Attachment 3 - Drawings 1 of 8.pdf
PDF 11 MB Posted
- Solicitation number
- 36E77620R0042
About this file
This solicitation is for retrofitting campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. The contractor will provide all labor, project management, materials, tools, and equipment required to complete the scope of work according to the drawings and specifications. The project must be finished in accordance with the statement of work, specifications, and attachments in the solicitation package. This is a competitive Service-Disabled Veteran-Owned Small Business set-aside, with a NAICS code of 236220 and a magnitude of construction between $10-20 million. The Department of Veterans Affairs Headquarters is the contracting agency.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
2017-12-19T21:38:37-0800
George Drake, PE
PHASE 8
SPS
DIABETES
BUSINESS OFFICE/EDUCATION/
PROSTHETICS/OPTOMETRY
DENTAL/PCS/RDS/PSYCH/
AUDIO/ENT/DERM/ORTHO
RESIDENTIAL HEALTHCARE/
PULMONARY
LIBRARY/ITOS
OT/PT ADVOCATE/
PODIATRY/PT/EXERCISE CLINIC
RES.BEDS
PU
BLIC AFFAIRS/Q
M
VO
LU
N
TEERS/PO
LICE
C&P TELEHEALTH
ADM
IN
/HR/CPAC
O U
TPATIEN
T PRIM
ARY CARE/
PHARM
ACY/RADIO
LO
GY LAB
ADMISSIONS/COV
CT
CHAPEL
T
PRIM
ARY CARE
VACAN
SO
CIAL W
RK/HBPC
LOGISTICS
U.S. Department of Veterans Affairs william wilson architects pc 1022 SW Salmon Street, Suite 350 Portland, OR 97205 503.223.6693
VA Project Number
Building Number
Drawing Number
Revisions: Date:
APPROVAL SIGNATURES
Retrofit Campus Wide Infrastructure Systems - Water, Sewer, Storm
VA Southern Oregon Rehabilitation Center & Clinics 8495 Crater Lake Highway, White City, OR 97503
692-16-101 Drawing TitleCONSULTANT
Date Checked Drawn
Project Title
Location
Approved: Chief ITOS
Approved: Chief FMS
Approved: VA SORCC Director
Approved: Safety Manager
Approved: Service Chief
Approved: Chief of StaffApproved: AFGE
Approved: Associate Director
Approved: Infection Cntrl.
Phase
ARCHITECTOffice of Construction and Facilities Management
STAMP
FINAL CONSTRUCTION DOCUMENTSOREGON
G
E
R
L
D
A
K
EXPIRES: 12/31/19
12/22/17 PBS PBS
4412 SW Corbett Avenue
Portland, OR 97239
503.248.1939
PBS Engineering and
Environmental Inc.
pbsusa.com
160'80'40'0'
SCALE: 1" = 80' (FULL SIZE)
SCALE: 1" = 160' (HALF SIZE)
NORTH PROJECT NORTH
CP109
CONSTRUCTION PHASE 8 PLAN
2017-12-19T21:40:34-0800
George Drake, PE
PHASE 9
CIP/PRRC
MENTAL HEALTH
NUTRITION AND FOOD
SERVICES
GAME ROOM/CANTEEN
THEATER
BUSINESS
SATP/DAV
REC. THERAPY
VOC/REHAB/CASE MNGT./
CAO/VJO
PARKING
AREA ISPS
EN
TAL HEALTH
CP110
CONSTRUCTION PHASE 9 PLAN
2017-12-19T21:42:20-0800
George Drake, PE
ABBREVIATIONS
OWNER
PROJECT TEAM
ARCHITECT
LAND SURVEYOR
04/21/2020
VA SOUTHERN OREGON REHABILITATION CENTER & CLINICS, WHITE CITY, OR
RETROFIT CAMPUS WIDE INFRASTRUCTURE SYSTEMS
WATER, SEWER, STORM
P.O.C.
SD
W
SS
TYP.
WM
FL
MJ
RJ
GV
BV
EX.
VA
PIV
FH
FDC
WM
LF
D.I.
ODOT
POINT OF CONNECTION
STORM DRAIN
WATER
SANITARY SEWER
TYPICAL
WATER MAIN
FLANGE
MECHANICAL JOINT
RESTRAINT JOINT
GATE VALVE
BUTTERFLY VALVE
EXISTING
VETERANS AFFAIRS
POST INDICATOR VALVE
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
WATER METER
LINEAR FEET
DUCTILE IRON
OREGON DEPARTMENT OF TRANSPORTATION
DEPARTMENT OF VETERANS AFFAIRS,
VA SOUTHERN OREGON
REHABILITATION CENTER & CLINICS
8495 CRATER LAKE HIGHWAY
WHITE CITY, OREGON 97503
CONTACT: JOHN M. MURPHEY COR - PROJECT ENGINEER
PHONE: 541.826.2111 ext. 7497 | 541.864.9432 (cell) EMAIL: John.Murphey@va.gov
WILLIAM WILSON ARCHITECTS PC
1022 SW SALMON STREET, SUITE 350
PORTLAND, OREGON 97205
CONTACT: BILL WILSON / PRINCIPAL
PHONE: 503.223.6693 ext. 11 | 503.307.7893 (cell) EMAIL: wwilson@wwarchitects.com
CIVIL ENGINEER
PBS ENGINEERING + ENVIRONMENTAL
4412 SW CORBETT AVENUE
PORTLAND, OREGON 97239
CONTACT: DAVE SEGAL / CIVIL PROJECT MANAGER
PHONE: 425.654.8775 (cell) E-MAIL: dave.segal@pbsusa.com
CONTACT: JUSTIN MAYNARD / PROJECT CIVIL ENGINEER
PHONE: 360.567.2105
EMAIL: justin.maynard@pbsusa.com
TOM NELSON & ASSOCIATES
4838 NE SANDY BOULEVARD., SUITE 200
PORTLAND, OREGON 97213
CONTACT: RICHARD KENNEDY
PHONE: 503.230.1932
E-MAIL: rkennedy@tnasurvey.com
CONTACT: TOM NELSON
PHONE: 503.203.1932
EMAIL: tnelson@tnasurvey.com
COST ESTIMATOR
ACC COST CONSULTANTS LLC
8060 SW PFAFFLE STREET, #110
TIGARD, OREGON 97223
CONTACT: STAN PSZCZOLKOWSKI
PHONE: 503.718.0075
EMAIL: stanp@archcost.com
BENCHMARK
FOUND MONUMENT
BUSH
CONIFEROUS TREE WITH SIZE
TELEPHONE MANHOLE
DECIDUOUS TREE WITH SIZE
GAS METER
GAS RISERBOLLARD
CABLE TV RISER
SURVEY CONTROL POINT
GAS STRIKE
GAS VALVEGUY WIRE
LIGHT POLE
POWER POLE
POWER RISER
POWER TRANSFORMER
YARD LIGHT
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
SIGN POST
STORMWATER CATCH BASIN
STORMWATER CLEANOUT
STORMWATER DRAIN
STORMWATER MANHOLE
TELEPHONE RISER
UTILITY POLE
UTILITY VAULT
FIRE HYDRANT
FIRE DEPT CONNECT
WATER METER
WATER SPIGOT
WATER VALVE
CABLE TELEVISION LINE
EXISTING CONTOUR MAJOR
EXISTING CONTOUR MINOR
GAS LINE
WATER LINE
SUBJECT PROPERTY
CURB AND GUTTER
TELEPHONE LINE
FENCELINE
CENTERLINE
OVERHEAD POWER LINE
WALL
SANITARY SEWER LINE
STORM LINE
POST INDICATOR VALVE
IRRIGATION CONTROL VALVE
FLAG POLE
POWER METER
EASEMENT
SETBACK
BUILDING
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL BOX
STORMWATER CURB INLET
POWER JUNCTION BOX
MAILBOX
AIR HANDLING UNIT
POWER OUTLET
POWER VAULT
POWER GENERATOR
UTILITY MANHOLE
TELEPHONE BOOTH
GAS COVER
MONITORING WELL
GAS PUMP
GAS VENT
AIR/WATER
VACUUM
2 POLE SIGN
UNDERGROUND POWER
UNDERGROUND UTILITY
DITCHLINE
FIBEROPTIC LINE
CATCH BASIN
STORM MANHOLE
STORM CLEANOUT
WATER VALVE
POST INDICATOR GATE VALVE
CAP
WATER METER
BLOW OFF ASSEMBLY
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
FIRE HYDRANT
WATER PIPELINE, SIZE AS NOTED
STORM DRAIN PIPELINE, SIZE AS NOTED
SANITARY SEWER PIPELINE, SIZE AS NOTED
TOPOGRAPHIC SURVEY LEGEND UTILITY LEGEND
G001
TITLE SHEET
FINAL CONSTRUCTION DOCUMENTS
TITLE SHEET
CONSTRUCTION PHASING PLAN OVERALL
CONSTRUCTION PHASE 1 PLAN
CONSTRUCTION PHASE 2 PLAN
CONSTRUCTION PHASE 3 PLAN
CONSTRUCTION PHASE 4 PLAN
CONSTRUCTION PHASE 5 PLAN
CONSTRUCTION PHASE 6 PLAN
CONSTRUCTION PHASE 7 PLAN
CONSTRUCTION PHASE 8 PLAN
CONSTRUCTION PHASE 9 PLAN
EROSION AND SEDIMENT CONTROL PLAN COVER
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL DETAILS
POTABLE WATER PLAN
POTABLE WATER PLAN
POTABLE WATER PLAN
POTABLE WATER PLAN
POTABLE WATER PLAN
POTABLE WATER PLAN
STORM SEWER PLAN
STORM SEWER PLAN
STORM SEWER PLAN
STORM SEWER PLAN
STORM SEWER PLAN
STORM SEWER PLAN
SANITARY SEWER PLAN
SANITARY SEWER PLAN
SANITARY SEWER PLAN
SANITARY SEWER PLAN
SANITARY SEWER PLAN
SANITARY SEWER PLAN
SEWER PROFILE PLAN - AVENUE J
SEWER PROFILE PLAN - AVENUE J
SEWER PROFILE PLAN - VETERANS MEMORIAL DRIVE
SEWER PROFILE PLAN - VETERANS MEMORIAL DRIVE
SEWER PROFILE PLAN - 96TH AVENUE
SEWER PROFILE PLAN - 96TH AVENUE
SEWER PROFILE PLAN - MESS HALL ROAD SOUTH
SEWER PROFILE PLAN - MESS HALL ROAD SOUTH
SEWER PROFILE PLAN - ANDRIES WAY
SEWER PROFILE PLAN - ANDRIES WAY
SEWER PROFILE PLAN - AVENUE N
SEWER PROFILE PLAN - AVENUE N
SEWER PROFILE PLAN - MESS HALL ROAD WEST
SEWER PROFILE PLAN - MESS HALL ROAD WEST
SEWER PROFILE PLAN - MESS HALL ROAD EAST
SEWER PROFILE PLAN - MESS HALL ROAD EAST
G001
CP101
CP102
CP103
CP104
CP105
CP106
CP107
CP108
CP109
CP110
EC1
EC2
EC3
EC4
EC5
EC6
EC7
EC8
C101 C102 C103 C104 C105 C106 C201 C202 C203 C204 C205 C206 C301 C302 C303 C304 C305 C306 C401 C402 C403 C404 C405 C406 C407 C408 C409 C410 C411 C412 C413 C414 C415 C416
CIVIL ENGINEERING
SHEET INDEX
04/21/2020
ABANDON IN PLACE
PHASE LIMITS
REMOVE PIPE
X" W
X" SD
X" SS
LARGE STORM MANHOLE WITH GRATED LID
STORM MANHOLE WITH GRATED LID
PBS PBS
SEWER PROFILE PLAN - KELLY ROAD
SEWER PROFILE PLAN - KELLY ROAD
SEWER PROFILE PLAN - KELLY ROAD
SURFACE RESTORATION PLAN
SURFACE RESTORATION PLAN
SURFACE RESTORATION PLAN
SURFACE RESTORATION PLAN
SURFACE RESTORATION PLAN
SURFACE RESTORATION PLAN
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
CONNECTION DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
TRENCHLESS CONSTRUCTION DETAILS
UTILITY CORRIDOR CROSSING DETAILS
STORMWATER FACILITY GENERAL NOTES & LEGEND
FACILITY DEMOLITION AND EROSION CONTROL
FACILITY DEMOLITION AND EROSION CONTROL
FACILITY STORM PLAN AND PROFILE
FACILITY STORM PLAN AND PROFILE
POND GRADING
DETAILS
DETAILS
DETAILS
DETAILS
FACILITY LANDSCAPE & IRRIGATION PLAN
C417 C418 C419 C501 C502 C503 C504 C505 C506 C601 C602 C603 C604 C605 C606 C607 C608 C609 C610 C701 C702 C703 C704 C705 C706 C707
GS001
CS101
CS102
CS201
CS202
CS203
CS301
CS302
CS303
CS304
LS101
I S
P
F
J
. M
Y
J
Y
93798
OREGON
EXPIRES: 12/31/2020
Sheets and Views
G001
2020-04-28T17:34:40-0700
Justin R Maynard
I am approving this document
2020-04-28T17:35:24-0700
Justin R Maynard
I am approving this document
2017-12-19T21:22:53-0800
George Drake, PE
PHASE 1
BO
W
LIN
G/
BIKE SHO
VIRO
TAL CARE
PSYCHO
GY
AIL RO
FM
ILER PLAN
PAIN
T SHO
HVAC SHO
FACILITIES MNGT.
AREA I
AREA K
AREA J
TP
AT
IE
PA
RK
WELL BLDG
FMS
CP102
CONSTRUCTION PHASE 1 PLAN
2017-12-19T21:26:34-0800
George Drake, PE
PHASE 2
CP103
CONSTRUCTION PHASE 2 PLAN
2017-12-19T21:28:53-0800
George Drake, PE
PHASE 3
CP104
CONSTRUCTION PHASE 3 PLAN
2017-12-19T21:30:57-0800
George Drake, PE
PHASE 4
CP105
CONSTRUCTION PHASE 4 PLAN
2017-12-19T21:33:08-0800
George Drake, PE
PHASE 5
CP106
CONSTRUCTION PHASE 5 PLAN
2017-12-19T21:34:57-0800
George Drake, PE
PHASE 6
CP107
CONSTRUCTION PHASE 6 PLAN
2017-12-19T21:36:53-0800
George Drake, PE
File details come from the government source that posted it. Updated .