Attachment 12 610A4-21-701 Specifications Bound.pdf

PDF 8 MB Posted

Attached to
Y1DA--610A4-21-701 EHRM Infrastructure Upgrades Construction Ft. Wayne Federal contract opportunity
Solicitation number
36C77622B0028
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is for construction services to complete EHRM Infrastructure Upgrades at the VA Medical Center in Fort Wayne, Indiana. Key project details include renovations and upgrades to buildings 1 through 6 as well as temporary structures T4 through T6. The solicitation number is 36C77622B0028. Construction work includes general alterations, site work, mechanical, electrical and technology system upgrades. The Department of Veterans Affairs Technology Acquisition Center in Austin, Texas issued this solicitation. Bids are due by the date specified on the website where the solicitation was posted.

The required construction work involves renovations and infrastructure upgrades to multiple buildings and structures at the VA Medical Center campus in Fort Wayne. The solicitation provides bidding details and outlines the scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--610A4-21-701 EHRM Infrastructure Upgrades Construction Ft. Wayne, newest first.
File Type Posted
36C77622B0028 0008.pdf PDF
Attachment 2 EHRM ICRA Form - Ft. Wayne.pdf PDF
Attachment 1 Technical Question Responses - Ft Wayne EHRM 20220722.pdf PDF
36C77622B0028 0007.pdf PDF
0006 Attachment 1 Technical Question Responses.pdf PDF
36C77622B0028 0006.pdf PDF
36C77622B0028 0005.pdf PDF
36C77622B0028 0004.pdf PDF
36C77622B0028 0003.pdf PDF
36C77622B0028 0002.pdf PDF
36C77622B0028 0001.pdf PDF
Attachment 3 Drawing 03_ENVIRONMENTAL.pdf PDF
Attachment 9 Drawing 08b_TELECOMMUNICATION.pdf PDF
Attachment 14 COVID-19 Safety Protocols 12-14-21.pdf PDF
36C77622B0028_1.docx DOCX document
Attachment 15 CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
Attachment 8 Drawing 08a_TELECOMMUNICATION.pdf PDF
Attachment 4 Drawing 04_ARCHITECTURAL_BID SET.pdf PDF
Attachment 1 Drawing 01_GENERAL_BID SET.pdf PDF
Attachment 17 ELECTRICAL BID SET.pdf PDF
Attachment 16 Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 DBA Wage Determination - Ft Wayne 20220602.pdf PDF
Attachment 11 EHRM Ft Wayne Bid Documents Narrative.pdf PDF
Attachment 10 Drawing 09_SECURITY.pdf PDF
Attachment 7 Drawing 07_ELECTRICAL_BID SET.pdf PDF
Attachment 6 Drawing 06_MECHANICAL_BID SET.pdf PDF
Attachment 5 Drawing 05_FIRE PROTECTION_BID SET.pdf PDF
Attachment 2 Drawing 02_CIVIL_BID SET.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6104-21-701 | EHRM Infrastructure Upgrades

VA Northern Indiana Health Care System

Fort Wayne, IN

BID DOCUMENTS

11/12/2021

Indiana Architectural Registration No: AR12100034 Indiana Civil Registration No: PE11300516

Indiana Fire Protection Registration No: PE12000219 Indiana Mechanical Registration No: PE12100220

Indiana Electrical Registration No: PE1210095 Indiana Telecommunication Registration No: 104026

VA 610A4-21-701 EHRM Infrastructure Upgrades

VANIHCS, Fort Wayne, IN

Bid Documents

01-01-21

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 74 19 Construction Waste Management 01-21

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE – NOT USED

DIVISION 04 – MASONRY - NOT USED

DIVISION 05 – METALS - NOT USED

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES - NOT USED

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 31 13 Access Doors and Frames 01-21

08 71 00 Door Hardware 01-21

Bid Documents

01-01-21

00 01 10-2

08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 26 00 Wall and Door Protection 01-21

DIVISION 11 – EQUIPMENT - NOT USED

DIVISION 12 – FURNISHINGS - NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION - NOT USED

DIVISION 14– CONVEYING EQUIPEMENT - NOT USED

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING - NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

23 81 23 Computer-Room Air-Conditioners 03-20

23 82 16 Air Coils 03-20

23 84 00 Humidity Control Equipment 03-20

Bid Documents

01-01-21

00 01 10-3

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 39 Underfloor Raceways for Electrical Systems 01-18

26 24 16 Panelboards 01-18

26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems

01-18

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 33 53 Static Uninterruptible Power Supply 01-17

26 43 13 Surge Protective Devices 01-17

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 11 00 Telecommunications Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 13 00 Physical Access Control Systems 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm Systems 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 39 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

DIVISION 33 – UTILITIES - NOT USED

Bid Documents

01-01-21

00 01 10-4

DIVISION 34 – TRANSPORTATION - NOT USED

DIVISION 48 – Electrical Power Generation - NOT USED

Bid Documents

05-01-20

00 01 15 - 1

LIST OF DRAWINGS

SECTION 00 01 15

The drawings listed below accompanying this specification form a part of the contract.

GENERAL

Drawing No. Title

G-000 COVER SHEET

GI001 GENERAL INFORMATION

CIVIL

GS001 GENERAL LAYOUT PLAN

GS002 NORTH SITE PLAN

GS003 SOUTH SITE PLAN

GS004 NORTH GRADING PLAN

GS005 SOUTH GRADING PLAN

GS006 DETAILS

HAZARDOUS MATERIALS

HA000 HAZARDOUS MATERIALS GENERAL INFORMATION

HA100 BUILDING 1 - BASEMENT - ENVIRONMENTAL HAZARDS

HA101 BUILDING

HAZARDS

1 - FIRST FLOOR - ENVIRONMENTAL

HA102 BUILDING

HAZARDS

1 - SECOND FLOOR - ENVIRONMENTAL

HA103 BUILDING

HAZARDS

1 - THIRD FLOOR - ENVIRONMENTAL

HA104 BUILDING

HAZARDS

1 - FOURTH FLOOR - ENVIRONMENTAL

HA105 BUILDING

HAZARDS

1 - FIFTH FLOOR - ENVIRONMENTAL

HA201 BUILDING

HAZARDS

2 - FIRST FLOOR - ENVIRONMENTAL

HA202 BUILDING

HAZARDS

2 - SECOND FLOOR - ENVIRONMENTAL

HA300 BUILDING 3 - BASEMENT - ENVIRONMENTAL HAZARDS

Bid Documents

05-01-20

00 01 15 - 2

HA301 BUILDING 3 - FIRST FLOOR - ENVIRONMENTAL

HAZARDS

HA400 BUILDING 4 - BASEMENT - ENVIRONMENTAL HAZARDS

HA401 BUILDING 4 - FIRST FLOOR - ENVIRONMENTAL

HAZARDS

HA500 BUILDING 5 - BASEMENT - ENVIRONMENTAL HAZARDS

HA501 BUILDING 5 - FIRST FLOOR - ENVIRONMENTAL

HAZARDS

HA502 BUILDING 5 - SECOND FLOOR - ENVIRONMENTAL

HAZARDS

HA600 BUILDING 6 - BASEMENT - ENVIRONMENTAL HAZARDS

HA601 BUILDING 6 - FIRST FLOOR - ENVIRONMENTAL

HAZARDS

HA602 BUILDING 6 - SECOND FLOOR - ENVIRONMENTAL

HAZARDS

ARCHITECTURAL

A-102 BLDG 2,3,4,5,6 & T4-T6 REFERENCE PLANS

AD111 BLDG 1 - DEMOLITION PLANS

AD112 BLDG 2,3,4,5,6 & T4-T6 DEMOLITION PLANS

AE021 PARTITION TYPES, DOOR SCHEDULE & FINISH

SCHEDULE

AE111 BLDG 1 - ENLARGED PLANS

AE112 BLDG 2,3,4,5,6 & T4-T6 ENLARGED PLANS

FIRE PROTECTION

FA001 BLDG 1 FIRE ALARM GENERAL NOTES, DIAGRAMS, AND

LEGEND

FA101 BLDG 1 OVERALL FIRE ALARM PLANS

FA102 BLDG 2,3,4,5,6 & T4-T6 OVERALL FIRE ALARM PLANS

FA111 BLDG 1 ENLARGED FIRE ALARM PLANS

FA112 BLDG 2,3,4,5,6 & T4-T6 ENLARGED FIRE ALARM

PLANS

FX101 BLDG 1 OVERALL FIRE SUPPRESSION HAZARD

CLASSIFICATION PLANS

Bid Documents 05-01-20

Title Drawing No.

00 01 15 - 3

FX102 BLDG 2,3,4,5,6 & T4-T6 OVERALL FIRE SUPPRESSION

HAZARD CLASSIFICATION PLANS

FX111 BLDG 1 ENLARGED FIRE SUPPRESSION HAZARD

CLASSIFICATION PLANS

FX112 BLDG 2,3,4,5,6 & T4-T6 ENLARGED FIRE

SUPPRESSION HAZARD CLASSIFICATION PLANS

SH001 BLDG 2,3,4,5,6 & T4-T6 FIRE ALARM GENERAL

NOTES, DIAGRAMS, & LEGEND

MECHANICAL

M-000 MECHANICAL LEGEND AND ABBREVIATIONS

M-101 BLDG 1 - MECHANICAL REFERENCE PLANS

M-102 BLDG 2,3,4,5,6 & T4-T6 MECHANICAL REFERENCE

PLANS

MD111 BLDG 1 - MECHANICAL DEMOLITIION PLANS

MD112 BLDG 2,3,4,5,6 & T4-T6 MECHANICAL DEMOLITION

PLANS

M-121 BLDG 1 - MECHANICAL ENLARGED PLANS

M-122 BLDG 2,3,4,5,6 & T4-T6 MECHANICAL ENLARGED

PLANS

M-501 MECHANICAL DETAILS - 1

M-502 MECHANICAL DETAILS - 2

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS - 1

M-702 MECHANICAL CONTROLS – 2

ELECTRICAL

E-001 ELECTRICAL LEGEND

ES101 ELECTRICAL SITE PLAN

E-101 OVERALL PLANS BLDG 1

E-102 OVERALL PLANS BLDG 2, 3, 4, 5, 6, T4, T5, T6

E-201 DEMO PLANS BLDG 1

E-202 DEMO PLANS BLDG 2, 3, 4, 5, 6, T4, T5, T6

E-301 ENLARGED PLANS BLDG 1

E-302 ENLARGED PLANS PLANS BLDG 2, 3, 4, 5, 6, T4-T6

E-501 ELECTRICAL DETAILS

Bid Documents 05-01-20

Title Drawing No.

00 01 15 - 4

E-502

E-601

E-602

E-603

ELECTRICAL

ELECTRICAL

ELECTRICAL

ELECTRICAL

DETAILS

ONE-LINE DIAGRAM

PANELBOARD SCHEDULES

PANELBOARD SCHEDULES

TECHNOLOGY

T-000 TECHNOLOGY LEGEND & ABBREVIATIONS

TS101 TECHNOLOGY SITE PLAN

T-100 BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN

T100A BUILDING 1

AREA A

- BASEMENT TECHNOLOGY FLOOR PLAN -

T100B BUILDING 1

AREA B

- BASEMENT TECHNOLOGY FLOOR PLAN -

T100C BUILDING 1

AREA C

- BASEMENT TECHNOLOGY FLOOR PLAN -

T100D BUILDING 1

AREA D

- BASEMENT TECHNOLOGY FLOOR PLAN -

T-101 BUILDING 1 - FIRST FLOOR TECHNOLOGY FLOOR PLAN

T101A BUILDING

A

1 - FIRST FLOOR TECHNOLOGY PLAN - AREA

T101B BUILDING

B

1 - FIRST FLOOR TECHNOLOGY PLAN - AREA

T101C BUILDING

C

1 - FIRST FLOOR TECHNOLOGY PLAN - AREA

T101D BUILDING

D

1 - FIRST FLOOR TECHNOLOGY PLAN - AREA

T101E BUILDING

E

1 - FIRST FLOOR TECHNOLOGY PLAN - AREA

T-102 BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN

T102A BUILDING

- AREA A

1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN

T102B BUILDING

- AREA B

1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN

T102C BUILDING

- AREA C

1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN

T102D BUILDING

- AREA D

1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN

T-103 BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN

T103A BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN

- AREA A

Bid Documents 05-01-20

Title Drawing No.

00 01 15 - 5

T103B BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN

- AREA B

T103C BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN

- AREA C

T103D BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN

- AREA D

T-104 BUILDING 1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN

T104A BUILDING

- AREA A

1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN

T104B BUILDING

- AREA B

1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN

T-105 BUILDING

PLAN

1 - FIFTH FLOOR - TECHNOLOGY FLOOR

T105A BUILDING 1 - FIFTH FLOOR - TECHNOLOGY FLOOR

PLAN - AERA A

T105B BUILDING 1 - FIFTH FLOOR - TECHNOLOGY FLOOR

PLAN - AREA B

T-106 BUILDING 2 - TECHNOLOGY FLOOR PLAN

T-107 BUILDING 3 - TECHNOLOGY FLOOR PLAN

T-108 BUILDING 4 - TECHNOLOGY FLOOR PLAN

T-109 BUILDING 5 - FIRST FLOOR - TECHNOLOGY FLOOR

PLAN

T-110 BUILDING 6 - FIRST FLOOR - TECHNOLOGY FLOOR

PLAN

T-111 BUILDINGS T4, T5, T6 - TECHNOLOGY FLOOR PLANS

T401A BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLAN

T401B BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLAN

BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLANS

BUILDINGS 3, 4, 5, 6, & T-4 - ENLARGED TECHNOLOGY FLOOR

PLANS

BUILDING 1 - TELECOM ROOM ELEVATIONS

BUILDING 1 - TELECOM ROOM ELEVATIONS

BUILDINGS 3, 4, 5, 6, & T-4 - TELECOM ROOM ELEVATIONS

BUILDINGS 3, 4, 5, 6, & T-4 - TELECOM ROOM ELEVATIONS

REDUNDANT - DIVERSE OSP FIBER CABLE ROUTING DETAIL

REDUNDANT - DIVERSE ISP FIBER CABLE RISER DETAIL

TECHNOLOGY DETAILS

Bid Documents 05-01-20

Title Drawing No.

00 01 15 - 6

SECURITY

TY101 TYPICAL SECURITY FLOOR PLANS

- - - E N D - - -

Bid Documents

01-01-21

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, furnish labor and materials and perform work for Electronic Health

Records Maintenance Infrastructure Upgrades as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Contracting Officer Representative.

C. Offices of Spur Design and Aspen Engineering, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, BASE BID: Work includes general construction, alterations, site work, mechanical work, electrical work, necessary removal of existing construction and certain other items.

Bid Documents

01-01-21

01 00 00 -2

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

Bid Documents

01-01-21

01 00 00 -3

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours

Bid Documents

01-01-21

01 00 00 -4 before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as shown on the drawings and as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

Bid Documents

01-01-21

01 00 00 -5

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements and approval by COR.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion

Bid Documents

01-01-21

01 00 00 -6 thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor.

J. Building(s) No.(s) 1, 2, 3, 4, 5, 6, T4, T5 & T6 will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air

Bid Documents

01-01-21

01 00 00 -7 pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished

Bid Documents

01-01-21

01 00 00 -8 areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the

Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will

Bid Documents

01-01-21

01 00 00 -9 be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

Bid Documents

01-01-21

01 00 00 -10

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

Bid Documents

01-01-21

01 00 00 -11

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

Bid Documents

01-01-21

01 00 00 -12

1.12 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

Bid Documents

01-01-21

01 00 00 -13

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely

Bid Documents

01-01-21

01 00 00 -14 manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

E. Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

Bid Documents

01-01-21

01 00 00 -15

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems

Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

Power failure (entire area or any building operational after

1600 hours).

Security lights.

Smoke detectors.

f) Code 2-Electrical

Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical

Exterior lights not operational.

h) Code 1-Heat

Power failure affecting heat.

i) Code 3-Interior

Floors damaged.

Paint chipping or peeling.

Casework damaged.

Bid Documents

01-01-21

01 00 00 -16

j) Code 1-Roof Leaks

Damage to property is occurring.

k) Code 3

All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.13 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

Bid Documents

01-01-21

01 00 00 -17

1.14 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevators for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators.

The COR will ascertain that elevators are in proper condition.

Contractor may use elevators for daily use between the hours of 7 am and 4 pm and for special nonrecurring time intervals when permission is granted. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a) Entrance jambs, heads soffits and threshold plates.

b) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c) Finish flooring.

3. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.

1.15 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1. Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by Medical Center.

Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.

Bid Documents

01-01-21

01 00 00 -18

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the

Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. Electricity for all other uses is available at no cost to the Contractor.

D. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

1.17 TESTS

A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Bid Documents

01-01-21

01 00 00 -19

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.18 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site.