4-4-2021 VA Addendum 2.Attachments.pdf
PDF 3 MB Posted
- Solicitation number
- 36E77620R0050
About this file
This document provides details of a federal contract opportunity for the renovation of a mental health ward at the Minneapolis VA Medical Center. The Department of Veterans Affairs will solicit proposals and award a firm-fixed-price contract for design-bid-build services including general construction, demolition, structural, civil, mechanical, plumbing, electrical, low voltage, and equipment work. The solicitation will be a total Service-Disabled Veteran-Owned Small Business set-aside with a NAICS code of 236220 and size standard of $39.5 million. The period of performance is approximately 790 calendar days with construction values between $10-20 million. Questions must be submitted in writing by February 4, 2020, and award is anticipated on or around that date.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISOMETRIC DETAIL
VERTICAL STUDS @ 2' - 0" MAX
W/ GYPSUM BD 1' - 4" W/ GYPSUM LATH &
PLASTER DOUBLE STUDS FOR SUPPORTING CONC
BACKER BOARD
PROVIDE CONTINUOUS BRACING WHEN STUDS
EXCEED 10' - 0" & ARE FINISHED BOTH SIDES
JAMB ANCHOR CLIPS 3 PER SIDE -
COORDINATE W/ HINGE REINFORCEMENT
NOTE 1:
OMIT BRACE WHEN "D" DIMENSION IS LESS THAN 2' - 0"
FOR GYP WALLBD. OR 16" FOR PLASTER PARTITION.
CRIPPLE STUD
DO NOT ANCHOR TO
BEARING STUD
GYPBD PANELS
CONTROL
JOINT
PROVIDE SOUND
DEADENING
WHERE REQ'D.
ISOMETRIC OF CONSTRUCTION JT.
SECTION A DETAIL C
JAMB ANCHORS
(FURNISHED WITH FRAME)
DETAIL D
DOUBLE STUDS
JAMB ANCHOR
SHIM AS
REQ'D
METAL
ANCHOR CLIP
METAL DOOR
FRAME
SANITARY STOP
WHERE REQ'D
SEC B
CONTROL JOINT
6" M
A X
DETAIL D
SEE DOOR SCHEDULE
VARIES
SHIM AS REQ'D
DETAIL C
V A
R
IE
S
E Q
E Q
E Q
E Q
D
RUNNER
BET.
STUDS
MTL
DOOR
FRAME
A A
1/2" MIN
1/ 2"
M
IN
SECTION B
STUDWIDTH
FRAME FACE
MINUS 3/16"
KYKC
3/ 4"
M
IN
JAMB DEPTDH
MINUS 3/16"
FRAME FACE
MINUS 3/16"3/
4"
M
IN
1/2" M
IN
5/8" M
AX
STUDWIDTH
3/ 4"
M
IN
GYPSUM
CONTROL JOINT
@ DOOR HEADS
VA JOB NUMBER: 618-17-127
VA MEDICAL CENTER, MINNEAPOLIS, MN
RENOVATE MENTAL HEALTH WARD. BLDG 1338
Date:
SHEETRENOVATE MH WARD 1L,1H,1K
FRAME DETAILS 03/30/21
AE103
1 1/2" = 1'-0"
TYPICAL PARTITION CONTROL JOINT FRAMING AT DOORS
AE
A002
WX
A401
9 7
A401
A5112A5196 P9400
A5081
P9160
A1086
A5074
A5140
SINGLE 102
1K-102
TLT.
1K-102A
A5140
M7011
.0
3'-0"
R 2'-9"
6'-5"
27.0°
3'-2"
SLOPE
C1
C1
C1
VA JOB NUMBER: 618-17-127
VA MEDICAL CENTER, MINNEAPOLIS, MN
RENOVATE MENTAL HEALTH WARD. BLDG 1338
Date:
DETAILRENOVATE MH WARD 1L,1H,1K
TPY SINGLE PATIENT ROOM 04/02/21
1/A401
1/4" = 1'-0"
TYPICAL- SINGLE PATIENT AND TOILET RM
SINGLE TOILET P9400 Toilet, Wall Hung, Siphon Jet, Psychiatric CC
SINGLE TOILET P9160 Lavatory, China, for Disturbed Patient CC
SINGLE TOILET P5350 Shower, Patient, Psychiatric CC
SINGLE TOILET A5207 Bar, Towel, 1" Diameter, SS, Surface Mntd, Psych CC
SINGLE TOILET A5196 Dispenser, Toilet Tissue, Psychiatric CC
SINGLE TOILET A5140 Hook, Garment, Security CC
SINGLE TOILET A5112 Grab Bar, Psychiatric CC
SINGLE TOILET A5081 Dispenser, Paper Towel, SS, Recessed, Psychiatric CC
SINGLE TOILET A5074 Soap Dispenser, Recessed, SS, Psychiatric CC
SINGLE TOILET A1086 Mirror, Safety, Psychiatric CC
SINGLE TOILET M7011 Bed, Platform, Without Visible Legs, Psychiatric CC
SINGLE A5140 Hook, Garment, Security CC
Room Number JSN Content Name Provided By
0 4' 8'2'
WX
A401
A5207
A5112
A5196
P9400
A5081
P9160
A5074
A1086
A5140
CONTRACTOR SHALL SECURE
BEDS TO CONCRETE FLOOR
BELOW PER BED MANUFACTURER
DETAILS
BARIATRIC
SINGLE 107
1K-107
TLT.
1K-107A
A5140
M7011
3'-0" 6'-3 1/2" 2'-9 1/2"
27.0°
1'-1"
.0
1K-107A
SLOPE
C1
C1
C1
/2
/2
VA JOB NUMBER: 618-17-127
VA MEDICAL CENTER, MINNEAPOLIS, MN
RENOVATE MENTAL HEALTH WARD. BLDG 1338
Date:
DETAILRENOVATE MH WARD 1L,1H,1K
TYP BARIATRIC SINGLE 04/02/21
2/A401
1/4" = 1'-0"
TYPICAL - BARIATRIC SINGLE AND TOILET RM
DOUBLE PATIENT TOILET P9400 Toilet, Wall Hung, Siphon Jet, Psychiatric CC
DOUBLE PATIENT TOILET P9160 Lavatory, China, for Disturbed Patient CC
DOUBLE PATIENT TOILET P5350 Shower, Patient, Psychiatric CC
DOUBLE PATIENT TOILET A5207 Bar, Towel, 1" Diameter, SS, Surface Mntd, Psych CC
DOUBLE PATIENT TOILET A5196 Dispenser, Toilet Tissue, Psychiatric CC
DOUBLE PATIENT TOILET A5140 Hook, Garment, Security CC
DOUBLE PATIENT TOILET A5112 Grab Bar, Psychiatric CC
DOUBLE PATIENT TOILET A5081 Dispenser, Paper Towel, SS, Recessed, Psychiatric CC
DOUBLE PATIENT TOILET A5074 Soap Dispenser, Recessed, SS, Psychiatric CC
DOUBLE PATIENT TOILET A1086 Mirror, Safety, Psychiatric CC
DOUBLE PATIENT TOILET M7011 Bed, Platform, Without Visible Legs, Psychiatric CC
DOUBLE PATIENT A5140 Hook, Garment, Security CC
TU
A5074
P9160
A1086
A5081
A5112
P9400
A5196
CONTRACTOR SHALL SECURE
BEDS TO CONCRETE FLOOR
BELOW PER BED MANUFACTURER
DETAILS
DOUBLE 115
1K-115
TLT.
