Attachment 2 - Drawings - COVER SHEET GI000.pdf
PDF 18 MB Posted
- Solicitation number
- 36C77623R0103
About this file
This document provides details for a federal contract opportunity to construct an addition and renovations project. The solicitation number is 36C77623R0103 and seeks offers for the Y1DB project to construct an addition and renovations to the Joint Ambulatory Care Clinic located in Pensacola, Florida. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The related file is an 18MB drawing attachment to the solicitation covering site plans and technical specifications for the construction work required. Responses to the solicitation are due based on the specified response dates.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs GULF COAST VETERANS HEALTH CARE SYSTEM, PENSACOLA VA CLINIC
790 Veterans Way, Pensacola, FL 32503
520-331
CONSTRUCT ADDITION AND RENOVATIONS TO JOINT AMBULATORY
CARE CENTER - LABORATORY AND INFUSION CLINIC
TRIPLE C THE A&E GROUP
4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609
(813) 261 1023
MAT PERKINS
10.07.2022
B
IM
/5
-3
C o n s tr u c t R e n o v a ti o n a n d A d d it io n t o
J A
C C
P e n s a c o la
/5
-3
.J A
C C
.P a c k a g e
.A
R C
H .r v t
/1 /2
:3
:5
P M
GI000
COVER SHEET 520-331
JACC-2F
10.07.2022 M. PERKINS C. LOWERY
ISSUED FOR
CONSTRUCTION
CONSTRUCT ADDITION AND
RENOVATIONS TO JACC
790 Veterans Way, Pensacola, FL 32503
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
.0
.2
THERE IS NO LEAD PAINT OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE __________________________09.01.2022 DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
Section 01 00 00
1.3 STATEMENT OF BID ITEM(S)
A. Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for the Veterans Affairs Gulf Coast Health Care System, Project 520-331, Construct Addition and Renovations to Joint Ambulatory Care Center, Pensacola, FL, Addition & Renovation as required by drawings and specifications.
Period of performance is projected to be no greater than 540 calendar days. The work will require construction of 11,731 sf of Addition onto the existing roof of a ~207,191 SF building. This includes the addition of a new chiller tower (CT-3) in the mechanical yard, and replacement of the water chiller (CH-3) and associated pumps in existing mechanical room 1B179. The programs that will be supported in this addition will support Phlebotomy and Laboratory Services and the Infusion Clinic. There is also ~92,000 SF of surface parking to be constructed in the existing grass areas in the parking lot. The existing building shall remain operational during the entirety of the construction project.
B. The construction shall be Phased as follows below. Each Phase shall be completed in its entirety, for all disciplines, from demolition to final punch-walk and acceptance by the VA, prior to the commencement of the subsequent Phase. The Contractor shall prepare and submit their own Phasing Plan along with the Interim Life Safety Plans and Construction Schedule, to show accommodation of these phases. Period of performance not to exceed 18 months for all phases. Phases 2A and 2B shall be completed concurrently with Phase 1. Two weeks minimum required between Phase 2A and Phase 2B to allow for traffic patterns and parking to be shifted.
1. Phase 1:
a. Perform all scope of work associated with “Area F” – the Phlebotomy, Blood Draw, Core Lab, Infusion Clinic, and Associated Spaces. Include all associated scope of work with Ahu-2-N being installed on the third floor mechanical space. Also include all scope of work associated with the installation of new Chiller Tower 3, in the existing mechanical yard, and replacement of water Chiller 3 (CH-3).
Contractor to provide proposed phasing and construction timeline plan for review and approval by the VA.
2. Phase 2A:
a. Perform all scope of work associated with new parking lot areas A and C. Coordinate any required shutdowns to adjacent parking lot areas with the COR – plan work to minimize the number of required shutdowns during operating hours. Period of Performance not to exceed 6 months. Work to be performed concurrently with Phase 1.
3. Phase 2B:
a. Perform all scope of work associated with new parking lot area B. Coordinate any required shutdowns to adjacent parking lot areas with the COR – plan work to minimize the number of required shutdowns during operating hours. Period of Performance not to exceed 6 months. Work to be performed concurrently with Phase 1. Two weeks minimum required between Phase 2A and 2B to allow for traffic patterns and parking to be shifted.
C. Work includes general construction, alterations, and certain other items. Contractor shall provide services but not limited to furnish all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition, replacement, and construction as required by specifications and drawings, including basis of design established in 09 06 00 SCHEDULE OF FINISHES.
D. Electrical Work: Electrical work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including materials and construction equipment to provide new electrical, communications and security systems to the new addition detailed by the construction drawings and specifications.
a. All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) per Specification 01 91 00.
E. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements.
F. Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.
1. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the HVAC shop as detailed by the mechanical control drawings and specifications.
2. All controls, fire systems, security systems, etc. shall be an extension of the existing, in-place systems. Coordinate extensions and parts with the existing system manufacturers to ensure compatibility and continuity between existing and new parts of the whole system.
G. New Fire Protection systems shall be an extension of the existing systems per the construction drawings and specifications.
