Attachment 6 Drawing 06_MECHANICAL_BID SET.pdf
PDF 4 MB Posted
- Attached to
- Y1DA--610A4-21-701 EHRM Infrastructure Upgrades Construction Ft. Wayne Federal contract opportunity
- Solicitation number
- 36C77622B0028
About this file
This document package includes mechanical drawings and schedules for infrastructure upgrades at a Department of Veterans Affairs medical center. The project involves upgrades to HVAC, plumbing and controls systems across multiple buildings on the campus. Key project components include replacement of computer room units, split system fan coil units, air cooled condensing units and associated ductwork, piping and controls. Detailed drawings and schedules provide specifications for equipment, materials, construction and installation. Controls sequences of operation are included along with points lists and trending intervals. The project is a design-bid-build construction contract with an anticipated award date in late 2021.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
THIS LEGEND DEFINING TYPICAL ABBREVIATIONS AND SYMBOLS IS INTENDED TO BE AN OVERALL LEGEND FOR ALL PROJECTS. PLEASE UNDERSTAND THAT NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR EVERY PROJECT. MANY OF THE SYMBOLS WILL BE UTILIZED IN DETAILS AND DIAGRAMS VIA PLAN SHEETS.
HVAC PIPING TYPES
GENERAL DUCT SYMBOLS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
A
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
FSD COMBINATION FIRE / SMOKE DAMPER
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIONALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
H
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
(61-300 PSIG)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HC HOT WATER HEATING COIL
HHP HEATING HOT WATER PUMP
HHR HEATING HOT WATER RETURN
HHS HEATING HOT WATER SUPPLY
HHUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE SUPPLY (STEAM)
(0-15 PSIG)
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
M
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
(16-60 PSIG)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OSD ORGANIC SOIL FILTER
Q
Q INTENTIONALLY LEFT BLANK
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
DSD DUCT SMOKE DETECTOR
SD SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
T
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
U
X INTENTIONALLY LEFT BLANK
W
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFM WATER FLOWMETER
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
X
V
GENERAL NOTES:
A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE
SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY
FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.
C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT
DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS
ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS
COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND
NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR
INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.
D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION
"PAINTING".
E. COORDINATE FAN COIL (FCU) AND TERMINAL UNIT (TU/VAV/CV) REHEAT COIL RIGHT OR
LEFT HAND COIL CONNECTIONS WITH PIPING PLANS.
F. ALL FLUE AND COMBUSTION AIR PIPING FROM GAS-FIRED EQUIPMENT SHALL BE SIZED BY
THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND
ELEVATIONS FOR THIS PROJECT. REFER TO MANUFACTURERS INSTALLATION MANUAL AND
LOCAL CODE REQUIREMENTS FOR REQUIRED FLUE AND COMBUSTION AIR PIPING
MATERIALS.
G. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
H. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN
50' OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM
MAINS WITHIN 50' OF BOILER OR PRESSURE REDUCING VALVES.
I. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
J. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
K. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
L. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
M. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
CWR
CWS
CD
LPC
LPS
MPC
MPS
HPC
HPS
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
HIGH PRESSURE STEAM CONDENSATE
HIGH PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE
MEDIUM PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM SUPPLY
VACUUM RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
CONTINUOUS BLOWDOWN
CHEMICAL FEED
BOILER BLOWOFF BO
CF
CBD
FWPD
FWPS
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE
PIPING AND TO THE INVERT OF ALL GRAVITY PIPING.
C. MAINTAIN A MINIMUM OF 3′-6″ OF GROUND COVER OVER ALL UNDERGROUND HVAC PIPING
(EDIT DEPTH OF GROUND COVER TO SUIT FROST LINE DEPTH AND PROJECT
REQUIREMENTS).
D. UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE
3/4" SIZE (EDIT SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).
E. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED
WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT
PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
F. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
G. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
H. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT
OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.
I. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION
INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
J. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED
GREATER THAN 7′-0″ ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7′-0″ ABOVE FLOOR
LEVEL.
K. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.
L. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
M. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.
PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW
1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH
BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.
N. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER
FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE
ONE SIZE LARGER THAN NOTED.
O. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME
DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY
FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE
EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.
C. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN
THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN
THE SAME FIXTURE.
D. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4′-0″
(CENTERLINE) ABOVE FINISHED FLOOR.
E. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.
F. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING
THICKNESS.
G. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST
SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES
THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH
TURNING VANES.
H. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
I. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE
ARRANGED FOR REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS.
PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST
COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.
J. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.
K. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME,
CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT
HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
L. FINNED TUBE RADIATION ENCLOSURES SHALL BE WALL TO WALL UNLESS OTHERWISE
INDICATED.
M. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND
EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE
POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:
EXISTING TO BE DEMOLISHED
LIMIT OF DEMOLITION
CONNECT NEW TO EXISTINGEXISTING TO REMAIN
NEW DUCT (INSIDE DIMENSIONS: W" X D")
RS
RL
REFRIGERANT SUCTION
REFRIGERANT LIQUID
SUPPLY AIR DUCT UP
SUPPLY AIR DUCT DOWN
H
T
H
T
26-P-3
MH-100
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DETAIL NUMBER
SHEET NUMBER
SHEET NUMBER
SECTION NUMBER
THERMOSTAT
HUMIDISTAT
TEMPERATURE SENSOR
HUMIDITY SENSOR
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
26-TU-1-1
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT)
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
SERVED BY AIR HANDLER UNIT NO. 1
TERMINAL UNIT TAG
MECHANICAL EQUIPMENT TAG
1 OWNER FURNISHED, CONTRACTOR
INSTALLED EQUIPMENT DESIGNATION
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
NEW PIPE
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
GENERAL PIPING SYMBOLS
GENERAL ANNOTATIONS
AV
STRAINERFLOAT & THERMOSTATIC
STEAM TRAP
INVERTED BUCKET
STEAM TRAP
FLANGE CONNECTION PIPE DROP
PIPE RISER TEE DOWN
TEE UP
UNION
PRESSURE REDUCING
VALVE
BALL VALVE
ANGLE GLOBE VALVE
SAFETY RELIEF VALVE
GLOBE VALVE
MANUAL OR
AUTOMATIC AIR VENT
EXPANSION JOINT
EJ
PRESSURE AND
TEMPERATURE TEST PLUG
QUICK-COUPLE HOSE
CONNECTOR
FLOW METER
HVAC PIPING SYMBOLS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHR
CHS
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
HHR
HHS QV CRYOGEN VENT
DR DRIP RETURN
CAP
REDUCER (ECCENTRIC)
TYPE
AIRFLOW (CFM)
SD-1
TYPE
AIRFLOW (CFM)
RG-1
TYPE
AIRFLOW (CFM)
EG-1
SQUARE TO ROUND TRANSITION
ELBOW WITH TURNING
VANES
ROUND ELBOW
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT DOWN
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT UP
RETURN DUCT DOWN
RETURN DUCT UP
BRANCH DUCT WITH HIGH EFFICIENCY
TAKE-OFF (HETO) BRANCH FITTING &
MANUAL VOLUME DAMPER
BRANCH DUCT WITH CONICAL
FITTING & MANUAL VOLUME
DAMPER
DAMPERS: (BD, FD, FSD, MD, SD, VD)
BD
XX-XX
ANCHOR
TEEDIRECTION OF FLOW
S
N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND
LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL
BE 4". PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4" ON EACH SIDE.
CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT
SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE
AND LOCATION OF CONCRETE HOUSEKEEPING PADS.
O. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS SUB-CONTRACTED, IT
SHALL BE THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO COORDINATE
SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL
CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR
ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
P. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
Q. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN
IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL
BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
R. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED
TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED
MECHANICAL EQUIPMENT.
S. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL
BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS
MEETING MSS STANDARDS.WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
T. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL
CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. COORDINATE
INSTALLATION WITH GENERAL CONTRACTOR.
U. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
V. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.
W. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND
ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P-TRAP, AND
PIPED TO NEAREST DRAIN. SEE DETAILS AND SPECIFICATIONS FOR DEPTH OF AIR
CONDITIONING CONDENSATE TRAP.
X. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
P. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE
DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,
RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE
REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.
Q. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP
LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE
DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO
THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.
R. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.
S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
U. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
V. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
W. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS,
CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE
TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
X. SLOPE REFRIGERANT PIPING ONE PERCENT IN THE DIRECTION OF OIL RETURN. LIQUID
LINES MAY BE INSTALLED LEVEL.
Y. INSTALL HORIZONTAL REFRIGERANT HOT GAS DISCHARGE PIPING WITH 1/2″ PER 10'
DOWNWARD SLOPE AWAY FROM THE COMPRESSOR.
Z. INSTALL HORIZONTAL REFRIGERANT SUCTION LINES WITH 1/2″ PER 10' DOWNWARD SLOPE
TO THE COMPRESSOR, WITH NO LONG TRAPS OR DEAD ENDS WHICH MAY CAUSE OIL TO
SEPARATE FROM THE SUCTION GAS AND RETURN TO THE COMPRESSOR IN DAMAGING
SLUGS.
AA. PROVIDE LINE SIZE LIQUID INDICATORS IN MAIN LIQUID LINE LEAVING CONDENSER OR
RECEIVER. INSTALL MOISTURE LIQUID INDICATORS IN LIQUID LINES BETWEEN FILTER
DRYERS AND THERMOSTATIC EXPANSION VALVES AND IN LIQUID LINE TO RECEIVER.
BB. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF
VALVE ON EACH SIDE OF STRAINER.
CC. PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS
USING HERMETIC COMPRESSORS.
DD. PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE-WAY VALVE BYPASS A
ASSEMBLY FOR SOLENOID VALVES, ADJACENT TO RECEIVERS.
EE. PROVIDE REFRIGERANT CHARGING VALVE CONNECTIONS IN LIQUID LINE BETWEEN
RECEIVER SHUTOFF VALVE AND EXPANSION VALVE.
N. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF
THE STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.
M. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.
O. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
P. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE
DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS,
AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRE SERVICE AND/OR
INSPECTION.
Q. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND
MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.
R. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO
BOTH THE EQUIPMENT AND THE DUCT.
S. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR.
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE
DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH
MANUFACTURER’S PRINTED INSTRUCTIONS.
T. TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS
WASHER, HIGH PRESSURE CLEANER, AND OTHER GAS APPLIANCES A MINIMUM OF 3′-0″
ABOVE ROOF WITH RAIN CAP (NOTE TO DESIGNER: EDIT APPLIANCES AND HEIGHT ABOVE
ROOF TO MEET CODE AND TO SUIT PROJECT REQUIREMENTS).
U. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER
REQUIREMENTS.
V. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE COORDINATED WITH
OTHER TRADES INVOLVED. REFER TO ARCHITECTURAL SPECIFICATIONS FOR DETAILED
DESCRIPTIONS.
DIRECTION OF PIPE
PITCH (DOWN)
FM
MV
HVAC VALVE SYMBOLS
PC PUMPED CONDENSATE
ROOM TAG
FLEXIBLE CONNECTOR
PUMP
REDUCER (CONCENTRIC)
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
THERMOMETER
PRESSURE GAUGE
STRAINER WITH BLOWOFF
AND HOSE CONNECTION
YR YEAR
Y
Z INTENTIONALLY LEFT BLANK
Z
M
CONTROL VALVE
CONTROL VALVE, THREE WAY
MOTOR CONTROLLED
VALVE
M
M th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :1
P
M
MECHANICAL LEGEND, ABBREVIATIONS
AND GENERAL NOTES
SCP 45 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
M-000
1,3,4,5,6,T4,T5,T6
No. REVISION DESCRIPTION DATE
TELECOMMUNICATION
A154
POLICE
SUPPLY
187A
STORAGE
A156K
BATH
186A
STORAGE
STAIR
UP
VESTIBULE
A170
WAITING
A116
EXAM
A115
EXAM
A131
EXAM
A133
OFFICE
A135
TRIAGE
A136
OFFICE
A138
UP
UP
BREAK
EXAM
A114
TOILET
A113
EXAM
A112
EXAM
A111
EXAM
A110
EXAM
A109
EXAM
A108
EXAM
A126
TOILET
A125
OFFICE
A144
SOILED
UTILITY
A107
CLEAN
UTILITY
A124
TOILET
A123
NURSE
STATION
A145
TOILET
A146 192C
STORAGE
194D
UP
OFFICE
A106
NURSE
STATION
A122
OFFICE
A121
EXAM
A143
EXAM
A152 EXAM
A153
OFFICE
A156A
EXAM
A105
CLINIC
A102
A149
A102A
ONCOLOGY
WAITING
A101
OFFICE
A156D A156E
OFFICE
EXAM
A103
EXAM
A118
EXAM
A117
EXAM
A141
EXAM
A148
A156C
OFFICE
A156F
STORAGE
MED
A120
A140 A119
EXAM
A142
EXAM
A150
STORAGE
A151
MECH
A156G
OFFICE
A156B CHAPEL
H.A.C.
CLOSET
180A
OFFICE
OFFICE
OFFICE
OFFICE
A156
STORAGE
194B 194A STORAGE
OFFICE
KITCHEN
192B CLOSET
184A
EXAM
A128
OBSERVATION
A127A
BATH
A127B
MED
A137
STORAGE
A130
H.A.C.
A129
SOILED
UTILITY
A132
A127
MECH
A155
CLEAN
UTILITY
A134 STAIR 5
UP
EMERGENCY
A139
AUDITORIUM
WELCOME
DESK
A104 MENS
VENDING
SECURITY
WELCOME
LOUNGE
A167
TOILET
A165
A157 CASHIER
A158 A159
REGISTRATION
A164
ON CALL
169E
LOCKERS
A169
DATA
176A
TOILET
A166 BATH
TOILET
110B
PHARMACY
EXAM
121H
OFFICE
117 VESTIBULE
EXAM
MECH
LAB
EXAM
EXAM
120A
EXAM
121A
EXAM
121B
EXAM
121E
CORRIDOR
LACTATION
121D
STAIR #2
OFFICE
121F
CONSULT
121G
UUPP
UP
FIRE
PROTECTION
123D PATIENT
EDUCATION
GARAGE
BREAK
CORRIDOR
128A
EXAM
OFFICE
STORAGE
134A TOILET
MED
133A
TOILET
126A
EXAM
EXAM
TOILET
STORAGE
135A
MECHANICAL
DW
TOILET
1-C-132
OFFICE
OFFICE
OFFICE
EXAM
WAITING
1-C-133
PATIENT
CORR.
1-C-C2
DW
1-C-123
INTAKE #2
1-C-130
CONSULT
1-C-129
EXAM 12
1-C-128
HYBRID 13
1-C-127
EXAM 14
1-C-126
EXAM 15
1-C-125
MED ROOM 1
1-C-124
CONSULT 16
1-C-122
CONSULT 17
1-C-121
CONSULT 18
1-C-120
CONSULT 19
1-C-119
EQUIPMENT
STORAGE
1-C-118
TOILET
1-C-146
CORRIDOR
1-C-C3
STORAGE
1-C-134
HYBRID 20
1-C-135
EXAM 21
1-C-136
EXAM 22
1-C-137
HYBRID 23
1-C-138
ELECTRICAL
1-C-140
FUTURE HAC
148A
NURSE
MANAGER
EGRESS
CORRIDOR
1-C-C4
TEAM ROOM
(FUTURE
ELEV.)
