This solicitation is for retrofitting campus-wide infrastructure systems at the White City VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. The contractor will provide all labor, project management, materials, tools, and equipment required to complete the scope of work according to the drawings and specifications. The project must be finished in accordance with the statement of work, specifications, and attachments in the solicitation package. This is a competitive Service-Disabled Veteran-Owned Small Business set-aside, with a NAICS code of 236220 and a magnitude of construction between $10-20 million. The Department of Veterans Affairs Headquarters is the contracting agency.

View the file

Other files

File Type Posted
Technical Questions - White City Retrofit 1 VA SORCC.docx DOCX document
36E77620R0042 0005.docx DOCX document
692-16-101 Access Map.pdf PDF
Technical Questions - White City Retrofit 1_VA SORCC.docx DOCX document
36E77620R0042 0004.docx DOCX document
692-16-101 List of Notes 27 28 and 29 on Sheets C102 through C201.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.pdf PDF
Construction Wage Rates - Heavy - Jackson County - 8.14.20.pdf PDF
692-16-101 Job Yard and laydown area.pdf PDF
White City Technical Question.docx DOCX document
36E77620R0042 0003.docx DOCX document
692-16-101 Retrofit Infrastructure - Sign in sheets 2020-08-10.pdf PDF
36E77620R0042 0002.docx DOCX document
C301 Sanitary Sewer - Drawing 4 of 8.pdf PDF
S06 - White City Technical Question.docx DOCX document
C101 Potable Water - Drawing 3 of 8.pdf PDF
C502 Surface Restoration Plan - Drawing 6 0f 8.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 85 thru 90.pdf PDF
Amendment 0001.pdf PDF
Attachment 3 - Drawings 8 of 8 - Sheets 80 thru 84.pdf PDF
Attachment 3 - Drawings 7 of 8.pdf PDF
Attachment 3 - Drawings 4 of 8.pdf PDF
Attachemnt 12 - VA Southern Oregon Rehabilitation Center and Clinics - Site Map.pdf PDF
Attachment 1 - Summary of Work.pdf PDF
S02 - Attachment 4 - Aerial-V1 of 9.pdf PDF
Attachment 3 - Drawings 3 of 8.pdf PDF
Attachment 8 - WhiteCityVA_Stormwater Facility Design.pdf PDF
Attachment 5 - Geotechnical Report - 04-21-17.pdf PDF
Attachment 10 - Contractor Safety _ Env Record Form.docx DOCX document
Attachment 3 - Drawings 2 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V7 of 9.pdf PDF
Attachment 3 - Drawings 5 of 8.pdf PDF
36E77620R0042.docx DOCX document
S02 - Attachment 4 - Aerial-V8 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V9 of 9.pdf PDF
Attachment 6 - Geo Infiltration Testing - 2019-12-05 - FNL.pdf PDF
Attachment 9 - ECPDC 692-16-101 - FY20.pdf PDF
Attachment 2 - Final Specifications Revised - 06-29-20.pdf PDF
S02 - Attachment 4 - Aerial-V4 of 9.pdf PDF
Attachment 3 - Drawings 6 of 8.pdf PDF
S02 - Attachment 4 - Aerial-V2 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V5 of 9.pdf PDF
Attachment 7 - 692-16-101 Testing Requirements.pdf PDF
S02 - Attachment 4 - Aerial-V6 of 9.pdf PDF
S02 - Attachment 4 - Aerial-V3 of 9.pdf PDF
Attachment 11 - Construction Wage Rates - 7.3.20.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

2017-12-19T21:38:37-0800

George Drake, PE

PHASE 8

SPS

DIABETES

BUSINESS OFFICE/EDUCATION/

PROSTHETICS/OPTOMETRY

DENTAL/PCS/RDS/PSYCH/

AUDIO/ENT/DERM/ORTHO

RESIDENTIAL HEALTHCARE/

PULMONARY

LIBRARY/ITOS

OT/PT ADVOCATE/

PODIATRY/PT/EXERCISE CLINIC

RES.BEDS

PU

BLIC AFFAIRS/Q

M

VO

LU

N

TEERS/PO

LICE

C&P TELEHEALTH

ADM

IN

/HR/CPAC

O U

TPATIEN

T PRIM

ARY CARE/

PHARM

ACY/RADIO

LO

GY LAB

ADMISSIONS/COV

CT

CHAPEL

T

PRIM

ARY CARE

VACAN

SO

CIAL W

RK/HBPC

LOGISTICS

U.S. Department of Veterans Affairs william wilson architects pc 1022 SW Salmon Street, Suite 350 Portland, OR 97205 503.223.6693