H. Contractor shall reconfigure existing plumbing piping and provide new plumbing piping and fixtures as required by the construction drawings and specifications.
I. Site Work: Site work includes all labor, material, equipment and supervision to perform the required hardscape and landscape construction work on this project including materials and construction equipment to provide new concrete walkways, planting beds, artificial turf, fencing, trees and additional landscape materials to the building addition detailed by the construction drawings and specifications.
1. Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor.
J. Inspections: Comprehensive Third-Party inspections, testing and written reports for all Divisions are required and paid for by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract. All new and existing systems, including mechanical, electrical, plumbing, and fire protection, within the scope of work are required to be inspected.
ACOR: Craig Crawley Capital Asset Coordinator Gulf Coast Veterans Healthcare System Phone: 228-523-4677
COR: Tess Finnegan
GCVHCS - ENGINEERING OFFICE (138)
Phone: 228-523-5365
PROJECT DATA:PROJECT TEAM
OWNER ARCHITECT:
Triple C - The A/E Group 4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609 813-261-1023 Mat Perkins - Project Manager mat.perkins@triplecaeg.com Caleb Lowery - Project Architect caleb.lowery@triplecaeg.com Lauren Bell - Project Interior Designer
Lauren.bell@triplecaeg.com Kelly Struble - Project Civil Engineer kelly.struble@triplecaeg.com
MEPF & CxA Engineers:
MES Group, Inc.
550 N Reo Street, Suite 203 Tampa, FL 33609 813-289-4700 Nick Stephenson - Mechanical Engineer
Nick.Stephenson@mesgroupinc.com Sary.Chhoeung -sary.chhoeung@mesgroupinc.com Taylor Rinaldi -taylor.rinaldi@mesgroupinc.com
Structural Engineer:
PROJECT SCOPE:
C&S Companies 2203 N Lois Avenue, STE 400 Tampa, FL 33607
(813) 434-4997 Juan Lozoya - Structural Engineer
Jlozoya@cscos.com
ADDRESS:
Joint Ambulatory Care Center (JACC) 790 Veterans Way, Pensacola, FL 32503
SQUARE FOOTAGE:
EXISTING TOTAL BUILDING AREA: 207,191 GSF
ADDITIONAL NEW BUILDING AREA: 11,731 GSF
ADDITIONAL NEW PARKING AREA: ~92,000 SF
STORIES: 3 STORIES (EXT'G)
PENSACOLA BAY
292 - GULF BEACH HWY
I-1 0H
W Y
HWY 98
PROJECT LOCATION
VICINITY MAP
NTS
H W
Y
US HWY 98
S
S
T A
V E
W N
AVY B
LVD
S
FAIR
FIE
LD
D R
CHIEF'S
WAY
PROJECT LOCATION
LOCATION MAP
NTS
P A
R K
IN
G
PARKING
PARKING
PARKING
RETENTION
RETENTION
RETENTION
V E
T E
R A
N S
W A
Y
US HIGHWAY 98
LOADING DOCK
MECHANICAL YARD2
SOUTH ENTRANCE3
NORTH ENTRANCE4
VEHICLE INSPECTION LANE5
CAMPUS REFERENCE MAP
NTS
CROSSHATCH REPRESENTS
AREA OF 2ND FLOOR ADDITION
AERIAL VIEW
NTS
DEDUCTIVE ALTERNATES
D1 DEDUCTIVE ALTERNATE #1: REMOVE ALL SCOPE OF WORK ASSOCIATED
WITH ~51,200 SF OF NEW PARKING. SEE GI100.
D2 DEDUCTIVE ALTERNATE #2: REMOVE ALL SCOPE OF WORK ASSOCIATED
WITH ~39,000 SF OF NEW PARKING. SEE GI100.
D3 DEDUCTIVE ALTERNATE #3: REDUCE WINDOW QUANTITY BY 8. SEE
A-201.
D4
DEDUCTIVE ALTERNATE #4: REMOVE ALL SCOPE ASSOCIATED
WITH 600 TON CHILLER (CH-3) REPLACEMENT IN MECHANICAL
ROOM 1B179.
NOTE: DEDUCTIVE ALTERNATES ARE CASCADING. EACH DEDUCT WILL BE TAKEN IN
SUCCESSION AND SHALL BE PRICED UNDER SEQUENTIAL, SEPARATE CLINs
(CONTRACT LINE ITEM NUMBER) SO DETERMINATIONS CAN BE MADE AND
PRIORITIES ESTABLISHED BASED ON BIDS RECEIVED.
CONTRACTOR STAGING AREA7
CONSTRUCTION PHASING
PHASE 1: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH "AREA F", THE
PHLEBOTOMY, BLOOD DRAW, CORE LAB, INFUSION CLINIC AND ASSOCIATED
SPACES. INCLUDE ALL ASSOCIATED WORK WITH AHU-2-N BEING INSTALLED
ON THE THIRD FLOOR MECHANICAL SPACE, THE NEW CHILLER TOWER CT-3,
AND REPLACEMENT OF CHILLER CH-3 IN 1B179. PHASE 1 CONSTRUCTION TO
BE COMPLETED FULLY AND ACCEPTED BY THE VA PRIOR TO
COMMENCEMENT OF PHASE 2.