1-C-EL1-2
MED ROOM 2
1-C-141
OIT
1-C-139
SPECIALTY
1-C-154
EXAM 24
1-C-142
EXAM 25
1-C-143
CONSULT 26
1-C-144
CLEAN
UTILITY
1-C-145
TOILET
1-C-147
TEAM ROOM
(FUTURE
ELEV.)
1-C-EL3
OPEN
OFFICE
1-C-148
STAIRS 9-1
1-C-ST9
EXAM
EXAM
123A
EXAM
123B 123C
WAITING
137 PATIENT
REGISTRATION
RECEP
MEANS
ELIGIBILITY
138A
TESTING
138B
STAFF
LOUNGE
SMALL
CONFERENCE
TOILET
TOILET
UP
H.A.C.
SOILED
UTILITY
SOILED
UTILITY
STAIR
1-B-ST3
OFFICE
RECEP
HYBRID 5-1
EXAM 5-2
154A
OFFICE
RECEP
CHECK-IN
EXAM 4-2
EXAM 4-1
158A CORRIDOR
1E-4
OFFICE
DN
ENGINEERING
109D
OFFICE
OFFICE
UP
UP
6' - 3 1/2"
CORRIDOR
1E-3
RN-3
TOILET
UP
OFFICE
109C
MECH
A109B A109A 109
EXAM
EXAM
107A
EXAM
OFFICE
STORAGE
STORAGE
MULTIPURPOSE
100A
OFFICE
DATA
WAITING
REGISTER
MED
EXAM 1-1
175A
EXAM 1-2
RN-1
OFFICE
EXAM 2-1
169A
RN-2
CHECK OUT
168 PROCEDURE
OFFICE
CLEAN
UTILITY 2
165 OFFICE
OFFICE
UP
STAIR
EXAM 3-2
162A
EXAM 3-1
STAFF
LOUNGE
1-C-116
WAITING
1-C-101
COFFEE
1-C-101D
RECEPTION
1-C-102
OPEN
OFFICE
1-C-117
KIOSKS
1-C-101C
CORRIDOR
1-C-C5
CONCIERGE
1-C-101A
NEG.
PRESSURE
HYBRID
1-C-104
UP
STAIRS10-1
1-C-ST10
INTAKE #1
1-C-103
PATIENT
CORR.
1-C-C1
EXAM 2
1-C-105
EXAM 3
1-C-106
EXAM 4
1-C-107
EXAM 5
1-C-108
EXAM 6
1-C-109
P. TOILET
1-C-110
HYBRID 7
1-C-111
EXAM 8
1-C-112
EXAM 9
1-C-113
EXAM 10
1-C-114
MULTIPURPOSE
1-C-115
VESTIBULE
1-C-100
MECH
FAMILY
ROOM
VENDING
FAMILTY
TOILET
PUBLIC
TOILET
CONSULT
CORRIDOR
C4109
CORRIDOR
C4110
CORRIDOR
C4111
ELEVATOR
WAITING
BATH
4124A
BATH
4104A
MED/SURG/
ISOLATION
ANTEROOM
(AIRBORNE
INFECTION
ISOLATION)
MED/SURG/
ISOLATION
BATH
4108A
UP
STAIR 1-4
ST4.1
SOILED
HOLD
ALCOVE
C4103
BATH
4114A
BATH
4116A
BATH
4118A
BATH
4120A
MED/SURG
MED/SURG
MED/SURG
MED/SURG
MED/SURG
CLOSET
ALCOVE
BATH
4130A
MED/SURG
4130 MED/SURG
MED/SURG
WASHROOM
MED/SURG
PERSONAL
STORAGE
BUILDING
SERVICES
4164A
ELEVATOR
UTILITY
CORRIDOR
C4104
ELEC.
SOILED
HOLD
CORRIDOR
C4101
STAIR 2-4
ST4.2
SOILED
UTILITY
ROOM
SOILED
EQUIPMENT
CLEAN
UTILITY
MEDICATION
ROOM
NURSE
STATION
NOURISHMENT
CLEAN
SUPPLY
CLEAN LINEN
EKG
STORAGE
OPEN
OFFICE
STORAGE
(EMS)
BATH
4143A
BATH
4144A
STAFF
TOILET
CORRIDOR
C4302
CORRIDOR
C4106
MED/SURG
MED/SURG
BARIATRIC/PHYSICAL
DISABILITIES
MED/SURG
BARIATRIC
PHYSICAL
DISABILITIES
MED/SURG
BATH
4332A
CORRIDOR
C4105
ELECTRICAL
NURSE
STATION
CORRIDOR
C4107
ALCOVE
EQUIPMENT
STORAGE
ALCOVE
CORRIDOR
C4301
CORRIDOR
C4303
NURSE
WORKROOM
LEADER
CLINICAL
NURSE
OFFICE
SOCIAL
WORKER
OFFICE
NURSE
MANAGER
OFFICE
ICU NURSE
MANAGER
OFFICE
SOCIAL
WORKER
DIETICIAN
NURSE
WORKROOM
NURSE
STATION
4317 4319
ELECTRICAL
TOILET
4331 BATH
4333A
STAIR 3-4
ST4.3
CLEAN
SUPPLY
MEDICATION
ROOM
SOILED
UTILITY/EQUIP
BATH
4353A
MED/SURG
4150A
MED/SURG
4154A
MED/SURG
4156A
MED/SURG
4160A CORRIDOR
C4108
ELECTRICAL
BATH
4312A
BATH
4316A
CLEAN LINEN
H.A.C.