1K-115A
A5140
A5140
M7011 M70113'-0"
.0
6'-2"
/2
/2 " C1
C1
C1
1'-1 1/2"
2'-1 1/2"
VA JOB NUMBER: 618-17-127
VA MEDICAL CENTER, MINNEAPOLIS, MN
RENOVATE MENTAL HEALTH WARD. BLDG 1338
Date:
DETAILRENOVATE MH WARD 1L,1H,1K
TPY DOUBLE PATIENT ROOM 04/02/21
3/A401
1/4" = 1'-0"
TYPICAL - DOUBLE PATIENT AND TOILET RM
BARIATRIC SINGLE TOILET P9400 Toilet, Wall Hung, Siphon Jet, Psychiatric CC
BARIATRIC SINGLE TOILET P9160 Lavatory, China, for Disturbed Patient CC
BARIATRIC SINGLE TOILET P5350 Shower, Patient, Psychiatric CC
BARIATRIC SINGLE TOILET A5207 Bar, Towel, 1" Diameter, SS, Surface Mntd, Psych CC
BARIATRIC SINGLE TOILET A5196 Dispenser, Toilet Tissue, Psychiatric CC
BARIATRIC SINGLE TOILET A5140 Hook, Garment, Security CC
BARIATRIC SINGLE TOILET A5112 Grab Bar, Psychiatric CC
BARIATRIC SINGLE TOILET A5081 Dispenser, Paper Towel, SS, Recessed, Psychiatric CC
BARIATRIC SINGLE TOILET A5074 Soap Dispenser, Recessed, SS, Psychiatric CC
BARIATRIC SINGLE TOILET A1086 Mirror, Safety, Psychiatric CC
BARIATRIC SINGLE TOILET M7011 Bed, Platform, Without Visible Legs, Psychiatric CC
BARIATRIC SINGLE A5140 Hook, Garment, Security CC
Temporary AHU Location
Locate temporary AHU on-grade outside of 'K' Mechanical Room.
Confirm location with
COR.
RESIDENTS TM. RM.
1H-108
CORR 2
C1-67
PT. STOR.
1H-114
STAFF LKR/TLT
1H-103
STAFF BREAK
1H-104
NOURISHMENT
1H-109
MEDS.
1H-112
3" FD-B
2" FD-B
3" FD-B
2" FD-B
P-201
P-511
P-103
P-702
P-702
P-103
P-104
P-402
P-402
P-402 P-402
1 1/2" HW
1" HW
1" HW
3/4" HW
3/4" HW
2" CW
2 1/2" CW
2 1/2" CW
3/4" CW
1" CW
3/4" CW
3" V
3" V
1 1/2" V
3" FD-B
3" FD-B
2 1/2" CW
1 1/2" HW
3" V
3" V
1 1/2" V
1 1/2" HW
1 1/2" HW
1" HW-R
1 1/2" HW
2 1/2" CW
1" HW-R 1" HW
1 1/2" CW
EXISTING SANITARY WASTE PIPING
SERVING THE FLOORS ABOVE TO
REMAIN. TYPICAL
P-512
P-708
TMV-1
P-512
F.C.O.
3/4" HW
P-702
4" SS
PP11
PP11
PP11
PP11
PP11
PP11
1" HW-R
PP12
PP11
1" HW-R
1" HW-R
1" HW-R
1" HW-R
1" HW-R
1" HW-R
1" HW-R
PP13
1 1/4" HW-R
P-601
P-510
3/4" CW
3/4" HW
1/2" CW
3" FD-C
PP16
PP17
P-702
PLUMBING GENERAL NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL AND LOCAL
CODES, WHICHEVER IS MORE STRINGENT.
C. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
D. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
E. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
F. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
G. ALL PLUMBING EQUIPMENT, ACCESSORIES AND/OR PLUMBING FIXTURES WILL
BE SECURED WITH VANDAL RESISTANT MOUNTING HARDWARE.
H. INSTALL VERTICAL SANITARY AND VENT PIPING TRUE AND PLUMB.
I. INSTALL ALL HORIZONTAL SANITARY PIPING SLOPED AT 1/4" PER FOOT.
J. INSTALL HORIZONTAL SANITARY VENT PIPING SLOPED AT 1/8" PER FOOT.
K. REFER TO ARCHITECTURAL PLANS FOR PIPING ACCESS PANEL LOCATIONS.
L. REFER TO FIRE PROTECTION DRAWINGS FOR PIPING AND SPRINKLER HEAD
LOCATIONS.
M. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO
AVOID INTERFERENCE WITH OTHER TRADES. ROUTE ALL PIPING AS HIGH AS
POSSIBLE.
N. COORDINATE FINAL LOCATIONS OF NEW PIPING AND PLUMBING FIXTURES WITH
EXISTING SYSTEMS, STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,
DUCTWORK, PIPING AND SPRINKLERS.
O. REFER TO PLUMBING DETAILS FOR ACCESSORIES AND FINAL CONNECTIONS TO
PLUMBING EQUIPMENT.
P. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT THE
BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH PRESSURE PIPING
SYSTEM. VERIFY WITH ACCESS PANEL LOCATIONS.
Q. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED
ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.
R. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF JOISTS,
BEAM FLANGES OR CONCRETE FLOOR DECK BY APPROVED MEANS.
S. FOR PLUMBING PIPE SIZES, SEE RISER DIAGRAMS.
T. ALL LAVATORIES AND HAND SINKS SHALL HAVE THERMOSTATIC MIXING VALVES
BELOW THE SINKS TO MAINTAIN A MAXIMUM HOT WATER TEMPERATURE OF 110
DEGREES F. MIXING VALVE SHALL BE A WATTS SERIES LFUSG-B LEAD FREE OR
EQUAL.
U. REBALANCE THE BUILDING RECIRCULATED HOT WATER SYSTEM UPON
COMPLETION OF NEW WORK. PROVIDE NEW, OR ADDITIONAL RECIRC. PUMP AS
REQUIRED FOR A COMPLETE AND WORKING BUILDING CIRCULATED HOT WATER
SYSTEM.
V. PROVIDE ISOLATION SHUT-OFF VALVES ON ALL PIPE RUNOUTS FROM MAINS TO
PATIENT ROOMS ,FROM MAINS TO SINGLE PLUMBING FIXTURES, AND WEREVER
SHOWN ON PLANS AND RISERS.
W. FIELD VERIFY ALL NEW WATER, WASTE, AND VENT CONNECTIONS, AND PROVIDE
NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.
X. PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS
NOTED OTHERWISE.
Y. WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"
MINIMUM.
Z. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS AT THE BASE OF ALL
PLUMBING RISERS.
KEYNOTE LEGEND
KEY DESCRIPTION
PP11 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURNS . BALANCE
FLOW TO .25 GPM
PP12 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURN MAIN. BALANCE
FLOW TO 4.5 GPM
PP13 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURN MAIN. BALANCE
FLOW TO 5.75 GPM
PP16 1/2" CW DOWN TO ICE/WATER DISPENSER. STUB OUT OF WALL AND PROVIDE BALL
VALVE, BACKFLOW PREVENTER AND WATER FILTER.
PP17 PROVIDE 3/4" COPPER DRAIN FROM ICE/WATER DISPENSER DRAIN CONNECTION
DOWN TO FUNNEL FLOOR DRAIN BELOW COUNTER. PROVIDE 1" MINIMUM AIR GAP.
