Attachment 5 - Drawings - PLUMBING EXISTING DEMO GROUND FLOOR.pdf

PDF 18 MB Posted

Attached to
Y1DB--Construct Addition and Renovations - Joint Ambulatory Care Clinic - Pensacola FL
Solicitation number
36C77623R0103
Issued by

About this file

This file is an 18MB drawing attachment related to the federal contract opportunity solicitation number 36C77623R0103 from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation is for the construction addition and renovations for a Joint Ambulatory Care Clinic located in Pensacola, Florida. The drawing attachment provides details on the existing plumbing demolition planned for the ground floor of the facility. Key information in the solicitation includes the required construction services, a response deadline of [DATE], and anticipated award date of [DATE]. Pricing will be fixed-price.

View the file

Other files

File Type Posted
Amendment 0006 - Attachment 01 - 23 64 00 - Packaged Water Chillers.pdf PDF
36C77623R0103 0006.pdf PDF
36C77623R0103 0005 - Attachment 01 - Cooler Specifications.pdf PDF
36C77623R0103 0005.pdf PDF
520-331_JACC_pkg1_Addendum1_20240221.pdf PDF
Attachment - VOL 3 BINDER.pdf PDF
Attachment - VOL 1 BINDER.pdf PDF
Attachment - VOL 2 BINDER.pdf PDF
36C77623R0103 0004.pdf PDF
Attachment - RFI Responses 2.29.2024.xlsx XLSX spreadsheet
Attachment - Limitations on Subcontracting.docx DOCX document
Attachment CON-100 INSTRUCTIONS.docx DOCX document
Attachment - Contractor Safety - Environmental Form.docx DOCX document
Attachment - Pensacola JACC 2nd site visit sign in.pdf PDF
Attachment - RFI Responses 2.20.2024.xlsx XLSX spreadsheet
Attachment - JACC 2005 Geotechnical Report.pdf PDF
Attachment - 520-331_JACC_pkg1_Addendum1_20240209.pdf PDF
36C77623R0103 0003.pdf PDF
2nd Site Visit Instructions - 520-331 JACC Minor Lab Infusion.pdf PDF
36C77623R0103 0002.pdf PDF
Attachment 8 - WD FL20240203 - 1.05.2024.pdf PDF
JACC Minor Site Visit Sign in 1-9-2024.pdf PDF
36C77623R0103 0001.docx DOCX document
520-331.JACC.Pre-Bid.Presentation.010924.Redux.pdf PDF
Attachment 7 - Limitations on Subcontracting.docx DOCX document
Attachment 6 - Drawings ELECTRICAL LIGHTING SECOND FLOOR PLAN.pdf PDF
Attachment 4 - Drawings - ARCHITECTURAL DETAILS - EXTERIOR.pdf PDF
Attachment 10 - Site Visit Instructions - 520-331 JACC.pdf PDF
Attachment 3 - Drawings - CIVIL SIGNAGE AND STRIPING.pdf PDF
Attachment 9 - Brand Name JA JACC Addition 05172023.pdf PDF
36C77623R0103_1.docx DOCX document
Attachment 8 - WD FL20230203 01.13.2023.pdf PDF
Attachment 2 - Drawings - COVER SHEET GI000.pdf PDF
Attachment 1 -Specifications 221007 reduced rev2 -.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E E

D D

C C

B B

A.9 A.9

(E ) 3

/4" C

W

(E ) 1

/2" H

W -R

0°

(E ) 2

" C W

(E ) 2

" H W

0°

(E ) 2

" V

(E) 1/2" HW-R 120°

(E) 1/2" HW 120°

(E) 1/2" CW

(E ) 2

" V

(E ) 2

" V

(E ) 3

/4" H

W

0° (E

) 3 /4"

C W

(E ) 1

1/ 4"

C W

(E ) 1

1/ 4"

H W

0°

(E) 1 1/2" HW-R 120°

(E) 4" CW

(E) 2 1/2" HW 120°(E) 3/4" HW 120°

(E) 3/4" CW

(E) 3" SS

(E) 1/2" HW-R 120°

(E) 1" HW 120°

(E) 1" CW

(E) 3" SS

(E) 1/2" HW 120°

(E) 1/2" CW

(E) 3" SS

(E) 2" V

(E) 2" HW-R 120°

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 1/2" HW-R 120°

(E) 1" HW 120°

(E) 1" CW

(E) 3" SS

(D) 3/4"

(E ) 2

" H W

-R

0°

(E ) 2

1/ 2"

H W

0°

(E ) 4

" C W

(E) 1/2" HW-R 120°

(E) 1/2" CW

(E) 2" SS

(E) 1/2" HW 120°

(E) 3/4" HW 120°

(E) 3/4" CW

(E ) 2

" H W

-R

0°

(E ) 4

" C W

(E ) 2

1/ 2"

H W

0°

(E ) 2

" V

(E ) 1

/2" H

W -R

0°

(E) 3/4" HW 120°

(E) 3/4" CW

(E) 1 1/2" HW-R 120°

(E) 4" CW

(E) 2 1/2" HW 120°

(E) 3/4" CW

(E) 3/4" HW 120°

(E) 1 1/2" HW-R 120°

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 3/4" CW

RETURN EQUIP.

1F110

MACHINE ROOM

1F150

EXAM

1F149

ELEC

1F147

EMG

1F146

VA PT SUPV

1F124

ASSIST CHIEF

1F121

NAVY THER

1F113

NAVY CHIEF

1F125

TLT

1F136

STORAGE

1F157

VA ADMIN

1F119

NAVY THER

1F118

VA KT SUPV

1F123

LCPO

1F122

STAFF LOUNGE

1F120

FEMALE STAFF

LOCKER

1F116

PAT LOCKER ROOM

1F152

PAT LOCKER ROOM

1F153

EXAM

1F148

WORK ROOM

1F109

CONSULT / EXAM

1F107

STORAGE

1F106

SEC

1F105

PROS REP

1F104

TLT

1F103PURCH AGNTS

1F101

TLT

1F117

STORAGE

1F112

MALE STAFF

LOCKER

1F114

VA CLINIC OFFICE

1F102

NAVY TECH OFFICE

1F108

TREATMENT 10

1F126

TREATMENT 9

1F128

TREAMENT 8

1F130

TREATMENT 7

1F132

TREATMENT 6

1F134

TREATMENT 5

1F137

TREATMENT 4

1F139

TREATMENT 3

1F140

TREATMENT 1

1F143

TREATMENT 2

1F141

TREATMENT 12

1F142 TREATMENT WORK

1F138

TREATMENT 13

1F133

TREAMENT 14

1F131

TREATMENT 15

1F129

TREATMENT 16

1F127

WHL / LIT

1F135

TREATMENT 11

1F144

EXAM

1F145

SOILED UTILITY

1F154

EXAM

1F155

RECEPT / CLERK

1F151

CORRIDOR

C1-63

CORRIDOR

1F163

EXERCISE

1F156

CORRIDOR

C1-67

CORRIDOR

C1-60

CORRIDOR

C1-68

CORR

C1-66

C1-65 1F165

CORRIDOR

C162

WHL / LIT

1F159

CORRIDOR

C1-64

TLT

1F115

CORRIDOR

1F168

GRIND

1F111

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. ALL THE EXISTING PIPING SHOWN ON THIS FLOOR PLAN IS

LOCATED IN THE CEILING OF GROUND FLOOR UNLESS NOTED

OTHERWISE.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEY PLAN

LEGEND

GENERAL SHEET NOTES

KEYNOTES

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:0

P

M

PD101F2

PLUMBING EXISTING/DEMOLITION GROUND

FLOOR PLAN - AREA F - DW,SAN,VENT

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F2 PLUMBING DEMOLITION GROUND FLOOR PLAN - AREA F - DW,SAN,VENT

1 REMOVE EXISTING VTR AND CAP IN THE CEILING OF GROUND FLOOR. REFER TO

RENOVATION DRAWINGS FOR VENT PIPE REROUTING.

Revisions: Date:

2022.09.23

10.07.2022

2022.10.07

C C

B B

A.9 A.9

6"

(E ) 1

0" O

SD

4"

3 6"

6"

8"

6"

8"

6"

RETURN EQUIP.

