ATTACHMENT 4 - VAMH-618-17-127 CD SET_4.pdf
PDF 8 MB Posted
- Solicitation number
- 36E77620R0050
About this file
This notice provides details for a planned solicitation seeking proposals for design-build renovation services at the Minneapolis VA Medical Center. The Department of Veterans Affairs intends to award a firm-fixed-price contract to furnish all labor, materials, tools and equipment for renovating Mental Health Wards 1L, 1H and 1K, including general construction, demolition, structural, civil, mechanical, plumbing, electrical and low voltage work. The solicitation will be issued as a request for proposal on February 4, 2020, with a period of performance of approximately 790 calendar days from notice to proceed. The construction value is estimated between $10-20 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and use NAICS code 236220 with a size standard of $39.5 million.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HJKLMNPQRSTUVWX
WON-DOOR
AREA K
FIRE SPRINKLER ZONE K
AREA L
FIRE SPRINKLER ZONE L
AREA H
FIRE SPRINKLER ZONE H
1-HR FIRE/SMOKE BARRIER
SCALE: 1/16" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 OVERALL
MNPQRST
FX01
FX01 FX01
FX01
FX03
FX06
LIGHT HAZARD
DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT
ORDINARY HAZARD GROUP 2
DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT
HATCH LEGEND
NOT IN SCOPE
ORDINARY HAZARD GROUP 1
DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT
THE SCOPE OF WORK FOR AREA L PHASE 1 SHALL BE AS FOLLOWS
1. DEMOLISH SPRINKLERS AND ARMOVER PIPING IN THE AREAS OF NEW WALLS AND
IN CONFLICT WITH NEW DOORS AND CEILINGS.
2. ADD/RELOCATE SPRINKLERS TO ACCOMMODATE NEW WALLS AND CEILING
LAYOUTS.
3. MAIN AND BRANCH PIPING TO REMAIN FOR PHASE 1.
4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.
5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.
FIRE SUPPRESSION SCOPE OF WORK
SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA L PHASE 1
KEYNOTE LEGEND
KEY DESCRIPTION
FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND
ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.
FX03 EXISTING AREA L VALVE ASSEMBLY LOCATED HERE.
FX06 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE. BRANCH LINE
PIPING NOT SHOWN IS TO REMAIN FOR PHASE 1.
TUVWX
FX01
FX01FX01
EXERCISE
1K-119
SOIL
1K-122
HSKP
1K-127
ROUND
1K-123
ROUND
1K-126
SENS
1K-124
STOR.
1K-125
DOUBLE 117
1K-117
DOUBLE 114
1K-114
DOUBLE 115
1K-115
DOUBLE 112
1K-112
DOUBLE 111
1K-111
TLT.
1K-116A
TLT.
1K-110A
DOUBLE 110
1K-110
TLT.
1K-108A
BARIATRIC SINGLE
1K-108
BARIATRIC SINGLE
1K-107
TLT.
1K-104A
SINGLE 104
1K-104
SINGLE 105
1K-105
TLT.
1K-106A
SINGLE 106
1K-106
STOR
1K-109 TLT.
1K-111A
DOUBLE 116
1K-116
TLT.
1K-114A
TLT.
1K-115A
DOUBLE 113
1K-113
TLT.
1K-113A
TLT.
1K-112A
SINGLE 102
1K-102
TLT.
1K-102A
SINGLE 103
1K-103
TLT.
1K-103A
TLT.
1K-105A
SINGLE
1K-101
TLT.
1K-101A
CLN. LIN.
1K-121
MEDS.
1H-112
CORR 2
C1-67
PT. STOR.
1H-114
THEATER
1K-118
TLT.
1K-107A
CORR 1
C1-69
CORR 1
C1-71
CORR 1
C1-70
CORR 1
C1-71A
FX01
FX05
FX07
LIGHT HAZARD
DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT
ORDINARY HAZARD GROUP 2
DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT
HATCH LEGEND
NOT IN SCOPE
ORDINARY HAZARD GROUP 1
DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT
THE SCOPE OF WORK FOR AREAS H AND K PHASE 2 SHALL BE AS FOLLOWS
1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS H AND
K.
2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW
MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.
3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO
ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER
HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL
FEATURES.
4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.
5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.
FIRE SUPPRESSION SCOPE OF WORK
SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA K PHASE 2
KEYNOTE LEGEND
KEY DESCRIPTION
FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND
ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.
FX05 EXISTING AREA K VALVE ASSEMBLY LOCATED HERE.
FX07 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE.
TUVWX
FX02FX02
FX02
FX01
MD OFFICE
1H-111
STAFF LKR/TLT
1H-105
STAFF LKR/TLT
1H-103
STAFF BREAK
1H-104
CORR 2
C1-66
? MEDS.
1H-112
ASST. RN.
1H-107
CORR 2
C1-67
PT. STOR.
1H-114
RX OFF.
1H-113
NOURISHMENT
1H-109
NURSE STATION
1H-110
RESIDENTS TM. RM.
1H-108
WORK ROOM
1H-110A
ELEVATOR LOBBY
C1-313 ELEVATOR LOBBY
C1-314
CORR.
C1-75
CORR 2
C1-65
CORR 2
C1-67A
MSA
1H-110B
FX01
FX04
FX02
FX08
LIGHT HAZARD
DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT
ORDINARY HAZARD GROUP 2
DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT
HATCH LEGEND
NOT IN SCOPE
ORDINARY HAZARD GROUP 1
DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT
THE SCOPE OF WORK FOR AREAS H AND K PHASE 2 SHALL BE AS FOLLOWS
1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS H AND
K.
2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW
MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.
3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO
ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER
HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL
FEATURES.
4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.
5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.
FIRE SUPPRESSION SCOPE OF WORK
SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA H PHASE 2
KEYNOTE LEGEND
KEY DESCRIPTION
FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND
ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.
FX02 INSTALL NEW SEMI-RECESSED SPRINKLERS IN SMOKE ZONE H AND ASSOCIATED
PIPING TO ACCOMMODATE NEW WALLS.
FX04 EXISTING AREA H VALVE ASSEMBLY LOCATED HERE.
FX08 CONTROL VALVE LOCATED HERE
LMNPQRST
GROUP THERAPY
1L-116REC THERAPY
1L-112
CI-61
C1-61
REC. THER. OFFICE
1L-112B
SINGLE 122
1L-122
SINGLE 121
1L-121
TLT.
1L-121A
TLT.
1L-122A
SINGLE 123
1L-123
SINGLE 124
1L-124
TLT.
1L-124A
SINGLE
1L-125
TLT.
1L-125A
SINGLE
1L-126
MSA
1H-110B
SENS
1L-129
SECL
1L-128C
SECL
1L-128B ANTE RM.
1L-128
FAM
1L-107
FAMILY ROOM
1L-105
INTERVIEW
1L-102
TOILET 101
1L-101
EXAM
1L-104
LAUNDRY
1L-106
OCC THERAPY
1L-114
OCC. THER. OFFICE
1L-114B
TLT.
1L-128A
HIGH ACUITY RN
STATION
1L-120
SOIL
1L-127
TOILET 113
1L-113A
TLT.
1L-123A
TLT.
1L-126A
VAPD STOR.
1L-103
DAY ROOM
1L-110
RN-MGR.
1L-109
SOCIAL WRKR
OFFICE
1L-115CLN. LIN.
1L-113
STOR.
1L-140
DINING
1L-130
SERVING AREA
1L-131
FX01
FX01FX01
FX01
FX01
FX03
FX07
STORAGE
1L-225
LIGHT HAZARD
DENSITY: 0.10 GPM/SQFT OVER 1500 SQFT
ORDINARY HAZARD GROUP 2
DENSITY: 0.20 GPM/SQFT OVER 2500 SQFT
HATCH LEGEND
NOT IN SCOPE
ORDINARY HAZARD GROUP 1
DENSITY: 0.15 GPM/SQFT OVER 2500 SQFT
THE SCOPE OF WORK FOR AREAS L PHASE 3 SHALL BE AS FOLLOWS
1. DEMOLISH ALL SPRINKLERS, ARMOVER, AND BRANCHLINE PIPING IN AREAS L
2. EXISTING MAIN PIPING IS TO REMAIN. IF EXISTING MAIN IS IN CONFLICT WITH NEW
MECHANICAL OR CEILINGS, REROUTE MAIN TO ACCOMMODATE NEW FEATURES.
3. INSTALL NEW SPRINKLERS, BRANCHLINE, AND ARMOVER PIPING TO
ACCOMMODATE NEW WALLS AND CEILING LAYOUT. COORDINATE SPRINKLER
HEAD LOCATIONS WITH ELECTRICAL, MECHANICAL AND ARCHITECTURAL
FEATURES.
4. COORDINATE THE CONSTRUCTION PHASING WITH THE GENERAL CONTRACTOR.
5. SEE GENERAL DEMO AND FIRE SUPPRESSION NOTES ON SHEET F-001.
FIRE SUPPRESSION SCOPE OF WORK
SCALE: 1/8" = 1'-0"1 FIRE SUPPRESSION PLAN LEVEL 1 AREA L PHASE 3
KEYNOTE LEGEND
KEY DESCRIPTION
FX01 INSTALL NEW INSTITUTIONAL STYLE SPRINKLERS IN SMOKE ZONES L AND K AND
ASSOCIATED PIPING TO ACCOMMODATE NEW WALLS.
FX03 EXISTING AREA L VALVE ASSEMBLY LOCATED HERE.
FX07 EXISTING SPRINKLER MAIN TO REMAIN. LOCATION IS APPROXIMATE.
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
CHWS
CWV
CA
CD
CDR
CWR
CWS
CW
F-CW
H-CW
S-CW
HW
HW 140°
HW-R
HW-R 140°
GV
GW
HWR
HWS
G
OV
OW
PD
V
SS
SHWR
SHWS
STM
SD
OSD
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMBINATION WASTE & VENT
COMPRESSED AIR
CONDENSATE DRAINAGE
CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DOMESTIC COLD WATER
FILTERED COLD WATER
HARD COLD WATER
SOFT COLD WATER
HOT WATER
HOT WATER 140°
HOT WATER RECIRCULATION
HOT WATER RECIRCULATION 140°
GREASE VENT
GREASE WASTE
HEATING WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
OIL VENT
OIL WASTE
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
SOLAR HOT WATER RETURN
SOLAR HOT WATER SUPPLY
STEAM
STORM DRAINAGE
OVERFLOW STORM DRAINAGE
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
2"
4"
4"
REF-HG REFRIGERANT-HOT GAS
PLUMBING AND PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
DRAIN SIZE
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
PG PROPANE GAS
TYPE (SEE SCHEDULE)
Room
INVERT: -10' - 1"
1/8" / 12" SLOPE
RO REVERSE OSMOSIS WATER
IW INDIRECT WASTE
16"x8"
16"/8"
(E)
F
S
M
B
D
C
16"Ø
E/A
O/A
T/A
L/A
R/A
S/A
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS TAG
CFM
THROW-150FPM/ 100FPM/ 50FPM
NECK SIZE / MODULE SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
LINEAR DIFFUSER TAG
CFM
TYPE (SEE SCHEDULE) NUMBER OF SLOTS /
ACTIVE SLOT LENGTH (PLENUM LENGTH) /
NECK SIZE
DUCT BEING DEMOLISHED
ELEVATION (CENTER OF FACE)
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GE/A GREASE EXHAUST AIR
SE/A SMOKE EXHAUST AIR
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL INFORMATION)
EXISTING EQUIPMENT
TO REMAIN
FLUE EXHAUST GAS FLUE
C/A COMBUSTION AIR
S-O/A CONDITIONED OUTSIDE AIR
VAV-XX
10' - 0"
(E)VAV-XX
VAV-XX
FIRE PROTECTION SYMBOLS
OBSTRUCTION FROM DUCTWORK 48"
AND GREATER
FP-DOM-W
FP-W
FP-PA
FP-O
FP-D
FIRE PROTECTION OTHER
FIRE PROTECTION DRY
FIRE PROTECTION PRE-ACTION
FIRE PROTECTION WET
COMBINATION FIRE & DOMESTIC
48"x18" S/A
4000 SF
6" SD-1
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EWS EMERGENCY SHOWER
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
SS STAINLESS STEEL
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
48"x2 1/2"
400SLB3
8" / 24x24
300SD3
12" / ---
SD9
LINEAR BAR GRILLE
LINEAR SLOT DIFFUSER
PERFORATED DIFFUSER
WITH DEFLECTORS
ROUND DIFFUSER WITH
ADJUSTABLE PATTERNS
LOUVERED DOUBLE
DEFLECTION GRILLE
12"x10" / ---
500SG7
TYPE (SEE SCHEDULE)
10" / 24x24 H-5/7/1422
400SD1
3-CONE DIFFUSER
THROW PATTERN
MAX NC RATING
1 / 4' - 0" / 8"
200LSD1
8' - 0" AFF
1 / 4' - 0" / 8"
200LSD1
18' - 0" 1 / 4' - 0" / 8"
200LSD1
SECTION TOTAL TRACK LENGTH
12"x10" / 24x12
500RG9
LOUVERED GRILLE
12"x10" / 24x24
500RG2
EGGCRATE RETURN
GRILLE
BOTTOM OF EQUIPMENT
ELEVATION
590 lb
RTU-XX
4.0 ton
RTU-XX
115000 Btu/h
115 CFH
RTU-XX
Htg: 3.7 GPM
VAV-XX
HEATING COIL
FLOW
OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY
4" FD-AFLOOR DRAIN
VAV BOX
ROOFTOP UNIT
4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
8 WFU
4" FD-13HUB DRAIN
DRAIN TAGS
"P" - INDICATES
PRIMER CONNECTION
FIXTURE UNITS
FLOW CONTROL
DRAIN4" SD-12
COMBINATION
DRAINS
STORM DRAIN4" SD-15
ROOF AREA
SERVED BY DRAIN
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
DATA DEVICE TAGS
DAMPER TAGS
VAV-XX
RTU-XX
EQUIPMENT ID
SYMBOL
BBB INLET COLLAR DAMPER
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
SENSOR
MANUAL SWITCH
THERMOSTAT
TEMPERATURE SENSOR
TEMPERATURE & HUMIDITY SENSOR
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
HUMIDISTAT
UPRIGHT SPRINKLER HEAD
PENDENT SPRINKLER HEAD
RECESSED SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
'D' REPRESENTS DRY SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
EXTENDED COVERAGE SIDEWALL SPRINKLER HEAD
WATER
CLOSET-WALL
HUNG-ADA P-101
P-201
1 WFU
P-401
1.5 CWFU
1.5 HWFU
P-401
FIXTURE UNITS
4" WCO
PIPE ACCESORY
TAG
PLUMBING FIXTURE TAGS
4" WCO
TYPE (SEE SCHEDULE)
P-103
CAP
PLUG
GWR
GWS
GEOTHERMAL WATER RETURN
GEOTHERMAL WATER SUPPLY
EXISTING RELOCATED
EQUIPMENT (R)VAV-XX
PLUMBING GENERAL NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL AND LOCAL
CODES, WHICHEVER IS MORE STRINGENT.
C. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
D. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
E. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
F. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
G. ALL PLUMBING EQUIPMENT, ACCESSORIES AND/OR PLUMBING FIXTURES WILL
BE SECURED WITH VANDAL RESISTANT MOUNTING HARDWARE.
H. INSTALL VERTICAL SANITARY AND VENT PIPING TRUE AND PLUMB.
I. INSTALL ALL HORIZONTAL SANITARY PIPING SLOPED AT 1/4" PER FOOT.
J. INSTALL HORIZONTAL SANITARY VENT PIPING SLOPED AT 1/8" PER FOOT.
K. REFER TO ARCHITECTURAL PLANS FOR PIPING ACCESS PANEL LOCATIONS.
L. REFER TO FIRE PROTECTION DRAWINGS FOR PIPING AND SPRINKLER HEAD
LOCATIONS.
M. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO
AVOID INTERFERENCE WITH OTHER TRADES. ROUTE ALL PIPING AS HIGH AS
POSSIBLE.
N. COORDINATE FINAL LOCATIONS OF NEW PIPING AND PLUMBING FIXTURES WITH
EXISTING SYSTEMS, STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,
DUCTWORK, PIPING AND SPRINKLERS.
O. REFER TO PLUMBING DETAILS FOR ACCESSORIES AND FINAL CONNECTIONS TO
PLUMBING EQUIPMENT.
P. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT THE
BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH PRESSURE PIPING
SYSTEM. VERIFY WITH ACCESS PANEL LOCATIONS.
Q. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED
ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.
R. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF JOISTS,
BEAM FLANGES OR CONCRETE FLOOR DECK BY APPROVED MEANS.
S. FOR PLUMBING PIPE SIZES, SEE RISER DIAGRAMS.
T. ALL LAVATORIES AND HAND SINKS SHALL HAVE THERMOSTATIC MIXING VALVES
BELOW THE SINKS TO MAINTAIN A MAXIMUM HOT WATER TEMPERATURE OF 110
DEGREES F. MIXING VALVE SHALL BE A WATTS SERIES LFUSG-B LEAD FREE OR
EQUAL.
U. REBALANCE THE BUILDING RECIRCULATED HOT WATER SYSTEM UPON
COMPLETION OF NEW WORK. PROVIDE NEW, OR ADDITIONAL RECIRC. PUMP AS
REQUIRED FOR A COMPLETE AND WORKING BUILDING CIRCULATED HOT WATER
SYSTEM.
V. PROVIDE ISOLATION SHUT-OFF VALVES ON ALL PIPE RUNOUTS FROM MAINS TO
PATIENT ROOMS ,FROM MAINS TO SINGLE PLUMBING FIXTURES, AND WEREVER
SHOWN ON PLANS AND RISERS.
W. FIELD VERIFY ALL NEW WATER, WASTE, AND VENT CONNECTIONS, AND PROVIDE
NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.
X. PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS
NOTED OTHERWISE.
Y. WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"
MINIMUM.
Z. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS AT THE BASE OF ALL
PLUMBING RISERS.
A REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
B THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO
FINAL BID, ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN
TENANT SPACE AND WITHIN CLOSE PROXIMITY OF TENANT SPACE.
C THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND REPAIR ON THE EXISTING
EQUIPMENT AND ITS ACCESSORIES AS FOLLOWS: CLEAN ALL COILS, REPLACE THE FILTERS
AND BELTS, INSPECT, REPAIR, OR REPLACE THE ECONOMIZERS, DRIVES AND FAN
BEARINGS, MOTORS, CONTROL COMPONENTS, VALVES AND ANY OTHER ITEM NECESSARY
FOR A COMPLETE AND PROPER OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT
THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING SITE CONDITIONS. PROVIDE
ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE UNITS TO FULL COMPLIANCE
OF THE LANDLORD'S CRITERIA AND LOCAL AUTHORITY HAVING JURISDICTION.
D WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR
TO START OF WORK. UNSEAL DRAINS AT COMPLETION OF CONSTRUCTION.
E COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,
STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
F THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND
THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE
REASONABLY ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL,
ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
G FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM
TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING
BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL
MECHANICAL CODE.
H LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
J ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
K LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
L FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
M PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
N ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL
EQUIPMENT.
P REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
Q PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE
IS SHOWN.
R FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE
SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
S INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP
CONSISTENT WITH THE SPECIFICATIONS.
T LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
U INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT
CEILINGS.
PP-100 PLUMBING SYMBOLS AND ABBREVIATIONS
PD102U-P2 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA K - PHASE 2
PD103U-P2 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA H - PHASE 2
PD104U-P3 PLUMBING DEMOLITION PLANS - UNDERGROUND - AREA L- PHASE 3
PD101-P1 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA L - PHASE 1
PD102-P2 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA K - PHASE 2
PD103-P2 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA H - PHASE 2
PD104-P3 PLUMBING DEMOLITION PLANS - LEVEL 1 - AREA L - PHASE 3
PP102U-P2 PLUMBING PLANS - UNDERGROUND - AREA K - PHASE 2
PP103U-P2 PLUMBING PLANS - UNDERGROUND- AREA H - PHASE 2
PP104U-P3 PLUMBING PLANS - UNDERGROUND - AREA L - PHASE 3
PP101-P1 PLUMBING PLANS - LEVEL 1 - AREA L - PHASE 1
PP102-P2 PLUMBING PLANS - LEVEL 1 - AREA K - PHASE 2
PP103-P2 PLUMBING PLANS - LEVEL 1 - AREA H - PHASE 2
PP104-P3 PLUMBING PLANS - LEVEL 1 - AREA L - PHASE 3
PP-501 PLUMBING DETAILS
PP-601 PLUMBING SCHEDULES
PP-901 WASTE & VENT RISER DIAGRAMS
PP-902 WASTE & VENT RISER DIAGRAMS
PP-903 DOMESTIC RISER DIAGRAMS
PP-904 DOMESTIC RISER DIAGRAMS
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION
ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS
THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.
CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS
ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON
COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS
WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED
OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.
REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF
THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,
LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR
AND RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT
BEYOND DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION
DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION
DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,
WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION
REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE
SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY
AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY
OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
WORK WITH THE OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES
TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF
CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT
STRUCTURES OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE
ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT
CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS.
O. DEMO ALL PIPING NOTED TO BE DEMOLISHED BACK TO ITS SOURCE, DO
NOT LEAVE DEAD ENDS. DO NOT ABANDON UNUSED PIPING.
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________ Typed or printed name: Chad Michael Eslinger Date: ___________ License Number: 4871001/07/2021
EXERCISE
1K-119
CLN. LIN.
1K-121
STOR.
1K-120
THEATER
1K-118
STOR.
1K-125
SENS
1K-124
HSKP
1K-127
ROUND
1K-123
ROUND
1K-126
SOIL
1K-122
TLT.
1K-106A
TLT.
1K-116A
DOUBLE
1K-116
TLT.
1K-114A
TLT.
1K-115A
TLT.
1K-113A
TLT.
1K-112A
TLT.
1K-104A
TLT.
1K-105A
TLT.
1K-102A
TLT.
1K-103A
TLT.
1K-108A
TLT.
1K-107A
PT. STOR.
1H-114
MEDS.
1H-112
DOUBLE
1K-115
DOUBLE
1K-114
DOUBLE
1K-113
DOUBLE
1K-117
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03PD03
PD03
PD03
KEYNOTE LEGEND
KEY DESCRIPTION
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREA K, PHASE 2
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER
PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT
ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO
VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF
DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS
SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS
REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY
CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO
THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE
SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND
RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND
DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS
TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN
DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS
ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES
OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
RESIDENTS TM. RM.
1H-108
CORR 2
C1-67
PT. STOR.
1H-114
STAFF LKR/TLT
1H-103
STAFF BREAK
1H-104
NOURISHMENT
1H-109
MEDS.
1H-112
PD03
PD03
PD03
PD03
PD03
SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREAH, PHASE 2
KEYNOTE LEGEND
KEY DESCRIPTION
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER
PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT
ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO
VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF
DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS
SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS
REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY
CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO
THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE
SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND RESTORATION
TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS
TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN
DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS
ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES
OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING AND
ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
PD03
EXISTING 4" SS TO REMAIN
EXISTING 4" SS TO REMAIN
PD03
PD03
PD03 PD03 PD03
PD03PD03PD03
PD03
PD03
PD03
PD03
EXISTING 4" SANITARY SEWER MAIN (SS)
AND ALL ASSOCIATED RUNOUT
PIPING ARE TO BE REMOVED. TYPICAL
EXISTING 4" SANITARY SEWER MAIN (SS)
AND ALL ASSOCIATED RUNOUT
PIPING ARE TO BE REMOVED. TYPICAL
EXISTING 4" SANITARY SEWER MAIN (SS)
AND ALL ASSOCIATED RUNOUT
PIPING ARE TO BE REMOVED. TYPICAL
PD03
EXISTING 4" SANITARY SEWER MAIN (SS)
AND ALL ASSOCIATED RUNOUT
PIPING ARE TO BE REMOVED. TYPICAL
PD03
PD03PD03 PD03
PD03
PD03
PD03
PD03
PD03PD03
PD03
SCALE: 1/8" = 1'-0"1 UNDERGROUND PLUMBING DEMOLITION PLAN, AREA L, PHASE 3
KEYNOTE LEGEND
KEY DESCRIPTION
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS
THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.
CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS
ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON
COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS
WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED
OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.
REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF
THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,
LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND
RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND
DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION
DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION
DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,
WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION
REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE
SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY
AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY
OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
WORK WITH THE OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF
CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT
STRUCTURES OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT
CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
PD01
PD01
PD01
PD01
PD01
PD01
PD01 PD01 PD01
PD01
PD01 PD01
PD01
PD01
PD01
PD01
PD01
PD01
PD01
PD01
PD01
PD01
PD01PD01
PD01
PD01
PD01
PD01
PD02
PD02
KEYNOTE LEGEND
KEY DESCRIPTION
PD01 REMOVE EXISTING PLUMBING FIXTURE. MAINTAIN EXISTING ASSOCIATED PLUMBING
PIPING AND MAKE READY FOR NEW PLUMBING FIXTURE, IN THE SAME LOCATION.
PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING
BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA L, PHASE 1
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT
ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO
VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED
OF DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE
SYSTEMS SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR
AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT
ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE
PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE
SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND
RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND
DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED
BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY
ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT
WORK IS WITHIN DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY
OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK
WITH THE OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR
TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE
PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION
ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT
STRUCTURES OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT
CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
CLN. LIN.
1K-121
STOR.
1K-120
THEATER
1K-118
STOR.
1K-125
SENS
1K-124
HSKP
1K-127
ROUND
1K-123
ROUND
1K-126
SOIL
1K-122
TLT.
1K-106A
TLT.
1K-116A
DOUBLE
1K-116
TLT.
1K-114A
TLT.
1K-115A
TLT.
1K-113A
TLT.
1K-112A
TLT.
1K-104A
TLT.
1K-105A
TLT.
1K-102A
TLT.
1K-103A
TLT.
1K-108A
TLT.
1K-107A
PT. STOR.
1H-114
MEDS.
1H-112
DOUBLE
1K-115
DOUBLE
1K-114
DOUBLE
1K-113
DOUBLE
1K-117
PD02
PD03
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD03
PD03
PD03PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03PD03
PD03
PD03
PD03
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD03
PD02
KEYNOTE LEGEND
KEY DESCRIPTION
PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING
BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT
MAINS AS SHOWN DASHED ON PLAN
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA K, PHASE 2
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION
ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS
THAT ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK.
CONTRACTOR TO VERIFY THESE AREAS AND ENSURE THAT THESE AREAS
ARE NOT DEPRIVED OF DOMESTIC OR SANITARY PIPING, ETC. UPON
COMPLETION THESE SYSTEMS SHOULD BE RETURNED TO PREVIOUS
WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED
OR AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS.
REPORT ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF
THE PROJECT TO THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS,
LEAVE SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR
AND RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT
BEYOND DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION
DAMAGED BY DEMOLITION EXTENDS TO EXISTING CONSTRUCTION
DAMAGED BY ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS,
WHETHER OR NOT WORK IS WITHIN DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION
REQUIREMENTS AND SUBCONTRACTOR'S OPERATIONS. COORDINATE
SEQUENCING WITH THE CONSTRUCTION MANAGER AND PROCEED ONLY
AFTER OBTAINING THE OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY
OPERATIONS WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
WORK WITH THE OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES
TO THE PROJECT ENGINEER PRIOR TO START OF DEMOLITION OF
CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT
STRUCTURES OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE
ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT
CONDITIONS 24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
CORR 2
C1-67
PT. STOR.
1H-114
STAFF LKR/TLT
1H-103
STAFF BREAK
1H-104
NOURISHMENT
1H-109
MEDS.
1H-112
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD03PD03
PD02 PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD02
PD03
PD03
PD03
PD03
PD03
PD02
PD02
PD05
PD05
PD02
KEYNOTE LEGEND
KEY DESCRIPTION
PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING
BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT
MAINS AS SHOWN DASHED ON PLAN
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA H, PHASE 2
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER
PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT
ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO
VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF
DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS
SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR AS
REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT ANY
CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT TO
THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE
SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND RESTORATION
TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY ALTERATIONS
TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT WORK IS WITHIN
DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE OWNERS
ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES
OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
PD04
PD04 PD04
PD04
PD04
PD04
PD04 PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04 PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD04
PD03 PD03
PD03
PD03
PD03
PD03 PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03
PD03PD03
PD03
PD03PD03 PD03
PD04
PD02
PD02
PD05
PD05PD05
PD05
PD05
PD05
PD05
PD05
PD05
PD05
REMOVE EXISTING RECIRCULATED
HOT WATER PIPING
REMOVE EXISTING DOMESTIC
WATER MAINS- TYPICAL
REMOVE EXISTING DOMESTIC
WATER MAINS- TYPICAL
REMOVE EXISTING DOMESTIC
WATER MAINS- TYPICAL
4"
4" V
4"
2 1/2" CW
2"
3/4" HW-R
6" V
2" HW2 1/2" CW
2"
2 1/2" CW4"
3/4" HW
3" V
3/4" CW
1 1/2" HW2 1/2" CW
4" V
1/2" HW-R
3/4" HW 2" CW 4" V
PD04
KEYNOTE LEGEND
KEY DESCRIPTION
PD02 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP PIPING
BACK AT MAINS FOR FUTURE CONNECTION IN REMODELING PHASE.
PD03 REMOVE ALL PIPING SHOWN AS DASHED. CAP PIPES BACK AT MAIN. VERIFY ALL PIPE
SIZES AND LOCATIONS.
PD04 REMOVE EXISTING PLUMBING FIXTURE THAT WAS INSTALLED IN PHASE 1. STORE
EXISTING FIXTURES IN A CLEAN DRY AREA DESIGNATED BY THE VA
REPRESENTATIVE FOR RE-INSTALLATION IN NEW REMODELED SPACE.``
PD05 REMOVE EXISTING COLD WATER, HOT WATER, RECIRC HW AND SANITARY VENT
MAINS AS SHOWN DASHED ON PLAN
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING DEMOLITION PLAN, AREA L, PHASE 3
PLUMBING DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT ENGINEER
PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. SCOPE OF CONSTRUCTION FOR THIS PROJECT IS SERVED BY SYSTEMS THAT
ALSO SERVE AREAS OUTSIDE OF THE SCOPE OF WORK. CONTRACTOR TO
VERIFY THESE AREAS AND ENSURE THAT THESE AREAS ARE NOT DEPRIVED OF
DOMESTIC OR SANITARY PIPING, ETC. UPON COMPLETION THESE SYSTEMS
SHOULD BE RETURNED TO PREVIOUS WORKING ORDER.
C. REMOVE EXISTING CONSTRUCTION WITHIN PROJECT LIMITS AS INDICATED OR
AS REQUIRED TO COMPLETE WORK. VERIFY EXISTING CONDITIONS. REPORT
ANY CONDITION DETRIMENTAL TO SUCCESSFUL COMPLETION OF THE PROJECT
TO THE OWNER BEFORE PROCEEDING WITH THE WORK.
D. WHEN DEMOLISHING PIPING ABOVE CEILINGS THAT PENETRATE WALLS, LEAVE
SLEEVES WHERE APPLICABLE. CAP AND FIRE CAULK.
E. REPAIR AND RESTORE EXISTING CONSTRUCTION DAMAGED BY DEMOLITION
OPERATIONS. MATCH EXISTING CONDITIONS. EXTEND REPAIR AND
RESTORATION TO BREAK IN PLAN OR TO FIRST MATERIAL JOINT BEYOND
DAMAGE.
F. REQUIREMENT TO REPAIR OR RESTORE EXISTING CONSTRUCTION DAMAGED BY
DEMOLITION EXTENDS TO EXISTING CONSTRUCTION DAMAGED BY
ALTERATIONS TO MECHANICAL AND PLUMBING SYSTEMS, WHETHER OR NOT
WORK IS WITHIN DEMOLITION AREAS SHOWING.
G. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
H. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
THE START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
J. REMOVAL OF WORK AT EXTERIOR OF BUILDING SHALL BE DONE IN SUCH A
MANNER AS TO PREVENT MATERIALS FROM DAMAGING ADJACENT STRUCTURES
OR STRUCTURES BELOW.
K. CONTRACTOR SHALL NOT STORE MATERIALS OR EQUIPMENT ON THE ROOF.
L. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
M. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
N. FOR ADDITIONAL DEMOLITION, SEE ARCHITECTURAL, HVAC, HVAC PIPING
AND ELECTRICAL DRAWINGS
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________
CLN. LIN.
1K-121
STOR.
1K-120
THEATER
1K-118
STOR.
1K-125
SENS
1K-124
HSKP
1K-127
ROUND
1K-123 ROUND
1K-126
SOIL
1K-122
TLT.
1K-106A
TLT.
1K-116A
TLT.
1K-113A
TLT.
1K-112A
TLT.
1K-104A
TLT.
1K-105A
TLT.
1K-102A
TLT.
1K-103A
TLT.
1K-108A
TLT.
1K-107A
PT. STOR.
1H-114
MEDS.
1H-112
DOUBLE
1K-115
DOUBLE
1K-114
DOUBLE
1K-113
DOUBLE
1K-117
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
4" SS UP
TO P-1011-1/2" V UP
1-1/2" V UP
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
4" SS UP
TO P-101
1-1/2" V UP
1-1/2" V UP
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
4" SS UP
TO P-101
1-1/2" V UP
1-1/2" V UP
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" V UP
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" V UP
4" SS UP
TO P-101
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
1-1/2" V UP
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" V UP
4" SS UP
TO P-101
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
2" SS UP
TO TD-1
2" SS UP
TO TD-1
1-1/2" V UP
4" SS UP
TO P-101
1-1/2" SS UP
TO P-401
1-1/2" SS UP
TO P-401
1-1/2" V UP
1-1/2" SS UP
TO P-401
4" SS UP
TO P-101
2" SS UP
TO TD-1
3" SS UP TP FD-A
4" SS
4" SS UP TO
LAV AND WC
2" SS UP
TO TD-1
4" SS UP TO
LAV AND WC
1-1/2" V UP
2" UP TO
TD-1
1-1/2" SS
UP TO P-401
4" SS UP
TO P-101
4" S
S
1-1/2" V UP
PP04
2" SS
1-1/2"SS UP TO P-708
1-1/2"SS UP TO P-512
3"SS UP TO P-501
1-1/2"V UP
1-1/2"SS UP TO P-708
2" SS UP
4" SS 4" SS
4" SS4" SS
4" S
S 4"
S S
4" S
S 4"
S S
4" S
S 4"
S S
4"SANITARY IN TUNNEL BELOW LEVEL 1
INV. EL. 15'-7" ABOVE TUNNEL FLOOR OR
APPROX. 3'-0" BELOW LEVEL 1 TOP OF SLAB
4"SANITARY IN TUNNEL BELOW LEVEL 1.
4"SANITARY IN TUNNEL BELOW LEVEL 1.
4"SS UP TO F.C.O.
2"SS UP TO F.C.O.
2" SS
2" SS
2" S
S
2"SS UP TO F.C.O.
4" SS4" SS
2" SS
2"SS UP TO F.C.O.
4" SS 4" SS
4" SS
4"SS UP TO F.C.O.
4"SANITARY IN TUNNEL BELOW LEVEL 1
INV. EL. 12'-5" ABOVE TUNNEL FLOOR.
1-1/2" V UP
2" SS UP
TO TD-1
1-1…