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING PLAN, AREA H, PHASE 2
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________ Typed or printed name: Chad Michael Eslinger Date: ___________ License Number: 4871001/07/2021
2.0
GPM
1.0 GPM
3/4"HWR
1-1/2"HW
1"HW
1"HWR
1"HWR
1-1/4"HWR
EXERCISE
1K-119
CLN. LIN.
1K-121
STOR.
1K-120
THEATER
1K-118
STOR.
1K-125
SENS
1K-124
HSKP
1K-127
ROUND
1K-123 ROUND
1K-126
SOIL
1K-122
TLT.
1K-106A
TLT.
1K-116A
TLT.
1K-114A
TLT.
1K-115A
TLT.
1K-113A
TLT.
1K-112A
TLT.
1K-104A
TLT.
1K-105A
TLT.
1K-102A
TLT.
1K-103A
TLT.
1K-108A
TLT.
1K-107A
PT. STOR.
1H-114
MEDS.
1H-112
DOUBLE
1K-115
DOUBLE
1K-114
DOUBLE
1K-113
DOUBLE
1K-117
P-401 P-101 P-101 P-401
P-701
P-701
P-701
P-101
P-101
P-401
P-401
P-701
P-701
P-701
P-101
P-101
P-101
P-401
P-101
P-101
P-101
P-401
P-401 P-101
P-101
P-401
P-401
P-101
P-101
P-101
P-101
P-701
P-701
P-401
P-401
P-701
P-701
P-701
P-401
P-401
1" HW-R
2 1/2" CW
1 1/2" HW
1" HW
2" CW
P-512
P-501
P-701
P-701
P-701
P-701
P-701
P-401 P-401
3" V
1" HW-R 1" HW
1 1/2" CW
1" HW
1 1/2" CW
1" HW-R
3/4" HW-R
2 1/2" CW
2" HW
2 1/2" CW2" HW
3" V
3" V
3" V
2" V
3" V
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-12" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
2" TD-1
3/4" HW-R
2" HW
2 1/2" CW
3" V
3" V
3" V
3" V
3" V
1 1/2" V
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP05
PP10
PP08
PP07
PP09
EXISTING SANITARY WASTE PIPING
SERVING THE FLOORS ABOVE TO
REMAIN. TYPICAL
EXISTING SANITARY WASTE PIPING
SERVING THE FLOORS ABOVE TO
REMAIN. TYPICAL
DOUBLE 112
1K-112
DOUBLE 111
1K-111
BARIATRIC SINGLE 108
1K-108
BARIATRIC SINGLE 107
1K-107
SINGLE 106
1K-106
SINGLE 105
1K-105
SINGLE 104
1K-104
SINGLE 103
1K-103
SINGLE 102
1K-102
SINGLE
1K-101
CORR 1
C1-71A
C-7 C-7
STOR
1K-109
DOUBLE 110
1K-110
TMV-1
TMV-1
P-708
P-708
PP05
PP05
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
1 1/4" HW-R
1 1/4" HW-R
1 1/4" HW-R
PP11
1" HW-R
3/4" HW-R
3/4" HW-R
P-601
3/4" CW
3/4" HW
1/2" CW
1" HW-R
PLUMBING GENERAL NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL AND LOCAL
CODES, WHICHEVER IS MORE STRINGENT.
C. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
D. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
E. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
F. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
G. ALL PLUMBING EQUIPMENT, ACCESSORIES AND/OR PLUMBING FIXTURES WILL
BE SECURED WITH VANDAL RESISTANT MOUNTING HARDWARE.
H. INSTALL VERTICAL SANITARY AND VENT PIPING TRUE AND PLUMB.
I. INSTALL ALL HORIZONTAL SANITARY PIPING SLOPED AT 1/4" PER FOOT.
J. INSTALL HORIZONTAL SANITARY VENT PIPING SLOPED AT 1/8" PER FOOT.
K. REFER TO ARCHITECTURAL PLANS FOR PIPING ACCESS PANEL LOCATIONS.
L. REFER TO FIRE PROTECTION DRAWINGS FOR PIPING AND SPRINKLER HEAD
LOCATIONS.
M. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO
AVOID INTERFERENCE WITH OTHER TRADES. ROUTE ALL PIPING AS HIGH AS
POSSIBLE.
N. COORDINATE FINAL LOCATIONS OF NEW PIPING AND PLUMBING FIXTURES WITH
EXISTING SYSTEMS, STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,
DUCTWORK, PIPING AND SPRINKLERS.
O. REFER TO PLUMBING DETAILS FOR ACCESSORIES AND FINAL CONNECTIONS TO
PLUMBING EQUIPMENT.
P. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT THE
BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH PRESSURE PIPING
SYSTEM. VERIFY WITH ACCESS PANEL LOCATIONS.
Q. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED
ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.
R. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF JOISTS,
BEAM FLANGES OR CONCRETE FLOOR DECK BY APPROVED MEANS.
S. FOR PLUMBING PIPE SIZES, SEE RISER DIAGRAMS.
T. ALL LAVATORIES AND HAND SINKS SHALL HAVE THERMOSTATIC MIXING VALVES
BELOW THE SINKS TO MAINTAIN A MAXIMUM HOT WATER TEMPERATURE OF 110
DEGREES F. MIXING VALVE SHALL BE A WATTS SERIES LFUSG-B LEAD FREE OR
EQUAL.
U. REBALANCE THE BUILDING RECIRCULATED HOT WATER SYSTEM UPON
COMPLETION OF NEW WORK. PROVIDE NEW, OR ADDITIONAL RECIRC. PUMP AS
REQUIRED FOR A COMPLETE AND WORKING BUILDING CIRCULATED HOT WATER
SYSTEM.
V. PROVIDE ISOLATION SHUT-OFF VALVES ON ALL PIPE RUNOUTS FROM MAINS TO
PATIENT ROOMS ,FROM MAINS TO SINGLE PLUMBING FIXTURES, AND WEREVER
SHOWN ON PLANS AND RISERS.
W. FIELD VERIFY ALL NEW WATER, WASTE, AND VENT CONNECTIONS, AND PROVIDE
NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.
X. PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS
NOTED OTHERWISE.
Y. WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"
MINIMUM.
Z. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS AT THE BASE OF ALL
PLUMBING RISERS.
KEYNOTE LEGEND
KEY DESCRIPTION
PP05 PROVIDE SOLENOID SHUT OFF VALVE ON EACH HOT AND COLD WATER LINE THAT
SERVES AN INDIVIDUAL PATIENT ROOM. THE SOLENOID VALVE SHALL BE
CONTROLLED BY A USER PROGRAMMABLE TOUCH SCREEN DIGITAL MONITOR
LOCATED IN A PANEL BACK IN THE NURSES STATION.
PP07 CONNECT TO EXISTING MINIMUM 3" COLD WATER MAIN. VERIFY SIZE AND LOCATION
OF EXISTING PIPING.
PP08 CONNECT TO EXISTING MINIMUM 2" HOT WATER MAIN. VERIFY SIZE AND LOCATION
OF EXISTING PIPING.
PP09 CONNECT TO EXISTING MINIMUM 1-1/2" RECIRCULATED HOT WATER MAIN. VERIFY
SIZE AND LOCATION OF EXISTING PIPING.
PP10 CONNECT NEW SANITARY VENTS TO EXISTING VENT RISER. VERIFY SIZE AND
LOCATION OF EXISTING RISER.
PP11 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURNS . BALANCE
FLOW TO .25 GPM
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING PLAN, AREA K, PHASE 2
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________ Typed or printed name: Chad Michael Eslinger Date: ___________ License Number: 4871001/07/2021
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
2"HW
2"HW
1-1/2"HW
2"HW
2"HW
2"HW
2"HW
1-1/2"HW
1"HW
P-701
P-401P-101 P-101 P-401
P-401
P-101
P-101
P-101
P-701P-701P-701P-701 P-701
P-101
P-101
P-401
3" FD-A
1" HW
3/4" CW
P-511
P-511
P-511
3" FD-A
P-401
P-701
P-101
1" CW
1" HW
3" C
W 2"
H W
1 1/2" CW1 1/2" HW
3/4 " H
W -R
3/4" CW
3/4" HW
1" CW1 1/2" HW
1 1/2" HW
3/4" HW
3/4" CW
P-402
P-103
P-702
1 1/2" CW
P-808
1" HW
3/4" CW1 1/2" CW
1 1/2" HW 1 1/2" CW
3" FD-B
2" TD-1
2" TD-1 2" TD-1 2" TD-1 2" TD-1 2" TD-1
2" TD-1
1 1/2" V
1 1/2" V
1 1/2" V1 1/2" V1 1/2" V
3" V 3" V 3" V
3" V
3" V
2" V
3" V
2" V2" V
2" V2" V
1 1/4" HW
PP05
PP05
PP05PP05
PP05
PP05
PP05
PP05
PP05
PP05 PP05PP05
PP05
PP05
PP05 PP09
PP07
PP08
PP10
PP10
3" SD
EXISTING STORM DRAIN PIPING TO
REMAIN. VERIFY SIZE AND LOCATION.
EXISTING SANITARY WASTE PIPING THAT SERVES
THE FLOORS ABOVE TO REMAIN. TYPICAL
SOIL
1L-127 SECL
1L-128B
ANTE RM.
1L-128 SECL
1L-128C
CLN. LIN.
1L-113 TOILET 113
1L-113A
TLT.
1L-128A
SOCIAL WRKR OFFICE
1L-115
SENS
1L-129
STOR.
1L-140
GROUP THERAPY
1L-116
OCC THERAPY
1L-114
OCC. THER. OFFICE
1L-114B
REC. THER. OFFICE
1L-112B
REC THERAPY
1L-112DAY ROOM
1L-110CI-61
C1-61
TOILET 101
1L-101
INTERVIEW
1L-102
EXAM
1L-104
LAUNDRY
1L-106
FAMILY ROOM
1L-105
FAM
1L-107
CORR 1
1L-100
RN-MGR.
1L-109
HIGH ACUITY RN STATION
1L-120
SINGLE 121
1L-121 SINGLE 122
1L-122 SINGLE 123
1L-123
SINGLE 124
1L-124
CI-57
C1-57
CI-57
C1-57
CORR 1
C1-60
CORR 1
C1-60
SERVING AREA
1L-131
DINING
1L-130
P-401
P-401
P-512
P-510
3/4" HW
3/4" CW
1 1/2" V
1 1/2" V
2" FD-B
3" FD-B
1" HW-R
3/4" HW-R3/4" HW-R
3/4" HW-R
3/4" HW-R
3/4" HW-R
3/4" HW-R
3/4" HW-R
1" HW-R
1" HW-R
1" HW-R
3/4" HW-R
PP11
PP11
PP11
PP11
PP11
PP11PP11
PP11
PP11
PP11
PP11
PP11
PP11
PP11
1" HW-R
3/4" HW-R
PP14
PP15
3" V
EXISTING SANITARY WASTE PIPING THAT
SERVES THE FLOORS ABOVE TO REMAIN.
TYPICAL
F.C.O.
F.C.O.
F.C.O.F.C.O.F.C.O.
F.C.O.
P-401
P-402
1 1/2" CW
CORR 2
C1-57
TLT.
1L-123A
SINGLE
1L-126
SINGLE
1L-126
SINGLE
1L-126
SINGLE
1L-125
3" FD-C
PP16
PP17
P-402
PLUMBING GENERAL NOTES
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE PROJECT
ENGINEER PRIOR TO START OF DEMOLITION OF CONSTRUCTION ACTIVITIES.
B. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF NATIONAL AND LOCAL
CODES, WHICHEVER IS MORE STRINGENT.
C. COORDINATE DEMOLITION WITH SCHEDULES, CONSTRUCTION REQUIREMENTS
AND SUBCONTRACTOR'S OPERATIONS. COORDINATE SEQUENCING WITH THE
CONSTRUCTION MANAGER AND PROCEED ONLY AFTER OBTAINING THE
OWNERS ACCEPTANCE OF DEMOLITION SCHEDULE.
D. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING FACILITY OPERATIONS
WITHOUT PRIOR COORDINATION AND APPROVAL OF THE WORK WITH THE
OWNER.
E. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS, ETC.) AS
REQUIRED FOR DEMOLITION & CONSTRUCTION ACTIVITIES.
F. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF WEATHER
CONDITIONS AT THE END OF EACH DAY. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
G. ALL PLUMBING EQUIPMENT, ACCESSORIES AND/OR PLUMBING FIXTURES WILL
BE SECURED WITH VANDAL RESISTANT MOUNTING HARDWARE.
H. INSTALL VERTICAL SANITARY AND VENT PIPING TRUE AND PLUMB.
I. INSTALL ALL HORIZONTAL SANITARY PIPING SLOPED AT 1/4" PER FOOT.
J. INSTALL HORIZONTAL SANITARY VENT PIPING SLOPED AT 1/8" PER FOOT.
K. REFER TO ARCHITECTURAL PLANS FOR PIPING ACCESS PANEL LOCATIONS.
L. REFER TO FIRE PROTECTION DRAWINGS FOR PIPING AND SPRINKLER HEAD
LOCATIONS.
M. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO
AVOID INTERFERENCE WITH OTHER TRADES. ROUTE ALL PIPING AS HIGH AS
POSSIBLE.
N. COORDINATE FINAL LOCATIONS OF NEW PIPING AND PLUMBING FIXTURES WITH
EXISTING SYSTEMS, STRUCTURE, LIGHTING, ARCHITECTURAL ELEMENTS,
DUCTWORK, PIPING AND SPRINKLERS.
O. REFER TO PLUMBING DETAILS FOR ACCESSORIES AND FINAL CONNECTIONS TO
PLUMBING EQUIPMENT.
P. PROVIDE DRAIN VALVES WITH CAPPED HOSE END CONNECTIONS AT THE
BOTTOM OF EACH RISER AND AT ALL LOW POINTS IN EACH PRESSURE PIPING
SYSTEM. VERIFY WITH ACCESS PANEL LOCATIONS.
Q. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE RATED
ASSEMBLIES AND SEAL WITH INTUMESCENT MATERIAL.
R. CONNECT PIPE AND EQUIPMENT HANGERS TO TOP CHORD OF ROOF JOISTS,
BEAM FLANGES OR CONCRETE FLOOR DECK BY APPROVED MEANS.
S. FOR PLUMBING PIPE SIZES, SEE RISER DIAGRAMS.
T. ALL LAVATORIES AND HAND SINKS SHALL HAVE THERMOSTATIC MIXING VALVES
BELOW THE SINKS TO MAINTAIN A MAXIMUM HOT WATER TEMPERATURE OF 110
DEGREES F. MIXING VALVE SHALL BE A WATTS SERIES LFUSG-B LEAD FREE OR
EQUAL.
U. REBALANCE THE BUILDING RECIRCULATED HOT WATER SYSTEM UPON
COMPLETION OF NEW WORK. PROVIDE NEW, OR ADDITIONAL RECIRC. PUMP AS
REQUIRED FOR A COMPLETE AND WORKING BUILDING CIRCULATED HOT WATER
SYSTEM.
V. PROVIDE ISOLATION SHUT-OFF VALVES ON ALL PIPE RUNOUTS FROM MAINS TO
PATIENT ROOMS ,FROM MAINS TO SINGLE PLUMBING FIXTURES, AND WEREVER
SHOWN ON PLANS AND RISERS.
W. FIELD VERIFY ALL NEW WATER, WASTE, AND VENT CONNECTIONS, AND PROVIDE
NEW CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.
X. PITCH UNDERFLOOR SANITARY WASTE PIPING AT 1/4" PER FOOT, UNLESS
NOTED OTHERWISE.
Y. WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2"
MINIMUM.
Z. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS AT THE BASE OF ALL
PLUMBING RISERS.
SCALE: 1/8" = 1'-0"1 LEVEL 1 PLUMBING PLAN. AREA L, PHASE 3
KEYNOTE LEGEND
KEY DESCRIPTION
PP05 PROVIDE SOLENOID SHUT OFF VALVE ON EACH HOT AND COLD WATER LINE THAT
SERVES AN INDIVIDUAL PATIENT ROOM. THE SOLENOID VALVE SHALL BE
CONTROLLED BY A USER PROGRAMMABLE TOUCH SCREEN DIGITAL MONITOR
LOCATED IN A PANEL BACK IN THE NURSES STATION.
PP07 CONNECT TO EXISTING MINIMUM 3" COLD WATER MAIN. VERIFY SIZE AND LOCATION
OF EXISTING PIPING.
PP08 CONNECT TO EXISTING MINIMUM 2" HOT WATER MAIN. VERIFY SIZE AND LOCATION
OF EXISTING PIPING.
PP09 CONNECT TO EXISTING MINIMUM 1-1/2" RECIRCULATED HOT WATER MAIN. VERIFY
SIZE AND LOCATION OF EXISTING PIPING.
PP10 CONNECT NEW SANITARY VENTS TO EXISTING VENT RISER. VERIFY SIZE AND
LOCATION OF EXISTING RISER.
PP11 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURNS . BALANCE
FLOW TO .25 GPM
PP14 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURN MAIN. BALANCE
TO 3.5 GPM
PP15 PROVIDE BALANCE VALVE ON RECIRCULATED HOT WATER RETURN MAIN. BALANCE
TO 1.75 GPM
PP16 1/2" CW DOWN TO ICE/WATER DISPENSER. STUB OUT OF WALL AND PROVIDE BALL
VALVE, BACKFLOW PREVENTER AND WATER FILTER.
PP17 PROVIDE 3/4" COPPER DRAIN FROM ICE/WATER DISPENSER DRAIN CONNECTION
DOWN TO FUNNEL FLOOR DRAIN BELOW COUNTER. PROVIDE 1" MINIMUM AIR GAP.
CME
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature: ______________________________________ Typed or printed name: Chad Michael Eslinger Date: ___________ License Number: 4871001/07/2021
S
S
S
SS
S
S
SS
S
S
S
S
S
S
1.0
GPM
1.0
GPM
2"HW
1-1/2"HW1-1/2"HW
2"HW
3/4"HWR
3/4"HWR
1"HW
3/4"HWR
MINNEAPOLIS VAMC BLDG. 70 Specification 618-17-127
RENOVATE MH WARD 1L,1H AND 1K Section No. 07 21 13
4-02-21
07 27 26 - 1
SECTION 07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Fluid-applied vapor-permeable air barrier at exterior above grade wall assemblies.
2. Connection to adjacent air barrier components providing a durable, continuous, full building air barrier.
1.2 RELATED WORK
A. Section 01 45 29 TESTING LABORATORY SERVICES: General Quality Assurance and Quality Control Requirements.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS: Commissioning of building envelope components.
C. Section 04 20 00 UNIT MASONRY: Masonry Unit Air Barrier Substrates.
D. Section 07 92 00, JOINT SEALANTS: Joint Sealants.
E. Division 08 sections for glazed aluminum curtain walls
F. Section 09 29 00 GYPSUM BOARD: Wall Sheathings Air Barrier Substrates.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. Air Barrier Association of America (ABAA):
Quality Assurance Program.
C. ASTM International (ASTM):
C920-18.................Elastomeric Joint Sealants.
C1193-16................Use of Joint Sealants.
D412-16.................Vulcanized Rubber and Thermoplastic
Elastomers-Tension.
E96/E96M-16.............Water Vapor Transmission of Materials.
E162-16.................Surface Flammability of Materials Using a
Radiant Heat Energy Source.
E783-02(2018)...........Field Measurement of Air Leakage Through
Installed Exterior Windows and Doors.
E1186-17................Air Leakage Site Detection in Building
Envelopes and Air Barrier Systems.
E2178-13................Air Permanence of Building Materials.
07 27 26 - 2
E2357-18................Determining Air Leakage of Air Barrier
Assemblies.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1. Show size, configuration, and fabrication and installation details.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
1.5 QUALITY ASSURANCE
A. Coordinate work with adjacent and related work to provide continuous, unbroken, durable air barrier system.
B. Manufacturer Qualifications:
1. Regularly and presently manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
C. Installer Qualifications:
1. Regularly and presently installs specified products.
2. Approved by manufacturer.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight, conditioned facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Work Area Ambient Temperature Range: 4 to 32 degrees C (40 to
90 degrees F) continuously, beginning 48 hours before installation.
2. Surface Requirements: visibly dry, and complying with manufacturer's instructions.
07 27 26 - 3
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
A. Air-Barrier Assembly Air Leakage: Maximum 0.2 L/s/square meter
(0.04 cfm/square feet) of surface area at 75 Pa (1.57 psf) differential pressure when tested according to ASTM E2357.
B. Provide full system of compatible materials under conditions of service and application required. Compatibility based on testing by material manufacturer.
C. Perform as continuous vapor permeable air barrier and moisture drainage plane.
D. Transition to adjacent flashings and discharge water to building exterior.
E. Accommodate substrate movement and seal expansion and control joints, construction material transitions, opening transitions, penetrations, and perimeter conditions without moisture deterioration and air leakage exceeding performance requirements.
2.2 PRODUCTS - GENERAL
A. Provide air barrier system components from one manufacturer.
2.3 AIR BARRIER
A. Fluid-Applied, Vapor-Permeable Membrane Air Barrier:
1. Elastomeric, modified bituminous or synthetic polymer membrane.
2. Air Permeance: ASTM E2178: 0.02 L/s/square meter
(0.004 cfm/square feet) of surface area at 75 Pa (1.57 psf) differential pressure.
3. Vapor Permeance: ASTM E96/E96M: Minimum 580 ng/Pa/s/square meter
(10 perms).
4. Elongation: Ultimate, ASTM D412, Die C: 200 percent, minimum.
5. Thickness: Minimum 1.0 mm (40 mils) dry film thickness, applied in single continuous coat.
6. Surface Burning Characteristics: When tested according to ASTM E84.
a. Flame Spread Rating: 25 maximum.
b. Smoke Developed Rating: 450 maximum.
07 27 26 - 4
2.4 ACCESSORIES
A. Primer: Waterborne primer complying with VOC requirements, recommended air barrier manufacturer to suit application.
B. Counterflashing Sheet: Modified bituminous, minimum 1.0 mm (40 mils) thick, self-adhering composite sheet consisting of minimum 0.8 mm
(33 mils) of rubberized asphalt laminated to polyethylene film.
C. Substrate Patching Material: Manufacturer's standard trowel-grade filler material.
D. Sprayed Polyurethane Foam Sealant: Foamed-in-place, 24 to 32 kg/cu. m
(1.5 to 2.0 pcf) density, with maximum flame-spread index of 25 when tested according to ASTM E84.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Correct substrate deficiencies:
1. Remove projections and excess materials and fill voids with substrate patching material.
2. Remove contaminants capable of affecting subsequently installed product's performance.
D. Prepare and treat substrate joints and cracks according to ASTM C1193 and membrane air barrier manufacturer's instructions.
3.2 INSTALLATION - AIR BARRIER
A. Install products according to manufacturer's instructions.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
B. Apply primer.
C. Install transition strips and accessory materials.
D. Seal air barrier to adjacent components of building air barrier system.
E. At penetrations, seal transition strips around penetrating objects with termination mastic.
1. Fill gaps at perimeter of penetrations with sprayed polyurethane foam sealant.
F. At top of through-wall flashings, seal with continuous transition strip of manufacturer's recommended material to suit application.
07 27 26 - 5
G. Apply air barrier in full contact with substrate to produce continuous seal with transitions.
H. Apply fluid membrane in thickness recommended by manufacturer, and minimum specified thickness.
I. Leave air barrier exposed until tested and inspected and approved by
Contracting Officer’s Representative.
3.3 FIELD QUALITY CONTROL
A. Field Inspections and Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING LABORATORY SERVICES.
1. Perform inspections and tests before concealing air barrier with subsequent work.
B. Inspection:
1. Compatibility of materials within air barrier system and adjacent materials.
2. Suitability of substrate and support for air barrier.
3. Suitability of conditions under which air barrier is applied.
4. Adequacy of substrate priming.
5. Application and treatment of joints and edges of transition strips, flexible opening transitions, and accessory materials.
6. Continuity and gap-free installation of air barrier, transition strips, and accessory materials.
C. Submit inspection and test reports to Contracting Officer’s
Representative within seven calendar days of completing inspection and test.
D. Defective Work:
1. Correct deficiencies, make necessary repairs, and retest as required to demonstrate compliance with specified requirements.
3.4 CLEANING
A. Remove masking materials.
B. Clean spills and overspray using cleaning agents recommended by manufacturers of affected construction.
3.5 PROTECTION
A. Protect air barrier from construction operations.
B. Protect air barrier from exposure to UV light exposure exceeding manufacturer's recommendation.
C. Replace overexposed materials and retest.
07 27 26 - 6
- - E N D - -
RENOVATE MH WARD 1L,1H,AND 1K Section No. 28 05 00
10-18
Issued For Construction 28 05 13 - 1
SECTION 28 05 13
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the finishing, installation, connection, testing and certification the conductors and cables required for a fully functional for electronic safety and security (ESS) system.
1.2 RELATED WORK
A. Section 01 00 00 - GENERAL REQUIREMENTS. For General Requirements.
B. Section 07 84 00 - FIRESTOPPING. Requirements for firestopping application and use.
C. Section 28 05 00 – COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND
SECURITY. Requirements for general requirements that are common to more than one section in Division 28.
D. Section 28 05 26 - GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND
SECURITY. Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
E. Section 28 05 28.33 - CONDUITS AND BOXES FOR ELECTRONIC SECURITY AND
SAFETY. Requirements for infrastructure.
F. Section 28 08 00 - COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY
SYSTEMS. Requirements for commissioning.
G. Section 31 20 00 - EARTH MOVING. For excavation and backfill for cables that are installed in conduit.
1.3 DEFINITIONS
A. BICSI: Building Industry Consulting Service International.
B. EMI: Electromagnetic interference.
C. IDC: Insulation displacement connector.
D. Ladder Cable Tray: A fabricated structure consisting of two longitudinal side rails connected by individual transverse members
(rungs).
E. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits.
F. Open Cabling: Passing telecommunications cabling through open space
(e.g., between the studs of a wall cavity).
G. RCDD: Registered Communications Distribution Designer.
H. Solid-Bottom or Nonventilated Cable Tray: A fabricated structure consisting of integral or separate longitudinal side rails, and a bottom without ventilation openings.
I. Trough or Ventilated Cable Tray: A fabricated structure consisting of integral or separate longitudinal rails and a bottom having openings sufficient for the passage of air and using 75 percent or less of the plan area of the surface to support cables.
J. UTP: Unshielded twisted pair.
1.4 QUALITY ASSURANCE
A. See section 28 05 00, Paragraph 1.4.
1.5 SUBMITTALS
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES, furnish the following:
1. Manufacturer's Literature and Data: Showing each cable type and rating.
2. Certificates: Two weeks prior to final inspection, deliver to the
Resident Engineer/COTR four copies of the certification that the material is in accordance with the drawings and specifications and diagrams for cable management system.
Issued For Construction 28 05 13 - 2
3. Shop Drawings: Cable tray layout, showing cable tray route to scale, with relationship between the tray and adjacent structural, electrical, and mechanical elements. Include the following:
a. Vertical and horizontal offsets and transitions.
b. Clearances for access above and to side of cable trays.
c. Vertical elevation of cable trays above the floor or bottom of ceiling structure.
d. Load calculations to show dead and live loads as not exceeding manufacturer's rating for tray and its support elements.
e. System labeling schedules, including electronic copy of labeling schedules that are part of the cable and asset identification system of the software specified in Parts 2 and 3.
4. Wiring Diagrams. Show typical wiring schematics including the following:
a. Workstation outlets, jacks, and jack assemblies.
b. Patch cords.
c. Patch panels.
5. Cable Administration Drawings: As specified in Part 3
"Identification" Article.
6. Project planning documents as specified in Part 3.
7. Maintenance Data: For wire and cable to include in maintenance manuals.
1.6 APPLICABLE PUBLICATIONS
A. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the extent referenced. Publications are reference in the text by the basic designation only.
B. American Society of Testing Material (ASTM):
D2301-04................Standard Specification for Vinyl Chloride
Plastic Pressure Sensitive Electrical
Insulating Tape
C. Federal Specifications (Fed. Spec.):
A-A-59544-08............Cable and Wire, Electrical (Power, Fixed
Installation)
D. National Fire Protection Association (NFPA):
70-11...................National Electrical Code (NEC)
E. Underwriters Laboratories, Inc. (UL):
44-05...................Thermoset-Insulated Wires and Cables
83-08...................Thermoplastic-Insulated Wires and Cables
467-07..................Electrical Grounding and Bonding Equipment
486A-03.................Wire Connectors and Soldering Lugs for Use with
Copper Conductors
486C-04.................Splicing Wire Connectors
486D-05.................Insulated Wire Connector Systems for
Underground Use or in Damp or Wet Locations
486E-00.................Equipment Wiring Terminals for Use with
Aluminum and/or Copper Conductors
493-07..................Thermoplastic-Insulated Underground Feeder and
Branch Circuit Cable
514B-04.................Fittings for Cable and Conduit
1479-03.................Fire Tests of Through-Penetration Fire Stops
1.7 DELIVERY, STORAGE, AND HANDLING
A. Test cables upon receipt at Project site.
1. Test optical fiber cable to determine the continuity of the strand end to end. Use optical loss test set.
Issued For Construction 28 05 13 - 3
2. Test optical fiber cable on reels. Use an optical time domain reflectometer (OTDR) to verify the cable length and locate cable defects, splices, and connector; include the loss value of each.
Retain test data and include the record in the maintenance data.
3. Test each pair of UTP cable for open and short circuits.
1.8 PROJECT CONDITIONS
A. Environmental Limitations: Do not deliver or install UTP, optical fiber, and coaxial cables and connecting materials until wet work in spaces is complete and dry, and temporary HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period.
PART 2 - PRODUCTS
2.1 GENERAL
A. General: All cabling locations shall be in conduit systems as outlined in Division 28 unless a waiver is granted in writing or an exception is noted on the construction drawings.
B. Support of Open Cabling: NRTL labeled for support of Category 6 cabling, designed to prevent degradation of cable performance and pinch points that could damage cable.
1. Support brackets with cable tie slots for fastening cable ties to brackets.
2. Lacing bars, spools, J-hooks, and D-rings.
3. Straps and other devices.
C. Cable Trays:
1. Cable Tray Materials: Metal, suitable for indoors, and protected against corrosion by electroplated zinc galvanizing, complying with
ASTM B 633, Type 1, not less than 0.000472 inch (0.012 mm) thick.
2. Basket Cable Trays: 6 inches (150 mm) wide and 2 inches (50 mm) deep. Wire mesh spacing shall not exceed 2 by 4 inches (50 by 100 mm).
3. Trough Cable Trays: Nominally 6 inches (150 mm) wide.
4. Ladder Cable Trays: Nominally 18 inches (455 mm) wide, and a rung spacing of 12 inches (305 mm).
5. Channel Cable Trays: One-piece construction, nominally 4 inches
(100 mm) wide. Slot spacing shall not exceed 4-1/2 inches (115 mm) o.c.
6. Solid-Bottom Cable Trays: One-piece construction, nominally 12 inches (305 mm) wide. Provide with solid covers.
D. Conduit and Boxes: Comply with requirements in Division 28 Section
"Conduits and Backboxes for Electrical Systems." Flexible metal conduit shall only be used in lengths less than 3 feet.
1. Outlet boxes shall be no smaller than 2 inches (50 mm) wide, 3 inches (75 mm) high, and 2-1/2 inches (64 mm) deep.
2.2 BACKBOARDS
A. Backboards: Plywood, fire-retardant treated, 3/4 by 48 by 96 inches
(19 by 1220 by 2440 mm). Comply with requirements for plywood backing panels in Division 06 Section "Rough Carpentry".
2.3 UTP CABLE
A. Description: 100-ohm, 4-pair UTP, formed into 25-pair binder groups covered with a blue thermoplastic jacket.
1. Comply with ICEA S-90-661 for mechanical properties.
2. Comply with TIA/EIA-568-B.1 for performance specifications.
3. Comply with TIA/EIA-568-B.2, Category 6.
4. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444 and NFPA 70 for the following types:
Issued For Construction 28 05 13 - 4
a. Communications, General Purpose: Type CM or CMG.
b. Communications, Plenum Rated: Type CMP, complying with NFPA 262.
c. Communications, Riser Rated: Type CMR, complying with UL 1666.
d. Communications, Limited Purpose: Type CMX.
e. Multipurpose: Type MP or MPG.
f. Multipurpose, Plenum Rated: Type MPP, complying with NFPA 262.
g. Multipurpose, Riser Rated: Type MPR, complying with UL 1666.
2.4 UTP CABLE HARDWARE
A. UTP Cable Connecting Hardware: IDC type, using modules designed for punch-down caps or tools. Cables shall be terminated with connecting hardware of the same category or higher.
B. Duress buttons shall use Orange colored Category 6 cable and shall terminate in a Security System Control Panel. Unused pairs shall be neatly coiled and supported at or near the Security System Control
Panel. Confirm location of Security System Control Panel with VA COR.
2.5 OPTICAL FIBER CABLE
A. Description: Multimode, 50/125-micrometer, minimum 6-fiber, tight buffer, optical fiber cable.
1. Comply with ICEA S-83-596 for mechanical properties.
2. Comply with TIA/EIA-568-B.3 for performance specifications.
3. Comply with TIA/EIA-492AAAA-B or TIA/EIA-492AAAA-A as applicable for detailed specifications.
4. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444, UL 1651, and NFPA 70 for the following types:
a. General Purpose, Nonconductive: Type OFN or OFNG.
b. Plenum Rated, Nonconductive: Type OFNP, complying with NFPA 262.
c. Riser Rated, Nonconductive: Type OFNR, complying with UL 1666.
d. General Purpose, Conductive: Type OFC or OFCG
e. Plenum Rated, Conductive: Type OFCP, complying with NFPA 262.
f. Riser Rated, Conductive: Type OFCR, complying with UL 1666.
5. Conductive cable shall be steel armored type.
6. Maximum Attenuation: 3.50 dB/km at 850 nm; 1.5 dB/km at 1300 nm.
7. Minimum Modal Bandwidth: 160 MHz-km at 850 nm; 500 MHz-km at 1300 nm.
B. Jacket:
1. Jacket Color: Aqua for 50/125-micrometer cable.
2. Cable cordage jacket, fiber, unit, and group color shall be according to TIA/EIA-598-B.
3. Imprinted with fiber count, fiber type, and aggregate length at regular intervals not to exceed 40 inches (1000 mm).
2.6 OPTICAL FIBER CABLE HARDWARE
A. Cable Connecting Hardware: Meet the Optical Fiber Connector
Intermateability Standards (FOCIS) specifications of TIA/EIA-604-2, TIA/EIA-604-3-A, and TIA/EIA-604-12. Comply with TIA/EIA-568-B.3.
1. Quick-connect, simplex and duplex, Type SC connectors. Insertion loss shall be not more than 0.75 dB.
2. Type SFF connectors may be used in termination racks, panels, and equipment packages.
2.7 COAXIAL CABLE
A. General Coaxial Cable Requirements: Broadband type, recommended by cable manufacturer specifically for broadband data transmission applications. Coaxial cable and accessories shall have 75-ohm nominal impedance with a return loss of 20 dB maximum from 7 to 806 MHz.
B. RG-11/U: NFPA 70, Type CATV.
1. No. 14 AWG, solid, copper-covered steel conductor.
Issued For Construction 28 05 13 - 5
2. Gas-injected, foam-PE insulation.
3. Double shielded with 100 percent aluminum polyester tape and 60 percent aluminum braid.
4. Jacketed with sunlight-resistant, black PVC or PE.
5. Suitable for outdoor installations in ambient temperatures ranging from minus 40 to plus 85 deg C.
C. RG59/U: NFPA 70, Type CATVR.
1. No. 20 AWG, solid, silver-plated, copper-covered steel conductor.
2. Gas-injected, foam-PE insulation.
3. Triple shielded with 100 percent aluminum polyester tape and 95 percent aluminum braid; covered by aluminum foil with grounding strip.
4. Color-coded PVC jacket.
D. RG-6/U: NFPA 70, Type CATV or CM.
1. No. 16 AWG, solid, copper-covered steel conductor; gas-injected, foam-PE insulation.
2. Double shielded with 100 percent aluminum-foil shield and 60 percent aluminum braid.
3. Jacketed with black PVC or PE.
4. Suitable for indoor installations.
E. RG59/U: NFPA 70, Type CATV.
1. No. 20 AWG, solid, copper-covered steel conductor; gas-injected, foam-PE insulation.
2. Double shielded with 100 percent aluminum polyester tape and 40 percent aluminum braid.
3. PVC jacket.
F. RG59/U (Plenum Rated): NFPA 70, Type CMP.
1. No. 20 AWG, solid, copper-covered steel conductor; foam fluorinated ethylene propylene insulation.
2. Double shielded with 100 percent aluminum-foil shield and 65 percent aluminum braid.
3. Copolymer jacket.
2.8 COAXIAL CABLE HARDWARE
A. Coaxial-Cable Connectors: Type BNC, 75 ohms.
2.9 RS-232 CABLE
A. Standard Cable: NFPA 70, Type CM.
1. Paired, 2 pairs, No. 22 AWG, stranded (7x30) tinned copper conductors.
2. Polypropylene insulation.
3. Individual aluminum foil-polyester tape shielded pairs with 100 percent shield coverage.
4. PVC jacket.
5. Pairs are cabled on common axis with No. 24 AWG, stranded (7x32) tinned copper drain wire.
6. Flame Resistance: Comply with UL 1581.
B. Plenum-Rated Cable: NFPA 70, Type CMP.
1. Paired, 2 pairs, No. 22 AWG, stranded (7x30) tinned copper conductors.
2. Plastic insulation.
3. Individual aluminum foil-polyester tape shielded pairs with 100 percent shield coverage.
4. Plastic jacket.
5. Pairs are cabled on common axis with No. 24 AWG, stranded (7x32) tinned copper drain wire.
6. Flame Resistance: Comply with NFPA 262.
Issued For Construction 28 05 13 - 6
2.10 RS-485 CABLE
A. Standard Cable: NFPA 70, Type CM.
1. Paired, 2 pairs, twisted, No. 22 AWG, stranded (7x30) tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with UL 1581.
B. Plenum-Rated Cable: NFPA 70, Type CMP.
1. Paired, 2 pairs, No. 22 AWG, stranded (7x30) tinned copper conductors.
2. Fluorinated ethylene propylene insulation.
3. Unshielded.
4. Fluorinated ethylene propylene jacket.
5. Flame Resistance: NFPA 262, Flame Test.
2.11 LOW-VOLTAGE CONTROL CABLE
A. Paired Lock Cable: NFPA 70, Type CMG.
1. 1 pair, twisted, No. 16 AWG, stranded (19x29) tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with UL 1581.
B. Plenum-Rated, Paired Lock Cable: NFPA 70, Type CMP.
1. 1 pair, twisted, No. 16 AWG, stranded (19x29) tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with NFPA 262.
C. Paired Lock Cable: NFPA 70, Type CMG.
1. 1 pair, twisted, No. 18 AWG, stranded (19x30) tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with UL 1581.
D. Plenum-Rated, Paired Lock Cable: NFPA 70, Type CMP.
1. 1 pair, twisted, No. 18 AWG, stranded (19x30) tinned copper conductors.
2. Fluorinated ethylene propylene insulation.
3. Unshielded.
4. Plastic jacket.
5. Flame Resistance: NFPA 262, Flame Test.
2.12 CONTROL-CIRCUIT CONDUCTORS
A. Class 1 Control Circuits: Stranded copper, Type THHN-THWN, in raceway complying with UL 83.
B. Class 2 Control Circuits: Stranded copper, Type THHN-THWN, in raceway complying with UL 83.
C. Class 3 Remote-Control and Signal Circuits: Stranded copper, Type TW or TF, complying with UL 83.
2.13 FIRE ALARM WIRE AND CABLE
A. General Wire and Cable Requirements: NRTL listed and labeled as complying with NFPA 70, Article 760.
B. Signaling Line Circuits: Twisted, shielded pair, size as recommended by system manufacturer.
Issued For Construction 28 05 13 - 7
1. Circuit Integrity Cable: Twisted shielded pair, NFPA 70, Article
760, Classification CI, for power-limited fire alarm signal service
Type FPL. NRTL listed and labeled as complying with UL 1424 and UL
2196 for a 2-hour rating.
C. Non-Power-Limited Circuits: Solid-copper conductors with 600-V rated, 75 deg C, color-coded insulation.
1. Low-Voltage Circuits: No. 16 AWG, minimum.
2. Line-Voltage Circuits: No. 12 AWG, minimum.
3. Multiconductor Armored Cable: NFPA 70, Type MC, copper conductors, Type TFN/THHN conductor insulation, copper drain wire, copper armor with red identifier stripe, NTRL listed for fire alarm and cable tray installation, plenum rated, and complying with requirements in
UL 2196 for a 2-hour rating.
2.14 IDENTIFICATION PRODUCTS
A. Comply with UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers.
2.15 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate cables.
B. Factory test UTP and optical fiber cables on reels according to
TIA/EIA-568-B.1.
C. Factory test UTP cables according to TIA/EIA-568-B.2.
D. Factory test multimode optical fiber cables according to TIA/EIA-526-
14-A and TIA/EIA-568-B.3.
E. Factory sweep test coaxial cables at frequencies from 5 MHz to 1 GHz.
Sweep test shall test the frequency response, or attenuation over frequency, of a cable by generating a voltage whose frequency is varied through the specified frequency range and graphing the results.
F. Cable will be considered defective if it does not pass tests and inspections.
G. Prepare test and inspection reports.
2.16 WIRE LUBRICATING COMPOUND
A. Suitable for the wire insulation and conduit it is used with, and shall not harden or become adhesive.
B. Shall not be used on wire for isolated type electrical power systems.
2.17 FIREPROOFING TAPE
A. The tape shall consist of a flexible, conformable fabric of organic composition coated one side with flame-retardant elastomer.
B. The tape shall be self-extinguishing and shall not support combustion.
It shall be arc-proof and fireproof.
C. The tape shall not deteriorate when subjected to water, gases, salt water, sewage, or fungus and be resistant to sunlight and ultraviolet light.
D. The finished application shall withstand a 200-ampere arc for not less than 30 seconds.
E. Securing tape: Glass cloth electrical tape not less than 0.18 mm
(7 mils) thick, and 19 mm (3/4 inch) wide.
PART 3 - EXECUTION
3.1 INSTALLATION OF CONDUCTORS AND CABLES
A. Comply with NECA 1.
B. General Requirements for Cabling:
1. Comply with TIA/EIA-568-B.1.
2. Comply with BICSI ITSIM, Ch. 6, "Cable Termination Practices."
3. Install 110-style IDC termination hardware unless otherwise indicated.
Issued For Construction 28 05 13 - 8
4. Terminate all conductors; no cable shall contain un-terminated elements. Make terminations only at indicated outlets, terminals, and cross-connect and patch panels.
5. Cables may not be spliced. Secure and support cables at intervals not exceeding 30 inches (760 mm) and not more than 6 inches (150 mm) from cabinets, boxes, fittings, outlets, racks, frames, and terminals.
6. Bundle, lace, and train conductors to terminal points without exceeding manufacturer's limitations on bending radii, but not less than radii specified in BICSI ITSIM, "Cabling Termination Practices"
Chapter. Install lacing bars and distribution spools.
7. Do not install bruised, kinked, scored, deformed, or abraded cable.
Do not splice cable between termination, tap, or junction points.
Remove and discard cable if damaged during installation and replace it with new cable.
8. Cold-Weather Installation: Bring cable to room temperature before dereeling. Heat lamps shall not be used for heating.
9. Pulling…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .