White City Technical Question.docx
DOCX document 126 KB Posted
- Solicitation number
- 36E77620R0042
About this file
This document contains a technical questions and response tracking sheet for a project to retrofit campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics. The contractor will provide all labor, project management, materials, tools, and equipment to complete upgrades to potable water, sanitary sewer, and surface restoration per the drawings and specifications. Six questions were received from potential offerors between July 29 and August 17 regarding proposal submission instructions, missing drawings, a job site layout sketch, and clarification on trenchless construction methods required around existing trees and a new duct bank. The contracting officer provided responses to ensure proposals are submitted electronically by the due date and that offerors account for non-trenched construction where necessary to avoid site obstacles.
The related federal contract opportunity notice is for the same retrofit project at the White City VA facility with a magnitude of construction between $10-20 million. In accordance with applicable legislation, this opportunity is set aside for service-disabled veteran-owned small businesses. The work must be completed per the statement of work and specifications included in the solicitation package issued by the Department of Veterans Affairs Headquarters.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS
AND RESPONSE TRACKING SHEET
PROJECT TITLE
SOLICITATION #
| QUESTION # |
| QUESTION RECEIVE |
DATE
QUESTION ANSWERED
DATE
| CONTRACTOR QUESTIONS |
| VA RESPONSES TO QUESTIONS |
| 1 |
| 7/29/20 |
| 8/3/20 |
| SF 1442 Block 8 states that we should send our proposal to the Address listed, Section (2.7 Proposal Requirements) says that we should submit our proposal via email to your email address. |
Please confirm that the proposal is to be submitted via email and not mailed physically.
Proposals will need to be submitted via email. Physical copies will not be accepted at this time. Please submit all proposals to jason.schultz@va.gov.
| 2 |
| 7/30/20 |
| 8/3/20 |
| For some reason there are three individual pages in the drawings that appear to be corrupt, or not uploaded correctly in SAM. |
| 1. | C101 Potable Water (first page of the file “Drawings 3 of 8) |
| 2. | C301 Sanitary Sewer (first page of the file “Drawings 4 of 8) |
| 3. | C502 Surface Restoration Plan (second page of the file “Drawings 6 of 8) |
| Attached are the 3 drawings: |
| 3 |
| 7/3/20 |
| 8/3/20 |
| Is there a Drawing 8 of 8 that can/will be included? The solicitation has Drawings 1 thru 7 of 8. |
| Drawing 8 of 8 has been posted to Amendment 0001 |
| 4 |
| 8/10/20 |
| 8/14/20 |
| The amendment SF 30’s indicate that the contractor is required to sign and return one copy to the issuing office. In which proposal volume shall we include signed SF 30’s |
| The signed amendment shuld be included in Volume III |
| 5 |
| 8/14/20 |
| 8/14/20 |
| Provide job yard and laydown area per attached sketch “692-16-101 Job yard and laydown area”. |
| Attached is the Job laydown area pdf |
| 6 |
| 8/17/20 |
| 8/17/20 |
| There were several locations shown during walk-thru that discussed trees being in the way, as well as a new duct bank that had been placed since the design was complete. Can you provide more information? |
| A group of trees exists over the storm drain at B202; this will require trenchless methods not shown in drawings. A new duct bank was installed near CC201 (east of B201) which requires the extension of the planned trenchless construction to the west (under the new ductbank). A sewer line goes under a noble spruce in the memorial garden that is important to the facility to save; this will require trenchless methods (whereas the plans show trenched methods). To ensure that these are addressed, and to allow for one additional instance not yet determined, provide 800 additional lineal feet of trenchless methods with up to 4 distinct run locations. This would be in lieu of said lengths being otherwise trenched. |
image1.jpeg image2.jpeg