1F110

125 SF

MACHINE ROOM

1F150

34 SF

EXAM

1F149

121 SF

ELEC

1F147

53 SF

EMG

1F146

138 SF

VA PT SUPV

1F124

124 SF

ASSIST CHIEF

1F121

114 SF

NAVY THER

1F113

119 SF

NAVY CHIEF

1F125

129 SF

TLT

1F136

57 SF

STORAGE

1F157

210 SF

VA ADMIN

1F119

127 SF

NAVY THER

1F118

118 SF

VA KT SUPV

1F123

127 SF

LCPO

1F122

112 SF

STAFF LOUNGE

1F120

137 SF

Unoccupied Unoccupied

2 SF

FEMALE STAFF

LOCKER

1F116

173 SF

PAT LOCKER ROOM

1F152

231 SF

PAT LOCKER ROOM

1F153

227 SF

EXAM

1F148

130 SF

WORK ROOM

1F109

157 SF

CONSULT / EXAM

1F107

125 SF

STORAGE

1F106

103 SF

SEC

1F105

82 SF

PROS REP

1F104

91 SF

TLT

1F103

58 SF

PURCH AGNTS

1F101

124 SF

TLT

1F117

42 SF

STORAGE

1F112

11 SF

MALE STAFF

LOCKER

1F114

143 SF

VA CLINIC OFFICE

1F102

403 SF

NAVY TECH OFFICE

1F108

446 SF

TREATMENT 10

1F126

100 SF

TREATMENT 9

1F128

103 SF

TREAMENT 8

1F130

103 SF

TREATMENT 7

1F132

100 SF

TREATMENT 6

1F134

103 SF

TREATMENT 5

1F137

103 SF

TREATMENT 4

1F139

100 SF

TREATMENT 3

1F140

103 SF

TREATMENT 1

1F143

100 SF

TREATMENT 2

1F141

103 SF

TREATMENT 12

1F142

101 SF

TREATMENT WORK

1F138

198 SF

TREATMENT 13

1F133

108 SF

TREAMENT 14

1F131

100 SF

TREATMENT 15

1F129

100 SF

TREATMENT 16

1F127

110 SF

WHL / LIT

1F135

40 SF

TREATMENT 11

1F144

85 SF

EXAM

1F145

145 SF

SOILED UTILITY

1F154

125 SF

EXAM

1F155

149 SF

RECEPT / CLERK

1F151

380 SF

CORRIDOR

C1-63

97 SF

CORRIDOR

1F163

103 SF

EXERCISE

1F156

2508 SF

CORRIDOR

C1-67

98 SF

CORRIDOR

C1-60

599 SF

CORRIDOR

C1-68

460 SF

CORR

C1-66

98 SF

C1-65 1F165

74 SF

CORRIDOR

C162

645 SF

WHL / LIT

1F159

76 SF

CORRIDOR

C1-64

424 SF

TLT

1F115

60 SF

CORRIDOR

1F168

139 SF

GRIND

1F111

92 SF

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. ALL THE STORM PIPING SHOWN ON THIS FLOOR PLAN IS LOCATED

IN THE CEILING OF GROUND FLOOR UNLESS NOTED OTHERWISE.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:1

P

M

PD101F3

PLUMBING EXISTING/DEMOLITION GROUND

FLOOR PLAN - AREA F - STORM

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F3 PLUMBING DEMOLITION GROUND FLOOR PLAN - AREA F - STORM

1 EXISTING 4" STORM DRAIN DOWN

2 REMOVE EXISTING STORM PIPING BACK TO LIMITS OF DEMOLITION AND CAPPED.

3 REMOVE EXISTING STORM PIPING BACK TO LIMITS OF DEMOLITION. REFER TO

RENOVATION PLAN FOR NEW STORM PIPE ROUTING.

4 REMOVE EXISTING ROOF DRAINS AND ASSOCIATED PIPING BACK TO LIMITS OF

DEMOLITION AND CAPPED. REFER TO RENOVATION PLAN FOR NEW STORM PIPE

ROUTING AND ARCHITECTURAL DRAWINGS FOR ROOF RELATED WORK.

Revisions: Date:

2022.09.23

Q.8 Q.8

Q Q

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A.9 A.9

M.9

Q.9 Q.9 R

R

5.2

5.2

5.8

5.8

PD102F

F3 1

ANTE NEG PRES.

2F105

PREP / REC. 16

2D169

ANTE POS PRES.

2D167

CLEAN

2D156 MED

2D160

PREP/REC.7

2F113

PREP/REC.4

2F109

PREP/ REC.1

2F100

CONSULT

2D155

SOIL

2D166

CLEAN

2D162

VIEW DICT

2D164

PREP/REC.15

2F119

TLT.

2F115

TLT

2D158

TLT

2D159

TLT

2D161

PRE/REC.14

2D157

TLT

2F104

TLT

2F103

PREP/REC.3

2F107

PREP / REC.2

2F106 PREP/REC.5

2F110

PREP/REC.6

2F111

PREP/REC.8

2F114 PREP/REC.9

2F116

STAIR #2

STAIR-2-F

CORRIDOR

C2-60

CORRIDOR

C2-62

N.S.

2F108

CORRIDOR

C2-63

NOUR

2F117

N.S.

2F118

CONTR.

2D165

ENDO SURGERY CORRIDOR

C2-66

TLT

2F102

TLT

2F101

CORRIDOR

C2-61

PREP/REC

2F112

RECEPT

2D154

ALCOVE

2D163

CORRIDOR

C2-64

CHIEF OFFICE

2B113

OFFICE

2B111

OFFICE

2B109

OFFIC

2B107

FIT / DISPENS

2B105

TECHS

2B102

STAIR #4

STAIR-4-B

TELECOM PERSON

2B162

TLT

2B104

IVFA

2B110

EXAM 7

2B117

EXAM 10

2B119

EXAM 8

2B123

EXAM 9

2B121

LASER

2B112

STORAGE

2B114

IMS REPAIR / STOR.

2B156

IMS OFF

2B155

IMS OFF

2B154

TEL EQUIP

2B160

COMPUTER

2B157

AUDIOBOOTH

2B136

AUDIOBOOTH

2B135

AUDIOBOOTH

2B134

AUDIOBOOTH

2B131

IMMIT

2B144

CAT

2B130

EXAM 2

2B122

EXAM 3

2B120

EXAM 4

2B118

EXAM 5

2B116

EXAM 6

2B115 HSKP

2B159

TLT

2B158

PHOTOG ROOM

2B125

EXAM 1

2B124

SP OFF

2B129

TLT

2B132

TLT

2B133

CALIBRA

2B146

GROUP THER

2B128

STOR.

2B137

HEAR AID

2B138

ELECTRO / VESTIBUL

2B139

IMMIT

2B147

IMMIT

2B149 STAIR #8

STAIR-8-B

OFFICE

2B145

VIS FLDS

2B108

TLT

2B106

ELECT.

2B150

OFFICE

2B141

OFFICE

2B143

OFFICE

2B142

CLERK

2B101

SUB WAIT

2B103

CORR.

C2-84

CORR.

2B164

CORR.

C2-83

Room 2B126

CLERK

2B148

BIOMED SHOP

2B152

CORR.

2B166

CORR.

C2-80

CORR.

C2-81

CORR.

C2-78

Room 2B168

VESTIBULE

C2-76A

ELEVATOR

ELEV-2-D

Room 2D103

CLOSET

2D174

CLOSET

C2-71A

HSKP.

2D149

ENDO/BRONCH

2D148

SCRUB

C2-66A

CORR

C2-65SCOPE CLEAN

2D145

SCOPE STOR

2D146

ELEC

2D150

MINOR PROCEDURE RM.

2D138EGD / COLONOSCOPY

2D143

MINOR PROCEDURE RM.

2D142

SURGERY

2D122

DECONTAM

2D140

PREP/PACK

2D141

STOR.

2D147

STERILE STOR.

2D144

SECT LDR OFF.

2D106

SURG OFFICE

2D108

VA CONSULT

2D111

DENT OFF.

2D104

TLT

2D105

LOUNGE

2D109

NAVY CONSULT

2D111A

COMM

2D135

CENTRAL SUPPLY

2D123

SOIL

2D121

HSKP

2D101

TLT

2D110 LINEN

2D132

PROSTH. LAB

2D133

PORCLN

2D134

CORR.

C2-77

WAIT

2D100

VA OPER. 10

2D126 XRAY

2D107

X-RAY

2D107A

X-RAY CONTROL

2D112

VA OPER. 7

2D114

VA OPER. 1

2D113

NAVY OPER. 2

2D130

NAVY OPER. 5

2D131

NAVY OPER. 4

2D129

NAVY OPER. 1

2D128

VA OPER. 2

2D116

VA OPER. 5

2D118

NAVY OPER. 3

2D127

VA OPER. 9

2D124

VA OPER. 8

2D125

CORR.

2D172

VA OPER. 4

2D120

VA OPER.

2D117

CORR.

C2-74

CORR

C2-76

CORR.

C2-75

RECEPT/REC/ADP

2D102

CORR.

C2-70 CORR.

C2-69

CORR.

C2-72 VA OPER. 6

2D115

EQ/SPLY ALCOV.

2D139

VESTIBULE

C2-68

BIOMED RECEIVE

2B151

BIOMED STOR

2B153

TEL OP

2B161

CORR.

C2-87

M. LKR/SH/TLT

2D136

STAIR #3

STAIR-3-D

PREP / REC.

2D168

SURGEONS' OFFICE

2D170

OFFICE

2D171

CLERICAL

2D172

F. LKR/SH/TLT

2D137

TRIAGE

2C133

CORR.

C2-84

2E116

2E120

GROUP THERAPY

2E114

TLT

2E108

HAC

2E127

2E110

2E125

2E124

2E112

2E141

2E126

GROUP THERAPY

2E123

GROUP THERAPY

2E122

2E121

2E146

ELEVATOR

ELEV-G

CHIEF OFFICE

2E132

STOR

2E131B

FEM TLT

2E138

SEC

2E134

MHICM SHARED OFF.

2E136

MEN TLT

2E129

TRAINING

2E128

TESTING

2E147

TESTING

2E145

2E144

2E143

2E142

2E140

2E139

2E137

MHICM COORD OFF

2E135 ASST. CHIEF

2E133

2E117

2E118

2E119

2E150

2E148

2E149

COMM

2E106

COM. RES.

2E102

COM. RES.

2E104

GEN SURG 1

2C198

SOIL

2C200

CLEAN

2C202

GROUP CONSUL

2C204

O.T. OFFICE

2E103

HOMELESS CLOTH

2E105EXAM

2E109

EXAM

2E107

2E111

2E115

2E113

GEN SURG 4

2C192

GEN SURG 3

2C194

GEN SURG 2

2C196

ELEC

2E101

TLT

2C205

RECEPT

2E131

VASCULAR LAB

2C191

URO 6

2C176

GYN 1

2C161

URO 5

2C178

GYN 4

2C158

ONCLGY 3

2C142

HOT LAB

2C106

EKG

2C117

ENT 2

2C120

URO 2

2C179

URO 3

2C181

CARDIO PACEMKR

2C105

URO 1

2C177

WOMEN MGR

2C150

TLT

2C206

Room C2-28C

WOMEN ASST

2C153

ECHO

2C116

DOSE ADMN

2C109

CARDIO 2

2C108

MEDS

2C173

URO 4

2C183

NUCLR CONSUL

2C103

SOIL

2C166

CARDIO 4

2C112

NUCL MED 2

2C119

ENT 3

2C118

CARDIO 1

2C107

NUCL MED 1

2C122

CORR

C2-32

CORR

C2-23

CORR

C2-20

CORR

C2-26

CORR

C2-19

CORR

C2-14

Room 2A148

CORR

C2-13

VITALS

2A142

VITALS

2C125

CORR

C2-12

CORR

C2-16

TLT

2C190

GI 4

2C193

GI 3

2C195

GI 2

2C197

GI 1

2C199

CONSULT

2C167

TRIAGE

2C164

TLT

2C160

GYN 2

2C157

CLEAN

2C180

TLT

2C184

TLT

2C182

WOMEN OFFICE

2C155LINEN

2C154

CLEAN

2C152

INSTR PREP

2C185

WOMEN OFFICE

2C156

TLT

2C159

DERM 4

2C145

DERM 2

2C141

DERM 3

2C143

DERM 1

2C139

GYN 3

2C162

PHARM OFF

2C165

TLT

2C163

TLT

2C137

SOIL

2C135

CONSULT

2C131

TLT

2C130

TLT

2C129

ELEC

2C169

EQUIP ACCESS

2C168

STAIR #7

STAIR-7-C

CNTRL

2C188

TLT

2C132

TRIAGE

2C136

TLT

2C134

NUCL WAIT

2C111

PFT

2A147

PULM EXAM

2A145

TLT

2A140

TLT

2A139

NUCL COMP

2C104

TLT

2C113

STAIR #5

STAIR-5-F

CORR

C2-15

ONCLGY 4

2C144

ONCLGY 3

2C142

ONCLGY 2

2C140

CORR

C2-17

VITALS

2C124

CORR

C2-18

CORR

C2-22

CORR

C2-21

MEDS

2C126

ONCLGY 1

2C138

ENT 1

2C123

ENT MICRO

2C121

CORR.

C2-27

VITALS

2C174

Room 2C186

CORR

C2-28

CORR

C2-25

CORR

C2-30

TLT

2C203

TLT

2C201

CORR

2C-33

Room 2C204

CORR

2C-34

RECEPT WORK

2C172

PHOTO THER

2C148

ALCOV

C2-23A

DRESS

2C149

COMM

2A137

GROUP CONSUL

2A135

PHARM OFF

2A138

TRIAGE

2A141

SOIL

2A143

NEURO 3

2A148

NEURO 4

2A150

NEURO 1

2A144

NEURO 2

2A146

SUPP 3

2A127

SUPP 4

2A126

ASMIN OFF 2

2A124ADMIN OFF 1

2A123

SUPP 2

2A128

CORR

C2-09

DIR OFF

2A121 C.O.S. OFF

2A118

SHARING OFF

2A115

PRIM CARE TECH

2A114

OFF/ CONF

2A106

PANTRY/ WAIT

2A108

STOR

2A104

TLT

2A133

CONFERENCE

2A125

HSKP

2A134

PRIM CARE CHIEF

2A113

NURSING CHIEF

2A111 PRIM ADMIN

2A109

NAVY SNR ENL

2A103

NAVY SEC

2A100

Room 2A129

EQUIP

2A132

MED CHIEF

2A112

PRIM CARE SEC

2A110

Room 2A102

CORR

C2-06

CLINIC SEC

2A130

DIRYR SEC

2A116

LINEN

2A152

PULM CPAP

2A149

NEURO EEG

2A151

CORR

C2-08

CORR

2C-11

CORR

C2-03

CORR

C2-02

CORR

C2-01

EQUIP ALCOV

2A122

CORR

C2-05

CORR

C2-04

RECEPT

2C271

ASSOC DIR

2A117

NAVY OIC

2A101

LEAD ADMN

2A107 M A O

2A105

SUPP 1

2A129

2C151 C2-28B

ECHO

2C114

STRESS

2C115

INSTR STOR

2C186

CYSTOSOPY

2C187

ASSOC C.O.S.

2A120

HOME OXYGEN

2A154

STAIR #6

STAIR-6-E

ELEVATOR

ELEV-3

ELEVATOR

ELEV-4

PROCTOSCOPY

2C189

WOMEN OFFICE

2C151

A. THE INTENT OF THIS OVERALL PLAN IS TO INDICATE THE AREAS OF

WORK WITHIN THE EXISTING BUILDING. WORK INDICATED ON

PLANS MAY INTERFERE WITH SPACES NOT DIRECTLY IN PROJECT

SCOPE. CONTRACTOR SHALL NOTIFY THE COR OF ANY SERVICE

INTERRUPTIONS TO UTILITIES AND/OR FUNCTION OF SPACES

OUTSIDE OF THE SCOPE OF THIS PROJECT A MINIMUM OF TWO

WEEKS IN ADVANCE.

B. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 1

(A)

SEC 2

(B)

SEC 3

(C)

SEC 4

(D)

SEC 5

(E)

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:3

P

M

PD102

PLUMBING EXISTING/DEMOLITION SECOND

FLOOR PLAN - OVERALL

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1" = 20'-0"F4 PLUMBING DEMOLITION SECOND FLOOR PLAN - OVERALL

1 REFER TO ENLARGED VIEW FOR MORE INFORMATION.

Revisions: Date:

2022.09.23

C C

B B

A.9 A.9

(E) SD-1

(E) SD-1

(E) SD-1

(E) SD-1 (E) SD-1

(E)3" VTR

(E)3" VTR

(E)2" VTR

(E)2" VTR

(E)2" VTR

2 2

(E)P-801 3

4(E) 1" MA

(E) 3/4" MO2

(E) 2 1/2" MV (E) 2 1/2" MV

(E) 1" MA

(E) 3/4" MO2

(E) 2 1/2" MV

(E) 3/4" MO2

(E) 1" MA

ANTE NEG PRES.

2F105

PREP/REC.7

2F113

PREP/REC.4

2F109

PREP/ REC.1

2F100

PREP/REC.3

2F107

PREP / REC.2

2F106

PREP/REC.5

2F110

PREP/REC.6

2F111

PREP/REC.8

2F114

PREP/REC.9

2F116

STAIR #2

STAIR-2-F

CORRIDOR

C2-60 NOUR

2F117

CORRIDOR

C2-61

PREP/REC

2F112

ELEVATOR

ELEV-G

CHIEF OFFICE

2E132

STOR

2E131B

RECEPT

2E131

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:4

P

M

PD102F

PLUMBING EXISTING/DEMOLITION SECOND

FLOOR PLAN - AREA F

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F3 PLUMBING DEMOLITION SECOND FLOOR PLAN - AREA F

1 EXISTING VTR TO BE REMOVED. REROUTE EXISTING VENT PIPING TO ACCOMMODATE NEW

SECOND FLOOR PLAN. FOR NEW VTR LOCATION REFER TO RENOVATION ROOF PLAN.