VA Project Number

Building Number

Drawing Number

Revisions: Date:

APPROVAL SIGNATURES

Retrofit Campus Wide Infrastructure Systems - Water, Sewer, Storm

VA Southern Oregon Rehabilitation Center & Clinics 8495 Crater Lake Highway, White City, OR 97503

692-16-101 Drawing TitleCONSULTANT

Date Checked Drawn

Project Title

Location

Approved: Chief ITOS

Approved: Chief FMS

Approved: VA SORCC Director

Approved: Safety Manager

Approved: Service Chief

Approved: Chief of StaffApproved: AFGE

Approved: Associate Director

Approved: Infection Cntrl.

Phase

ARCHITECTOffice of Construction and Facilities Management

STAMP

FINAL CONSTRUCTION DOCUMENTSOREGON

G

E

R

L

D

A

K

EXPIRES: 12/31/19

12/22/17 PBS PBS

4412 SW Corbett Avenue

Portland, OR 97239

503.248.1939

PBS Engineering and

Environmental Inc.

pbsusa.com

160'80'40'0'

SCALE: 1" = 80' (FULL SIZE)

SCALE: 1" = 160' (HALF SIZE)

NORTH PROJECT NORTH

CP109

CONSTRUCTION PHASE 8 PLAN

2017-12-19T21:40:34-0800

George Drake, PE

PHASE 9

CIP/PRRC

MENTAL HEALTH

NUTRITION AND FOOD

SERVICES

GAME ROOM/CANTEEN

THEATER

BUSINESS

SATP/DAV

REC. THERAPY

VOC/REHAB/CASE MNGT./

CAO/VJO

PARKING

AREA ISPS

EN

TAL HEALTH

CP110

CONSTRUCTION PHASE 9 PLAN

2017-12-19T21:42:20-0800

George Drake, PE

ABBREVIATIONS

OWNER

PROJECT TEAM

ARCHITECT

LAND SURVEYOR

04/21/2020

VA SOUTHERN OREGON REHABILITATION CENTER & CLINICS, WHITE CITY, OR

RETROFIT CAMPUS WIDE INFRASTRUCTURE SYSTEMS

WATER, SEWER, STORM

P.O.C.

SD

W

SS

TYP.

WM

FL

MJ

RJ

GV

BV

EX.

VA

PIV

FH

FDC

WM

LF

D.I.

ODOT

POINT OF CONNECTION

STORM DRAIN

WATER

SANITARY SEWER

TYPICAL

WATER MAIN

FLANGE

MECHANICAL JOINT

RESTRAINT JOINT

GATE VALVE

BUTTERFLY VALVE

EXISTING

VETERANS AFFAIRS

POST INDICATOR VALVE

FIRE HYDRANT

FIRE DEPARTMENT CONNECTION

WATER METER

LINEAR FEET

DUCTILE IRON

OREGON DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF VETERANS AFFAIRS,

VA SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON 97503

CONTACT: JOHN M. MURPHEY COR - PROJECT ENGINEER

PHONE: 541.826.2111 ext. 7497 | 541.864.9432 (cell) EMAIL: John.Murphey@va.gov

WILLIAM WILSON ARCHITECTS PC

1022 SW SALMON STREET, SUITE 350

PORTLAND, OREGON 97205

CONTACT: BILL WILSON / PRINCIPAL

PHONE: 503.223.6693 ext. 11 | 503.307.7893 (cell) EMAIL: wwilson@wwarchitects.com

