Attachment 3 - Drawings 4 of 8.pdf
PDF 8 MB Posted
- Solicitation number
- 36E77620R0042
About this file
This package includes construction drawings and specifications for a federal construction contract opportunity to retrofit campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics. The scope of work involves replacing and upgrading water, sewer, and storm systems across the campus. Drawings depict proposed sanitary sewer alignments, connections, and trenchless installation methods. The opportunity is a competitive SDVOSB set-aside with a value between $10-20 million. The Department of Veterans Affairs is the contracting agency. The contractor must complete all work in accordance with the statement of work, specifications, and drawings by the completion date.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
T
H
A
V E
KELLY ROAD
N
D R
I
S
W
Y
KELLY ROAD
250+00 251+00
252+00 253+00
254+00 255+00
256+00 256+35.55
10+00 11+00
12+00 13+00
14+00
0.0'
OFFSET
250+40 (0.00' ) KELLY RD (N)
222+27.38 (0.00') MESS HALL (S)
N: 291191.5911
E: 4290674.6607
13+72.64 (0.00' ) KELLY RD
220+50.00 (0.00') MESS HALL (S)
N: 291062.9735
E: 4290796.8135
255+84.89 (0.00' ) KELLY RD (N)
31+28.21 (0.00') ANDRIES WAY
N: 291567.7477
E: 4291068.8885
BUSINESS
SATP/DAV
REC. THERAPY
VOC/REHAB/CASE MNGT./
CAO/VJO
M
AIL RO
O
FM
FACILITIES MNGT.
WELL BLDG
FMS
PHASE 5
PHASE 6
P
PHASE 9
PHASE 6
9+93.36 (0.00' ) KELLY RD
190+50.00 (0.00') 96TH AVE.
N: 290801.5645
E: 4290522.0103
11+65.94 (220.97' L)
11+85.80 (221.00' L)
7 SS #2, 20 LF TRENCHLESS (PIPE BURSTING)
10+80.87 (153.43' L)
11+10.88 (153.52' L)
N: 291602.7155
E: 4291105.5363
N: 291474.9889
E: 4291157.3952
N: 291026.7187
E: 4290831.2459
N: 291081.8341
E: 4290816.6405
N: 290765.3081
E: 4290556.4410
9+61.61 (220.68' L)
10.2'
0.0' OFFSET
0.0' OFSET
SANITARY SEWER KEY NOTES
SANITARY SEWER CONSTRUCTION NOTES
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN
ON SEWER PROFILES AND MAY VARY FROM EXISTING CONDITIONS.
U.S. Department of Veterans Affairs william wilson architects pc 1022 SW Salmon Street, Suite 350 Portland, OR 97205 503.223.6693
VA Project Number
Building Number
Drawing Number
Revisions: Date:
APPROVAL SIGNATURES
Retrofit Campus Wide Infrastructure Systems - Water, Sewer, Storm
VA Southern Oregon Rehabilitation Center & Clinics 8495 Crater Lake Highway, White City, OR 97503
692-16-101 Drawing TitleCONSULTANT
Date Checked Drawn
Project Title
Location
Approved: Chief ITOS
Approved: Chief FMS
Approved: VA SORCC Director
Approved: Safety Manager
Approved: Service Chief
Approved: Chief of StaffApproved: AFGE
Approved: Associate Director
Approved: Infection Cntrl.
Phase
ARCHITECTOffice of Construction and Facilities Management
STAMP
FINAL CONSTRUCTION DOCUMENTSOREGON
G
L
K
EXPIRES: 12/31/19
12/22/17 PBS PBS
4412 SW Corbett Avenue
Portland, OR 97239
503.248.1939
PBS Engineering and
Environmental Inc.
pbsusa.com
KEY MAP
C301 C302
C303 C304
C305 C306
60'30'15'0'
SCALE: 1" = 30' (FULL SIZE)
SCALE: 1" = 60' (HALF SIZE)
NORTH PROJECT NORTH
6" SAN @ 1.00%
C302
SANITARY SEWER PLAN
2017-12-19T22:12:41-0800
George Drake, PE
RICKER ROAD
WHITE ROAD
100+00 101+00
102+00 103+00
104+00 105+00
106+00 107+00
108+00 109+00
110+00
130+00 131+00
132+00 133+00
134+00 135+00
136+00 137+00
138+00 139+00
140+00
135+10.74 (0.00' ) MESS HALL (W)
169+46.51 (0.00') VETERANS MEMORIAL
N: 291117.6752
E: 4289553.5710
130+50 (0.00' ) MESS HALL (W)
89+45.81 (0.00') J AVE.
N: 290799.6129
E: 4289220.2284
100+50.18 (0.00' ) MESS HALL (E)
85+82.92 (0.18'R) J AVE.
N: 290537.1330
E: 4289470.8219
105+10.26 (0.00' ) MESS HALL (E)
165+83.62 (0.00') VETERANS MEMORIAL
N: 290854.7415
E: 4289803.6890
33.5'
RESIDENTIAL HEALTHCARE/
PULMONARY
LIBRARY/ITOS
OT/PT ADVOCATE/
PODIATRY/PT/EXERCISE CLINIC
RES.BEDS
RES.BEDS
PU
BLIC AFFAIRS/Q
VO
LU
TEERS/PO
LICE
C&P TELEHEALTH
ADM
IN
/HR/CPAC
U
TPATIEN
T PRIM
ARY CARE/
PHARM
ACY/RADIO
LO
GY LAB
ADMISSIONS/COV
PHASE 3
PHASE 2
167+81.14 (129.11' R)
167+51.88 (128.99' R)
165+22.81 (128.00' R)
164+93.55 (127.87' R)
170+10.13 (162.10' R)
5BEGIN (NW)
8 SS#3, 29 LF TRENCHLESS
N: 290765.0934
E: 4289184.0505
N: 290502.5408
E: 4289434.5678
BUILDING 250 TO BE REMOVED
BY VA PRIOR TO CONSTRUCTION
8 BEGIN (W)
SANITARY TO BE
ABANDONED
IN PLACE
7 SS #5, 29 LF TRENCHLESS
(PIPE BURSTING)
7 SS #4, 29 LF TRENCHLESS
(BORE AND JACK)
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN
C303
2017-12-19T22:13:55-0800
George Drake, PE
MESS HALL RD
MESS HALL RD
110+00 111+00
112+00 113+00
114+00 115+00
116+00 117+00
118+00 119+00 119+67.83
140+00 141+00
142+00 143+00
144+00 145+00
146+00 147+00
148+00 149+00
150+00
139+95.31 (0.00' ) MESS HALL (W)
199+47.25 (0.00') 96TH AVE.
N: 291452.1853
E: 4289904.1517
109+94.52 (0.00' ) MESS HALL (E)
195+84.35 (0.00') 96TH AVE.
N: 291189.0392
E: 4290154.0470
113+73.93 (0.00' ) MESS HALL (E)
225+84.93 (0.16'R) MESS HALL (S)
N: 291450.9596
E: 4290428.5506
149+17.76 (0.00' ) MESS HALL (W)
38+48.65 (0.00') ANDRIES WAY
N: 292088.9850
E: 4290571.5446
12.1'
EN
VIRO
TAL CARE
MENTAL HEALTH
NUTRITION AND FOOD
SERVICES
GAME ROOM/CANTEEN
THEATER
BUSINESS
BO
ILER PLAN
PAIN
T SHO
HVAC SHO
PODIATRY/PT/EXERCISE CLINIC
PHASE 1
6 PHASE 3
6 PHASE 2
6 PHASE 2
143+74.54 (0.00' ) MESS HALL (W)
229+47.83 (0.00') MESS HALL (S)
N: 291713.9828
E: 4290178.5265
119+17.83 (0.00' ) MESS HALL (E)
34+85.76 (0.00') ANDRIES WAY
N: 291826.4324
E: 4290822.0619
36+18.18 (148.03' L)
7 SS #7, 402 LF TRENCHLESS
7 SS #6, 278 LF TRENCHLESS
5 BEGIN (SW)
PHASE 4
11.1'
20.4'
N: 292145.7562
E: 4290631.0432
N: 291860.9489
E: 4290858.2366
7BEGIN (W)
7BEGIN (W)
7 BEGIN (W)
7 SS #8, 76 LF TRENCHLESS
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN
C304
2017-12-19T22:15:10-0800
George Drake, PE
AVENUE "N"
J
50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00
50+50 (0.00' ) N AVE.
94+79.26 (0.00') J AVE.
N: 291185.6315
E: 4288852.0505
55+11.45 (0.00' ) N AVE.
174+78.87 (0.00') VETERANS MEMORIAL
N: 291503.3890
E: 4289186.6573
35.0'
SPS
DIABETES
BUSINESS OFFICE/EDUCATION/
PROSTHETICS/OPTOMETRY
DENTAL/PCS/RDS/PSYCH/
AUDIO/ENT/DERM/ORTHO
RESIDENTIAL HEALTHCARE/
PULMONARY
T PRIM
ARY CARE/
PHARM
ACY/RADIO
GY LAB
ADMISSIONS/COV
CT
CHAPEL
PRIM
ARY CARE
PHASE 7
PHASE 8
170+10.13 (162.10' R)
58+02.66 (215.69' R)
58+22.61 (215.73' R)
5 BEGIN (E)
8 SS#3, 29 LF TRENCHLESS
7 SS #9, 20 LF TRENCHLESS
N: 291151.2007
E: 4288815.7940
N: 291221.8131
E: 4288817.5411
N: 291539.6162
E: 4289152.1958
BUILDING 248CT TO BE REMOVED
BY VA PRIOR TO CONSTRUCTION
7 BEGIN (S)
7BEGIN (N)
(BORE AND JACK)
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN
C305
2017-12-19T22:16:22-0800
George Drake, PE
AVENUE "N"
60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 69+67.66
59+96.46 (0.00' ) N AVE.
204+78.46 (0.00') 96TH AVE.
N: 291837.3777
E: 4289538.3559
63+75.67 (0.00' ) N AVE.
234+78.13 (0.00') MESS HALL (S)
N: 292098.5062
E: 4289813.3309
69+17.66 (0.00' ) N AVE.
43+77.68 (0.00') ANDRIES WAY
N: 292471.7298
E: 4290206.3448
12.0'
39.4'
BO
LIN
G/
BIKE SHO
PSYCHO
GY
CIP/PRRC
PARKING
AREA I
AREA K
AREA J
TP
AT
IE
PA
RK
TP
AT
IE
PA
RK
BUSINESS OFFICE/EDUCATION/
TAL HEALTH
PHASE 4
N: 291873.6341
E: 4289503.9252
N: 292134.7610
E: 4289778.8984
N: 292507.9047
E: 4290171.8282
N: 292506.1606
E: 4290242.6013
65+22.19 (221.41' R)
65+02.30 (221.37' R)
9 BEGIN (S)
9BEGIN (N)
7 SS #10, 179 LF TRENCHLESS
5. TYPICAL SANITARY SEWER RETROFIT SHALL BE CONSTRUCTED AT ZERO-FOOT HORIZONTAL OFFSET FROM EX. PIPE, EXCEPT WHERE VARYING HORIZONTAL OFFSET IS SHOWN IN CASES WHERE PIPE IS
REALIGNED. OFFSET DIMENSIONS CONTROL. PLANS ARE DRAWN TO ALLOW EX. SYSTEM TO BE VISIBLE FOR REFERENCE. VERTICAL INVERT ELEVATION AND SLOPE FOR MAJOR RETROFIT PIPE WORK IS SHOWN