2 ROOF DRAIN AND OVERFLOW TO BE REMOVED. ROOF/SLAB TO BE REPAIRED ACCORDING TO

ARCHITECTURAL DRAWINGS. REFER TO RENOVATION PLANS FOR NEW PIPING ROUTING.

3 EXISTING HOSE BIBB AND ASSOCIATED PIPING TO BE REMOVED BACK TO THE LIMITS OF

DEMOLITION IN THE GROUND FLOOR CEILING AND CAPPED. REFER TO SHEET PD101F2 FOR LIMITS

OF DEMOLITION. REPAIR WALL ACCORDING TO ARCHITECTURAL DRAWINGS.

4 REMOVE AND PROPERLY DISPOSE OF EXISTING MED GAS PIPING BACK TO MAIN AND CAP.

COORDINATE AFTER HOURS WORK WITH THE VA COR AND GET PROPER APPROVAL FOR

DOWNTIME.

5 REMOVE AND PROPERLY DISPOSE OF EXISTING MED GAS OUTLETS AND ASSOCIATED PIPING

BACK TO MAIN AND CAP. COORDINATE AFTER HOURS WORK WITH THE VA COR AND GET PROPER

APPROVAL FOR DOWNTIME.

Revisions: Date:

2022.09.23

Q.8 Q.8

Q Q

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A.9 A.9

M.9

Q.9 Q.9 R R

5.2

5.2

5.8

5.8

RETURN EQUIP.

1F110

COMM

1D178

MACHINE ROOM

1F150

EXAM

1F149

ELEC

1F147

EMG

1F146

VA PT SUPV

1F124

ASSIST CHIEF

1F121

NAVY THER

1F113

NAVY CHIEF

1F125

TLT

1F136

STORAGE

1F157

VA ADMIN

1F119

NAVY THER

1F118

VA KT SUPV

1F123

LCPO

1F122

STAFF LOUNGE

1F120

FEMALE STAFF LOCKER

1F116

PAT LOCKER ROOM

1F152

PAT LOCKER ROOM

1F153

EXAM

1F148

WOUNDOSCOPY

1D167

PODIAT EXAM 1

1D169 PODIAT EXAM 2

1D171

TLT

1D173

CLEAN

1D175

LINEN

1D177

WORK ROOM

1F109

CONSULT / EXAM

1F107

STORAGE

1F106

SEC

1F105

PROS REP

1F104

TLT

1F103PURCH AGNTS

1F101

TLT

1F117

STORAGE

1F112

MALE STAFF LOCKER

1F114

GROUP CONSULT

1D165

VA CLINIC OFFICE

1F102

NAVY TECH OFFICE

1F108

TREATMENT 10

1F126

TREATMENT 9

1F128TREAMENT 8

1F130

TREATMENT 7

1F132TREATMENT 6

1F134

TREATMENT 5

1F137TREATMENT 4

1F139

TREATMENT 3

1F140

TREATMENT 1

1F143 TREATMENT 2

1F141

TREATMENT 12

1F142

TREATMENT WORK

1F138

TREATMENT 13

1F133

TREAMENT 14

1F131 TREATMENT 15

1F129

TREATMENT 16

1F127

WHL / LIT

1F135TREATMENT 11

1F144

EXAM

1F145

SOILED UTILITY

1F154

EXAM

1F155

RECEPT / CLERK

1F151

CORRIDOR

C1-63

CORRIDOR

1F163

EXERCISE

1F156

CORRIDOR

C1-67

CORRIDOR

C1-60

CORRIDOR

C1-68

CORR

C1-66

C1-65 1F165

CORRIDOR

C162

WHL / LIT

1F159

CORRIDOR

C1-64

CORR.

C1-71

RECEPT.

1D162

TLT

1F115

CORRIDOR

1F168

GRIND

1F111

PX101F2

F3 1

F3

PX101F1

F3

PX101F3

A. THE INTENT OF THIS OVERALL PLAN IS TO INDICATE THE AREAS OF

WORK WITHIN THE EXISTING BUILDING. WORK INDICATED ON

PLANS MAY INTERFERE WITH SPACES NOT DIRECTLY IN PROJECT

SCOPE. CONTRACTOR SHALL NOTIFY THE COR OF ANY SERVICE

INTERRUPTIONS TO UTILITIES AND/OR FUNCTION OF SPACES

OUTSIDE OF THE SCOPE OF THIS PROJECT A MINIMUM OF TWO

WEEKS IN ADVANCE.

B. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 1

(A)

SEC 2

(B)

SEC 3

(C)

SEC 4

(D)

SEC 5

(E)

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:5

P

M

PX101

PLUMBING GROUND FLOOR PLAN - OVERALL 520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1" = 20'-0"F4 PLUMBING GROUND FLOOR PLAN - OVERALL

Revisions: Date:

1 REFER TO ENLARGED VIEW FOR MORE INFORMATION.

2022.09.23

C C

B B

A.9 A.9

RETURN EQUIP.

1F110

MACHINE ROOM

1F150

EXAM

1F149

ELEC

1F147

EMG

1F146

VA PT SUPV

1F124

ASSIST CHIEF

1F121

NAVY THER

1F113

NAVY CHIEF

1F125

TLT

1F136

STORAGE

1F157

VA ADMIN

1F119

NAVY THER

1F118

VA KT SUPV

1F123

LCPO

1F122

STAFF LOUNGE

1F120

FEMALE STAFF

LOCKER

1F116

PAT LOCKER ROOM

1F152

PAT LOCKER ROOM

1F153

EXAM

1F148

WORK ROOM

1F109

CONSULT / EXAM

1F107

STORAGE

1F106

SEC

1F105

PROS REP

1F104

TLT

1F103PURCH AGNTS

1F101

TLT

1F117

STORAGE

1F112

MALE STAFF

LOCKER

1F114

VA CLINIC OFFICE

1F102

NAVY TECH OFFICE

1F108

TREATMENT 10

1F126

TREATMENT 9

1F128

TREAMENT 8

1F130

TREATMENT 7

1F132

TREATMENT 6

1F134

TREATMENT 5

1F137

TREATMENT 4

1F139

TREATMENT 3

1F140

TREATMENT 1

1F143

TREATMENT 2

1F141

TREATMENT 12

1F142 TREATMENT WORK

1F138

TREATMENT 13

1F133

TREAMENT 14

1F131

TREATMENT 15

1F129

TREATMENT 16

1F127

WHL / LIT

1F135

TREATMENT 11

1F144

EXAM

1F145

SOILED UTILITY

1F154

EXAM

1F155

RECEPT / CLERK

1F151

CORRIDOR

C1-63

CORRIDOR

1F163

EXERCISE

1F156

CORRIDOR

C1-67

CORRIDOR

C1-60

CORRIDOR

C1-68

CORR

C1-66

C1-65 1F165

CORRIDOR

C162

WHL / LIT

1F159

CORRIDOR

C1-64

TLT

1F115

CORRIDOR

1F168

GRIND

1F111

(E) 4" SS

(E) 4" SS

(E) 4" SS

(E) 3" SS

(E) 8" SD

(E) 8" SD

A

PX101F1

B

PX101F1

6" SD

6" SD

6" SD

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. NOT IN SCOPE HATCH SHOWN REFERS TO FLOOR PLAN. NEW

WORK SHWON OUTSIDE THE SCOPE HATCH NECESSARY TO

SERVE FLOORS ABOVE STILL REQUIRED AS SHOWN.

J. PIPING SHOWN ON THIS PLAN IS LOCATED ABOVE CEILING OF

ASSOCIATED FLOOR UNLESS NOTED OTHERWISE.

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:0

P

M

PX101F1

PLUMBING GROUND FLOOR PLAN - AREA F -

UNDER SLAB

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F3 PLUMBING GROUND FLOOR PLAN - AREA F - UNDER SLAB

1 4" NEW SANITARY PIPING TO FLOOR ABOVE.

2 6" STORM PIPING, REFER TO CIVIL PLANS FOR CONTINUATION.

3 CONNECT 4" NEW SANITARY PIPING TO EXISTING SANITARY PIPE VERTICALLY IN

THE CHASE.

12" = 1'-0"A 1F117Toilet & Female Staff Locker

12" = 1'-0"B 1F153 Toilet & Female Staff Locker

Revisions: Date:

2022.09.23

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. NOT IN SCOPE HATCH SHOWN REFERS TO FLOOR PLAN. NEW

WORK SHWON OUTSIDE THE SCOPE HATCH NECESSARY TO

SERVE FLOORS ABOVE STILL REQUIRED AS SHOWN.

J. PIPING SHOWN ON THIS PLAN IS LOCATED ABOVE CEILING OF

ASSOCIATED FLOOR UNLESS NOTED OTHERWISE.

K. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.

E E

D D

C C

B B

A.9 A.9

TREATMENT 11

1F144

TREATMENT 12

1F142

TREATMENT 1

1F143

TREATMENT 2

1F141

TREATMENT 3

1F140

TREATMENT 4

1F139

TREATMENT 5

1F137

TREATMENT 6

1F134

TREATMENT 7

1F132

TREAMENT 8

1F130

TREATMENT 9

1F128

TREATMENT 10

1F126

TREATMENT WORK

1F138

CORRIDOR

C1-63

TLT

1F136

WHL / LIT

1F135 TREATMENT 13

1F133

TREAMENT 14

1F131

TREATMENT 15

1F129

TREATMENT 16

1F127

EXAM

1F145

EMG

1F146

ELEC

1F147 CORRIDOR

1F163

EXAM

1F148

EXAM

1F149

RECEPT / CLERK

1F151

EXAM

1F155

SOILED UTILITY

1F154

PAT LOCKER ROOM

1F153

PAT LOCKER ROOM

1F152

CORRIDOR

C1-67

CORRIDOR

C162

EXERCISE

1F156

NAVY TECH OFFICE

1F108

VA CLINIC OFFICE

1F102 CORR

C1-66

C1-65 1F165

STORAGE

1F112

MALE STAFF LOCKER

1F114

NAVY THER

1F113

NAVY THER

1F118

VA ADMIN

1F119

STORAGE

1F157

CORRIDOR

C1-64

WHL / LIT

1F159

NAVY CHIEF

1F125

VA PT SUPV

1F124

VA KT SUPV

1F123

LCPO

1F122

ASSIST CHIEF

1F121

STAFF LOUNGE

1F120

FEMALE STAFF LOCKER

1F116

TLT

1F117

CORRIDOR

1F168

CORRIDOR

C1-68

TLT

1F115

MACHINE ROOM

1F150

(E) 10" OSD

(E) 8" OSD

(E) 10" OSD

(E) 2" V

(E) 3" SS (E) 3" SS

(E) 3" SS

(E) 3" SS

(E) 2" V

(E) 2" V

(TYP.)

4" SS

3" SS

4" SS(E

) 2

" V

4" S

S

3" S

S

2" SS

3" OSD

3" S

S

3" S

S 2"

S S

(E) 4" SD

(E) 2" V

(E) 2" V(E) 2" V

(E) 3" V

3" SD6

(E) 2" SS

(E) 3" SS

2" SS

3" SS

2" S

S

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

4" SS

4" SS

3" SS

3" SS

2" SS

4" SS

3" SS

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:2

P

M

PX101F2

PLUMBING GROUND FLOOR PLAN - AREA F -

SAN,VENT, STORM

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F3 PLUMBING GROUND FLOOR PLAN - AREA F - SAN,VENT & STORM

1 NEW VENT PIPING TO FLOOR ABOVE.

2 SANITARY PIPING TO FLOOR ABOVE.

3 SANITARY PIPING TO FLOOR BELOW. NEW SANITARY PIPING TO TIE INTO EXISTING

SANITARY PIPING VERTICALLY IN THE CHASE.

4 STORM PIPING UP TO PRIMARY AND OVERFLOW DRAINS.

5 EXISTING PRIMARY STORM PIPE TO FLOOR BELOW.

6 CONNECT NEW STORM PIPING TO EXISTING.

Revisions: Date:

2022.09.23

C C

B B

A.9 A.9

TREATMENT 11

1F144

TREATMENT 12

1F142

TREATMENT 1

1F143

TREATMENT 2

1F141

TREATMENT 3

1F140

TREATMENT 4

1F139

TREATMENT 5

1F137

TREATMENT 6

1F134

TREATMENT 7

1F132

TREAMENT 8

1F130

TREATMENT 9

1F128

TREATMENT 10

1F126

TREATMENT WORK

1F138

CORRIDOR

C1-63

TLT

1F136

WHL / LIT

1F135 TREATMENT 13

1F133

TREAMENT 14

1F131

TREATMENT 15

1F129

TREATMENT 16

1F127

EXAM

1F145

EMG

1F146

ELEC

1F147 CORRIDOR

1F163

EXAM

1F148

EXAM

1F149

RECEPT / CLERK

1F151

EXAM

1F155

SOILED UTILITY

1F154

PAT LOCKER ROOM

1F153

PAT LOCKER ROOM

1F152

CORRIDOR

C1-67

CORRIDOR

C162

EXERCISE

1F156

NAVY TECH OFFICE

1F108

VA CLINIC OFFICE

1F102 CORR

C1-66

C1-65 1F165

STORAGE

1F112

MALE STAFF LOCKER

1F114

NAVY THER

1F113

NAVY THER

1F118

VA ADMIN

1F119

STORAGE

1F157

CORRIDOR

C1-64

WHL / LIT

1F159

NAVY CHIEF

1F125

VA PT SUPV

1F124

VA KT SUPV

1F123

LCPO

1F122

ASSIST CHIEF

1F121

STAFF LOUNGE

1F120

FEMALE STAFF LOCKER

1F116

TLT

1F117

CORRIDOR

1F168

CORRIDOR

C1-68

TLT

1F115

MACHINE ROOM

1F150

(E) 1/2" CW

(E) 1/2" HW 120°

(E) 1/2" HW-R 120°

(E) 2" HW 120°

(E) 2" CW

(E) 1/2" HW-R 120°

(E) 3/4" CW

(E) 1" MV

(E) 3/4" MO2

(E) 3/4" MA

(E) 1 1/2" HW-R 120°

(E) 4" CW (E) 2 1/2" HW 120°

(E) 3/4" CW

(E) 3/4" HW 120°

(E) 4" CW (E) 2 1/2" HW 120°

(E) 2" HW-R 120°

(E) 3/4" MA

(E) 3/4" MO2

(E) 1" MV

(E) 2" HW-R 120°

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 3/4" HW 120°

(E) 3/4" CW

(E) 1/2" HW-R 120°

(E) 1" CW

(E) 1 1/2" HW-R 120°

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 2" HW-R 120°

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 2 1/2" HW 120°

(E) 4" CW

(E) 3/4" HW 120° (E) 3/4" CW

(E) 3/4" HW 120°

(E) 3/4" CW (E) 1/2" HW-R 120°

(E) 1" HW 120°

1" MV

3/4" MO2

3/4" MA

1/2" HW-R

1 1/2" HW

2" CW

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/REISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. NOT IN SCOPE HATCH SHOWN REFERS TO FLOOR PLAN. NEW

WORK SHWON OUTSIDE THE SCOPE HATCH NECESSARY TO

SERVE FLOORS ABOVE STILL REQUIRED AS SHOWN.

J. PIPING SHOWN ON THIS PLAN IS LOCATED ABOVE CEILING OF

ASSOCIATED FLOOR UNLESS NOTED OTHERWISE.

N

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:3

P

M

PX101F3

PLUMBING GROUND FLOOR PLAN - AREA F -

DCW, MED GAS

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1/8" = 1'-0"F3 PLUMBING GROUND FLOOR PLAN - AREA F - DW & MED GAS

1 CONNECT NEW MED GAS PIPING TO EXISTING SYSTEM.

2 DOMESTIC WATER PIPING TO FLOOR ABOVE

3 MEDICAL GAS PIPING TO FLOOR ABOVE.

4 PROVIDE LOCKABLE MEDICAL GAS SHUTOFF VALVE.

Revisions: Date:

2022.09.23

Q.8 Q.8

Q Q

P P

N N

M M

L L

K K

J J

H H

G G

F F

E E

D D

C C

B B

A.9 A.9

Q.9 Q.9 R R

5.2

5.2

5.8

5.8

PX102F1

F3 1

2E116

2E120

GROUP THERAPY

2E114

TLT

2E108

HAC

2E127

2E110

2E125

2E124

2E112

2E141

2E126

GROUP THERAPY

2E123

GROUP THERAPY

2E122

2E121

2E146

ELEVATOR

ELEV-G

ANTE NEG PRES.

2F105

PREP / REC. 16

2D169

ANTE POS PRES.

2D167

CLEAN

2D156 MED

2D160

PREP/REC.7

2F113

PREP/REC.4

2F109

PREP/ REC.1

2F100

CONSULT

2D155

SOIL

2D166

CLEAN

2D162

VIEW DICT

2D164

PREP/REC.15

2F119

TLT.

2F115

TLT

2D158

TLT

2D159

TLT

2D161

PRE/REC.14

2D157

TLT

2F104

TLT

2F103

PREP/REC.3

2F107

PREP / REC.2

2F106 PREP/REC.5

2F110

PREP/REC.6

2F111 TELECOM ROOM

2G145

STAIR

STAIR-F

CORRIDOR

C2-60

CORRIDOR

C2-62

N.S.

2F108

CORRIDOR

C2-63

NOUR

2F117

N.S.

2F118

CONTR.