CIVIL ENGINEER

PBS ENGINEERING + ENVIRONMENTAL

4412 SW CORBETT AVENUE

PORTLAND, OREGON 97239

CONTACT: DAVE SEGAL / CIVIL PROJECT MANAGER

PHONE: 425.654.8775 (cell) E-MAIL: dave.segal@pbsusa.com

CONTACT: JUSTIN MAYNARD / PROJECT CIVIL ENGINEER

PHONE: 360.567.2105

EMAIL: justin.maynard@pbsusa.com

TOM NELSON & ASSOCIATES

4838 NE SANDY BOULEVARD., SUITE 200

PORTLAND, OREGON 97213

CONTACT: RICHARD KENNEDY

PHONE: 503.230.1932

E-MAIL: rkennedy@tnasurvey.com

CONTACT: TOM NELSON

PHONE: 503.203.1932

EMAIL: tnelson@tnasurvey.com

COST ESTIMATOR

ACC COST CONSULTANTS LLC

8060 SW PFAFFLE STREET, #110

TIGARD, OREGON 97223

CONTACT: STAN PSZCZOLKOWSKI

PHONE: 503.718.0075

EMAIL: stanp@archcost.com

BENCHMARK

FOUND MONUMENT

BUSH

CONIFEROUS TREE WITH SIZE

TELEPHONE MANHOLE

DECIDUOUS TREE WITH SIZE

GAS METER

GAS RISERBOLLARD

CABLE TV RISER

SURVEY CONTROL POINT

GAS STRIKE

GAS VALVEGUY WIRE

LIGHT POLE

POWER POLE

POWER RISER

POWER TRANSFORMER

YARD LIGHT

SANITARY SEWER CLEANOUT

SANITARY SEWER MANHOLE

SIGN POST

STORMWATER CATCH BASIN

STORMWATER CLEANOUT

STORMWATER DRAIN

STORMWATER MANHOLE

TELEPHONE RISER

UTILITY POLE

UTILITY VAULT

FIRE HYDRANT

FIRE DEPT CONNECT

WATER METER

WATER SPIGOT

WATER VALVE

CABLE TELEVISION LINE

EXISTING CONTOUR MAJOR

EXISTING CONTOUR MINOR

GAS LINE

WATER LINE

SUBJECT PROPERTY

CURB AND GUTTER

TELEPHONE LINE

FENCELINE

CENTERLINE

OVERHEAD POWER LINE

WALL

SANITARY SEWER LINE

STORM LINE

POST INDICATOR VALVE

IRRIGATION CONTROL VALVE

FLAG POLE

POWER METER

EASEMENT

SETBACK

BUILDING

TRAFFIC SIGNAL POLE

TRAFFIC SIGNAL BOX

STORMWATER CURB INLET

POWER JUNCTION BOX

MAILBOX

AIR HANDLING UNIT

POWER OUTLET

POWER VAULT

POWER GENERATOR

UTILITY MANHOLE

TELEPHONE BOOTH

GAS COVER

MONITORING WELL

GAS PUMP

GAS VENT

AIR/WATER

VACUUM

2 POLE SIGN

UNDERGROUND POWER

UNDERGROUND UTILITY

DITCHLINE

FIBEROPTIC LINE

CATCH BASIN

STORM MANHOLE

STORM CLEANOUT

WATER VALVE

POST INDICATOR GATE VALVE

CAP

WATER METER

BLOW OFF ASSEMBLY

SANITARY SEWER MANHOLE

SANITARY SEWER CLEANOUT

FIRE HYDRANT

WATER PIPELINE, SIZE AS NOTED

STORM DRAIN PIPELINE, SIZE AS NOTED

SANITARY SEWER PIPELINE, SIZE AS NOTED

TOPOGRAPHIC SURVEY LEGEND UTILITY LEGEND

G001

TITLE SHEET

FINAL CONSTRUCTION DOCUMENTS

TITLE SHEET

CONSTRUCTION PHASING PLAN OVERALL

CONSTRUCTION PHASE 1 PLAN

CONSTRUCTION PHASE 2 PLAN

CONSTRUCTION PHASE 3 PLAN

CONSTRUCTION PHASE 4 PLAN

CONSTRUCTION PHASE 5 PLAN

CONSTRUCTION PHASE 6 PLAN

CONSTRUCTION PHASE 7 PLAN

CONSTRUCTION PHASE 8 PLAN

CONSTRUCTION PHASE 9 PLAN

EROSION AND SEDIMENT CONTROL PLAN COVER

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL DETAILS

POTABLE WATER PLAN

POTABLE WATER PLAN

POTABLE WATER PLAN

POTABLE WATER PLAN

POTABLE WATER PLAN

POTABLE WATER PLAN

STORM SEWER PLAN

STORM SEWER PLAN

STORM SEWER PLAN

STORM SEWER PLAN

STORM SEWER PLAN

STORM SEWER PLAN

SANITARY SEWER PLAN

SANITARY SEWER PLAN

SANITARY SEWER PLAN

SANITARY SEWER PLAN

SANITARY SEWER PLAN

SANITARY SEWER PLAN

SEWER PROFILE PLAN - AVENUE J

SEWER PROFILE PLAN - AVENUE J

SEWER PROFILE PLAN - VETERANS MEMORIAL DRIVE

SEWER PROFILE PLAN - VETERANS MEMORIAL DRIVE

SEWER PROFILE PLAN - 96TH AVENUE

SEWER PROFILE PLAN - 96TH AVENUE

SEWER PROFILE PLAN - MESS HALL ROAD SOUTH

SEWER PROFILE PLAN - MESS HALL ROAD SOUTH

SEWER PROFILE PLAN - ANDRIES WAY

SEWER PROFILE PLAN - ANDRIES WAY

SEWER PROFILE PLAN - AVENUE N

SEWER PROFILE PLAN - AVENUE N

SEWER PROFILE PLAN - MESS HALL ROAD WEST

SEWER PROFILE PLAN - MESS HALL ROAD WEST

SEWER PROFILE PLAN - MESS HALL ROAD EAST

SEWER PROFILE PLAN - MESS HALL ROAD EAST

G001

CP101

CP102

CP103

CP104

CP105

CP106

CP107

CP108

CP109

CP110

EC1

EC2

EC3

EC4

EC5

EC6

EC7

EC8

C101 C102 C103 C104 C105 C106 C201 C202 C203 C204 C205 C206 C301 C302 C303 C304 C305 C306 C401 C402 C403 C404 C405 C406 C407 C408 C409 C410 C411 C412 C413 C414 C415 C416

CIVIL ENGINEERING

SHEET INDEX

04/21/2020

ABANDON IN PLACE

PHASE LIMITS

REMOVE PIPE

X" W

X" SD

X" SS

LARGE STORM MANHOLE WITH GRATED LID

STORM MANHOLE WITH GRATED LID

PBS PBS

SEWER PROFILE PLAN - KELLY ROAD

SEWER PROFILE PLAN - KELLY ROAD

SEWER PROFILE PLAN - KELLY ROAD

SURFACE RESTORATION PLAN

SURFACE RESTORATION PLAN

SURFACE RESTORATION PLAN

SURFACE RESTORATION PLAN

SURFACE RESTORATION PLAN

SURFACE RESTORATION PLAN

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

CONNECTION DETAILS

STANDARD DETAILS

STANDARD DETAILS

STANDARD DETAILS

STANDARD DETAILS

STANDARD DETAILS

TRENCHLESS CONSTRUCTION DETAILS

UTILITY CORRIDOR CROSSING DETAILS

STORMWATER FACILITY GENERAL NOTES & LEGEND

FACILITY DEMOLITION AND EROSION CONTROL

FACILITY DEMOLITION AND EROSION CONTROL

FACILITY STORM PLAN AND PROFILE

FACILITY STORM PLAN AND PROFILE

POND GRADING

DETAILS

DETAILS

DETAILS

DETAILS

FACILITY LANDSCAPE & IRRIGATION PLAN

C417 C418 C419 C501 C502 C503 C504 C505 C506 C601 C602 C603 C604 C605 C606 C607 C608 C609 C610 C701 C702 C703 C704 C705 C706 C707

GS001

CS101

CS102

CS201

CS202

CS203

CS301

CS302

CS303

CS304

LS101

I S

P

F

J

. M

Y

J

Y

93798

OREGON

EXPIRES: 12/31/2020

Sheets and Views

G001

2020-04-28T17:34:40-0700

Justin R Maynard

I am approving this document

2020-04-28T17:35:24-0700

Justin R Maynard

I am approving this document

2017-12-19T21:22:53-0800

George Drake, PE

PHASE 1

BO

W

LIN

G/

BIKE SHO

VIRO

TAL CARE

PSYCHO

GY

AIL RO

FM

ILER PLAN

PAIN

T SHO

HVAC SHO

FACILITIES MNGT.

AREA I

AREA K

AREA J

TP

AT

IE

PA

RK

WELL BLDG

FMS

CP102

CONSTRUCTION PHASE 1 PLAN

2017-12-19T21:26:34-0800

George Drake, PE

PHASE 2

CP103

CONSTRUCTION PHASE 2 PLAN

2017-12-19T21:28:53-0800

George Drake, PE

PHASE 3

CP104

CONSTRUCTION PHASE 3 PLAN

2017-12-19T21:30:57-0800

George Drake, PE

PHASE 4

CP105

CONSTRUCTION PHASE 4 PLAN

2017-12-19T21:33:08-0800

George Drake, PE

PHASE 5

CP106

CONSTRUCTION PHASE 5 PLAN

2017-12-19T21:34:57-0800

George Drake, PE

PHASE 6

CP107

CONSTRUCTION PHASE 6 PLAN

2017-12-19T21:36:53-0800

George Drake, PE