure - Sign in sheets 2020-08-10.pdf PDF
36E77620R0042 0002.docx DOCX document
C301 Sanitary Sewer - Drawing 4 of 8.pdf PDF
C101 Potable Water - Drawing 3 of 8.pdf PDF
C502 Surface Restoration Plan - Drawing 6 0f 8.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 85 thru 90.pdf PDF
Amendment 0001.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 80 thru 84.pdf PDF
Attachment 3 - Drawings 7 of 8.pdf PDF
Attachment 3 - Drawings 4 of 8.pdf PDF
Attachemnt 12 - VA Southern Oregon Rehabilitation Center and Clinics - Site Map.pdf PDF
Attachment 1 - Summary of Work.pdf PDF
S02 - Attachment 4 - Aerial-V1 of 9.pdf PDF
Attachment 3 - Drawings 1 of 8.pdf PDF
Attachment 3 - Drawings 3 of 8.pdf PDF
Attachment 8 - WhiteCityVA_Stormwater Facility Design.pdf PDF
Attachment 5 - Geotechnical Report - 04-21-17.pdf PDF
Attachment 10 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 3 - Drawings 2 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V7 of 9.pdf PDF
Attachment 3 - Drawings 5 of 8.pdf PDF
36E77620R0042.docx DOCX document
S02 - Attachment 4 - Aerial-V8 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V9 of 9.pdf PDF
Attachment 6 - Geo Infiltration Testing - 2019-12-05 - FNL.pdf PDF
Attachment 9 - ECPDC 692-16-101 - FY20.pdf PDF
Attachment 2 - Final Specifications Revised - 06-29-20.pdf PDF
S02 - Attachment 4 - Aerial-V4 of 9.pdf PDF
Attachment 3 - Drawings 6 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V2 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V5 of 9.pdf PDF
Attachment 7 - 692-16-101 Testing Requirements.pdf PDF
S02 - Attachment 4 - Aerial-V6 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V3 of 9.pdf PDF
Attachment 11 - Construction Wage Rates - 7.3.20.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS

AND RESPONSE TRACKING SHEET

White City Retrofit Infrastructure Design-Bid-Build Project 36E77620R0042

PROJECT TITLE

SOLICITATION #

QUESTION #
QUESTION RECEIVE

DATE

QUESTION ANSWERED

DATE

CONTRACTOR QUESTIONS
VA RESPONSES TO QUESTIONS
1
7/29/20
8/3/20
SF 1442 Block 8 states that we should send our proposal to the Address listed, Section (2.7 Proposal Requirements) says that we should submit our proposal via email to your email address.

Please confirm that the proposal is to be submitted via email and not mailed physically.

Proposals will need to be submitted via email. Physical copies will not be accepted at this time. Please submit all proposals to jason.schultz@va.gov.

2
7/30/20
8/3/20
For some reason there are three individual pages in the drawings that appear to be corrupt, or not uploaded correctly in SAM.
1.C101 Potable Water (first page of the file “Drawings 3 of 8)
2.C301 Sanitary Sewer (first page of the file “Drawings 4 of 8)
3.C502 Surface Restoration Plan (second page of the file “Drawings 6 of 8)
Please see the Attached 3 drawings to amendment 0002

1. C101 Potable Water - Drawing 3 of 8

2. C301 Sanitary Sewer - Drawing 4 of 8

3. C502 Surface Restoration Plan - Drawing 6 0f 8

3
7/29/20
8/4/20
Is there a Drawing 8 of 8 that can/will be included? The solicitation has Drawings 1 thru 7 of 8.
Drawing 8 of 8 has been posted to Amendment 0001

image1.jpeg image2.jpeg