ATTACHMENT 4 - VAMH-618-17-127 CD SET_4.pdf

PDF 8 MB Posted

Attached to
Z1DA--Renovate MH Ward 1L, 1H and 1K - Minneapolis VAMC
Solicitation number
36E77620R0050
Issued by

About this file

This notice provides details for a planned solicitation seeking proposals for design-build renovation services at the Minneapolis VA Medical Center. The Department of Veterans Affairs intends to award a firm-fixed-price contract to furnish all labor, materials, tools and equipment for renovating Mental Health Wards 1L, 1H and 1K, including general construction, demolition, structural, civil, mechanical, plumbing, electrical and low voltage work. The solicitation will be issued as a request for proposal on February 4, 2020, with a period of performance of approximately 790 calendar days from notice to proceed. The construction value is estimated between $10-20 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and use NAICS code 236220 with a size standard of $39.5 million.

View the file

Other files

File Type Posted
36E77620R0050 0009.docx DOCX document
R4-A702.pdf PDF
Revision Set 4 - Narrative.pdf PDF
R4-A701.pdf PDF
Technical Questions Spreadsheet.pdf PDF
R4-A703.pdf PDF
VA Addendum-Revision Set 3.pdf PDF
36E77620R0050 0008.docx DOCX document
Construction Wage Rates - Hennepin County - 1.1.20.pdf PDF
1K Rec Area Utility Plan.pdf PDF
1K Landscape plan.pdf PDF
Technical Questions Spreadsheet.xlsx XLSX spreadsheet
Exterior Site Plan_Dumpster_Laydown.pdf PDF
4-4-2021 Combined Documents Addendum 2.pdf PDF
VA Pre-Bid Addendum 2 Revision Set 2.pdf PDF
36E77620R0050 0007.docx DOCX document
Technical Question Tracking Sheet.pdf PDF
4-4-2021 VA Addendum 2.Attachments.pdf PDF
23 07 11.pdf PDF
4-4-2021 VA Addendum 2.Narrative.pdf PDF
Renovate Inpatient Mental Health Project 618-17-127 Exterior Modifications.pdf PDF
36E77620R0050 0006.docx DOCX document
Renovate Mental Health Inpatient Ward Project Addendum 1.docx DOCX document
01 45 00 Quality Control.pdf PDF
36E77620R0050 0005.docx DOCX document
083313 Coiling Counter Doors.pdf PDF
Technical Question Tracking Sheet.docx DOCX document
Q 26 crafted plank oak grove.pdf PDF
36E77620R0050 0004.docx DOCX document
S05 -Technical Question Tracking Sheet.docx DOCX document
Minneapolis Mental Health Site Visit Sign-In.pdf PDF
36E77620R0050 0003.pdf PDF
36E77620R0050 0001.docx DOCX document
36E77620R0050 0002.docx DOCX document
ATTACHMENT 6 - 2018-27 MSP IPMH Renovation Specifications Vol 1 and Vol 2.pdf PDF
ATTACHMENT 1 - VAMH-618-17-127 CD SET_1.pdf PDF
ATTACHMENT 5 - VAMH-618-17-127 CD SET_5.pdf PDF
ATTACHMENT 3 - VAMH-618-17-127 CD SET_3.pdf PDF
ATTACHMENT 7 - Contractor Safety _ Env Record Form.docx DOCX document
36E77620R0050.docx DOCX document
ATTACHMENT 2 - VAMH-618-17-127 CD SET_2.pdf PDF
ATTACHMENT 8 - Construction Wage Rates - Hennepin County - 1.1.20.pdf PDF
ATTACHMENT 6 - 2018-27 MSP IPMH Renovation Specifications Vol 1 and Vol 2 - 2-1-21.pdf PDF
ATTACHMENT 9 - Brand Name JA - Minneapolis.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HJKLMNPQRSTUVWX

WON-DOOR

AREA K

FIRE SPRINKLER ZONE K

AREA L

FIRE SPRINKLER ZONE L

AREA H

FIRE SPRINKLER ZONE H

1-HR FIRE/SMOKE BARRIER

SCALE: 1/16" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 OVERALL

MNPQRST

FX01

FX01 FX01

FX01

FX03

FX06

LIGHT HAZARD

DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT

ORDINARY HAZARD GROUP 2

DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT

HATCH LEGEND

NOT IN SCOPE

ORDINARY HAZARD GROUP 1

DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT

THE SCOPE OF WORK FOR AREA L PHASE 1 SHALL BE AS FOLLOWS

1. DEMOLISH SPRINKLERS AND ARMOVER PIPING IN THE AREAS OF NEW WALLS AND

IN CONFLICT WITH NEW DOORS AND CEILINGS.

2. ADD/RELOCATE SPRINKLERS TO ACCOMMODATE NEW WALLS AND CEILING

LAYOUTS.

3. MAIN AND BRANCH PIPING TO REMAIN FOR PHASE 1.

4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.

5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.

FIRE SUPPRESSION SCOPE OF WORK

SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA L PHASE 1

KEYNOTE LEGEND

KEY DESCRIPTION

FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND

ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.

FX03 EXISTING AREA L VALVE ASSEMBLY LOCATED HERE.

FX06 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE. BRANCH LINE

PIPING NOT SHOWN IS TO REMAIN FOR PHASE 1.

TUVWX

FX01

FX01FX01

EXERCISE

1K-119

SOIL

1K-122

HSKP

1K-127

ROUND

1K-123

ROUND

1K-126

SENS

1K-124

STOR.

1K-125

DOUBLE 117

1K-117

DOUBLE 114

1K-114

DOUBLE 115

1K-115

DOUBLE 112

1K-112

DOUBLE 111

1K-111

TLT.

1K-116A

TLT.

1K-110A

DOUBLE 110

1K-110

TLT.

1K-108A

BARIATRIC SINGLE

1K-108

BARIATRIC SINGLE

1K-107

TLT.

1K-104A

SINGLE 104

1K-104

SINGLE 105

1K-105

TLT.

1K-106A

SINGLE 106

1K-106

STOR

1K-109 TLT.

1K-111A

DOUBLE 116

1K-116

TLT.

1K-114A

TLT.

1K-115A

DOUBLE 113

1K-113

TLT.

1K-113A

TLT.

1K-112A

SINGLE 102

1K-102

TLT.

1K-102A

SINGLE 103

1K-103

TLT.

1K-103A

TLT.

1K-105A

SINGLE

1K-101

TLT.

1K-101A

CLN. LIN.

1K-121

MEDS.

1H-112

CORR 2

C1-67

PT. STOR.

1H-114

THEATER

1K-118

TLT.

1K-107A

CORR 1

C1-69

CORR 1

C1-71

CORR 1

C1-70

CORR 1

C1-71A

FX01

FX05

FX07

LIGHT HAZARD

DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT

ORDINARY HAZARD GROUP 2

DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT

HATCH LEGEND

NOT IN SCOPE

ORDINARY HAZARD GROUP 1

DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT

THE SCOPE OF WORK FOR AREAS H AND K PHASE 2 SHALL BE AS FOLLOWS

1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS H AND

K.

2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW

MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.

3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO

ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER

HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL

FEATURES.

4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.

5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.

FIRE SUPPRESSION SCOPE OF WORK

SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA K PHASE 2

KEYNOTE LEGEND

KEY DESCRIPTION

FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND

ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.

FX05 EXISTING AREA K VALVE ASSEMBLY LOCATED HERE.

FX07 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE.

TUVWX

FX02FX02

FX02

FX01

MD OFFICE

1H-111

STAFF LKR/TLT

1H-105

STAFF LKR/TLT

1H-103

STAFF BREAK

1H-104

CORR 2

C1-66

? MEDS.

1H-112

ASST. RN.

1H-107

CORR 2

C1-67

PT. STOR.

1H-114

RX OFF.

1H-113

NOURISHMENT

1H-109

NURSE STATION

1H-110

RESIDENTS TM. RM.

1H-108

WORK ROOM

1H-110A

ELEVATOR LOBBY

C1-313 ELEVATOR LOBBY

C1-314

CORR.

C1-75

CORR 2

C1-65

CORR 2

C1-67A

MSA

1H-110B

FX01

FX04

FX02

FX08

LIGHT HAZARD

DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT

ORDINARY HAZARD GROUP 2

DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT

HATCH LEGEND

NOT IN SCOPE

ORDINARY HAZARD GROUP 1

DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT

THE SCOPE OF WORK FOR AREAS H AND K PHASE 2 SHALL BE AS FOLLOWS

1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS H AND

K.

2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW

MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.

3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO

ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER

HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL

FEATURES.

4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.

5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.

FIRE SUPPRESSION SCOPE OF WORK

SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA H PHASE 2

KEYNOTE LEGEND

KEY DESCRIPTION

FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND

ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.

FX02 INSTALL NEW SEMI-RECESSED SPRINKLERS IN SMOKE ZONE H AND ASSOCIATED

PIPING TO ACCOMMODATE NEW WALLS.

FX04 EXISTING AREA H VALVE ASSEMBLY LOCATED HERE.

FX08 CONTROL VALVE LOCATED HERE

LMNPQRST

GROUP THERAPY

1L-116REC THERAPY

1L-112

CI-61

C1-61

REC. THER. OFFICE

1L-112B

SINGLE 122

1L-122

SINGLE 121

1L-121

TLT.

1L-121A

TLT.

1L-122A

SINGLE 123

1L-123

SINGLE 124

1L-124

TLT.

1L-124A

SINGLE

1L-125

TLT.

1L-125A

SINGLE

1L-126

MSA

1H-110B

SENS

1L-129

SECL

1L-128C

SECL

1L-128B ANTE RM.

1L-128

FAM

1L-107

FAMILY ROOM

1L-105

INTERVIEW

1L-102

TOILET 101

1L-101

EXAM

1L-104

LAUNDRY

1L-106

OCC THERAPY

1L-114

OCC. THER. OFFICE

1L-114B

TLT.

1L-128A

HIGH ACUITY RN

STATION

1L-120

SOIL

1L-127

TOILET 113

1L-113A

TLT.

1L-123A

TLT.

1L-126A

VAPD STOR.

1L-103

DAY ROOM

1L-110

RN-MGR.

1L-109

SOCIAL WRKR

OFFICE

1L-115CLN. LIN.

1L-113

STOR.

1L-140

DINING

1L-130

SERVING AREA

1L-131

FX01

FX01FX01

FX01

FX01

FX03

FX07

STORAGE

1L-225

LIGHT HAZARD

DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT

ORDINARY HAZARD GROUP 2

DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT

HATCH LEGEND

NOT IN SCOPE

ORDINARY HAZARD GROUP 1

DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT

THE SCOPE OF WORK FOR AREAS L PHASE 3 SHALL BE AS FOLLOWS

1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS L

2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW

MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.

3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO

ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER

HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL

FEATURES.

4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.

5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.

FIRE SUPPRESSION SCOPE OF WORK

SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA L PHASE 3

KEYNOTE LEGEND

KEY DESCRIPTION

FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND

ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.

FX03 EXISTING AREA L VALVE ASSEMBLY LOCATED HERE.

FX07 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE.

CO2

CO

H

HS

NO2

S

TH

TS

T

MS

CHWS

CWV

CA

CD

CDR

CWR

CWS

CW

F-CW

H-CW

S-CW

HW

HW 140°

HW-R

HW-R 140°

GV

GW

HWR

HWS

G

OV

OW

PD

V

SS

SHWR

SHWS

STM

SD

OSD

(E)

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

COMBINATION WASTE & VENT

COMPRESSED AIR

CONDENSATE DRAINAGE

CONDENSATE RETURN

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DOMESTIC COLD WATER

FILTERED COLD WATER

HARD COLD WATER

SOFT COLD WATER

HOT WATER

HOT WATER 140°

HOT WATER RECIRCULATION

HOT WATER RECIRCULATION 140°

GREASE VENT

GREASE WASTE

HEATING WATER RETURN

HEATING WATER SUPPLY

NATURAL GAS

OIL VENT

OIL WASTE

PUMP DISCHARGE

SANITARY VENT

SANITARY SEWER

SOLAR HOT WATER RETURN

SOLAR HOT WATER SUPPLY

STEAM

STORM DRAINAGE

OVERFLOW STORM DRAINAGE

REF-L

REF-S

REFRIGERANT-LIQUID

REFRIGERANT-SUCTION

2"

2"

4"

4"

REF-HG REFRIGERANT-HOT GAS

PLUMBING AND PIPING SYMBOLS

KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

DRAIN SIZE

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN

THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE

USED IN THIS SET OF DRAWINGS.

PG PROPANE GAS

TYPE (SEE SCHEDULE)

Room

INVERT: -10' - 1"

1/8" / 12" SLOPE

RO REVERSE OSMOSIS WATER

IW INDIRECT WASTE

16"x8"

16"/8"

(E)

F

S

M

B

D

C

16"Ø

E/A

O/A

T/A

L/A

R/A

S/A

EXHAUST AIR

OUTSIDE AIR

RELIEF AIR

RETURN AIR

SUPPLY AIR

TRANSFER AIR

GRILLES, REGISTERS & DIFFUSERS TAG

CFM

THROW-150FPM/ 100FPM/ 50FPM

NECK SIZE / MODULE SIZE

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

HVAC SYMBOLS

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

MECHANICAL EQUIPMENT TAGS

ROUND DUCT SIZE TAG (DIAMETER)

LINEAR DIFFUSER TAG

CFM

TYPE (SEE SCHEDULE) NUMBER OF SLOTS /

ACTIVE SLOT LENGTH (PLENUM LENGTH) /

NECK SIZE

DUCT BEING DEMOLISHED

ELEVATION (CENTER OF FACE)

