R4-A702.pdf

PDF 219 KB Posted

Attached to
Z1DA--Renovate MH Ward 1L, 1H and 1K - Minneapolis VAMC
Solicitation number
36E77620R0050
Issued by

About this file

This document summarizes a federal contract opportunity and related technical specifications for renovating mental health wards at the Minneapolis VA Medical Center. The Department of Veterans Affairs seeks to award a firm-fixed-price contract valued between $10-20 million to furnish all labor, materials, tools and equipment for renovating Wards 1L, 1H and 1K. The scope of work includes general construction, demolition, structural, mechanical, plumbing and electrical work per the specifications. Submissions are due by February 4, 2020 and work must be completed within 790 calendar days of the notice to proceed. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and issued as a request for proposal, with evaluations following FAR Parts 15, 19 and 36.

View the file

Other files

File Type Posted
36E77620R0050 0009.docx DOCX document
Revision Set 4 - Narrative.pdf PDF
R4-A701.pdf PDF
Technical Questions Spreadsheet.pdf PDF
R4-A703.pdf PDF
VA Addendum-Revision Set 3.pdf PDF
36E77620R0050 0008.docx DOCX document
Construction Wage Rates - Hennepin County - 1.1.20.pdf PDF
1K Rec Area Utility Plan.pdf PDF
1K Landscape plan.pdf PDF
Technical Questions Spreadsheet.xlsx XLSX spreadsheet
Exterior Site Plan_Dumpster_Laydown.pdf PDF
4-4-2021 Combined Documents Addendum 2.pdf PDF
VA Pre-Bid Addendum 2 Revision Set 2.pdf PDF
36E77620R0050 0007.docx DOCX document
Technical Question Tracking Sheet.pdf PDF
4-4-2021 VA Addendum 2.Attachments.pdf PDF
23 07 11.pdf PDF
4-4-2021 VA Addendum 2.Narrative.pdf PDF
Renovate Inpatient Mental Health Project 618-17-127 Exterior Modifications.pdf PDF
36E77620R0050 0006.docx DOCX document
Renovate Mental Health Inpatient Ward Project Addendum 1.docx DOCX document
01 45 00 Quality Control.pdf PDF
36E77620R0050 0005.docx DOCX document
083313 Coiling Counter Doors.pdf PDF
Technical Question Tracking Sheet.docx DOCX document
Q 26 crafted plank oak grove.pdf PDF
36E77620R0050 0004.docx DOCX document
S05 -Technical Question Tracking Sheet.docx DOCX document
Minneapolis Mental Health Site Visit Sign-In.pdf PDF
36E77620R0050 0003.pdf PDF
36E77620R0050 0001.docx DOCX document
36E77620R0050 0002.docx DOCX document
ATTACHMENT 6 - 2018-27 MSP IPMH Renovation Specifications Vol 1 and Vol 2.pdf PDF
ATTACHMENT 1 - VAMH-618-17-127 CD SET_1.pdf PDF
ATTACHMENT 5 - VAMH-618-17-127 CD SET_5.pdf PDF
ATTACHMENT 3 - VAMH-618-17-127 CD SET_3.pdf PDF
ATTACHMENT 7 - Contractor Safety _ Env Record Form.docx DOCX document
36E77620R0050.docx DOCX document
ATTACHMENT 2 - VAMH-618-17-127 CD SET_2.pdf PDF
ATTACHMENT 4 - VAMH-618-17-127 CD SET_4.pdf PDF
ATTACHMENT 8 - Construction Wage Rates - Hennepin County - 1.1.20.pdf PDF
ATTACHMENT 6 - 2018-27 MSP IPMH Renovation Specifications Vol 1 and Vol 2 - 2-1-21.pdf PDF
ATTACHMENT 9 - Brand Name JA - Minneapolis.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 4

ALUM

NOT USED ALUM

HM

3'-1 1/2" 3'-1 1/2" 3'-1 1/2" 3'-1 1/2" 3'-1 1/2" 3'-6"

19'-1 1/2"

3' -4

5'

-8

9' -0

3'-6"2" EQ. 2" EQ. 2" EQ. 2" EQ. 2"

16'-8"

4"

7' -3

2" 7'

-9

HM

2" 1'-7"

2" 3'-0"

2" 1'-7"

2"

6'-10 1/2"

4" 6'

-8

2" 2'

-4

2"

T.O. SLAB

SCHEDULE

SEE DOOR

HM

SCHEDULE

SEE DOOR

HM

2"

2" 2" 2" 2"

4"

HM DOUBLE EGRESS

2"

2" 2"

2"

A703

A703

A703

A703

A703

A703

A703

A703

A703

A703

SCHEDULE

SEE DOOR

T.O. SLAB

HM

IL-1AIL-1A IL-1A

LG-1 LG-1 LG-1 LG-1 LG-1

LG-1 LG-1

LG-1LG-1LG-1

IL-1A

LG-1 LG-1

REMOVABLE

EMERGENCY

STOP AT

LATCH SIDE

W1

AL

W2

AL

W3

EQ. EQ. EQ. EQ. EQ.

16'-3"

3' -4

5'

-8

T.O. SLAB T.O. SLAB

W4

W14

2"

1'-3 1/2"

2"

3'-2"

2"

1'-3 1/2"

2"

3'-2"

2"

1'-3 1/2"

2"

3'-2"

2"

1'-3 1/2"

2" 2"

2' -4

2"

6' -8

4"

16'-0"+/-

9' -8

W5 W7 W8 W9

3' -0

4'

-9

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

17'-10"

3' -0

4'

-9

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

8'-4" 3'-6 1/2" 3'-6 1/2" 3'-6 1/2"

10'-7 1/2"

2' -1

0"

2"

4' -1

0"

2"

3' -0

2"

4' -0

2"

4'-6"

2' -1

0" 4'

-2

2"

EQ.

2"

EQ.

2"

8'-6"

3' -2

4'

-0

2" 1'-8"

2"

2'-0"

EQ. EQ. EQ. EQ. EQ.

15'-5 1/2"

W10

T.O. SLAB

9' -0

EQ. EQ. EQ.

8'-9 1/2"

W11

EQ. EQ. EQ.

8'-6"

3' -0

4'

-4

2" 2"

W12

3'-9"

3' -6

4'

-0

W13

17'-10"

2"

EQ.

2"

EQ.

2"

EQ.

2"

EQ.

2"

W15 W16 W17 W18

2" 4'

-0

2"

2" 2'-4" 2"

2'-8"

2" 4'

-0

2"

2" 2'-3" 2"

2'-7"

3' -6

4'

-4

3' -6

4'

-4

4" 8'

-6

2" 9'

-0

1'-9 1/2" 2'-6 1/2"

4" 8'

-6

2" 9'

-0

4"

7' -3

2" 7'

-9

2" 4'

-5

2"

2" 4'

-5

2"

5' -8

4' -4

2" 3'

-8

2"

2"

8' -6

4" 4" 8'

-6

2"

2"

3' -1

0"

2"

2"

4' -0

2"

2"

3' -8

2"

T.O. SLAB

A703

A703

A703

A703

A703

A703

A703

A703

A703

2"

4'-2"

2"

A702

A702

W6

3' -4

3'

-6

3'-11"

A703

4'-9" 1'-2" 4'-9"

5"

2" 3'

-6

2"

3' -4

3'

-1 0"

3'-7 1/2" 3'-7 1/2" 3'-7 1/2"

10'-11"

W19

EQ. EQ.

1' -6

EQ. 8" EQ.

IL-1A IL-1A IL-1A IL-1A

IL-1A

NOTE: USE SPANDRAL GLASS IL-1B W/ THIS WINDOW TYPE

@ ALL OPAQUE CONDITIONS SEE PLANS & SECTIONS

LG-1 LG-1 LG-1 LG-1 LG-1

LG-1 LG-1 LG-1

LG-1 LG-1

LG-1 LG-1 LG-1

LG-1 LG-1 LG-1 LG-1 LG-1 LG-1 LG-1 LG-1

LG-1 LG-1 LG-1

LG-1

LG-1 LG-1 LG-1 LG-1 LG-1 LG-1 LG-1

LG-1 LG-1 LG-1 LG-1 LG-1 LG-1 LG-1

LG-1 LG-1 LG-1 LG-1

LG-1 LG-1 LG-1

IL-1A

LG-1 LG-1LG-1

2" 3'

-4

2"

3' -6

3'

-8

5'-4" 5'-4" 5'-4"

16'-0"

W20

W21

T.O. SLAB T.O. SLAB

2" 5'

-4

2"

3' -4

5'

-8

EQ EQ EQ

11'-7"

LG-1 LG-1 LG-1

HM HM HM HM

HM

HM HM HM HM HM HM HM

AL HM HM HM HM HM HM

1'-0"

HIDDEN UNDER COUNTER BRACING

(16" O.C. MAXIMUM)

SS-1

SPRING-LOADED GUIDE

- REFER TO MANUFACTURERS

INSTALLATION INSTRUCTIONS

OVER-HEAD TRACK

DOUBLE METAL BOX

HEADER @ HEADER

PASS-THRU WINDOW

ASSEMBLY - INSTALL PER

MANUFACTURERS INSTRUCTIONS

WOOD BLOCKING

3' -6

A F

F

4' -2

GLAZING LG-1

HIDDEN UNDER COUNTER BRACKET

(16" O.C. MAX)

WALL MOUNTED ROLLING

SHUTTER DOOR - REFER

TO SPECS

ATTACH TO WALL PER MANUFACTURERS

RECOMMENDATIONS

3' -6

1'-0"

PROVIDE BLOCKING AS NEEDED

SS-1

3' -0

A F

F

A503

TYP

WALL MOUNTED ROLLING

SHUTTER DOOR - REFER

TO SPECS

ATTACH TO WALL PER MANUFACTURERS

RECOMMENDATIONS

3' -8

1"

PROVIDE BLOCKING AS NEEDED

2' -1

0"

A F

F

SS-1

A503

TYP

DOUBLE METAL BOX

HEADER @ HEADER

HOLLOW METAL FRAME

GLAZING

HIDDEN UNDER COUNTER BRACKET

(16" O.C. MAX)

SS-1

6"

3' -6

A F

F

6"

3' -8

DEAL TRAY - C.R. LAURENCE CO. -

CTDB08 (8"x10") - - REFER TO

MANUFACTURERS INSTRUCTIONS

FOR INSTALLATION

SPEAK-THRU - C.R. LAURENCE CO. -

SST7 - REFER TO MANUFACTURERS

INSTRUCTIONS FOR INSTALLATION

1' -6

CL

EQ.10"EQ.

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

G E

N E

R A

L N

O T

E S

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Date Checked Drawn

DRAWING NO.

Building Number

Project No.Drawing Title Project Title

Location

Office of Facilities

Management Drawing Scale

Approved: Service DirectorPlot Scale

Renovate Mental Health Inpatient Ward

TRUE NORTH

PLAN NORTH

As indicated

C

U s e rs

\P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\R -C

P S

M P

L S

I P

M H

S

S c h lo tt h a u e r.

rv t

/1

/2

:4 :5

A

M

4/12/2021 RJO JJG

618-17-127

1338 - A702

DOOR & WINDOW DETAILS

1 Veterans Dr., Minneapolis, MN 55417

1/4" = 1'-0"

FRAME TYPES

1/4" = 1'-0"

WINDOW TYPES

3" = 1'-0"

SECTION DETAIL - PASS-THRU WINDOW

1 1/2" = 1'-0"

SHUTTER DOOR @ SERVING AREA

1 1/2" = 1'-0"

SHUTTER DOOR @ SERVING AREA

1 1/2" = 1'-0"

EXCHANGE WINDOW @ HIGH ACUITY RN STATION

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

G E

N E

R A

L N

O T

E S

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Date Checked Drawn

DRAWING NO.

Building Number

Project No.Drawing Title Project Title

Location

Office of Facilities

Management Drawing Scale

Approved: Service DirectorPlot Scale

Renovate Mental Health Inpatient Ward

TRUE NORTH

PLAN NORTH

As indicated

C

U s e rs

\P u b lic

\D o c u m e n ts

\R e v it P ro je c ts

\R -C

P S

M P

L S

I P

M H

S

S c h lo tt h a u e r.

rv t

/1

/2

:4 :5

A

M

4/12/2021 RJO JJG

618-17-127

1338 - A702

DOOR & WINDOW DETAILS

1 Veterans Dr., Minneapolis, MN 55417

GENERAL NOTES: DOOR AND WINDOW TYPES

1. CONTRACTOR TO FIELD VERIFY ALL FRAME OPENINGS PRIOR TO MANUFACTURING FRAMES.

2. ALL FRAMES ARE 2" (NOMINAL) FRAMES U.N.O.

3. FRAME 6 AND WINDOW 14 ARE TO BE CONSTRUCTED AS A SINGLE FRAME AT ROOM 1K-118.

4. WINDOW 4 AND AND WINDOW 21 ARE TO BE CONSTRUCTED AS A SINGLE FRAME AT ROOM 1H-110A

5. WINDOW 17 AND WINDOW 18 ARE TO BE CONSTRUCTED AS A SINGLE FRAME AT ROOM IL-120.

6. WINDOW 20 AND WINDOW 13 ARE TO BE CONSTRUCTED AS A SINGLE FRAME AT ROOM IL-120.

REVISION SET 4

Sheets
A702 - DOOR & WINDOW DETAILS

File details come from the government source that posted it. Updated .