This document package includes construction drawings and a related federal contract opportunity. The drawings show plans for retrofitting campus-wide infrastructure systems at the VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. Work includes sanitary sewer construction and replacement. The solicitation seeks bids for the infrastructure retrofit project valued between $10-20 million. As a Service-Disabled Veteran-Owned Small Business set-aside, only SDVOSBs may submit proposals in response to the solicitation issuing from the Department of Veterans Affairs due by January 22, 2019. The selected contractor will perform all work according to the drawings and specifications, including providing labor, project management, materials and equipment.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V E
T E
R A
N S
M
M
O R
I A
L
D
R
A V
E N
U
J
T
H
A
V E
KELLY ROAD
0+00 1+00 2+00
3+00 4+00
5+00 6+00 7+00 8+00
9+00 10+00
0.0'
OFFSET
0.0'
OFFSET
RES.BEDS
RES.BEDS
RES.BEDS
RES.BEDS
PU
BLIC AFFAIRS/Q
M
VO
LU
N
TEERS/PO
LICE
C&P TELEHEALTH
VACAN
T
SO
CIAL W
O
RK/HBPC
LOGISTICS
PHASE 8
PHASE 6
PHASE 9
PHASE 6
P H
A S
E
5+09.55 (0.00' ) KELLY RD
160+50.00 (0.00') VETERANS MEMORIAL
N: 290468.1128
E: 4290171.4730
0+50 (0.00' ) KELLY RD
80+50.00 (0.00') J AVE.
N: 290151.3753
E: 4289838.5064
84+05.12 (110.43' R)
83+85.66 (110.44' R)
7 SS #1, 19 LF TRENCHLESS
P H
A S
E
N: 290116.9138
E: 4289802.2792
N: 290115.1937
E: 4289873.0158
N: 290431.8856
E: 4290205.9345
N: 290765.3081
E: 4290556.4410
BUILDING 250 TO BE REMOVED
BY VA PRIOR TO CONSTRUCTION
(PIPE BURSTING)
(PIPE BURSTING)
SANITARY SEWER KEY NOTES
SANITARY SEWER CONSTRUCTION NOTES
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN
ON SEWER PROFILES AND MAY VARY FROM EXISTING CONDITIONS.
U.S. Department of Veterans Affairs william wilson architects pc 1022 SW Salmon Street, Suite 350 Portland, OR 97205 503.223.6693
VA Project Number
Building Number
Drawing Number
Revisions: Date:
APPROVAL SIGNATURES
Retrofit Campus Wide Infrastructure Systems - Water, Sewer, Storm
VA Southern Oregon Rehabilitation Center & Clinics 8495 Crater Lake Highway, White City, OR 97503
692-16-101 Drawing TitleCONSULTANT
Date Checked Drawn
Project Title
Location
Approved: Chief ITOS
Approved: Chief FMS
Approved: VA SORCC Director
Approved: Safety Manager
Approved: Service Chief
Approved: Chief of StaffApproved: AFGE
Approved: Associate Director
Approved: Infection Cntrl.
Phase
ARCHITECTOffice of Construction and Facilities Management
STAMP
FINAL CONSTRUCTION DOCUMENTSOREGON
G
E
O
R
G
E
L
D
R
A
K
E
EXPIRES: 12/31/19
12/22/17 PBS PBS
4412 SW Corbett Avenue
Portland, OR 97239
503.248.1939
PBS Engineering and
Environmental Inc.
pbsusa.com
KEY MAP
C301 C302
C303 C304
C305 C306
60'30'15'0'
SCALE: 1" = 30' (FULL SIZE)
SCALE: 1" = 60' (HALF SIZE)
NORTH PROJECT NORTH
C301
SANITARY SEWER PLAN