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

GE/A GREASE EXHAUST AIR

SE/A SMOKE EXHAUST AIR

EQUIPMENT BY OTHERS

(REFER TO OTHER DISCIPLINE

FOR ADDITIONAL INFORMATION)

EXISTING EQUIPMENT

TO REMAIN

FLUE EXHAUST GAS FLUE

C/A COMBUSTION AIR

S-O/A CONDITIONED OUTSIDE AIR

VAV-XX

10' - 0"

(E)VAV-XX

VAV-XX

FIRE PROTECTION SYMBOLS

OBSTRUCTION FROM DUCTWORK 48"

AND GREATER

FP-DOM-W

FP-W

FP-PA

FP-O

FP-D

FIRE PROTECTION OTHER

FIRE PROTECTION DRY

FIRE PROTECTION PRE-ACTION

FIRE PROTECTION WET

COMBINATION FIRE & DOMESTIC

48"x18" S/A

4000 SF

6" SD-1

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EWS EMERGENCY SHOWER

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

SS STAINLESS STEEL

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNIT

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CHWP CHILLED WATER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HWP HEATING WATER PUMP

HRU HEAT RECOVERY UNIT

PRV POWER ROOF VENTILATOR

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

48"x2 1/2"

400SLB3

8" / 24x24

300SD3

12" / ---

SD9

LINEAR BAR GRILLE

LINEAR SLOT DIFFUSER

PERFORATED DIFFUSER

WITH DEFLECTORS

ROUND DIFFUSER WITH

ADJUSTABLE PATTERNS

LOUVERED DOUBLE

DEFLECTION GRILLE

12"x10" / ---

500SG7

TYPE (SEE SCHEDULE)

10" / 24x24 H-5/7/1422

400SD1

3-CONE DIFFUSER

THROW PATTERN

MAX NC RATING

1 / 4' - 0" / 8"

200LSD1

8' - 0" AFF

1 / 4' - 0" / 8"

200LSD1

18' - 0" 1 / 4' - 0" / 8"

200LSD1

SECTION TOTAL TRACK LENGTH

12"x10" / 24x12

500RG9

LOUVERED GRILLE

12"x10" / 24x24

500RG2

EGGCRATE RETURN

GRILLE

BOTTOM OF EQUIPMENT

ELEVATION

590 lb

RTU-XX

4.0 ton

RTU-XX

115000 Btu/h

115 CFH

RTU-XX

Htg: 3.7 GPM

VAV-XX

HEATING COIL

FLOW

OPERATING WEIGHT

NOT INCLUDING CURB

FUEL INPUT

GAS PIPE FLOW

NOMINAL COOLING

CAPACITY

4" FD-AFLOOR DRAIN

VAV BOX

ROOFTOP UNIT

4" AD-6 AREA DRAIN

4" FS-4FLOOR SINK

4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN

8 WFU

4" FD-13HUB DRAIN

DRAIN TAGS

"P" - INDICATES

PRIMER CONNECTION

FIXTURE UNITS

FLOW CONTROL

DRAIN4" SD-12

COMBINATION

DRAINS

STORM DRAIN4" SD-15

ROOF AREA

SERVED BY DRAIN

2" DOM. WM

PIPE ACCESSORY TAGS

DOMESTIC WATER METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL VALVE

3 WAY MOTORIZED CONTROL

VALVE

PRESSURE REDUCING VALVE

REFRIGERANT SOLENOID VALVE

BUTTERFLY VALVE

2" BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY CNTRL

2" PRV

3/8" SOLENOID

2" BUTTERFLY

DATA DEVICE TAGS

DAMPER TAGS

VAV-XX

RTU-XX

EQUIPMENT ID

SYMBOL

BBB INLET COLLAR DAMPER

MANUAL BALANCING DAMPER

BACKDRAFT DAMPER

COMBINATION FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

SENSOR

MANUAL SWITCH

THERMOSTAT

TEMPERATURE SENSOR

TEMPERATURE & HUMIDITY SENSOR

HUMIDITY SENSOR

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT

UPRIGHT SPRINKLER HEAD

PENDENT SPRINKLER HEAD

RECESSED SPRINKLER HEAD

CONCEALED SPRINKLER HEAD

'D' REPRESENTS DRY SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

EXTENDED COVERAGE SIDEWALL SPRINKLER HEAD

WATER

CLOSET-WALL

HUNG-ADA P-101

P-201

1 WFU

P-401

1.5 CWFU

1.5 HWFU

P-401

FIXTURE UNITS

4" WCO

PIPE ACCESORY

TAG

PLUMBING FIXTURE TAGS

4" WCO

TYPE (SEE SCHEDULE)

P-103

CAP

PLUG

GWR

GWS

GEOTHERMAL WATER RETURN

GEOTHERMAL WATER SUPPLY

EXISTING RELOCATED

EQUIPMENT (R)VAV-XX

PLUMBING GENERAL NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE

START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL AND LOCAL

CODES, WHICHEVER IS MORE STRINGENT.

C. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE

OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

D. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS

WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE

OWNER.

E. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

F. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS

24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

G. ALL PLUMBING EQUIPMENT, ACCESSORIES AND/OR PLUMBING FIXTURES WILL

BE SECURED WITH VANDAL RESISTANT MOUNTING HARDWARE.

H. INSTALL VERTICAL SANITARY AND VENT PIPING TRUE AND PLUMB.

I. INSTALL ALL HORIZONTAL SANITARY PIPING SLOPED AT 1/4" PER FOOT.

J. INSTALL HORIZONTAL SANITARY VENT PIPING SLOPED AT 1/8" PER FOOT.

K. REFER TO ARCHITECTURAL PLANS FOR PIPING ACCESS PANEL LOCATIONS.

L. REFER TO FIRE PROTECTION DRAWINGS FOR PIPING AND SPRINKLER HEAD

LOCATIONS.

M. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO

AVOID INTERFERENCE WITH OTHER TRADES. ROUTE ALL PIPING AS HIGH AS

POSSIBLE.

N. COORDINATE FINAL LOCATIONS OF NEW PIPING AND PLUMBING FIXTURES WITH

EXISTING SYSTEMS, STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,

DUCTWORK, PIPING AND SPRINKLERS.

O. REFER TO PLUMBING DETAILS FOR ACCESSORIES AND FINAL CONNECTIONS TO

PLUMBING EQUIPMENT.

P. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT THE

BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH PRESSURE PIPING

SYSTEM. VERIFY WITH ACCESS PANEL LOCATIONS.

Q. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED

ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.

R. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF JOISTS,

BEAM FLANGES OR CONCRETE FLOOR DECK BY APPROVED MEANS.

S. FOR PLUMBING PIPE SIZES, SEE RISER DIAGRAMS.

T. ALL LAVATORIES AND HAND SINKS SHALL HAVE THERMOSTATIC MIXING VALVES

BELOW THE SINKS TO MAINTAIN A MAXIMUM HOT WATER TEMPERATURE OF 110

DEGREES F. MIXING VALVE SHALL BE A WATTS SERIES LFUSG-B LEAD FREE OR

EQUAL.

U. REBALANCE THE BUILDING RECIRCULATED HOT WATER SYSTEM UPON

COMPLETION OF NEW WORK. PROVIDE NEW, OR ADDITIONAL RECIRC. PUMP AS

REQUIRED FOR A COMPLETE AND WORKING BUILDING CIRCULATED HOT WATER

SYSTEM.

V. PROVIDE ISOLATION SHUT-OFF VALVES ON ALL PIPE RUNOUTS FROM MAINS TO

PATIENT ROOMS ,FROM MAINS TO SINGLE PLUMBING FIXTURES, AND WEREVER

SHOWN ON PLANS AND RISERS.

W. FIELD VERIFY ALL NEW WATER, WASTE, AND VENT CONNECTIONS, AND PROVIDE

NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.

X. PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS

NOTED OTHERWISE.

Y. WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"

MINIMUM.

Z. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS AT THE BASE OF ALL

PLUMBING RISERS.

A REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

B THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO

FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN

TENANT SPACE AND WITHIN CLOSE PROXIMITY OF TENANT SPACE.

C THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND REPAIR ON THE EXISTING

EQUIPMENT AND ITS ACCESSORIES AS FOLLOWS: CLEAN ALL COILS, REPLACE THE FILTERS

AND BELTS, INSPECT, REPAIR, OR REPLACE THE ECONOMIZERS, DRIVES AND FAN

BEARINGS, MOTORS, CONTROL COMPONENTS, VALVES AND ANY OTHER ITEM NECESSARY

FOR A COMPLETE AND PROPER OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT

THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING SITE CONDITIONS. PROVIDE

ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE UNITS TO FULL COMPLIANCE

OF THE LANDLORD'S CRITERIA AND LOCAL AUTHORITY HAVING JURISDICTION.

D WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR

TO START OF WORK. UNSEAL DRAINS AT COMPLETION OF CONSTRUCTION.

E COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,

STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.

F THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND

THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE

REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,

ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.

G FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM

TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING

BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL

MECHANICAL CODE.

H LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.

J ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.

K LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE

ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.

L FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO

SPECIFICATION.

M PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,

FLOORS, WALLS, AND ROOF.

N ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL

EQUIPMENT.

P REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.

Q PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE

IS SHOWN.

R FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE

SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

S INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S

WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP

CONSISTENT WITH THE SPECIFICATIONS.

T LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE

APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE

COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.

U INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT

CEILINGS.

PP-100 PLUMBING SYMBOLS AND ABBREVIATIONS

PD102U-P2 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA K - PHASE 2

PD103U-P2 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA H - PHASE 2

PD104U-P3 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA L- PHASE 3

PD101-P1 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA L - PHASE 1

PD102-P2 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA K - PHASE 2

PD103-P2 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA H - PHASE 2

PD104-P3 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA L - PHASE 3

PP102U-P2 PLUMBING PLANS - UNDERGROUND - AREA K - PHASE 2

PP103U-P2 PLUMBING PLANS - UNDERGROUND- AREA H - PHASE 2

PP104U-P3 PLUMBING PLANS - UNDERGROUND - AREA L - PHASE 3

PP101-P1 PLUMBING PLANS - LEVEL 1 - AREA L - PHASE 1

PP102-P2 PLUMBING PLANS - LEVEL 1 - AREA K - PHASE 2

PP103-P2 PLUMBING PLANS - LEVEL 1 - AREA H - PHASE 2

PP104-P3 PLUMBING PLANS - LEVEL 1 - AREA L - PHASE 3

PP-501 PLUMBING DETAILS

PP-601 PLUMBING SCHEDULES

PP-901 WASTE & VENT RISER DIAGRAMS

PP-902 WASTE & VENT RISER DIAGRAMS

PP-903 DOMESTIC RISER DIAGRAMS

PP-904 DOMESTIC RISER DIAGRAMS

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE

START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION

ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS

THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.

CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS

ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON

COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS

WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED

OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.

REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF

THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,

LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR

AND RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT

BEYOND DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION

DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION

DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,

WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION

REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE

SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY

AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY

OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE

WORK WITH THE OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES

TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF

CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT

STRUCTURES OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE

ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT

CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS.

O. DEMO ALL PIPING NOTED TO BE DEMOLISHED BACK TO ITS SOURCE, DO

NOT LEAVE DEAD ENDS. DO NOT ABANDON UNUSED PIPING.

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________ Typed or printed name: Chad Michael Eslinger Date: ___________ License Number: 4871001/07/2021

EXERCISE

1K-119

CLN. LIN.

1K-121

STOR.

1K-120

THEATER

1K-118

STOR.

1K-125

SENS

1K-124

HSKP

1K-127

ROUND

1K-123

ROUND

1K-126

SOIL

1K-122

TLT.

1K-106A

TLT.

1K-116A

DOUBLE

1K-116

TLT.

1K-114A

TLT.

1K-115A

TLT.

1K-113A

TLT.

1K-112A

TLT.

1K-104A

TLT.

1K-105A

TLT.

1K-102A

TLT.

1K-103A

TLT.

1K-108A

TLT.

1K-107A

PT. STOR.

1H-114

MEDS.

1H-112

DOUBLE

1K-115

DOUBLE

1K-114

DOUBLE

1K-113

DOUBLE

1K-117

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03PD03

PD03

PD03

KEYNOTE LEGEND

KEY DESCRIPTION

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREA K, PHASE 2

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START

OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER

PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT

ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO

VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF

DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS

SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS

REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY

CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO

THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE

SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND

RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND

DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS

TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN

DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS

ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS

WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE

OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES

OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS

24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

RESIDENTS TM. RM.

1H-108

CORR 2

C1-67

PT. STOR.

1H-114

STAFF LKR/TLT

1H-103

STAFF BREAK

1H-104

NOURISHMENT

1H-109

MEDS.

1H-112

PD03

PD03

PD03

PD03

PD03

SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREAH, PHASE 2

KEYNOTE LEGEND

KEY DESCRIPTION

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START

OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER

PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT

ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO

VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF

DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS

SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS

REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY

CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO

THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE

SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND RESTORATION

TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS

TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN

DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS

ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS

WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE

OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES

OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS

24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING AND

ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

PD03

EXISTING 4" SS TO REMAIN

EXISTING 4" SS TO REMAIN

PD03

PD03

PD03 PD03 PD03

PD03PD03PD03

PD03

PD03

PD03

PD03

EXISTING 4" SANITARY SEWER MAIN (SS)

AND ALL ASSOCIATED RUNOUT

PIPING ARE TO BE REMOVED. TYPICAL

EXISTING 4" SANITARY SEWER MAIN (SS)

AND ALL ASSOCIATED RUNOUT

PIPING ARE TO BE REMOVED. TYPICAL

EXISTING 4" SANITARY SEWER MAIN (SS)

AND ALL ASSOCIATED RUNOUT

PIPING ARE TO BE REMOVED. TYPICAL

PD03

EXISTING 4" SANITARY SEWER MAIN (SS)

AND ALL ASSOCIATED RUNOUT

PIPING ARE TO BE REMOVED. TYPICAL

PD03

PD03PD03 PD03

PD03

PD03

PD03

PD03

PD03PD03

PD03

SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREA L, PHASE 3

KEYNOTE LEGEND

KEY DESCRIPTION

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE

START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS

THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.

CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS

ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON

COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS

WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED

OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.

REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF

THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,

LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND

RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND

DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION

DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION

DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,

WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION

REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE

SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY

AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY

OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE

WORK WITH THE OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO

THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF

CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT

STRUCTURES OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT

CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

PD01

PD01

PD01

PD01

PD01

PD01

PD01 PD01 PD01

PD01

PD01 PD01

PD01

PD01

PD01

PD01

PD01

PD01

PD01

PD01

PD01

PD01

PD01PD01

PD01

PD01

PD01

PD01

PD02

PD02

KEYNOTE LEGEND

KEY DESCRIPTION

PD01 REMOVE EXISTING PLUMBING FIXTURE. MAINTAIN EXISTING ASSOCIATED PLUMBING

PIPING AND MAKE READY FOR NEW PLUMBING FIXTURE, IN THE SAME LOCATION.

PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING

BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.

SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA L, PHASE 1

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE

START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT

ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO

VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED

OF DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE

SYSTEMS SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR

AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT

ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE

PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE

SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND

RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND

DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED

BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY

ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT

WORK IS WITHIN DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE

OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY

OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK

WITH THE OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR

TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE

PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION

ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT

STRUCTURES OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT

CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

CLN. LIN.

1K-121

STOR.

1K-120

THEATER

1K-118

STOR.

1K-125

SENS

1K-124

HSKP

1K-127

ROUND

1K-123

ROUND

1K-126

SOIL

1K-122

TLT.

1K-106A

TLT.

1K-116A

DOUBLE

1K-116

TLT.

1K-114A

TLT.

1K-115A

TLT.

1K-113A

TLT.

1K-112A

TLT.

1K-104A

TLT.

1K-105A

TLT.

1K-102A

TLT.

1K-103A

TLT.

1K-108A

TLT.

1K-107A

PT. STOR.

1H-114

MEDS.

1H-112

DOUBLE

1K-115

DOUBLE

1K-114

DOUBLE

1K-113

DOUBLE

1K-117

PD02

PD03

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD03

PD03

PD03PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03PD03

PD03

PD03

PD03

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD03

PD02

KEYNOTE LEGEND

KEY DESCRIPTION

PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING

BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT

MAINS AS SHOWN DASHED ON PLAN

SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA K, PHASE 2

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE

START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION

ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS

THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.

CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS

ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON

COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS

WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED

OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.

REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF

THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,

LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR

AND RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT

BEYOND DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION

DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION

DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,

WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION

REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE

SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY

AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY

OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE

WORK WITH THE OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS

PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES

TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF

CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT

STRUCTURES OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE

ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT

CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

CORR 2

C1-67

PT. STOR.

1H-114

STAFF LKR/TLT

1H-103

STAFF BREAK

1H-104

NOURISHMENT

1H-109

MEDS.

1H-112

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD03PD03

PD02 PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD02

PD03

PD03

PD03

PD03

PD03

PD02

PD02

PD05

PD05

PD02

KEYNOTE LEGEND

KEY DESCRIPTION

PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING

BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT

MAINS AS SHOWN DASHED ON PLAN

SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA H, PHASE 2

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START

OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER

PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT

ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO

VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF

DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS

SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS

REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY

CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO

THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE

SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND RESTORATION

TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS

TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN

DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS

ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS

WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE

OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES

OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS

24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

PD04

PD04 PD04

PD04

PD04

PD04

PD04 PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04 PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD04

PD03 PD03

PD03

PD03

PD03

PD03 PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03

PD03PD03

PD03

PD03PD03 PD03

PD04

PD02

PD02

PD05

PD05PD05

PD05

PD05

PD05

PD05

PD05

PD05

PD05

REMOVE EXISTING RECIRCULATED

HOT WATER PIPING

REMOVE EXISTING DOMESTIC

WATER MAINS- TYPICAL

REMOVE EXISTING DOMESTIC

WATER MAINS- TYPICAL

REMOVE EXISTING DOMESTIC

WATER MAINS- TYPICAL

4"

4" V

4"

2 1/2" CW

2"

3/4" HW-R

6" V

2" HW2 1/2" CW

2"

2 1/2" CW4"

3/4" HW

3" V

3/4" CW

1 1/2" HW2 1/2" CW

4" V

1/2" HW-R

3/4" HW 2" CW 4" V

PD04

KEYNOTE LEGEND

KEY DESCRIPTION

PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING

BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.

PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE

SIZES AND LOCATIONS.

PD04 REMOVE EXISTING PLUMBING FIXTURE THAT WAS INSTALLED IN PHASE 1. STORE

EXISTING FIXTURES IN A CLEAN DRY AREA DESIGNATED BY THE VA

REPRESENTATIVE FOR RE-INSTALLATION IN NEW REMODELED SPACE.``

PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT

MAINS AS SHOWN DASHED ON PLAN

SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA L, PHASE 3

PLUMBING DEMOLITION NOTES

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START

OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER

PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT

ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO

VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF

DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS

SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.

C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR

AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT

ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT

TO THE OWNER BEFORE PROCEEDING WITH THE WORK.

D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE

SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.

E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION

OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND

RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND

DAMAGE.

F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY

DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY

ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT

WORK IS WITHIN DEMOLITION AREAS SHOWING.

G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS

AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE

CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE

OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.

H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS

WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE

OWNER.

I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT

ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.

J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A

MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES

OR STRUCTURES BELOW.

K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.

L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS

REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.

M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER

CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS

24 HOURS A DAY FOR THE DURATION OF THE PROJECT.

N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING

AND ELECTRICAL DRAWINGS

CME

Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature: ______________________________________

CLN. LIN.

1K-121

STOR.

1K-120

THEATER

1K-118

STOR.

1K-125

SENS

1K-124

HSKP

1K-127

ROUND

1K-123 ROUND

1K-126

SOIL

1K-122

TLT.

1K-106A

TLT.

1K-116A

TLT.

1K-113A

TLT.

1K-112A

TLT.

1K-104A

TLT.

1K-105A

TLT.

1K-102A

TLT.

1K-103A

TLT.

1K-108A

TLT.

1K-107A

PT. STOR.

1H-114

MEDS.

1H-112

DOUBLE

1K-115

DOUBLE

1K-114

DOUBLE

1K-113

DOUBLE

1K-117

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

4" SS UP

TO P-1011-1/2" V UP

1-1/2" V UP

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

4" SS UP

TO P-101

1-1/2" V UP

1-1/2" V UP

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

4" SS UP

TO P-101

1-1/2" V UP

1-1/2" V UP

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" V UP

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" V UP

4" SS UP

TO P-101

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

1-1/2" V UP

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" V UP

4" SS UP

TO P-101

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

2" SS UP

TO TD-1

2" SS UP

TO TD-1

1-1/2" V UP

4" SS UP

TO P-101

1-1/2" SS UP

TO P-401

1-1/2" SS UP

TO P-401

1-1/2" V UP

1-1/2" SS UP

TO P-401

4" SS UP

TO P-101

2" SS UP

TO TD-1

3" SS UP TP FD-A

4" SS

4" SS UP TO

LAV AND WC

2" SS UP

TO TD-1

4" SS UP TO

LAV AND WC

1-1/2" V UP

2" UP TO

TD-1

1-1/2" SS

UP TO P-401

4" SS UP

TO P-101

4" S

S

1-1/2" V UP

PP04

2" SS

1-1/2"SS UP TO P-708

1-1/2"SS UP TO P-512

3"SS UP TO P-501

1-1/2"V UP

1-1/2"SS UP TO P-708

2" SS UP

4" SS 4" SS

4" SS4" SS

4" S

S 4"

S S

4" S

S 4"

S S

4" S

S 4"

S S

4"SANITARY IN TUNNEL BELOW LEVEL 1

INV. EL. 15'-7" ABOVE TUNNEL FLOOR OR

APPROX. 3'-0" BELOW LEVEL 1 TOP OF SLAB

4"SANITARY IN TUNNEL BELOW LEVEL 1.

4"SANITARY IN TUNNEL BELOW LEVEL 1.

4"SS UP TO F.C.O.

2"SS UP TO F.C.O.

2" SS

2" SS

2" S

S

2"SS UP TO F.C.O.

4" SS4" SS

2" SS

2"SS UP TO F.C.O.

4" SS 4" SS

4" SS

4"SS UP TO F.C.O.

4"SANITARY IN TUNNEL BELOW LEVEL 1

INV. EL. 12'-5" ABOVE TUNNEL FLOOR.

1-1/2" V UP

2" SS UP

TO TD-1

1-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .