Attachment 3 ES7035 Description Sheets.docx

DOCX document 13 KB Posted

Attached to
MJU-76/B Flare, Countermeasure Federal contract opportunity
Solicitation number
FA821326RB005-Solicitation
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This is a contract data requirement attachment establishing technical standards for energetic material documentation in the MJU-76/B Flare, Countermeasure procurement. The contractor must prepare Energetic Material Description Sheets and Propellant Loading Authorization Sheets in compliance with MIL-STD-1171B, with all documentation submitted through the Worldwide Ammunition-data Repository Program (WARP) system accessible via the Munitions History Program (MHP) network at https://mhp.redstone.army.mil/. These requirements flow down to all subcontractors, suppliers, and vendors engaged in the work.

Data entry into WARP's Description Sheets and Loading Authorizations module is the contractor's responsibility, and typed signatures carry the same legal weight as handwritten signatures, with signatories certifying the accuracy and truthfulness of all submitted information. This clause applies to the multiaward IDIQ contract for production of MJU-76/B Thrusted Flares for U.S. Government and Foreign Military Sales through the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to MJU-76/B Flare, Countermeasure, newest first.
File Type Posted
Solicitation Amendment - FA821326RB0050003.pdf PDF
Section M final.pdf PDF
Attachment 14 - MJU-76 Ordering Procedures.pdf PDF
Attachment 18 - Example Request for Order Proposal 5-6-25.pdf PDF
Section M final.pdf PDF
Section L final.pdf PDF
TEP worksheet.pdf PDF
Solicitation Amendment - FA821326RB0050002.pdf PDF
Attachment 14 MJU-76 Ordering Procedures.pdf PDF
Solicitation Amendment FA821326RB0050001 SF 30.pdf PDF
Attachment 14 - MJU-76 Ordering Procedures.pdf PDF
Attachment 22 - MJU-76 DD Form 254 Signed.pdf PDF
Attachment 18 - Example Request for Order Proposal 5-6-25.pdf PDF
Attachment 15 Example RFOP Worksheet - MJU-76.pdf PDF
Attachment 8 TransInstruction4.pdf PDF
Attachment 2 WARP 4-19-2018.docx DOCX document
Attachment 19 JQR MJU-76.pdf PDF
Attachment 4 ES6200.pdf PDF
Attachment 21 - Section M v2 1-29-25.doc.pdf PDF
Attachment 20 - Section L v2 1-29-25.doc.pdf PDF
Solicitation - FA821326RB005.pdf PDF
Attachment 9 - ES6925 MSE.pdf PDF
Attachment 5 - ES7034 (Rework Repair).docx DOCX document
Attachment 23 PHST SOW _HILL_2023.pdf PDF
GFPFA821326RB005_1.pdf PDF
Attachment 16 MJU-76 CDRL List FINAL.pdf PDF
Attachment 13 AFMC 260 FAT MJU-76 2-12-2026.pdf PDF
Attachment 12 EX2024072333-2024074618.pdf PDF
Attachment 7 REPSHIP.pdf PDF
Attachment 6 - ES7650_Oct2000 - MIL-STD-1916.docx DOCX document
Attachment 1 FD2020-24-52553 MJU-76B Air Specv4.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

ES7035

MIL-STD-1171B, ENERGETIC MATERIAL DESCRIPTION SHEETS AND PROPELLANT LOADING AUTHORIZATION SHEETS

(a) The contractor shall prepare Energetic Material Description Sheets and Propellant Loading Authorization Sheets in accordance with MIL-STD-1171B when mandated by the Contract Data Requirements List (CDRL). The Worldwide Ammunition-data Repository Program (WARP) shall be utilized to store the data sheets required by MIL-STD-1171B. The Munitions History Program (MHP) network located at https://mhp.redstone.army.mil/ must be used to gain access to WARP.

(b) The requirements of MIL-STD 1171B specified in the CDRL is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(c) The contractor is responsible for on-screen entry of the data sheets into the appropriate Description Sheets and Loading Authorizations module located in the WARP system.

(d) The presence of the contractor’s typed signature has the same legal effect and consequences of a handwritten signature. The signatory of the data sheets has the authority to sign for the contractor and certifies the information contained on the data sheets is truthful and accurate as evidenced by release of the typed signature.

(End of clause)

ES7035

File details come from the government source that posted it. Updated .