This set of construction documents outlines the scope of work for infrastructure upgrades at the VA Medical Center campus in Fort Wayne, Indiana. The project involves renovations and systems work across multiple buildings including technology, security, mechanical, electrical and plumbing systems. Drawings depict existing conditions, demolition plans, new construction details and specifications. Consultants involved in design include engineering firms for various disciplines. The solicitation seeks bids for project number 610A4-21-701 to upgrade electrical, mechanical and technology infrastructure at the Fort Wayne VA facility in accordance with requirements and standards outlined in the construction documents. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
TELECOMMUNICATION
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:5
:0
A
M
COVER SHEET
ZDL 1 OF 120AJS
BID DOCUMENTS
EHRM INFRASTRUCTURE UPGRADES
FORT WAYNE, INDIANA
VA PROJECT NUMBER: 610A4-21-701
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
VA NORTHERN INDIANA HEALTH CARE SYSTEM (VANIHCS)
2121 LAKE AVE,
FORT WAYNE, IN 46805
BID DOCUMENTS
G-000
SPUR # 1791.10
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
79 T101B BUILDING 1 - FIRST FLOOR TECHNOLOGY PLAN - AREA B
80 T101C BUILDING 1 - FIRST FLOOR TECHNOLOGY PLAN - AREA C
81 T101D BUILDING 1 - FIRST FLOOR TECHNOLOGY PLAN - AREA D
82 T101E BUILDING 1 - FIRST FLOOR TECHNOLOGY PLAN - AREA E
83 T-102 BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN
84 T102A BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN - AREA A
85 T102B BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN - AREA B
86 T102C BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN - AREA C
87 T102D BUILDING 1 - SECOND FLOOR TECHNOLOGY FLOOR PLAN - AREA D
88 T-103 BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN
89 T103A BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN - AREA A
90 T103B BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN - AREA B
91 T103C BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN - AREA C
92 T103D BUILDING 1 - THIRD FLOOR TECHNOLOGY FLOOR PLAN - AREA D
93 T-104 BUILDING 1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN
94 T104A BUILDING 1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN - AREA A
95 T104B BUILDING 1 - FOURTH FLOOR TECHNOLOGY FLOOR PLAN - AREA B
96 T-105 BUILDING 1 - FIFTH FLOOR - TECHNOLOGY FLOOR PLAN
97 T105A BUILDING 1 - FIFTH FLOOR - TECHNOLOGY FLOOR PLAN - AERA A
98 T105B BUILDING 1 - FIFTH FLOOR - TECHNOLOGY FLOOR PLAN - AREA B
99 T-106 BUILDING 2 - TECHNOLOGY FLOOR PLAN
100 T-107 BUILDING 3 - TECHNOLOGY FLOOR PLAN
101 T-108 BUILDING 4 - TECHNOLOGY FLOOR PLAN
102 T-109 BUILDING 5 - FIRST FLOOR - TECHNOLOGY FLOOR PLAN
103 T-110 BUILDING 6 - FIRST FLOOR - TECHNOLOGY FLOOR PLAN
104 T-111 BUILDINGS T4, T5, T6 - TECHNOLOGY FLOOR PLANS
105 T401A BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLAN
106 T401B BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLAN
107 T-402 BUILDING 1 - ENLARGED TECHNOLOGY FLOOR PLANS
108 T-403 BUILDINGS 3, 4, 5, 6, & T-4 - ENLARGED TECHNOLOGY FLOOR PLANS
109 T-404 BUILDING 1 - TELECOM ROOM ELEVATIONS
110 T-405 BUILDING 1 - TELECOM ROOM ELEVATIONS
111 T-406 BUILDINGS 3, 4, 5, 6, & T-4 - TELECOM ROOM ELEVATIONS
112 T-407 BUILDINGS 3, 4, 5, 6, & T-4 - TELECOM ROOM ELEVATIONS
113 T-501 REDUNDANT - DIVERSE OSP FIBER CABLE ROUTING DETAIL
114 T-502 REDUNDANT - DIVERSE ISP FIBER CABLE RISER DETAIL
115 T-503 TECHNOLOGY DETAILS
116 T-504 TECHNOLOGY DETAILS
117 T-505 TECHNOLOGY DETAILS
118 T-506 TECHNOLOGY DETAILS
119 T-507 TECHNOLOGY DETAILS
[09] SECURITY
120 TY101 TYPICAL SECURITY FLOOR PLANS
TOTAL SHEETS: 120
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
41 FX102
BLDG 2,3,4,5,6 & T4-T6 OVERALL FIRE SUPPRESSION HAZARD
CLASSIFICATION PLANS
42 FX111 BLDG 1 ENLARGED FIRE SUPPRESSION HAZARD CLASSIFICATION PLANS
43 FX112
BLDG 2,3,4,5,6 & T4-T6 ENLARGED FIRE SUPPRESSION HAZARD
CLASSIFICATION PLANS
44 SH001 BLDG 2,3,4,5,6 & T4-T6 FIRE ALARM GENERAL NOTES, DIAGRAMS, & LEGEND
[06] MECHANICAL
45 M-000 MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES
46 M-101 BLDG 1 - MECHANICAL REFERENCE PLANS
47 M-102 BLDG 3,4,5,6 & T4-T6 MECHANICAL REFERENCE PLANS
48 MD111 BLDG 1 - MECHANICAL DEMOLITIION PLANS
49 MD112 BLDG 3,4,5,6 & T4-T6 MECHANICAL DEMOLITION PLANS
50 M-121 BLDG 1 - MECHANICAL ENLARGED PLANS
51 M-122 BLDG 3,4,5,6 & T4-T6 MECHANICAL ENLARGED PLANS
52 M-501 MECHANICAL DETAILS - 1
53 M-502 MECHANICAL DETAILS - 2
54 M-601 MECHANICAL SCHEDULES
55 M-701 MECHANICAL CONTROLS - 1
56 M-702 MECHANICAL CONTROLS - 2
[07] ELECTRICAL
57 E-001 ELECTRICAL LEGEND
58 ES101 ELECTRICAL SITE PLAN
59 E-101 OVERALL PLANS BLDG 1
60 E-102 OVERALL PLANS BLDG 2, 3, 4, 5, 6, T4, T5, T6
61 E-201 DEMO PLANS BLDG 1
62 E-202 DEMO PLANS BLDG 2, 3, 4, 5, 6, T4, T5, T6
63 E-301 ENLARGED PLANS BLDG 1
64 E-302 ENLARGED PLANS PLANS BLDG 2, 3, 4, 5, 6, T4-T6
65 E-501 ELECTRICAL DETAILS
66 E-502 ELECTRICAL DETAILS
67 E-601 ELECTRICAL ONE-LINE DIAGRAM
68 E-602 ELECTRICAL PANELBOARD SCHEDULES
69 E-603 ELECTRICAL PANELBOARD SCHEDULES
[08] TECHNOLOGY
70 T-000 TECHNOLOGY LEGEND & ABBREVIATIONS
71 TS101 TECHNOLOGY SITE PLAN
72 T-100 BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN
73 T100A BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN - AREA A
74 T100B BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN - AREA B
75 T100C BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN - AREA C
76 T100D BUILDING 1 - BASEMENT TECHNOLOGY FLOOR PLAN - AREA D
77 T-101 BUILDING 1 - FIRST FLOOR TECHNOLOGY FLOOR PLAN
78 T101A BUILDING 1 - FIRST FLOOR TECHNOLOGY PLAN - AREA A
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
1 G-000 COVER SHEET
2 GI001 GENERAL INFORMATION
[02] CIVIL
3 GS001 GENERAL LAYOUT PLAN
4 GS002 NORTH SITE PLAN
5 GS003 SOUTH SITE PLAN
6 GS004 NORTH GRADING PLAN
7 GS005 SOUTH GRADING PLAN
8 GS006 DETAILS
[03] HAZARDOUS MATERIALS
9 HA000 HAZARDOUS MATERIALS GENERAL INFORMATION
10 HA100 BUILDING 1 - BASEMENT - ENVIRONMENTAL HAZARDS
11 HA101 BUILDING 1 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
12 HA102 BUILDING 1 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
13 HA103 BUILDING 1 - THIRD FLOOR - ENVIRONMENTAL HAZARDS
14 HA104 BUILDING 1 - FOURTH FLOOR - ENVIRONMENTAL HAZARDS
15 HA105 BUILDING 1 - FIFTH FLOOR - ENVIRONMENTAL HAZARDS
16 HA201 BUILDING 2 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
17 HA202 BUILDING 2 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
18 HA300 BUILDING 3 - BASEMENT - ENVIRONMENTAL HAZARDS
19 HA301 BUILDING 3 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
20 HA400 BUILDING 4 - BASEMENT - ENVIRONMENTAL HAZARDS
21 HA401 BUILDING 4 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
22 HA500 BUILDING 5 - BASEMENT - ENVIRONMENTAL HAZARDS
23 HA501 BUILDING 5 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
24 HA502 BUILDING 5 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
25 HA600 BUILDING 6 - BASEMENT - ENVIRONMENTAL HAZARDS
26 HA601 BUILDING 6 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
27 HA602 BUILDING 6 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
[04] ARCHITECTURAL
28 A-101 BLDG 1- REFERENCE PLAN
29 A-102 BLDG 2,3,4,5,6 & T4-T6 REFERENCE PLANS
30 AD111 BLDG 1 - DEMOLITION PLANS
31 AD112 BLDG 2,3,4,5,6 & T4-T6 DEMOLITION PLANS
32 AE021 PARTITION TYPES, DOOR SCHEDULE & FINISH SCHEDULE
33 AE111 BLDG 1 - ENLARGED PLANS
34 AE112 BLDG 2,3,4,5,6 & T4-T6 ENLARGED PLANS
[05] FIRE PROTECTION
35 FA001 BLDG 1 FIRE ALARM GENERAL NOTES, DIAGRAMS, AND LEGEND
36 FA101 BLDG 1 OVERALL FIRE ALARM PLANS
37 FA102 BLDG 2,3,4,5,6 & T4-T6 OVERALL FIRE ALARM PLANS
38 FA111 BLDG 1 ENLARGED FIRE ALARM PLANS
39 FA112 BLDG 2,3,4,5,6 & T4-T6 ENLARGED FIRE ALARM PLANS
40 FX101 BLDG 1 OVERALL FIRE SUPPRESSION HAZARD CLASSIFICATION PLANS
1, 2, 3, 4, 5, 6, T4, T5, T6
E STATE BLVD
LAKE AVE
R A
N D
A
LLIA
D R
T4
T5
T6
5 6
R A
N D
A
L LIA
D R
N
LOCATION
PLAN
AREA
PLAN
N
LAKE AVE
N . C
O
LIS
E U
M B
LV
D
E STATE BLVD
C A
R E
W S
T
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE PROTECTION CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: FORT WAYNE, INDIANA
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 5A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM AND MINIMUM
VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 5 (A, B, C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-11.4 c.i. EXISTING METAL BUILDING: R-0 + R-19 c.i. EXISTING STEEL-FRAMED: R-13 + R-10 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-7.5 c.i. or R-19 + R-5 c.i. EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 48 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 EXISTING
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
ROOM NAME
150 SF
000A
ROOM NAME
000A
/1 A101
X0000
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
REFERENCE SYMBOLS IDENTIFICATION TAGS
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
M
IN
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HMD HOLLOW METAL DOOR PAINT
HMDF HOLLOW METAL DOOR FRAME
PAINT
HMWF HOLLOW METAL WINDOW FRAME
PAINT
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HARDWARE
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
BID ALTERNATE OPTIONS
BID ALTERNATE OPTION 1:
OMIT REMOVAL OF EXISTING ABANDONED FIBER LINE – REFER CIVIL DRAWINGS FOR LOCATIONS AND QUANTITIES.
BID ALTERNATE OPTION 2:
BUILDING 1 - SECOND FLOOR - ROOM 210C:
• DEDUCT ROOM 210C DEMOLITION AND NEW CONSTRUCTION FROM PROJECT SCOPE.
• LEAVE EXISTING IT CAGE IN PLACE AND RUN NEW FIBER IN PREPARATION FOR FUTURE RENOVATION.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
IN ARCH REG. NO. AR12100034 EXP. 12/31/2021
IN MECH ENGR REG. NO. PE12100220 EXP. 07/31/2022
IN ELEC ENGR REG. NO. PE12100195 EXP. 07/31/2022
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
TELECOMMUNICATION
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 85712
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:5
:0
A
M
GENERAL INFORMATION
ZDL 2 OF 120AJS
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES FORT WAYNE,
INDIANA
11/12/2021
610A4-21-701
VANIHCS
2121 LAKE AVE,
FORT WAYNE, IN 46805
GI001
SPUR # 1791.10
1, 2, 3, 4, 5, 6, T4, T5, T6
No. REVISION DESCRIPTION DATE
| Sheets |
| G-000 - COVER SHEET |
| GI001 - GENERAL INFORMATION |
File details come from the government source that posted it. Updated .