0006 Attachment 1 Technical Question Responses.pdf
PDF 416 KB Posted
- Attached to
- Y1DA--610A4-21-701 EHRM Infrastructure Upgrades Construction Ft. Wayne Federal contract opportunity
- Solicitation number
- 36C77622B0028
About this file
This document contains responses to technical questions regarding federal solicitation number 36C77622B0028 for infrastructure upgrades to the EHRM facility at Fort Wayne for the Department of Veterans Affairs Technology Acquisition Center Austin. Key details include a response deadline of July 1, 2022; an anticipated 10-day period between award and notice to proceed; firm fixed pricing requirements; a Simplex fire alarm system; and clarification that certain notes referencing hazardous materials removal or water well capping apply only if such items are discovered. Parking, storage areas and responsibility for addressing potential project delays due to COVID-19 are also addressed.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID RFI RESPONSE
PROJECT NUMBER VA101F-17-D-2913 (1791.10)
PROJECT NAME EHRM Infrastructure Upgrade
Fort Wane, IN DATE July 1, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
NO. QUESTION RESPONSE
1 Since the site visit was today Friday June 17th and Monday a Federal Holiday, Please extend the RFI question period to allow all trades and vendors to submit questions. Questions that are reviewed since the site visit
N/a
2 After award, the Contracting Officer will provide a NTP to the awardee .What is the approximant duration between issuing the award and issuing the NTP?
10 calendar days
3 For planning the preliminary project schedule, what is the anticipated award date?
Information will be disclosed to apparent high bidder
4 What is the anticipated duration between issuance of contract award and issuance of the NTP?
See above
5 How many calendar days should be included in the critical-path schedule for owner and A/E review and respond to RFIs?
To be determined by postaward
6 How many calendar days should be included in the critical-path method schedule for owner and A/E submittal review?
See above
7 Where will the designated parking & laydown area be for workers accessing the construction site?
To be determined by COR
8 Due to the unprecedented and unpredictable material price increases occurring in the nation, will the CO/VA/Owner allow a fixed price contract with economic price adjustments per FAR 16.203 to be used as the basis for contract award? This will allow the most competitive price to be offered at this time.
The VA will only utilize Firm Fixed Pricing for this contract.
9 What is the existing electrical service? (Square D, 208Y/120V: Westinghouse
PROJECT NAME EHRM Infrastructure Upgrade
Fort Wane, IN DATE July 1, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
Cutler-Hammer, ABB/GE, or Siemens 480Y/277V: Square D
10 What is the existing fire alarm system? (Siemens, Notifier, or Simplex0
Existing fire alarm system is Simplex.
11 As a result of the effect of COVID-19 throughout the U.S., and the resulting Federal, State and local governments’ responses / requirements of safe distancing and potential advocations of working remotely and/or complete organization closures, please advise how the Government intends to address delays resulting there as it pertains to the current solicitation schedule for this and all future projects
This project cannot dictate how future projects will operate.
12 Since this solicitation involves multiple buildings, floors, rooms, campus wide, please consider allowing more time the provide a bid proposal. Also note there are two federal holidays in the midst of this solicitation period.
Under advisement.
13 Drawing GS002 Demolition note 9. If hazardous materials are believed to be present, contractor is to remove and dispose. Are there known hazardous materials onsite? We assume that the note is to be interpred as: if hazardous materials are found, contractor is to notify the government.
Any costs for removal and disposal will be approved by the government per unforseen conditions contract clauses.
Review the specifications and solicitation
14 Drawing GS002 Demolition note 11. If un-capped water wells are discovered on site, contractor is coordinate with authorized company to have wells plugged and capped. Are there known un-capped water wells onsite? We assume that the note is to be interpred as: if un-capped water wells are found, contractor is to notify the government. Any costs for removal and disposal will be approved by the government per unforseen conditions contract clauses.
Correct. To our knowledge there are not. This note is meant as a catch all.
PROJECT NAME EHRM Infrastructure Upgrade
Fort Wane, IN DATE July 1, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
15 Drawing GS002 Demolition note 12. If existing septic systems are discovered on site, contractor shall coordinate with a septic hauler to pump any remaining wastewater and sludge from all tanks in system, remove the tanks, and the lateral fields.
Are there known existing septic systems onsite?
We assume that the note is to be interpred as: if existing septic sytems are found, contractor is to notify the government. Any costs for removal and disposal will be approved by the government per unforseen conditions contract clauses.
Correct. To our knowledge there are not. This note is meant as a catch all.
16 There references to Bid Alternates on the drawings but not shown on the solicitation price schedule.
We assume we are to ignore references to bid alternates on the bid documents unless directed by admendment.
There are no bid alternatives or deducts, price without regard to language involving deducts.
17 Is it permissible to use a conventional releasing panel for releasing the Novec1230 system in the main server room 057 and monitor this panel with three new Simplex addressable monitor modules connected to the building fire alarm system for alarm, trouble, and supervisory?
Yes, this is acceptable. Provided that the RSFACU can monitor the required number of inputs as identified on the contract documents.
18 Will there be a new raised floor in the main server room 057, if so what will be the depth?
No raised floor system for this server room due to limitations on room size and equipment clearances
19 What will be the new ceiling height (deck height if exposed) in main server room 057?
Existing Height is 8’-9” to accounstical tile, new ceiling height (exposed) was not shown in drawings but is roughly 10’-0”. Measurements can be taken on site during walk thru
20 Several electrical and datacom contractor / vendors are requesting more time to prepare pricing noting that there are challenges with obtaining pricing due to supply chain shortages and vendor supplier manpower.
See above
PROJECT NAME EHRM Infrastructure Upgrade
Fort Wane, IN DATE July 1, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
Detail 6 on sheet M-501 shows a pipe support that is connected to the roof deck and flashed
in. In lieu of this particular pipe support, would a Miro or Durablock pipe support be considered? I have attached cut sheets of each for your review. These would eliminate the need to add additional roof penetrations.
As long as they comply with specification section
23 05 11 Common Work Results for HVAC –
Pipe Supports, they would be considered.
What is the duration that you will require cooling for the temporary cooling?
Duration is to be determined through coordination by the general contractor and telecommunications subcontractor.
What power is available in this room? We can do 208v or 480v. The room has 208v
What is the route / door accommodations for the temporary unit? The proposed unit is 86”
Long X 34” Wide X 78” Tall.
Provide a temporary unit or multiple units which fit within the existing door(s).
For both hardware sets there is a continuous hinge with a TW8 option which is a “Through
Wire – 8 count” wired through the hinge to power the door and there is an EPT10 which is an “electric power transfer – 10 count” listed to power the door. Is the door supposed to be powered through the hinge or the EPT? Please clarify.
Lockset is low voltage and shall be electrified from junction bosx for EPT10. Refer to detail 3/TY-101.
Existing Electrical Service: (Square D.?
Cutler-Hammer? ABB/GE? Siemens?) 208Y/120V: Westinghouse
480Y/277V: Square D
PROJECT NAME EHRM Infrastructure Upgrade
Fort Wane, IN DATE July 1, 2022 SUBJECT RFI Responses
A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com
Existing Fire Alarm System: (Siemens?
Notifier? Simplex?) Existing fire alarm system is Simplex.