4322 ELEC.
NOURISHMENT
BATH
4324A
CORRIDOR
C4304
ELEVATOR
MED/SURG
DATA
ALCOVE
STORAGE
MED/SURG
MED/SURG
SECURITY
CLOSET
BATH
4320A
MED/SURG
MED/SURG
BATH
4326A
BATH
4346A
BATH
4348A
MED/SURG
MED/SURG
BATH
4352A
PATIENT
ROOM
INTENSIVE
CARE
ISOLATION
NOURISHMENT
UP
STAIR 4-4
ST4.4
CORRIDOR
C4305
ANTEROOM
PATIENT
TOILET
INTENSIVE
CARE
4364A
ANTEROOM
PATIENT
ROOM
INTENSIVE
ISOLATION
ICU
EQUIPMENT
STORAGE
CLEAN LINEN
ROOM
CLEAN
NURSE
STATION
4345 ELEC
CLEAN
SUPPLY
4351 PATIENT
ROOM
INTENSIVE
CARE
MEDICATION
ROOM
NURSE
STATION
PATIENT
INTENSIVE
CARE
BATH
4365A
STAFF
LOUNGE
STAFF
TOILET
SUPPLY
ROOM
KITCHENETTE
OPEN
TOILET
4146A
ON CALL
ROOM
OFFICE
STAFF
DICTATION
4147A
LOUNGE
4334B
INTER-DISCIOLINARY
ROOM
4334A
CONFERENCE
OFFICE
CLOSET
551A
STORAGE
TOILET
TOILET
ELEVATOR
MED
515D1
MENS
OFFICE
515E
UP
STAIR
5-1
MED
515D
EXAM
515C
EXAM
515B
EXAM
515A
TOILET
NURSE
STATION
WOMENS
TOILET
WAITING
OFFICE
510A
OFFICE
510B
OFFICE
CLEAN
UTILITY
STORAGE
507C
VESTIBULE
OFFICE
507A
PAIN
OFFICE
507B
MANAGEMENT
SOILED
UTILITY
ELEC
UP
ELEVATOR
STORAGE
VESTIBULE
ELEVATOR
H.A.C.
STORAGE
OFFICE
546A
OFFICE
546B 545
EXAM
OFFICE
DATA
549A
STORAGE
CLOSET
539A
CLEAN
SUPPLY
BATH
543A
PYXIS
CLASSROOM
MECH
MECH
SOILED
UTILITY
515F
LOCKERS
LAB
OFFICE
OFFICE
BATH
521A
EXAM
EXAM
520A
EXAM
520B OFFICE
STAIR
5-2 OFFICE
SOILED
UTILITY
EXAM
EXAM
525A
EXAM
EXAM
526A
OFFICE
DATA
528C
WAITING
CHECK-IN
COLLAB
EXAM
EXAM
EXAM
SOILED
UTILITY
EXAM
BATH
537A
STAIR
5-3 OFFICE
EXAM
MECH
MECH
MD111
M-121
MD111
M-121
MD111
M-121
MD111
M-121
MD111
M-121
MD111
M-121
MD111
M-121
MD111
M-121
BLDG 3
BLDG T4, T5, T6
BLDG 6BLDG 5
BLDG 2 BLDG 4
N
KEY PLAN - BLDG 1, 2, 3, 4, 5, 6 T4, T5, & T6
BLDG 1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :1
P
M
BLDG 1 - MECHANICAL REFERENCE
PLANS
SCP 46 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
M-101
N
1" = 40'-0"
BLDG 1 - BASEMENT OVERALL PLAN1
N
1" = 40'-0"
BLDG 1 - FIRST FLOOR OVERALL PLAN2
N
1" = 40'-0"
BLDG 1 - FOURTH FLOOR OVERALL PLAN3
N
1" = 40'-0"
BLDG 1 - FIFTH FLOOR OVERALL PLAN4
No. REVISION DESCRIPTION DATE
MD112
M-122
MD112
M-122
MD112
M-122
MD112
M-122
M-122
M-122
M-122
MD112
MD112
MD112
BLDG 3
BLDG T4, T5, T6
BLDG 6BLDG 5
BLDG 2 BLDG 4
N
KEY PLAN - BLDG 1, 2, 3, 4, 5, 6 T4, T5, & T6
BLDG 1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :1
P
M
BLDG 3,4,5,6 & T4-T6 MECHANICAL
REFERENCE PLANS
SCP 47 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
M-102
3,4,5,6,T4,T5,T6
N
1/16" = 1'-0"
BLDG 3 - BASEMENT OVERALL PLAN1
N
1/16" = 1'-0"
BLDG 4 - BASEMENT OVERALL PLAN2
N
1/16" = 1'-0"
BLDG 5 - BASEMENT OVERALL PLAN3
N
1/16" = 1'-0"
BLDG 6 - FIRST FLOOR OVERALL PLAN4
N
1/16" = 1'-0"
BLDG T4-T6 - FIRST FLOOR OVERALL PLAN5
No. REVISION DESCRIPTION DATE
OFFICE
D1
D1
D2D2
D5D5
DATA
MECH
A155
D3
A154
D4
Corridor
AC-1-A63
ACCU-1-A63
TELECOM ROOM /
TCB
063 D4
(ON FIRST FLOOR
ROOF ABOVE)
TELECOM ROOM
176A
AC-1-176A
ACCU-1-176A
(ON FIRST FLOOR
ROOF OUTSIDE)D4
TELECOM ROOM
AC-1-4308
D4
SECURITY
CLOSET
AC-1-528C
ACCU-1-528C
TELECOM ROOM
528C D4
(ON SIXTH FLOOR
ROOF ABOVE)
TELECOM ROOM
B606
D7
D7
DATA
053A
AC-1-053A
D4
HAC
FIRST FLOOR ROOF
OFFICE
OFFICE
OFFICE
D4 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :2
P
M
BLDG 1 - MECHANICAL DEMOLITION
PLANS
SCP 48 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
MD111
DEMOLITION KEYNOTES
D1 REMOVE AND DEMOLISH COMPUTER ROOM UNIT AND ASSOCIATED CONDENSING UNIT OUTSIDE BY THE LOADING DOCK. REMOVE AND DEMOLISH
ASSOCIATED DUCTWORK, PIPING, AND ACCESSORIES IN ITS ENTIRETY.