2A
PHASE 2A: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH THE NEW
PARKING AREAS FOR DEDUCTIVE ALTERNATE #1 (AREAS A AND C).
COORDINATE ANY REQUIRED SHUTDOWNS TO ADJACENT PARKING
AREAS WITH THE COR - PLAN WORK TO MINIMIZE AMOUNT OF
SHUTDOWNS DURING OPERATING HOURS.
REFER TO SHEET GI100 FOR DIAGRAM
2B
PHASE 2B: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH THE NEW
PARKING AREA FOR DEDUCTIVE ALTERNATE #2 (AREA B). COORDINATE
ANY REQUIRED SHUTDOWNS TO ADJACENT PARKING AREAS WITH THE
COR - PLAN WORK TO MINIMIZE AMOUNT OF SHUTDOWNS DURING
OPERATING HOURS.
AXONOMETRIC VIEW - PROPOSED WORK
NTS
Siemens Contact:
Timothy Hornocker Siemens Industry, Inc.
14231 Seaway Road, Suite F2 Gulfport, MS, 39503 Dir: 228-265-8100 Fax: 228-265-8149 Cell: 601-329-1731 timothy.hornocker@siemens.com
Revisions: Date: 10.07.2022 10.07.2022
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C THE A&E GROUP
4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609
(813) 261 1023
MAT PERKINS
09.26.2022
B
IM
/5
-3
C o n s tr u c t R e n o v a ti o n a n d A d d it io n t o
J A
C C
P e n s a c o la
/5
-3
.J A
C C
.P a c k a g e
.A
R C
H .r v t
/7 /2
:5
:2
P
M
GI001
DRAWING INDEX 520-331
JACC-2F
09.26.2022 M. PERKINS N.BLANCHARD
ISSUED FOR
CONSTRUCTION
CONSTRUCT ADDITION AND
RENOVATIONS TO JACC
790 Veterans Way, Pensacola, FL 32503
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
100%
ISSUED FOR
CONSTRUCTION
FIRE PROTECTION
FX000 FIRE PROTECTION NOTES Yes Yes Yes Yes Yes FX001 FIRE PROTECTION NOTES No No No No Yes FX102 FIRE PROTECTION SECOND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes FX102F FIRE PROTECTION SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes FX501 DETAILS - FIRE PROTECTION No Yes Yes Yes Yes FA001 FIRE ALARM NOTES & LEGEND Yes Yes Yes Yes Yes FA102F FIRE ALARM SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes
PLUMBING
P-001 LEGEND - PLUMBING Yes Yes Yes Yes Yes PD101 PLUMBING EXISTING/DEMOLITION GROUND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes PD101F1 PLUMBING EXISTING/DEMOLITION GROUND FLOOR PLAN - AREA F - UNDER SLAB No Yes Yes Yes Yes PD101F2 PLUMBING EXISTING/DEMOLITION GROUND FLOOR PLAN - AREA F - DW,SAN,VENT No Yes Yes Yes Yes PD101F3 PLUMBING EXISTING/DEMOLITION GROUND FLOOR PLAN - AREA F - STORM No Yes Yes Yes Yes PD102 PLUMBING EXISTING/DEMOLITION SECOND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes PD102F PLUMBING EXISTING/DEMOLITION SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes PX101 PLUMBING GROUND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes PX101F1 PLUMBING GROUND FLOOR PLAN - AREA F - UNDER SLAB No No Yes Yes Yes PX101F2 PLUMBING GROUND FLOOR PLAN - AREA F - SAN,VENT, STORM No Yes Yes Yes Yes PX101F3 PLUMBING GROUND FLOOR PLAN - AREA F - DCW, MED GAS No No Yes Yes Yes PX102 PLUMBING SECOND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes PX102F1 PLUMBING SECOND FLOOR PLAN - AREA F - SAN, VENT & STORM No No Yes No Yes PX102F2 PLUMBING SECOND FLOOR PLAN - AREA F - DW Yes Yes Yes Yes Yes PX102F3 PLUMBING SECOND FLOOR PLAN - AREA F - MED & LAB GAS No Yes Yes No Yes PX103F PLUMBING ROOF PLAN - AREA F No Yes Yes Yes Yes P-501 DETAILS - PLUMBING No No Yes No Yes P-502 SHEDULES & DETAILS - PLUMBING No No Yes No Yes P-902 SANITARY RISER DIAGRAM - AREA F No No Yes Yes Yes P-904 DOMESTIC RISER DIAGRAM - AREA F No No Yes Yes Yes P-906 MED GAS RISER DIAGRAM No Yes Yes Yes Yes
MECHANICAL
M-001 LEGEND - HVAC Yes Yes Yes Yes Yes M-002 NOTES - HVAC Yes Yes Yes Yes Yes MD101 MECHANICAL DEMOLITION GROUND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes MD101B1 MECHANICAL DEMOLITION GROUND FLOOR PLAN - AREA B Yes Yes Yes Yes Yes MD101B2 MECHANICAL DEMOLITION GROUND FLOOR PLAN - AREA B2 Yes Yes Yes Yes Yes MD402 MECHANICAL DEMOLITION GROUND FLOOR PLAN - AREA B ENLARGED PLAN No No Yes Yes Yes MD403 MECHANICAL DEMOLITION GROUND FLOOR PLAN - AREA B ENLARGED PLAN No No Yes Yes Yes MD404 MECHANICAL DEMOLITION GROUND FLOOR PLAN - AREA B ENLARGED PLAN No No Yes Yes Yes MH101 MECHANICAL GROUND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes MH101B1 MECHANICAL GROUND FLOOR PLAN - AREA B Yes Yes Yes Yes Yes MH101B2 MECHANICAL GROUND FLOOR PLAN - AREA B2 Yes Yes Yes Yes Yes MH102 MECHANICAL SECOND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes MH102F MECHANICAL SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes MH103 MECHANICAL ROOF PLAN - OVERALL Yes Yes Yes Yes Yes MH103F MECHANICAL ROOF PLAN - AREA F Yes Yes Yes Yes Yes MH103P MECHANICAL THIRD FLOOR PLAN - PENTHOUSE NORTH No Yes Yes Yes Yes MP102B MECHANICAL PIPING SECOND FLOOR PLAN - AREA B No Yes Yes Yes Yes MP102F MECHANICAL PIPING SECOND FLOOR PLAN - AREA F No Yes Yes Yes Yes MP103P MECHANICAL THIRD FLOOR PLAN - PENTHOUSE NORTH No No Yes Yes Yes MH202F MECHANICAL SECOND CEILING PLAN - AREA F No Yes Yes No Yes MH302F MECHANICAL SECOND FLOOR THERMOSTAT PLAN - AREA F No No Yes Yes Yes MH402 MECHANICAL GROUND FLOOR PLAN - AREA B2 ENLARGED PLAN No No Yes Yes Yes MH403 MECHANICAL GROUND FLOOR PLAN - AREA B2 ENLARGED PLAN No No Yes Yes Yes MH404 MECHANICAL GROUND FLOOR PLAN - AREA B2 ENLARGED PLAN No No Yes Yes Yes M-501 DETAILS - MECHANICAL No Yes Yes Yes Yes M-502 DETAILS - MECHANICAL No No Yes No Yes M-503 DETAILS - MECHANICAL No No Yes No Yes M-601 SCHEDULES - MECHANICAL Yes Yes Yes Yes Yes M-602 SCHEDULES - MECHANICAL Yes Yes Yes Yes Yes M-701 CONTROLS - MECHANICAL No No Yes Yes Yes M-704 CONTROLS - MECHANICAL No No Yes No Yes M-901 AREA F HW ISOMETRIC No No No No Yes
ELECTRICAL
E-001 ELECTRICAL NOTES & LEGENDS Yes Yes Yes Yes Yes ED201B ELECTRICAL POWER & SPECIAL SYSTEMS DEMOLITION GROUND FLOOR PLAN - AREA B Yes Yes Yes Yes Yes ED203F ELECTRICAL POWER & SPECIAL SYSTEMS DEMOLITION ROOF PLAN - AREA F No Yes Yes Yes Yes EL102F ELECTRICAL LIGHTING SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes EP102F ELECTRICAL POWER SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes EP103F ELECTRICAL ROOF PLAN - AREA F Yes Yes Yes Yes Yes EY102F ELECTRICAL SPECIAL SYSTEMS SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes EM101B MECHANICAL POWER GROUND FLOOR PLAN - AREA B No Yes Yes Yes Yes EM102F MECHANICAL POWER SECOND FLOOR PLAN - AREA F No Yes Yes Yes Yes EM103P MECHANICAL POWER THIRD FLOOR PLAN - PENTHOUSE NORTH No Yes Yes Yes Yes E-501 ELECTRICAL DETAILS No Yes Yes Yes Yes E-502 ELECTRICAL DETAILS No Yes Yes Yes Yes E-503 ELECTRICAL DETAILS No Yes Yes Yes Yes E-601 ELECTRICAL RISER DIAGRAM Yes Yes Yes Yes Yes E-602 ELECTRICAL RISER DIAGRAM CONT. No No Yes Yes Yes E-701 PANEL SCHEDULES No Yes Yes Yes Yes E-702 PANEL SCHEDULES No Yes Yes Yes Yes E-703 PANEL SCHEDULES Yes Yes Yes Yes Yes E-704 PANEL SCHEDULES No No Yes Yes Yes Grand total: 183
- DRAWING INDEX -
SHEET NUMBER SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED IN
95% CD
INCLUDED IN
100%
ISSUED FOR
CONSTRUCTION
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes Yes GI001 DRAWING INDEX Yes Yes Yes Yes Yes GI050 GENERAL NOTES Yes Yes Yes Yes Yes GI100 OVERALL SITEPLAN Yes Yes Yes Yes Yes GI102F LIFE SAFETY PLAN - AREA F Yes Yes Yes Yes Yes GI200 ICRA PLAN - GROUND FLOOR No No Yes Yes Yes GI201 ICRA PLAN - SECOND FLOOR No Yes Yes Yes Yes
CIVIL
VF101 CIVIL SITE SURVEY No Yes Yes Yes Yes CD101 CIVIL DEMOLITION PLAN OVERALL No Yes Yes Yes Yes CD102 CIVIL DEMOLITION PLAN ENLARGED VIEWS A & B No Yes Yes Yes Yes CD103 CIVIL DEMOLITION PLAN ENLARGED VIEWS C No Yes Yes Yes Yes CS101 CIVIL SITE PLAN OVERALL No Yes Yes Yes Yes CS102 CIVIL SITE PLAN ENLARGED VIEWS A & B No Yes Yes Yes Yes CS103 CIVIL SITE PLAN ENLARGED VIEWS C No Yes Yes Yes Yes CG101 CIVIL GRADING PLAN OVERALL No Yes Yes Yes Yes CG102 CIVIL GRADING PLAN ENLARGED VIEWS A & B No Yes Yes Yes Yes CG103 CIVIL GRADING PLAN ENLARGED VIEWS C No Yes Yes Yes Yes CG104 CIVIL EROSION CONTROL PLAN No Yes Yes Yes Yes CG501 CIVIL GRADING DETAILS SHEET 1 No Yes Yes Yes Yes CG502 CIVIL GRADING DETAILS SHEET 2 No Yes Yes Yes Yes CG503 CIVIL EROSION PROTECTION DETAILS No Yes Yes Yes Yes CU101 CIVIL UTILITY PLAN No Yes Yes Yes Yes CU102 CIVIL UTILITY PLAN ENLARGED VIEWS No Yes Yes Yes Yes CU103 CIVIL UTILITY PLAN ENLARGED VIEWS No Yes Yes Yes Yes CU501 CIVIL UTILITY DETAIL SHEET No Yes Yes Yes Yes CT101 CIVIL TRAFFIC SIGNAGE AND STRIPING PLAN No Yes Yes Yes Yes CT102 CIVIL TRAFFIC SIGNAGE AND STRIPING PLAN ENLARGED VIEWS A & B No Yes Yes Yes Yes CT103 CIVIL TRAFFIC SIGNAGE AND STRIPING PLAN ENLARGED VIEWS C No Yes Yes Yes Yes CT501 CIVIL SIGNAGE AND STRIPING DETAIL SHEET No Yes Yes Yes Yes
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES Yes Yes Yes Yes Yes S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes Yes Yes Yes Yes S-003 SPECIAL INSPECTIONS Yes Yes Yes Yes Yes SD102 STRUCTURAL DEMOLITION PLAN - SECOND FLOOR Yes Yes Yes Yes Yes SD103 STRUCTURAL DEMOLITION PLAN - ROOF Yes Yes Yes Yes Yes S-101 STRUCTURAL FOUNDATION PLAN - OVERALL Yes Yes Yes Yes Yes S-101B2 STRUCTURAL FOUNDATION PLAN - AREA B2 - ENLARGED No Yes Yes Yes Yes S-102 STRUCTURAL SECOND FLOOR FRAMING PLAN - OVERALL Yes Yes Yes Yes Yes S-102F STRUCTURAL SECOND FLOOR FRAMING PLAN - AREA F - ENLARGED Yes Yes Yes Yes Yes S-103 STRUCTURAL THIRD FLOOR - MECHANICAL PENTHOUSE No Yes Yes Yes Yes S-104 STRUCTURAL ROOF FRAMING PLAN - OVERALL Yes Yes Yes Yes Yes S-104F STRUCTURAL ROOF FRAMING PLAN - AREA F - ENLARGED Yes Yes Yes Yes Yes S-201 BRACED FRAME ELEVATIONS Yes Yes Yes Yes Yes S-301 SECTIONS No Yes Yes Yes Yes S-401 ENLARGED PARTIAL FRAMING PLANS No Yes Yes Yes Yes S-501 TYPICAL DETAILS Yes Yes Yes Yes Yes S-502 TYPICAL DETAILS Yes Yes Yes Yes Yes S-503 TYPICAL DETAILS Yes Yes Yes Yes Yes S-504 TYPICAL DETAILS Yes Yes Yes Yes Yes S-505 TYPICAL DETAILS Yes Yes Yes Yes Yes S-510 FOUNDATION DETAILS No Yes Yes Yes Yes S-511 FOUNDATION DETAILS No No Yes Yes Yes S-520 FRAMING DETAILS Yes Yes Yes Yes Yes S-521 FRAMING DETAILS Yes Yes Yes Yes Yes S-522 FRAMING DETAILS Yes Yes Yes Yes Yes S-523 FRAMING DETAILS No Yes Yes Yes Yes S-524 FRAMING DETAILS Yes Yes Yes Yes Yes S-525 FRAMING DETAILS Yes Yes Yes Yes Yes S-601 GRAPHICAL COLUMN SCHEDULES Yes Yes Yes Yes Yes
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES Yes Yes Yes Yes Yes A-003F ARCHITECTURAL ROOM PROGRAM PLAN - SECOND LEVEL - AREA F Yes Yes Yes Yes Yes AD101 ARCHITECTURAL DEMOLITION PLAN - FIRST FLOOR Yes Yes Yes Yes Yes AD102 ARCHITECTURAL DEMOLITION PLAN - SECOND FLOOR Yes Yes Yes Yes Yes A-101 ARCHITECTURAL GROUND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes A-101B ARCHITECTURAL GROUND FLOOR PLAN - AREA B Yes Yes Yes Yes Yes A-102 ARCHITECTURAL SECOND FLOOR PLAN - OVERALL Yes Yes Yes Yes Yes A-102F ARCHITECTURAL SECOND FLOOR PLAN - AREA F Yes Yes Yes Yes Yes A-102F1 ARCHITECTURAL SECOND FLOOR DIMENSION PLAN - AREA F No Yes Yes Yes Yes A-103 ARCHITECTURAL THIRD FLOOR - MECHANICAL PENTHOUSES No Yes Yes Yes Yes A-104 ARCHITECTURAL ROOF PLAN - OVERALL Yes Yes Yes Yes Yes A-104F ARCHITECTURAL ROOF PLAN - AREA F No Yes Yes Yes Yes AC102F ARCHITECTURAL REFLECTED CEILING PLAN - SECOND FLOOR - AREA F Yes Yes Yes Yes Yes A-201 ARHICTECTURAL EXTERIOR ELEVATIONS - AREA F Yes Yes Yes Yes Yes A-251 ARCHITECTURAL SECTIONS - ATRIUM / CLINIC ENTRY No No Yes Yes Yes A-301 ARCHITECTURAL BUILDING SECTIONS - AREA F Yes Yes Yes Yes Yes A-351 ARCHITECTURAL SECTIONS - EXTERIOR WALL - AREA F No Yes Yes Yes Yes A-352 ARCHITECTURAL SECTIONS - EXTERIOR WALL - AREA F No Yes Yes Yes Yes A-401 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-402 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-403 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-404 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-405 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-406 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes Yes A-407 ARCHITECTURAL ENLARGED VIEWS - REFLECTED CEILING PLANS No Yes Yes Yes Yes A-501 ARCHITECTURAL DETAILS - EXTERIOR No Yes Yes Yes Yes A-502 ARCHITECTURAL DETAILS - EXTERIOR No No Yes Yes Yes A-551 ARCHITECTURAL CASEWORK DETAILS No Yes Yes Yes Yes A-571 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes Yes A-601 ARCHITECTURAL SCHEDULES Yes Yes Yes Yes Yes A-720 ARCHITECTURAL STANDARD PARTITION TYPES No Yes Yes Yes Yes A-722 ARCHITECTURAL PARTITION FRAMING DETAILS No Yes Yes Yes Yes A-730 ARCHITECTURAL TYPICAL MOUNTING HEIGHTS No Yes Yes Yes Yes
INTERIORS
IN001 INTERIOR NOTES AND FINISH LEGEND No Yes Yes Yes Yes IN102F INTERIOR FINISH PLANS - SECOND FLOOR - AREA F Yes Yes Yes Yes Yes IN501 INTERIOR FINISH DETAILS No Yes Yes Yes Yes IN502 INTERIOR WALL FINISH TYPES AND DETAILS No Yes Yes Yes Yes IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes Yes IN901 INTERIOR 3D CONCEPT IMAGES Yes Yes Yes Yes Yes
FURNITURE
IF102F INTERIOR FURNITURE PLAN - SECOND FLOOR - AREA F Yes Yes Yes Yes Yes IF112F INTERIOR FURNITURE PLAN - SECOND FLOOR - AREA F No Yes Yes Yes Yes
SIGNAGE
AW001 ARCHITECTURAL SIGNAGE ABBREVIATIONS,SYMBOLS, GENERAL NOTES AND SCHEDULE No Yes Yes Yes Yes AW102F ARCHITECTURAL SIGNAGE PLAN - SECOND FLOOR AREA F No Yes Yes Yes Yes
EQUIPMENT
Q-102F ARCHITECTURAL EQUIPMENT PLAN - SECOND FLOOR - AREA F No Yes Yes Yes Yes Q-401F ARCHITECTURAL EQUIPMENT PLAN -SECOND FLOOR - CORE LAB ENLARGED No Yes Yes Yes Yes Q-601 EQUIPMENT SCHEDULE No Yes Yes Yes Yes
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C THE A&E GROUP
4830 W. Kennedy Blvd. Suite 600 Tampa, FL 33609
(813) 261 1023
MAT PERKINS
09.26.2022
B
IM
/5
-3
C o n s tr u c t R e n o v a ti o n a n d A d d it io n t o
J A
C C
P e n s a c o la
/5
-3
.J A
C C
.P a c k a g e
.A
R C
H .r v t
/7 /2
:5
:2
P
M
GI050
GENERAL NOTES 520-331
JACC-2F
09.26.2022 M. PERKINS C. LOWERY
ISSUED FOR
CONSTRUCTION
CONSTRUCT ADDITION AND
RENOVATIONS TO JACC
790 Veterans Way, Pensacola, FL 32503
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
15. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
PHASING NOTES:
PHASE 1: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH "AREA F",
THE PHLEBOTOMY, BLOOD DRAW, CORE LAB, INFUSION CLINIC AND
ASSOCIATED SPACES. INCLUDE ALL ASSOCIATED WORK WITH AHU-2-N
BEING INSTALLED ON THE THIRD FLOOR MECHANICAL SPACE. PHASE 1
AND 2 MAY BE RUN CONCURRENTLY AT CONTRACTOR'S DISCRETION.
CONTRACTOR TO PROVIDE PROPOSED PHASING AND CONSTRUCTION
TIMELINE PLAN FOR REVIEW AND APPROVAL BY THE VA.
PHASE 2A: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH THE
NEW PARKING AREAS FOR DEDUCTIVE ALTERNATE #1 (AREAS A AND C).
COORDINATE ANY REQUIRED SHUTDOWNS TO ADJACENT PARKING
AREAS WITH THE COR - PLAN WORK TO MINIMIZE AMOUNT OF
SHUTDOWNS DURING OPERATING HOURS.
PHASE 2B: PERFORM ALL SCOPE OF WORK ASSOCIATED WITH THE
NEW PARKING AREA FOR DEDUCTIVE ALTERNATE #2 (AREA B).
COORDINATE ANY REQUIRED SHUTDOWNS TO ADJACENT PARKING
AREAS WITH THE COR - PLAN WORK TO MINIMIZE AMOUNT OF
SHUTDOWNS DURING OPERATING HOURS.
GENERAL PHASING NOTES:
1. FOR NEW CONSTRUCTION IN PHASES 1:
A. REMOVE ONLY SMALL PORTIONS OF ROOFING TO INSTALL NEW
COLUMNS. INSTALL NEW BASE FLASHING TO MAKE ROOF
WATERTIGHT AGAIN.
B. CONSTRUCT ROOF AND EXTERIOR WALLS TO CREATE
WEATHER-TIGHT ENCLOSURE.
C. REMOVE EXISTING ROOFING ONLY AFTER SHELL OF SECOND
FLOOR IS WEATHER TIGHT.
D. ROUTING OF NEW UTILITIES THROUGH THE FIRST FLOOR
CEILING PLENUM SHALL BE A ROOM BY ROOM BASIS
COORDINATED WITH THE COR. THIS WORK CAN TAKE PLACE AT
NIGHT, GC MUST HAVE WORK AREA CLEAN, CEILING TILES
BACK IN PLACE, FOR THE NEXT DAY TO HAVE UNINTERRUPTED
OPERATION OF FACILITY SERVICES.
2. AT ALL TIMES MAINTAIN VEHICLE ACCESS TO PATIENT DROP-OFFS
AND AMBULANCE ENTRY POINTS. MAINTAIN PEDESTRIAN ACCESS AT
ALL EGRESS DOORS. MAINTAIN EXISTING EGRESS PATHS INSIDE AND
OUTSIDE THE BUILDING AT ALL TIMES.
3. FOR ANY WORK THAT WILL DISTURB OR DISPLACE EXISTING
OCCUPIED AND OPERATIONAL SPACES, ESCORTS WILL BE
REQUIRED - COORDINATE WITH COR MINIMUM 3 WEEKS IN ADVANCE.
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. REFER TO SPECIFICATION SECTION 09 06 00 FOR BASIS OF
DESIGN FOR PRODUCTS AND MATERIALS.
3. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE
INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
4. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED
BY THE CONTRACTOR(S) PRIOR TO FABRICATION AND
CONSTRUCTION. IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
5. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL
AND ELECTRICAL DUCT SIZES AND LOCATIONS.
6. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE
USE OF A KEY OR SPECIAL KNOWLEDGE.
7. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
8. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL
SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE
OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.
9. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD
VERIFIED. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT
FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
10. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT ACTUAL
CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT
DOCUMENTS. REPORT DISCREPANCIES TO ARCHITECT AND COR
PRIOR TO BIDDING OR PERFORMING WORK RELATED TO ANY
DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
11. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS,
SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO
THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING,
THE CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE
MORE COSTLY TIME, METHOD, SYSTEM, PRODUCT,
SUBCONTRACT AND/OR MATERIAL.
12. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS
"NIC" IS NOT IN THE CONTRACT. HOWEVER, THE CONTRACTOR
SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.
13. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH
COR, INCLUDING STAGING AREAS, MATERIAL STORAGE, ACCESS
TO WORK, TIMING OF WORK, NOISY OPERATIONS,
INTERRUPTION OF UTILITIES. SEE SPECIFICATIONS.
14. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE
PLACEMENT OF EACH TRADE'S WORK SO THAT THERE ARE NO
CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION
IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE
PENETRATIONS THROUGH FOUNDATIONS, FLOORS, WALLS AND
CEILING SPACES. SEE SPECIFICATIONS.
15. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
16. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL
BE FIRE TREATED. SEE SPECIFICATIONS. ALL SURFACE
ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR
MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT,
"PEEL AND STICK" OR OTHER MATERIAL AS APPROVED BY
ARCHITECT AND COR.
17. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING OR
ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
18. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS "a" PROTECTION OF NFPA 101
LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE FIRE ALARM MAINTENANCE CONTRACTOR MUST
CERTIFY ALL PROGRAMMING DONE TO THE FIRE ALARM
SYSTEM. THE CONSTRUCTION CONTRACTOR MUST
EITHER HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR (PANACEA FIRE & SECURITY) TO PERFORM
ALL FIRE ALARM PROGRAMMING WORK OR IF THE
PROGRAMMING IS COMPLETED BY ANOTHER FIRE ALARM
CONTRACTOR, THE CONSTRUCTION CONTRACTOR MUST
HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY THE
PROGRAMMING WORK DONE BY ANOTHER CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES
TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY
THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. PROVIDE FIRE & SMOKE DAMPERS WHERE REQUIRED FOR
NEW WORK.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF FINISH, UNLESS NOTED
OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. ROOF PLAN DIMENSIONS
A. UN-DIMENSIONED LOCATIONS OF ROOFTOP
EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH
AS ROOF HATCH DETERMINED BY REFERENCE TO A
FIXED WALL AND LADDER, OR MECHANICAL
EQUIPMENT DETERMINED BY DUCT PENETRATIONS
BETWEEN JOISTS.
B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT
RAILS, HVAC EQUIPMENT, SCREEN WALLS,
ANTENNAS, WALK PADS, LADDERS, SCUPPER
LOCATIONS, ETC., MAY BE LOCATED FROM
MECHANICAL AND ELECTRICAL DRAWINGS OR
LOCATED BY SCALING. CONFIRM ALL ROOF ITEM
DIMENSIONS WITH THE ARCHITECT AND COR PRIOR
TO CONSTRUCTION.
8. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 32'-6". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATHING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-
WAY OF THE PROJECT SITE WILL BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR.
GENERAL DEMOLITION AND
PHASING NOTES:
THIRD-PARTY INSPECTIONS
INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS,
TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS ARE
REQUIRED AND PAID FOR BY THE GENERAL CONTRACTOR.
CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION
CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY
THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY
REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD PARTY
INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS
SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THE
CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND
PERMITS ARE TO BE PAIR FOR BY THE GENERAL
CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY
REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE
ONLY, WHEN PERFORMED, AND DO NOT REDUCE THE
INSPECTION BURDEN ON THE CONTRACTOR. THIRD PARTY
INSPECTION SERVICES MUST BE SUBMITTED FOR
ACCEPTANCE BY THE VA AFTER AWARD. SUBMISSION TO
INCLUDE RESUMES OF INSPECTORS, WITH ALTERNATES,
PROJECTED DAYS ON SITE, QUALIFICATIONS OF INSPECTORS
SHOWING SIMILAR PROJECTS, RELATED PORTFOLIO, AND
DESCRIPTION OF COMMUNICATION PROTOCOL WITH THE
OWNER. MINIMUM QUALIFICATIONS FOR EACH DIVISION'S
INSPECTOR ARE IDENTIFIED IN SPECIFICATION SECTION 01 45
00. THIRD-PARTY INSPECTIONS ARE IN ADDITION TO, AND
INDEPENDENT OF, THE GENERAL CONTRACTOR'S PRIMARY
QUALITY CONTROL MANAGER AND ASSOCIATED PROTOCOL
OR GOVERNMENT / AE CONSTRUCTION PERIOD SERVICES.
4 4
D1
D2D1
GI100
F2
GI100
E2
PHASE 1
(AREA F)
PHASE 2B
PHASE 2APHASE 2A
D3
D4
SITE SYMBOL LEGEND
GENERAL SHEET NOTES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION,
ACCESS, MAINTENANCE AND / OR VISIBILITY.
AREA OF ADDITION
DEDUCTIVE ALTERNATE
FOUNDATION DRAIN - SEE CIVIL
5' -0
4'-0"
TEMP
AHU-10
6'-0"
2A
11A
6' -0
"12
21'-0" 14'-0"
'-1
3/
4" 5'
-1
/4
11B
(E)CWR
(E )C
W R
(E )C
W S
18 18
19 19
22'-9" 6'-0"
3"
5'-3 1/4" 11'-10 3/4"
GI100
F1
1'-6"6"10"6"
6" 6"
1'-0"
5'-0"
45°
NO DIG AREA
/4
/4
/4 "1
10" 19'-4" 10"
21'-0"
1'-0" 8'-0"
/4
Project Number
Building Number
Drawing Number
Project Title
Locatio…
This is the start of the file's text. The full file is on GovTribe.