White City Technical Question.docx

DOCX document 126 KB Posted

Attached to
Z2NZ--Retrofit Campus Wide Infrastructure Systems - White City VA Southern Oregon Rehabilitation Center and Clinics (SORCC)
Solicitation number
36E77620R0042
Issued by

About this file

This document contains a technical questions and response tracking sheet for a project to retrofit campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics. The contractor will provide all labor, project management, materials, tools, and equipment to complete upgrades to potable water, sanitary sewer, and surface restoration per the drawings and specifications. Six questions were received from potential offerors between July 29 and August 17 regarding proposal submission instructions, missing drawings, a job site layout sketch, and clarification on trenchless construction methods required around existing trees and a new duct bank. The contracting officer provided responses to ensure proposals are submitted electronically by the due date and that offerors account for non-trenched construction where necessary to avoid site obstacles.

The related federal contract opportunity notice is for the same retrofit project at the White City VA facility with a magnitude of construction between $10-20 million. In accordance with applicable legislation, this opportunity is set aside for service-disabled veteran-owned small businesses. The work must be completed per the statement of work and specifications included in the solicitation package issued by the Department of Veterans Affairs Headquarters.

View the file

Other files

File Type Posted
Technical Questions - White City Retrofit 1 VA SORCC.docx DOCX document
36E77620R0042 0005.docx DOCX document
692-16-101 Access Map.pdf PDF
Technical Questions - White City Retrofit 1_VA SORCC.docx DOCX document
36E77620R0042 0004.docx DOCX document
692-16-101 List of Notes 27 28 and 29 on Sheets C102 through C201.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.20.pdf PDF
692-16-101 Job Yard and laydown area.pdf PDF
36E77620R0042 0003.docx DOCX document
692-16-101 Retrofit Infrastructure - Sign in sheets 2020-08-10.pdf PDF
36E77620R0042 0002.docx DOCX document
C301 Sanitary Sewer - Drawing 4 of 8.pdf PDF
S06 - White City Technical Question.docx DOCX document
C101 Potable Water - Drawing 3 of 8.pdf PDF
C502 Surface Restoration Plan - Drawing 6 0f 8.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 85 thru 90.pdf PDF
Amendment 0001.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 80 thru 84.pdf PDF
Attachment 3 - Drawings 7 of 8.pdf PDF
Attachment 3 - Drawings 4 of 8.pdf PDF
Attachemnt 12 - VA Southern Oregon Rehabilitation Center and Clinics - Site Map.pdf PDF
Attachment 1 - Summary of Work.pdf PDF
S02 - Attachment 4 - Aerial-V1 of 9.pdf PDF
Attachment 3 - Drawings 1 of 8.pdf PDF
Attachment 3 - Drawings 3 of 8.pdf PDF
Attachment 8 - WhiteCityVA_Stormwater Facility Design.pdf PDF
Attachment 5 - Geotechnical Report - 04-21-17.pdf PDF
Attachment 10 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 3 - Drawings 2 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V7 of 9.pdf PDF
Attachment 3 - Drawings 5 of 8.pdf PDF
36E77620R0042.docx DOCX document
S02 - Attachment 4 - Aerial-V8 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V9 of 9.pdf PDF
Attachment 6 - Geo Infiltration Testing - 2019-12-05 - FNL.pdf PDF
Attachment 9 - ECPDC 692-16-101 - FY20.pdf PDF
Attachment 2 - Final Specifications Revised - 06-29-20.pdf PDF
S02 - Attachment 4 - Aerial-V4 of 9.pdf PDF
Attachment 3 - Drawings 6 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V2 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V5 of 9.pdf PDF
Attachment 7 - 692-16-101 Testing Requirements.pdf PDF
S02 - Attachment 4 - Aerial-V6 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V3 of 9.pdf PDF
Attachment 11 - Construction Wage Rates - 7.3.20.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS

AND RESPONSE TRACKING SHEET

PROJECT TITLE

SOLICITATION #

QUESTION #
QUESTION RECEIVE

DATE

QUESTION ANSWERED

DATE

CONTRACTOR QUESTIONS
VA RESPONSES TO QUESTIONS
1
7/29/20
8/3/20
SF 1442 Block 8 states that we should send our proposal to the Address listed, Section (2.7 Proposal Requirements) says that we should submit our proposal via email to your email address.

Please confirm that the proposal is to be submitted via email and not mailed physically.

Proposals will need to be submitted via email. Physical copies will not be accepted at this time. Please submit all proposals to jason.schultz@va.gov.

2
7/30/20
8/3/20
For some reason there are three individual pages in the drawings that appear to be corrupt, or not uploaded correctly in SAM.
1.C101 Potable Water (first page of the file “Drawings 3 of 8)
2.C301 Sanitary Sewer (first page of the file “Drawings 4 of 8)
3.C502 Surface Restoration Plan (second page of the file “Drawings 6 of 8)
Attached are the 3 drawings:
3
7/3/20
8/3/20
Is there a Drawing 8 of 8 that can/will be included? The solicitation has Drawings 1 thru 7 of 8.
Drawing 8 of 8 has been posted to Amendment 0001
4
8/10/20
8/14/20
The amendment SF 30’s indicate that the contractor is required to sign and return one copy to the issuing office. In which proposal volume shall we include signed SF 30’s
The signed amendment shuld be included in Volume III
5
8/14/20
8/14/20
Provide job yard and laydown area per attached sketch “692-16-101 Job yard and laydown area”.
Attached is the Job laydown area pdf
6
8/17/20
8/17/20
There were several locations shown during walk-thru that discussed trees being in the way, as well as a new duct bank that had been placed since the design was complete. Can you provide more information?
A group of trees exists over the storm drain at B202; this will require trenchless methods not shown in drawings. A new duct bank was installed near CC201 (east of B201) which requires the extension of the planned trenchless construction to the west (under the new ductbank). A sewer line goes under a noble spruce in the memorial garden that is important to the facility to save; this will require trenchless methods (whereas the plans show trenched methods). To ensure that these are addressed, and to allow for one additional instance not yet determined, provide 800 additional lineal feet of trenchless methods with up to 4 distinct run locations. This would be in lieu of said lengths being otherwise trenched.