D2 REMOVE AND DEMOLISH ALL CEILING MOUNTED DIFFUSERS, ASSOCIATED DUCTWORK, AND ACCESSORIES IN ITS ENTIRETY.
D3 REMOVE ICE MACHINE AND ASSOCIATED ACCESSORIES AND PREPARE ICE MACHINE TO BE RELOCATED. COORDINATE NEW LOCATION WITH THE VA
COR.
D4 NO MECHANICAL DEMOLITION WORK REQUIRED IN THIS ROOM/AREA.
D5 REMOVE AND DEMOLISH ALL CEILING MOUNTED DIFFUSERS, ASSOCIATED DUCTWORK UP TO THE END OF BRANCH LINE, AND ACCESSORIES.
D7 REMOVE AND DEMOLISH AIR GRILLE, ASSOCIATED DUCTOWRK, AND ALL ACCESSORIES BACK TO NEAREST BRANCH AND CAP.
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL DEMO - RM 057/058 ENLARGED PLAN1
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL DEMO - RM A154/A155 ENLARGED PLAN6
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL DEMO - RM 063 ENLARGED PLAN3
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL DEMO - RM 176A ENLARGED PLAN5
N
1/4" = 1'-0"
BLDG 1 - FOURTH FLOOR MECHANICAL DEMO - RM 4308 ENLARGED PLAN7
N
1/4" = 1'-0"
BLDG 1 - FIFTH FLOOR MECHANICAL DEMO - RM 528C ENLARGED PLAN8
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL DEMO - RM B606 & 053A ENLARGED PLAN2
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL DEMO - ROOF ENLARGED PLAN4
No. REVISION DESCRIPTION DATE
TELECOM ROOM
301AC-3.01
ACCU-3.01
(ON GROUND OUTSIDE)
D6
BASEMENT
TELECOM ROOM
AC-4.01
ACCU-4.01
(ON GROUND OUTSIDE)
D4
BASEMENT
AC-5.01
ACCU-5.01
(ON GROUND OUTSIDE)
TELECOM ROOM
D6
BASEMENT
TELECOM ROOM
AC-6-107
ACCU-6-107
(ON GROUND OUTSIDE)
D4
D4
D4 D4
ROOM
HAC
ROOM
HAC
ROOM
HAC
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :2
P
M
BLDG 3,4,5,6 & T4-T6 MECHANICAL
DEMOLITION PLANS
SCP 49 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
MD112
3,4,5,6,T4,T5,T6
DEMOLITION KEYNOTES
D4 NO MECHANICAL DEMOLITION WORK REQUIRED IN THIS ROOM/AREA.
D6 REMOVE SPLIT SYSTEM FAN COIL UNIT, ASSOCIATED PIPING AND ACCESSORIES. PREPARE FAN COIL UNIT TO BE RELOCATED. REFER TO SHEET M-122
FOR NEW LOCATION.
N
1/4" = 1'-0"
BLDG 3 - BASEMENT MECHANICAL DEMO - RM 301 ENLARGED PLAN1
N
1/4" = 1'-0"
BLDG 4 - BASEMENT MECHANICAL DEMO - RM 401 ENLARGED PLAN2
N
1/4" = 1'-0"
BLDG 5 - BASEMENT MECHANICAL DEMO - RM 501 ENLARGED PLAN3
N
1/4" = 1'-0"
BLDG 6 - FIRST FLOOR MECHANICAL DEMO - RM 107 ENLARGED PLAN4
N
1/4" = 1'-0"
BLDG T4 - FIRST FLOOR MECHANICAL DEMO - RM 118 ENLARGED PLAN5
N
1/4" = 1'-0"
BLDG T5 - FIRST FLOOR MECHANICAL DEMO - RM 129 ENLARGED PLAN6
N
1/4" = 1'-0"
BLDG T6 - FIRST FLOOR MECHANICAL DEMO - RM 107 ENLARGED PLAN7
No. REVISION DESCRIPTION DATE
VD
MAIN SERVER ROOM
CRU-1-057 1
L-1-057 4
CRU-2-057
1" CD
1" CD
24"x18" OA
36"x30" RA
24"x18" OA14
RL
RL
H T P
101010
MECH
A155
TELECOM ROOM
FCU-1-154
CU-1-154
(ON SECOND FLOOR
ROOF ABOVE)
3/4" CD 8
Corridor
A154
TELECOM ROOM /
TCB
AC-1-A63
ACCU-1-A63
(ON FIRST FLOOR
ROOF ABOVE)
TELECOM ROOM
176A
AC-1-176A
ACCU-1-176A
(ON FIRST FLOOR
ROOF OUTSIDE)
TELECOM ROOM
AC-1-4308
TELECOM ROOM
528C
AC-1-528C
ACCU-1-528C
(ON SIXTH FLOOR
ROOF ABOVE)
TELECOM ROOM
B606
FCU-1-B606
CU-1-B606
(ON SECOND FLOOR
ROOF ABOVE)
3/4" CD
DATA
053A
HAC
AC-1-053A
ACCU-1-057
ACCU-2-057
FIRST FLOOR ROOF
OFFICE
OFFICE
OFFICE
RL
RL
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :1
P
M
BLDG 1 - MECHANICAL ENLARGED
PLANS
SCP 50 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
M-121
KEYNOTES
1 PROVIDE REFRIGERANT PIPING FROM COMPUTER ROOM UNIT TO THE ASSOCIATED AIR-COOLED CONDENSING UNIT ON THE FIRST FLOOR ROOF.
2 PROVIDE REFRIGERANT PIPING FROM SPLIT SYSTEM FAN COIL UNIT TO THE ASSOCIATED SPLIT SYSTEM CONDENSING UNIT ON THE SECOND FLOOR
ROOF.
4 PROVIDE AND INSTALL OUTSIDE AIR LOUVER AND ASSOCIATED ACCESSORIES.
5 ADEQUATE COOLING EXISTS FOR THIS ROOM. NO NEW MECHANICAL WORK REQUIRED IN THIS ROOM.
7 CONNECT FULL SIZE RETURN DUCT FROM THE SERVER CABINET DUCT OPENING TO THE RETURN DUCT ABOVE (TYPICAL FOR ALL SERVER CABINETS).
8 ROUTE 3/4" CONDENSATE PIPE FROM SPLIT SYSTEM FAN COIL UNIT TO EXISTING FLOOR DRAIN IN ROOM A155 (MECH). SLOPE CONDENSATE PIPING A MINIMUM OF 1/8" PER FOOT TOWARD THE FLOOR DRAIN. TERMINATE WITH MINIMUM 2" AIR GAP.
9 ROUTE 1" CONDENSATE PIPE FROM COMPUTER ROOM UNIT TO EXISTING JANITOR'S SINK IN ROOM 052 (HAC). SLOPE CONDENSATE PIPING A MINIMUM
OF 1/8" PER FOOT TOWARD THE JANITOR'S SINK. TERMINATE WITH MINIMUM 2" AIR GAP.
10 PROVIDE HUMIDITY SENSOR AND TEMPERATURE SENSOR FOR COMPUTER ROOM UNITS. PROVIDE ROOM PRESSURE SENSOR FOR OUTSIDE AIR DAMPER. COORDINATE EXACT LOCATION WITH OWNER AND CONTROLS CONTRACTOR. REFER SHEET M-702 FOR CONTROLS.
11 PROVIDE AND INSTALL AIR-COOLED CONDENSING UNIT ON THE FIRST FLOOR ROOF KEEPING THE MANUFACTURER RECOMMENDED CLEARANCES IN MIND. ROUTE REFRIGERANT LINES PARALLEL TO THE EXTERIOR WALL OF THE BUILDING FROM THE CONDENSING UNIT AND CONNECT TO THE ASSOCIATED COMPUTER ROOM UNIT IN ROOM 057 (MAIN SERVER ROOM) ON THE BASEMENT LEVEL.
12 ROUTE 3/4" CONDENSATE PIPE FROM SPLIT SYSTEM FAN COIL UNIT THROUGH THE CORRIDOR TO CONNECT INTO EXISTING LAVATORY TRAP IN ROOM B608 (LOUNGE, STAFF). DO NOT ROUTE ANY PIPING THROUGH ROOM B607 (ELECTRICAL). SLOPE CONDENSATE PIPING A MINIMUM OF 1/8" PER FOOT
TOWARD THE LAVATORY TRAP.
14 ELBOW 24" X 18" OUTSIDE AIR DUCT UP JUST OUTSIDE THE EXTERIOR WALL AND ROUTE AS CLOSE TO THE EXTERIOR WALL AS POSSIBLE. TERMINATE DUCT WITH A GOOSENECK TURN, BIRD SCREEN, AND INSECT SCREEN SUCH THAT IT IS AT LEAST 30' ABOVE FINISHED GRADE.
16 CONTRACTOR SHALL PROVIDE TEMPORARY SPOT COOLERS IN ROOM 053A (DATA) TOTALLING 10 TONS OF COOLING FOR TEMPORARY SERVER RACK RELOCATION FROM EXISTING ROOM 057 (DATA) TO ROOM 053A (DATA). ROUTE TEMPORARY FLEXIBLE EXHAUST DUCT FROM SPOT COOLERS IN ROOM 053A (DATA) THROUGH THE CEILING IN THE CORRIDOR TO EXISTING ROOM 057 (DATA), THEN TO EXISTING ROOM 058 (OFFICE) AND EVENTUALLY OUT
THE WEST WINDOW.
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL HVAC - RM 057 ENLARGED PLAN1
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL HVAC - RM 154 ENLARGED PLAN6
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL HVAC - RM 063 ENLARGED PLAN3
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL HVAC - RM 176A ENLARGED PLAN5
N
1/4" = 1'-0"
BLDG 1 - FOURTH FLOOR MECHANICAL HVAC - RM 4308 ENLARGED PLAN7
N
1/4" = 1'-0"
BLDG 1 - FIFTH FLOOR MECHANICAL HVAC - RM 528C ENLARGED PLAN8
N
1/4" = 1'-0"
BLDG 1 - BASEMENT MECHANICAL HVAC - RM B606 & 053A ENLARGED PLAN2
N
1/4" = 1'-0"
BLDG 1 - FIRST FLOOR MECHANICAL HVAC - ROOF ENLARGED PLAN4
No. REVISION DESCRIPTION DATE
CONTROLLED UNCLASSIFIED INFORMATION - CUI
CONTROLLED UNCLASSIFIED INFORMATION - CUI
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
IE
D
I N
F O
R M
A T
IO
N
C
U I
FCU-1-118
CU-1-118
TELECOM ROOM
EXISTING RAMP EDGE
3/4" CD13
(ON GROUND OUTSIDE)
HAC
FCU-1-129
CU-1-129
TELECOM ROOM
EXISTING RAMP EDGE
3/4" CD13
HAC
(ON GROUND OUTSIDE)
FCU-1-107
CU-1-107
TELECOM ROOM
3/4" CD13
HAC
(ON GROUND OUTSIDE)
ACCU-3.01
(ON GROUND OUTSIDE)
TELECOM ROOM
DH-1-301 6
AC-3.01 15
BASEMENT
AC-4.01
ACCU-4.01
TELECOM ROOM
(ON GROUND OUTSIDE)
DH-1-401 6
BASEMENT
ACCU-5.01
TELECOM ROOM
(ON GROUND OUTSIDE)
DH-1-5016
AC-3.02 15
BASEMENT
AC-6-107
ACCU-6-107
(ON GROUND OUTSIDE)
TELECOM ROOM
107 5 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
HEALTHCARE PLANNER
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
SPUR # 1791.10
/9
/2
:5 :2
P
M
BLDG 3,4,5,6 & T4-T6 MECHANICAL
ENLARGED PLANS
SCP 51 119JRM
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
M-122
3,4,5,6,T4,T5,T6
KEYNOTES
3 PROVIDE REFRIGERANT PIPING FROM SPLIT SYSTEM FAN COIL UNIT TO THE ASSOCIATED SPLIT SYSTEM CONDENSING UNIT OUTSIDE.
5 ADEQUATE COOLING EXISTS FOR THIS ROOM. NO NEW MECHANICAL WORK REQUIRED IN THIS ROOM.
6 PROVIDE AND INSTALL WALL MOUNT DEHUMIDIFIER (ULTRA-AIRE 4035900 OR APPROVED EQUAL) AND ASSOCIATED ACCESSORIES. ROUTE 1/2" CONDENSATE PIPE TO CONNECT INTO EXISTING CONDENSATE PIPING FROM THE FAN COIL UNIT.
13 ROUTE 3/4" CONDENSATE PIPE FROM SPLIT SYSTEM FAN COIL UNIT TO EXISTING FLOOR DRAIN IN ROOM 105 (HAC). SLOPE CONDENSATE PIPING A MINIMUM OF 1/8" PER FOOT TOWARD THE FLOOR DRAIN. TERMINATE WITH MINIMUM 2" AIR GAP.
15 INSTALL EXISTING TO RELOCATE SPLIT SYSTEM FAN COIL UNIT IN THE LOCATION SHOWN. RE-ROUTE ASSOCIATED REFRIGERANT AND CONDENSATE
PIPING AS REQUIRED.
N
1/4" = 1'-0"
BLDG T4 - FIRST FLOOR MECHANICAL HVAC - RM 118 ENLARGED PLAN5
N
1/4" = 1'-0"
BLDG T5 - FIRST FLOOR MECHANICAL HVAC - RM 129 ENLARGED PLAN6
N
1/4" = 1'-0"
BLDG T6 - FIRST FLOOR MECHANICAL HAVC - RM 107 ENLARGED PLAN7
N
1/4" = 1'-0"
BLDG 3 - BASEMENT MECHANICAL HVAC - RM 301 ENLARGED PLAN1
N
1/4" = 1'-0"
BLDG 4 - BASEMENT MECHANICAL HVAC - RM 401 ENLARGED PLAN2
N
1/4" = 1'-0"
BLDG 5 - BASEMENT MECHANICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .