Attachment 5 - ES7034 (Rework Repair).docx

DOCX document 18 KB Posted

Attached to
MJU-76/B Flare, Countermeasure Federal contract opportunity
Solicitation number
FA821326RB005-Solicitation
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This attachment is a quality assurance specification document outlining contractor requirements for reworking and repairing nonconforming material on federal contracts. The document, dated January 2012 (ES7034 version), defines rework as reprocessing nonconforming material to achieve complete conformance with drawings, specifications, and contract requirements, while repair involves reprocessing to bring material into usable condition without eliminating all nonconformances. Contractors must document all rework and repair procedures along with associated inspection procedures and submit them to the Government Quality Assurance Representative (QAR) for review and approval prior to implementation, with the QAR retaining disapproval authority over rework procedures. Repair procedures must be submitted on DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for written approval before use. All submissions must include descriptions of the causes of nonconformances and preventive actions taken or planned to prevent recurrence.

The rework and repair procedures must include reinspection provisions that supersede standard Technical Data Package requirements and provide government assurance that items meet reprocessing standards. This requirement applies as a supply chain flow-down mandate to contractors and their suppliers, vendors, and subcontractors. The specification applies to the referenced Air Force solicitation FA821326RB005 for production of MJU-76/B Thrusted Flares under a 5-year Multiaward Contract IDIQ vehicle with a 6th year option, requiring offerors to possess Secret-level security clearance or higher and comply with NISPOM and Industrial Security Regulation guidelines.

View the file

Other files for this federal contract opportunity

Other files attached to MJU-76/B Flare, Countermeasure, newest first.
File Type Posted
Solicitation Amendment - FA821326RB0050003.pdf PDF
Section M final.pdf PDF
Attachment 14 - MJU-76 Ordering Procedures.pdf PDF
Attachment 18 - Example Request for Order Proposal 5-6-25.pdf PDF
Section M final.pdf PDF
Section L final.pdf PDF
TEP worksheet.pdf PDF
Solicitation Amendment - FA821326RB0050002.pdf PDF
Attachment 14 MJU-76 Ordering Procedures.pdf PDF
Solicitation Amendment FA821326RB0050001 SF 30.pdf PDF
Attachment 14 - MJU-76 Ordering Procedures.pdf PDF
Attachment 22 - MJU-76 DD Form 254 Signed.pdf PDF
Attachment 18 - Example Request for Order Proposal 5-6-25.pdf PDF
Attachment 15 Example RFOP Worksheet - MJU-76.pdf PDF
Attachment 8 TransInstruction4.pdf PDF
Attachment 3 ES7035 Description Sheets.docx DOCX document
Attachment 2 WARP 4-19-2018.docx DOCX document
Attachment 19 JQR MJU-76.pdf PDF
Attachment 4 ES6200.pdf PDF
Attachment 21 - Section M v2 1-29-25.doc.pdf PDF
Attachment 20 - Section L v2 1-29-25.doc.pdf PDF
Solicitation - FA821326RB005.pdf PDF
Attachment 9 - ES6925 MSE.pdf PDF
Attachment 23 PHST SOW _HILL_2023.pdf PDF
GFPFA821326RB005_1.pdf PDF
Attachment 16 MJU-76 CDRL List FINAL.pdf PDF
Attachment 13 AFMC 260 FAT MJU-76 2-12-2026.pdf PDF
Attachment 12 EX2024072333-2024074618.pdf PDF
Attachment 7 REPSHIP.pdf PDF
Attachment 6 - ES7650_Oct2000 - MIL-STD-1916.docx DOCX document
Attachment 1 FD2020-24-52553 MJU-76B Air Specv4.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of attachment)

(ES7034)

File details come from the government source that posted it. Updated .