Attachment 5 - Plan_Drawings Red Rock Lookout Renovation.pdf

PDF 2 MB Posted

Attached to
GAOA Red Rock Lookout Renovation, Plumas National Forest
Solicitation number
127EAW26Q0028
Issued by

About this file

This document is a design package containing architectural and engineering drawings for the Red Rock Lookout Renovation project located in Plumas National Forest, Mt Hough Ranger District, Plumas County, California. The project is managed by the United States Department of Agriculture Forest Service, Pacific Southwest Region.

The renovation scope includes comprehensive interior and exterior work on the lookout structure. Exterior work involves removing and replacing roofing with new composite shake materials per specification 07 31 00, installing a new lightning protection system compliant with NFPA 780, repainting all exterior wood, installing new doors with glass lites, repairing and repainting shutter frames with new metal facing, and installing metal building numbers. Interior work requires installing new plumbing infrastructure including a 30-gallon propane water heater with high-elevation orifice, a standalone shower stall (Durastall Model 68 or similar), and a 200-gallon vertical water tank with pump and pressure tank (12 HP Everbuilt SKU1001187540 or equal). Additional interior installations include a Williams propane wall heater (model 1403821), a solar system with controllers and batteries per specification 26 31 00, kitchen appliances (Unique refrigerator model UGP-3 SM W and stove model UGP-20G OF1 W), electrical fixtures (LED ceiling lights and lighting per specification 09 90 00), and refinished cabinetry with drop-in sink and faucet. The project also requires removal of existing infrastructure including the chimney, propane piping, water heater, shower base, radio antennae, roof number, solar systems, and wall heater. All work includes lead-based paint disposal per specification 02 83 19, rodent infiltration prevention through foam sealant and wire mesh at penetrations, and interior finishes including wood floor and ceiling refinishing. The design package includes seven sheets dated 04/16/2026 addressing exterior demolition, exterior and interior demolition, exterior elevations, interior plans, utilities, and miscellaneous details.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

Red Rock Lookout Renovation

From downtown Greenville, California, head south on Hwy 89. Turn left on to Stampfli Lane. After 3 miles, turn right on to North Valley Road. Continue on N Valley Rd for 1.5 miles, then turn left onto Diamond Mountain Road.

Continue on Diamond Mountain Road towards the Lights Creek Area for approximately 15 miles. Turn left onto Diamond Mountain Road (County Road 213). Continue and turn right onto Forest Service Rd 28N02. Continue and stay to the left on 28N15A. Follow 28N15A until one has reached the designated lookout parking area.

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

RO FACILITIES PROGRAM MANAGER DATE

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

California Plumas County

Plumas National Forest Mt Hough Ranger District

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVERSHEET 04/16/26

D-01 EXTERIOR DEMO 04/16/26

D-02 EXTERIOR & INTERIOR DEMO 04/16/26

A-01 EXTERIOR ELEVATIONS 04/16/26

A-02 INTERIOR PLANS 04/16/26

A-03 UTILITIES 04/16/26

A-04 MISC DETAILS 04/16/26

Map Data @2026 Google

1 North Elevation 2 East Elevation

Key Notes:

1. Remove existing roofing down to sheathing.Reference prep requirements in

Spec Section 07 31 00.

2. Remove all above ground existing lightning protection system infrastructure typical.

3. Remove existing chimney entirely and patch hole in sheathing and interior ceiling with like materials.

4. Remove existing door and any needed jamb material for install of new door frame.

5. Remove metal on shutters

6. Remove all loose paint and dispose of lead based paint according to

Specification 02 83 19 typical for all exposed wood on the building.

7. Remove all existing propane pipe from propane tank connection to fixtures on both levels.

General Demo Notes:

· Windows and shutters not shown on drawing for clarity

· Similar Demo Scope on South and West Elevations.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Exterior Demo

04/16/2026

JZENI

JZENI D-01

002 007

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

1 1st Floor Interior Plan

2 Roof Plan View

Stairs Down

Key Notes:

1. Remove existing door frame and any necessary jamb material for install of new door and frame

2. Remove existing water heater and all associated piping infrastructure

3. Remove existing shower base and associated water supply and drain piping.

4. Existing cabinet. Keep in place.

5. Remove existing radio antennae and associated attachment infrastructure.

6. Remove existing roof number. Salvage if possible for reuse.

7. Remove existing chimney entirely and patch hole in sheathing and interior ceiling with like material.

8. Remove all loose paint and dispose of lead based paint according to

Specification 02 83 19 typical for all exposed wood on the building.

9. Remove any existing solar system infrastructure including wiring and boxes.

10. Existing overhead cabinets typical. Keep in place.

11. Existing Fire Finder. Keep in place.

12. Remove existing cabinets, countertop and integrated infrastructure.

13. Remove existing wall heater and vent including propane piping

14. Remove lights typical. Salvage and turn over to Government.

3 2nd Floor (Cab) Interior Plan

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Exterior & Interior Demo

04/16/2026

JZENI

JZENI D-02

003 007

N

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1 North Elevation 2 East Elevation

Key Notes:

1. Install new lightning protection system including air terminals and radials in compliance with NFPA 780.

2. Install new roofing per specification 07 31 00. Reference Detail 1/A-04

3. Replace any damaged shutter frame supports and paint shutter frame. Install new metal to match existing per Detail

2/A-04 & 2/A-04

4. Prep and paint all exterior wood typical. Reference Spec 09 90 00 .

5. Paint stairs and walking surface with slip resistant texture. Reference Spec 09 90 00

6. New metal knock down door frame and HM door with hardware shown on A-04.

7. Install new door with glass lite to match height of lookout windows. Hardware shown on A-04.

8. Install metal number to match pre-demo size and location. Material to be salvaged or 16 Ga white aluminum.

Reference 04/A-04 for support details.

General Note:

Any and all penetrations must be foamed and overlayed with small wire mesh to prevent rodent infiltration. To occur before painting activities

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Exterior Elevations

04/16/2026

JZENI

JZENI A-01

004 007

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1 1st Floor Interior Plan

3 2nd Floor (Cab) Interior Plan

2 Not to Scale 2nd Floor (Cab) Furniture Plan

Key Notes:

1. Install new HM door and door frame. Paint to match exterior of Lookout. Hardware shown on A-04

2. Install new 30 gal propane water heater with high elevation propane orifice and associated piping infrastructure including venting and pressure relief valve.

3. Install new standalone shower stall, Durastall Model 68 or similar, and associated piping infrastructure.

4. Install controllers, equipment and batteries for a fully functional solar system. See spec 26 31 00.

5. Install new door with glass lite to match height of lookout windows. Hardware shown on A-04. Paint exterior in white to match lookout exterior and interior in color coordinated with Government.

6. Install Williams propane wall heater model 1403821 with high altitude propane orifice kit 8A144 with orifice P090561 through existing vent hole.

7. Refinish existing cabinets and paint in color coordinated with the Gov. Replace and damaged or non-functional hardware in-kind.

8. Prep and paint all exposed wood walls. Reference Spec 09 90 00.

9. Clean, Sand, Stain, and clear coat existing wood floor and ceiling, see 09 90 00.

10. Install and plumb drop in sink, Elkay ECTSRAD25226TBG or equal, and faucet, Elkay HDFAV1411 or equal.

11. Furnish/Install Unique UGP-3 SM W fridge or equal.

12. Furnish/Install Unique UGP-20G OF1 W stove or equal.

13. Desk and bed. Not in Contract. Supplied and installed by Gov.

14. General cabinet layout shown. Contractor to provide shop drawings detailing all dimensions and drawer/door layout. Cabinets to be painted in color coordinated with Gov. Back of cabinets visible through windows shall be painted to match exterior.

Reference Spec 12 35 30.

15. Install new 200 gal vertical water tank with pump and pressure tank,12 HP Everbuilt SKU1001187540 or equal. Tie into water piping infrastructure.

16. Remove existing wood patch, remove any debris, foam, place small wire mesh and replace wood trim to match existing.

General Note:

Any and all penetrations must be foamed and overlayed with small wire mesh to prevent rodent infiltration. To occur before painting activities

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Interior Plans

04/16/2026

JZENI

JZENI A-02

005 007

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

2 Not to Scale 2nd Floor (Cab) Utilities Plan

ER

ER

ER

ER

G G

G

ER

HW

CWD

EL

EL

D

G

EL

1 Not to Scale 1st Floor Utilities Plan

ERP

HWCW

CW

Legend/Notes:

ER = 15A 120V Electrical receptacle ERP = 20A 120V Electrical receptacle for water pump only EL = Electric Light fixture with switch.

G = Gas connection with shutoff valve HW = Hot water supply with shut off valve CW = Cold water supply with shut off valve D = Drain with piping to exterior using existing holes in building exterior, Reference detail 5/A-04

1. Approximate locations shown. Contractor to coordinate with Government for exact locations.

2. Routing of CW and HW piping not shown. Contractor to field fit.

3. Low point drain to exterior for CW/HW lines to be provided for winterization of system.

4. Light fixture in 1st floor - 11" Low Profile LED Ceiling mount.

5. Light fixture in cab - White Innovations Lighting 516-1W-WPC-G422 with LED bulb or equal in similar shape to existing propane fixtures.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Utilities

04/16/2026

JZENI

JZENI A-03

006 007

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1 Not to Scale Typical Roof Assembly

New composite Shake Roofing

Roofing Underlayment

Fascia Flashing

Building Edge

Roof Sheathing

2 Not to Scale Typical Shutter Elevation

Existing Hinges Typ

Stainless Steel Eye Bolt Typ.

Hasp lock attached to adjacent shutter to lock in place. Typical both sides.Eyelet and hook, typical 2x on bottom of shutter to connect shutter to window sill.

4" min wire rope with loop on each end to connect to adjacent shutter. Loop should fit through eye bolt.

Paint shutter frame.

D-01

3 Not to Scale Shutter Section

Painted shutter frame

Eye Bolt Typ

Existing hinge

New white sheet metal facing

Note: Holes to be made in metal where shutter bolts line up to pass through the frame when shutters are secured in the open position

4 Not to Scale Typical Number Support Detail

New composite Shake Roofing

Roofing Underlayment

Number support.

Anchored to roof sheathing

5 Not to Scale Drain Waste Details

(1) Schd 80 or other UV resistant drain pipefrom lookout

Leach Location Located 15-25' from Lookout exterior Final Location coordinated with Gov.

~12"

~1 2"

Repurposed Rocks from existing area to cover drain pipe

Existing Ground Surface

~1 8"

Plan

4" Drain Rock

Existing Ground Below Grade

Drain Pipe

Elevation Location of Leach Hole to be coordinated in Field with Government.

2" Holes drilled in pipe every 3" typ in leach leg

Door Hardware (Reference Spec 087000 and coordinate with door type required):

1st Floor:

(3) ea. Hinge

(1) ea. Threshold

(1) ea. Door Sweep

(1) ea. Weatherstripping Kit

(1) ea. Exterior Lockset Schlage ND

Series or Equal

(1) ea. Deadbolt w/ interior thumb turn

2nd Floor/Cab:

(3) ea. Hinge

(1) ea. Threshold

(1) ea. Door Sweep

(1) ea. Weatherstripping Kit

(1) ea. Schlage Andover Knob Keyed

Entry Lock or Equal

(1) ea. Externally mounted deadbolt w/ interior thumb turn

*Keys for all locks to be the same.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 6/2

6 1 3:

JZ

EN

I C

:\U

SE

RS

\JZ

EN

I\B

OX

\71

EN

GI

NE

ER

IN

G\ #F

AC

IL

IT

IE

S

EN

GI

NE

ER

\01

FA

CI

LI

TI

ES

H

IS

TO

RY

B Y

LO

CA

TI

ON

\M H

- 5

6 - R

ED

R

OC

K

LO

OK

OU

T\

GA

OA

R

ED

R

OC

K

DE

SI

GN

\R

ED

R

OC

K

RE

NO

VA

TI

ON

D

ES

IG

N.

DW

G;

(R05) Pacific Southwest

Red Rock LO Renovation

Plumas NF

Mt Hough RD

Misc Details

04/16/2026

JZENI

JZENI A-04

007 007

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Red Rock Renovation Design-Cover Sheet
Red Rock Renovation Design-Demo
Red Rock Renovation Design-Demo 2
Red Rock Renovation Design-New Ext
Red Rock Renovation Design-New Int
Red Rock Renovation Design-New Utilities
Red Rock Renovation Design-Details

File details come from the government source that posted it. Updated .