2D165

ENDO SURGERY CORRIDOR

C2-66

TLT

2F102

TLT

2F101

CORRIDOR

C2-61

PREP/REC

2F112

RECEPT

2D154

ALCOVE

2D163

CORRIDOR

C2-64

CHIEF OFFICE

2B113

OFFICE

2B111

OFFICE

2B109

OFFICE

2B107

FIT / DISPENS

2B105

TECHS

2B102

STAIR #4

STAIR-4-B

TELECOM PERSON

2B162

TLT

2B104

IVFA

2B110

EXAM 7

2B117

EXAM 10

2B119

EXAM 8

2B123

EXAM 9

2B121

LASER

2B112

STORAGE

2B114

IMS REPAIR / STOR.

2B156

IMS OFF

2B155

IMS OFF

2B154

TEL EQUIP

2B160

COMPUTER

2B157

AUDIOBOOTH

2B136

AUDIOBOOTH

2B135

AUDIOBOOTH

2B134

AUDIOBOOTH

2B131

IMMIT

2B144

CAT

2B130

EXAM 2

2B122

EXAM 3

2B120

EXAM 4

2B118

EXAM 5

2B116

EXAM 6

2B115 HSKP

2B160

TLT

2B159

PHOTOG ROOM

2B125

EXAM 1

2B124

SP OFF

2B129

TLT

2B132

TLT

2B133

CALIBRA

2B146

GROUP THER

2B128

STOR.

2B137

HEAR AID

2B138

ELECTRO / VESTIBUL

2B139

IMMIT

2B147

IMMIT

2B149 STAIR

STAIR-B2

OFFICE

2B145

VIS FLDS

2B108

TLT

2B106

ELECT.

2B150

OFFICE

2B141

OFFICE

2B143

OFFICE

2B142

CLERK

2B101

SUB WAIT

2B103

CORR.

C2-84

CORR.

C2-85

CORR.

C2-83

CORRIDOR

C2-82

CLERK

2B148

CORR.

2B166

CORR.

C2-80

CORR.

C2-81

CORR.

C2-78

Room 2B168

ELEVATOR

ELEV-D

Room 2D103

CLOSET

2D174

CLOSET

C2-71A

HSKP.

2D149

ENDO/BRONCH

2D148

SCRUB

C2-66A

CORR

C2-65SCOPE CLEAN

2D145

SCOPE STOR

2D146

ELEC

2D150

MINOR PROCEDURE RM.

2D138EGD / COLONOSCOPY

2D143

MINOR PROCEDURE RM.

2D142

SURGERY

2D122

DECONTAM

2D140

PREP/PACK

2D141

STOR.

2D147

STERILE STOR.

2D144

SECT LDR OFF.

2D106

SURG OFFICE

2D108

VA CONSULT

2D111

DENT OFF.

2D104

TLT

2D105

LOUNGE

2D109

NAVY CONSULT

2D111A

COMM

2D135

CENTRAL SUPPLY

2D123

SOIL

2D121

HSKP

2D101

TLT

2D110 LINEN

2D132

PROSTH. LAB

2D133

PORCLN

2D134

CORR.

C2-77

WAIT

2D100

VA OPER. 10

2D126 XRAY

2D107

X-RAY

2D107A

X-RAY CONTROL

2D112

VA OPER. 7

2D114

VA OPER. 1

2D113

NAVY OPER. 2

2D130

NAVY OPER. 5

2D131

NAVY OPER. 4

2D129

NAVY OPER. 1

2D128

VA OPER. 2

2D116

VA OPER. 5

2D118

NAVY OPER. 3

2D127

VA OPER. 9

2D124

VA OPER. 8

2D125

CORR.

2B167

VA OPER. 4

2D120

VA OPER.

2D117

CORR.

C2-74

CORR

C2-76

CORR.

C2-75

RECEPT/REC/ADP

2D102

CORR.

C2-70 CORR.

C2-69

CORR.

C2-72 VA OPER. 6

2D115

EQ/SPLY ALCOV.

2D139

VESTIBULE

C2-68

BIOMED RECEIVE

2B151

TEL OP

2B161

CORR.

C2-87

VESTIBULE

2G117A

CORRIDOR

C2-99

LAB OFFICE

2G125

CORRIDOR

C2-101

MED ROOM

2G142

TREATMENT 9

2G135J

TREATMENT 8

2G135I

TREATMENT 7

2G135H

TREATMENT 4

2G135E

TREATMENT 1

2G135B

TREATMENT 2

2G135C

SPECIMEN 05

2G110

SPECIMEN 03

2G106

SPECIMEN 02

2G104SPECIMEN 01

2G102

SPECIMEN 08

2G105

SPECIMEN 07

2G107

SPECIMEN 06

2G109

SPECIMEN 10

2G115

SPECIMEN 09

2G113

SPECIMEN DROP OFF

2G111

LAB OFFICE TOUCHDOWN

2G123

SPECIMEN 04

2G108

CONFERENCE/ BREAK ROOM

2G143 TREATMENT 3

2G135D

TREATMENT 6

2G135G

TREATMENT 5

2G135F

COLD STORAGE

2G121

NEG. PRESSURE LAB

MICROBIOLOGY

2G122

INFUSION CLINIC

2G135

EXAM / CONSULT

2G136

PHLEBOTOMY

2G101

M. LKR/SH/TLT

2D136

PREP / REC.

2D168

SURGEONS' OFFICE

2D170

OFFICE

2D171

CLERICAL

2D172

F. LKR/SH/TLT

2D137

STAIR #3

STAIR-3-D

CONSULT

2G128

CONSULT

2G129

CORRIDOR

C2-97

SOILED UTILITY

2G140

STERILE SUPPLY

2G141BULK STORAGE

2G120

WAITING ROOM

2G133 RECEPTION

2G134

STERILE SUPPLY

2G119

RESTROOM

2G100A

RECEPTION

2G103

WAITING ROOM

2G100

CHIEF OFFICE

2E132

STOR

2E131B

FEM TLT

2E138

SEC

2E134

MHICM SHARED OFF.

2E136

MEN TLT

2E129

TRAINING

2E128

TESTING

2E147

TESTING

2E145

2E144

2E143

2E142

2E140

2E139

2E137

MHICM COORD OFF

2E135 ASST. CHIEF

2E133

2E117

2E118

2E119

2E150

2E148

2E149

COMM

2E106

COM. RES.

2E102

COM. RES.

2E104

GEN SURG 1

C1-91UUUU

SOIL

C1-91WWWW

CLEAN

C1-91XXXX

GROUP CONSUL

C1-91BBBBB

O.T. OFFICE

2E103

HOMELESS CLOTH

2E105

EXAM

2E109

EXAM

2E107

2E111

2E115

2E113

GEN SURG 4

C1-91OOOO

GEN SURG 3

C1-91QQQQ

GEN SURG 2

C1-91SSSS

ELEC

2E101

TLT

C1-91CCCCC TLT

C1-91DDDDD

RECEPT

2E131

TREATMENT 10

2G135K

NURSE STATION

2G135A

Room C1-91M

WOMEN ASST

2C153

INSTR STOR

2C186

EKG

2C117ECHO

C1-91CC

HOT LAB

C1-91QQ DOSE ADMN

C1-91RR

CARDIO 2

C1-91GG

ONCLGY 3

C1-91II

ENT 2

C1-91JJ

GYN 4

C1-91H

MEDS

C1-91GGGG

URO 2

C1-91RRR

URO 3

C1-91PPP

URO 4

C1-91NNN

CARDIO PACEMKR

C1-91DD

NUCLR CONSUL

C1-91XX

URO 1

C1-91TTT

URO 6

C1-91UUU

GYN 1

C1-91XXX

URO 5

C1-91SSS

2C151

C1-91L TRIAGE

C1-91X

SOIL

C1-91AA

CARDIO 4

C1-91LL

NUCL MED 2

C1-91PP

ENT 3

C1-91KK

ECHO

C1-91MM

STRESS

C1-91OO

CARDIO 1

C1-91EE

NUCL MED 1

C1-91TT

CORR

C1-91DDDD

CORR

C1-91GGG

CORR

C1-91HHH

CORR

C1-91YY

CORR

C1-91VV

Room 2A148

CORR

C1-91UU

VITALS

2A142

VITALS

2C125

CORR

C2-12

CORR

C2-16

TLT

2C190

GI 4

C1-91PPPP

GI 3

C1-91RRRR

GI 2

C1-91TTTT

GI 1

C1-91VVVV

CONSULT

C1-91FFFF

TRIAGE

C1-91EEEE

TLT

C1-91YYY

GYN 2

C1-91ZZZ

CLEAN

C1-91QQQ

TLT

C1-91OOO TLT

C1-91HHHH

WOMEN OFFICE

C1-91AAAA

LINEN

2C154

CLEAN

C1-91KKKK

INSTR STOR

C1-91MMMM

INSTR PREP

C1-91LLLL

WOMEN OFFICE

C1-91I

TLT

C1-91G

DERM 4

C1-91P

DERM 2

C1-91U

DERM 3

C1-91R

DERM 1

C1-91V

GYN 3

C1-91J

PHARM OFF

C1-91K

TLT

C1-91BBB

TLT

C1-91EEE

SOIL

C1-91DDD

CONSULT

C1-91Z

TLT

C1-91CCC TLT

C1-91BB

ELEC

2C169

EQUIP ACCESS

2C168

STAIR #7

STAIR-7-C

CYSTOSOPY

C1-91CCCC

CNTRL

C1-91MMM

TLT

C1-91AAA

TRIAGE

C1-91Y

TLT

C1-91ZZ

NUCL WAIT

C1-91SS

PFT

2A147

PULM EXAM

2A145

TLT

2A140

TLT

2A139

NUCL COMP

2C104

TLT

C1-91WW

STAIR #5

STAIR-5-F

CORR

C1-91NN

ONCLGY 4

C1-91Q

ONCLGY 3

C1-91S

ONCLGY 2

C1-91T

CORR

C1-91III

VITALS

2C124

CORR

C1-91JJJ

CORR

C2-22

CORR

C2-21

MEDS

2C126

ONCLGY 1

C1-91W

ENT 1

C1-91FF

ENT MICRO

C1-91HH

CORR.

C1-91BBBB

VITALS

C1-91VVV

Room

C1-91JJJJ

CORR

C1-91IIII

CORR

C1-91WWW

TLT

C1-91YYYY

TLT

C1-91ZZZZ

CORR

2C-33

CORR

2C-34

RECEPT WORK

2C172

PHOTO THER

C1-91O

ALCOV

C1-91FFF

DRESS

C1-91N

COMM

2A137

GROUP CONSUL

2A135

PHARM OFF

2A138

TRIAGE

2A141

SOIL

2A143

NEURO 3

C1-91LLL

NEURO 4

2A150

NEURO 1

2A144

NEURO 2

2A146

SUPP 3

2A127

SUPP 4

2A126

ASMIN OFF 2

2A124

ADMIN OFF 1

2A123

SUPP 2

2A128

CORR

C2-09

ASSOC C.O.S.

2A120

DIR OFF

2A121 C.O.S. OFF

2A118

SHARING OFF

2A115

PRIM CARE TECH

2A114

OFF/ CONF

2A106

PANTRY/ WAIT

2A108

STOR

2A104

TLT

2A133

CONFERENCE

2A125

HSKP

2A134

PRIM CARE CHIEF

2A113

NURSING CHIEF

2A111 PRIM ADMIN

2A109

NAVY SNR ENL

2A103

NAVY SEC

2A100

Room 2A129

EQUIP

2A132

MED CHIEF

2A112

PRIM CARE SEC

2A110

Room 2A102

CORR

C2-06

CLINIC SEC

2A130

DIRYR SEC

2A116

LINEN

2A152

HOME OXYGEN

2A154

PULM CPAP

2A149

NEURO EEG

2A151

CORR

C2-08

CORR

2C-11

CORR

C2-03

CORR

C2-02

CORR

C2-01

EQUIP ALCOV

2A122

CORR

C2-05

CORR

C2-04

RECEPT

2C271

ELECTRICAL

2G131

HAC

2G132

STAIR #6

STAIR-6-E

ELEVATOR

ELEV-3

ELEVATOR

ELEV-4

PROCTOSCOPY

2C189

RESTROOM

2G114

RESTROOM

2G116

RESTROOM

2G112

STAFF RESTROOM

2G126

CORE LAB

2G117

STAFF RESTROOM

2G144

LAB OFFICE

2G127

RESTROOM

2G118

RESTROOM

2G139

ADMIN SUPPORT

2G137

RESTROOM

2G138

ASSOC DIR

2A117

NAVY OIC

2A101

LEAD ADMN

2A107

M A O 2A105

SUPP 1

C1-91KKK

VASCULAR LAB

C1-91NNNN

WOMEN OFFICE

2C151

FILE CLOSET

2G130

PX102F3

F3

PX102F2

F3

A. THE INTENT OF THIS OVERALL PLAN IS TO INDICATE THE AREAS OF

WORK WITHIN THE EXISTING BUILDING. WORK INDICATED ON

PLANS MAY INTERFERE WITH SPACES NOT DIRECTLY IN PROJECT

SCOPE. CONTRACTOR SHALL NOTIFY THE COR OF ANY SERVICE

INTERRUPTIONS TO UTILITIES AND/OR FUNCTION OF SPACES

OUTSIDE OF THE SCOPE OF THIS PROJECT A MINIMUM OF TWO

WEEKS IN ADVANCE.

B. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

N

SEC 1

(A)

SEC 2

(B)

SEC 3

(C)

SEC 4

(D)

SEC 5

(E)

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:1

:4

P

M

PX102

PLUMBING SECOND FLOOR PLAN - OVERALL 520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1" = 20'-0"F4 PLUMBING SECOND FLOOR PLAN - OVERALL

1 REFER TO ENLARGED VIEW FOR MORE INFORMATION.

Revisions: Date:

2022.09.23

AREA OF NO WORK, FACILITY TO REMAIN OPERATIONAL

MATCHLINE

1 HR FIRE AND SMOKE BARRIER

2 HR FIRE AND SMOKE BARRIER

SMOKE RATED PARTITION / SMOKE BARRIER /

COMPARTMENT

1 HR FIRE RATED PARTITION

2 HR FIRE RATED PARTITION

EXPANSION JOINT

DEDUCTIVE ALTERNATE

UNRATED PARTITION

KEYNOTES

KEY PLAN

LEGEND

GENERAL SHEET NOTES

LAB WASTE NOTE

LAB EQUIPMENT HAS BEEN COORDINATED WITH

VENDOR AND NONE OF THE INTENDED EQUIPMENT

WILL DISCHARGE HAZARDOUS WASTE INTO THE

SANITARY SYSTEM. ADDITIONALLY, INTENDED LAB

EQUIPMENT DISCHARGE IS ABLE TO DISCHARGE INTO

THE SANITARY WASTE SYSTEM WITHOUT PH

TREATMENT.

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE

CONTAMINATION.

F. ANY EXISTING SANITARY, VENT, DOMESTIC WATER, MEDGAS, OR

ROOF DRAIN PIPING/RISER FROM FLOOR BELOW SHALL BE

RELOCATED OR REROUTED AS NECESSARY THROUGH NEW WALLS

OR CHASES.

G. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEG WILL BE

NO LONGER THAN TWICE THE DIAMETER OF THE PIPE LEFT IN ANY

PIPING WITHIN THE AREA OF WORK.

H. EXISTING BUILDING UTILITIES SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION. CONTRACTOR SHALL UTILIZE EXISTING

SHUT-OFF VALVES OR INSTALL NEW IN ORDER TO ISOLATE WATER

PIPING.

I. NOT IN SCOPE HATCH SHOWN REFERS TO FLOOR PLAN. NEW

WORK SHOWN OUTSIDE THE SCOPE HATCH NECESSARY TO

SERVE FLOORS ABOVE STILL REQUIRED AS SHOWN.

J. SANITARY PIPE SHOWN ON THIS PLAN IS LOCATED BELOW THE 2ND

FLOOR SLAB, UNLESS NOTED OTHERWISE. VENT AND STORM

PIPING SHOWN ON THIS PLAN IS LOCATED IN THE SECOND FLOOR

CEILING, UNLESS NOTED OTHERWISE.

TREATMENT 8

2G135I

TREATMENT 7

2G135H

TREATMENT 4

2G135E

TREATMENT 3

2G135D

TREATMENT 6

2G135G

TREATMENT 5

2G135F

EXAM / CONSULT

2G136

ADMIN SUPPORT

2G137

4" SS

2" SS

3" SS

3" FCO

E E

D D

C C

B B

A.9 A.9

P-608

P-103 P-418

P-418 P-418 P-103

P-418

P-418

P-103

P-103

P-418 P-502

P-418 P-708

P-104

P-401

P-418P-103

P-418

P-103

P-103

P-418

P-418

P-103

ELEVATOR

ELEV-G

ANTE NEG PRES.

2F105

PREP/REC.7

2F113

PREP/REC.4

2F109

PREP/ REC.1

2F100

PREP/REC.3

2F107

PREP / REC.2

2F106

PREP/REC.5

2F110

PREP/REC.6

2F111 TELECOM ROOM

2G145

STAIR

STAIR-F

CORRIDOR

C2-60

NOUR

2F117

CORRIDOR

C2-61

PREP/REC

2F112

VESTIBULE

2G117A

CORRIDOR

C2-99

LAB OFFICE

2G125

CORRIDOR

C2-101

MED ROOM

2G142

TREATMENT 9

2G135J

TREATMENT 8

2G135I

TREATMENT 7

2G135H

TREATMENT 4

2G135E

TREATMENT 1

2G135B

TREATMENT 2

2G135C

SPECIMEN 05

2G110

SPECIMEN 03

2G106

SPECIMEN 02

2G104

SPECIMEN 01

2G102

SPECIMEN 08

2G105

SPECIMEN 07

2G107

SPECIMEN 06

2G109

SPECIMEN 10

2G115

SPECIMEN 09

2G113

SPECIMEN DROP

OFF

2G111

LAB OFFICE

TOUCHDOWN

2G123

SPECIMEN 04

2G108

CONFERENCE/

BREAK ROOM

2G143

TREATMENT 3

2G135D

TREATMENT 6

2G135G

TREATMENT 5

2G135F

COLD STORAGE

2G121

NEG. PRESSURE

LAB

MICROBIOLOGY

2G122

INFUSION CLINIC

2G135

EXAM / CONSULT

2G136

PHLEBOTOMY

2G101

CONSULT

2G128

CONSULT

2G129

CORRIDOR

C2-97

SOILED UTILITY

2G140

STERILE SUPPLY

2G141

BULK STORAGE

2G120

WAITING ROOM

2G133

RECEPTION

2G134

STERILE SUPPLY

2G119

RESTROOM

2G100A

RECEPTION

2G103

WAITING ROOM

2G100

STOR

2E131B

TREATMENT 10

2G135K

NURSE STATION

2G135A

ELECTRICAL

2G131

HAC

2G132

RESTROOM

2G114

RESTROOM

2G116

RESTROOM

2G112

STAFF RESTROOM

2G126

CORE LAB

2G117

STAFF RESTROOM

2G144

LAB OFFICE

2G127

RESTROOM

2G118

RESTROOM

2G139

ADMIN SUPPORT

2G137

RESTROOM

2G138

FILE CLOSET

2G130

P-708

P-531

P-531

P-528

P-418

P-418

P-531

P-418

P-418

P-418 P-708

P-531

FD-F

P-418

P-531

FD-R

FD-R

FD-F

P-418

P-708

2" V

1 1/2" V P-812

P-521

P-813

P-813

3" FCO

P-813

P-813

P-813

P-813

3" OSD

3" SD

P-528

1 1/2" V

FD-S

FD-M

FD-M

ANALYZER

ANALYZER

N

SEC 6

(F)

JACC KEYPLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C THE A&E GROUP

4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609

(813) 261 1023

MAT PERKINS

B

IM

/5

-3

C o n s tr u c t R e n o v a ti o n a n d

A d d it io n t o

J A

C C

P e n s a c o la /5

-2

.J

A C

C .P a c k a g e .M

E P

F

R

.r v t

/2

/2

:2

:0

P

M

PX102F1

PLUMBING SECOND FLOOR PLAN - AREA F - SAN,

VENT & STORM

520-331

JACC-2F

09.26.2022 NPS MES

ISSUED FOR

CONSTRUCTION

CONSTRUCT ADDITION AND

RENOVATIONS TO JACC

790 Veterans Way, Pensacola, FL 32503

1 NEW VENT PIPING FROM FLOOR BELOW TO VENT THROUGH ROOF.

2 STORM AND STORM OVERFLOW PIPING TO FLOOR BELOW.

3 SANITARY PIPING TO FLOOR BELOW.

4 NEW DOWNSPOUT LOCATION. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.

5 NEW VENT PIPING TO VENT THROUGH ROOF.

6 CONNECT NEW VENT PIPING TO EXISTING VENT PIPING IN THE CEILING OF GROUND FLOOR.

7 PROVIDE WALL DRAIN BELOW COUNTER FOR LAB EQUIPMENT. REFER TO DETAILS C5 AND D5 ON

SHEET Q-401F FOR ELEVATIONS.

8 FLOOR SINK FOR SUPPLY WATER DRAIN VALVES

9 PROVIDE CONTROLLER TO SHUT OFF DW TO STAFF RESTROOM 2G126. CONTROLLER SHALL BE

LOW VOLTAGE. CONTROLLER SHALL CLOSE SUPPLY VALVES AND OPEN DRAIN VALVES. BASIS OF

DESIGN IS ISMET DLA-LVL-K-F-5-2-2.

10 STORM AND STORM OVERFLOW PIPING DOWN TO SECOND FLOOR CEILING FROM LOWER ROOF

DRAIN.

11 PROVIDE FUNNEL DRAIN FOR COLD STORAGE COOLER CONDENSATE.

12 SHOWN FOR REFERENCE ONLY. REFER TO SHEET Q-401F FOR ADDITIONAL INFORMATION.

1/8" = 1'-0"F3 PLUMBING SECOND FLOOR PLAN - AREA F - SAN,VENT & STORM

Revisions: Date:

2022.09.23

B F

P

BFP

E E

D D

C C

B B

A.9 A.9

P-608

P-103 P-418

P-418 P-418 P-103

P-418

P-418 P-103

P-103

P-418

P-502

P-418 P-708

P-104

P-401

P-418

P-103

P-418 P-103

P-103

P-418

P-418P-103

ELEVATOR

ELEV-G

ANTE NEG PRES.

2F105

PREP/REC.7

2F113

PREP/REC.4

2F109

PREP/ REC.1

2F100

PREP/REC.3

2F107

PREP / REC.2

2F106

PREP/REC.5

2F110

PREP/REC.6

2F111

TELECOM ROOM

2G145

STAIR

STAIR-F

CORRIDOR

C2-60

NOUR

2F117

CORRIDOR

C2-61

PREP/REC

2F112

VESTIBULE

2G117A

CORRIDOR

C2-99

LAB OFFICE

2G125

CORRIDOR

C2-101

MED ROOM

2G142

TREATMENT 9

2G135J

TREATMENT 8

2G135I

TREATMENT 7

2G135H

TREATMENT 1

2G135B

TREATMENT 2

2G135C

SPECIMEN 05

2G110

SPECIMEN 03

2G106

SPECIMEN 02

2G104

SPECIMEN 01

2G102

SPECIMEN 08

2G105

SPECIMEN 07

2G107

SPECIMEN 06

2G109

SPECIMEN 10

2G115

SPECIMEN 09

2G113

SPECIMEN DROP

OFF

2G111

LAB OFFICE

TOUCHDOWN

2G123

SPECIMEN 04

2G108

CONFERENCE/

BREAK ROOM

2G143

TREATMENT 3

2G135D

TREATMENT 5

2G135F

COLD STORAGE

2G121

NEG. PRESSURE

LAB

MICROBIOLOGY

2G122

INFUSION CLINIC

2G135

EXAM / CONSULT

2G136

PHLEBOTOMY

2G101

CONSULT

2G128

CONSULT

2G129

CORRIDOR

C2-97

SOILED UTILITY

2G140

STERILE SUPPLY

2G141

BULK STORAGE

2G120

WAITING ROOM

2G133

RECEPTION

2G134

STERILE SUPPLY

2G119

RESTROOM

2G100A

RECEPTION

2G103

WAITING ROOM

2G100

STOR

2E131B

TREATMENT 10

2G135K

NURSE STATION

2G135A

ELECTRICAL

2G131

HAC

2G132

RESTROOM

2G114

RESTROOM

2G116

RESTROOM

2G112

STAFF RESTROOM

2G126

CORE LAB

2G117

STAFF RESTROOM

2G144

LAB OFFICE

2G127

RESTROOM

2G118

RESTROOM

2G139

ADMIN SUPPORT

2G137

RESTROOM

2G138

FILE CLOSET

2G130

P-708

P-531

P-531

P-528

P-418

P-418

P-531

P-418

P-418

P-418 P-708

P-531

FD-F

P-418

P-531

FD-R

FD-R

FD-F

11" CW1" HW

1/2" HW-R

1 1/2" HW

2" CW

1/2" HW-R

1 1/2" HW

2" CW

1/2" HW-R

1 1/4" HW

2" CW

1/2" HW-R

1" HW

2" CW

1/2" HW-R

1" HW

2" CW

P-418

P-708

P-812

P-521

P-813 5

5 P-813

P-813

P-8135

P-813

P-813 5

TREATMENT 6

2G135G

TREATMENT 4

2G135E

CORE LAB

2G117

6 7

P-528

A. EXISTING CONDITIONS ARE BASED ON FIELD OBSERVATIONS AND

'AS-BUILT' DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS AND REPORT DISCREPANCIES TO ENGINEER

PRIOR TO DISTURBING EXISTING INSTALLATION.

B. CONTRACTOR SHALL FIELD VERIFY ALL CONNECTION POINTS TO

EXISTING SYSTEM PIPING AND IDENTIFY ALL RISERS AFFECTED.

C. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE

COORDINATED WITH COR.

D. COORDINATE NEW EQUIPMENT INSTALLATION WITH ALL EXISTING

COMPONENTS TO REMAIN.

E. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,

THOROUGHLY CLEANED, AND SANITIZED TO AVOID…