ATTACHMENT_4_ITB-F_2025-07_Design_Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- ITB-F 2025-07
- Issued by
- Orange County, Orlando City, Florida
About this file
The document is a set of design drawings for the Valencia College East Campus Walkway Coverings / Canopies Roof Remedial Repairs project, prepared by NOVA Engineering & Environmental, LLC. The project involves comprehensive roof repairs across six different canopy sections connecting various buildings on the college's east campus, with a total roof area spanning approximately 29,207 square feet. The scope of work includes pressure washing metal roof panels, replacing damaged panels (34 metal panels total), removing and replacing valley sections, replacing corroded fasteners, cleaning and preparing roof panels, and applying new coatings in accordance with manufacturer guidelines.
The project specifications detail precise repair requirements for each canopy section, including specific quantities of panel and sealant replacements. Key technical requirements include using Tremco Solargard coating assemblies, performing adhesion tests, and following manufacturer installation instructions. The project will require precise field measurements, destructive analysis during bid preparation is allowed, and contractors must coordinate closely with the owner. Additional requirements include providing payment and performance bonds, engineering letters signed by a Florida Professional Engineer, a 12-year manufacturer warranty, a 5-year contractor watertight warranty, and compliance with the 2020 Florida Building Code.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE LOCATION:
CLIENT: DRAWING INDEX:
G-000 COVER SHEET
G-001 PROJECT INFORMATION
G-002 PROJECT INFORMATION
A-100 ROOF PLAN CANOPY 1
A-101 ROOF PLAN CANOPY 2
A-102 ROOF PLAN CANOPY 3
A-103 ROOF PLAN CANOPY 4
A-104 ROOF PLAN CANOPY 5
A-105 ROOF PLAN CANOPY 6
A-200 DETAILS
A-201 DETAILS
Valencia College 701 N. Econlockhatchee Trail Orlando, FL 32825
DESIGN:
NOVA Engineering & Environmental, LLC 650 Northlake Boulevard Suite 430 Altamonte Springs, FL 32701
SCOPE OF WORK
G-000
Cover Sheet
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
Valencia College East Campus Walkway Coverings / Canopies Roof Remedial Repairs
701 E. Econlockhatchee Trail Orlando, Florida
701 E. Econlockhatchee Tr Orlando, Florida
N
1. PRESSURE WASH ALL CANOPY ROOF METAL PANELS (TOP AND UNDERSIDE)
AND THE UNDERSIDE STRUCTURAL MEMBERS.
2. ALL WEATHERED OR MECHANICALLY DAMAGED ROOF PANELS SHALL BE
REMOVED AND REPLACED WITH NEW PANELS.
a. INCLUDE THIRTY FOUR (34) METAL PANELS IN A BASE BID. SPECIFICALLY
SIX (6) PANELS IN THE FIELD, TWENTY EIGHT (28) IN THE VALLEY
SECTIONS.
b. INDIVIDUAL PANELS ARE DEFINED AS SEMICIRCULAR PANELS 36" WIDE, 29' IN LENGTH.
c. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS.
d. SUBMIT PRODUCT DATA TO ENGINEER FOR APPROVAL.
3. ALL METAL PANELS IN THE VALLEY SECTIONS WILL BE REMOVED AND
REPLACED.
4. REMOVE AND REPLACE DESIGNATED METAL ROOF PANELS IN THE FIELD
SECTIONS.
5. REMOVE AND REPLACE ALL CORRODED AND WEATHERED MECHANICAL
FASTENERS
6. CLEAN AND PREPARE ALL METAL ROOF PANELS PER COATING
MANUFACTURER REQUIREMENTS.
7. SEAL MECHANICAL FASTENERS, METAL ROOF PANELS LAPS, ROOF
PANEL-TO-VERTICAL WALL TRANSITIONS PER COATING MANUFACTURER
REQUIREMENTS.
8. APPLY COATINGS AT THE PRE-SELECTED MOCK-UP SECTIONS.
a. MANUFACTURER TECHNICAL REPRESENTATIVE SHALL PERFORM THE
SPECIFIED ADHESION TEST AT EACH LAYER OF THE COATING SYSTEM
AND SUBSTRATE THAT COATING WILL BE APPLIED TO PRIOR TO
INSTALLATION IN SMALL AREAS TO CONFIRM ADHESION.
9. APPLY COATINGS TO THE ENTIRE TOP OF ALL METAL ROOF PANELS (NEW
AND EXISTING) IN STRICT ACCORDANCE WITH THE MANUFACTURER
PUBLISHED GUIDELINES.
a. COATING SYSTEM SHALL MEET OR EXCEED THE TREMCO SOLARGARD
ASSEMBLIES.
This item has been digitally signed and sealed by Jacob S. Kelln, PE, on 2/7/2024 using a Digital Signature.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
G-001
Project Info
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
B. PREPARATION:
1. CONDUCT A COMPLETE INVESTIGATION OF THE EXISTING PROJECT CONDITIONS TO
IDENTIFY THE AREAS OF WORK, EXTENT OF WORK AND CONSIDERATIONS REQUIRED TO
COMPLETE THE WORK. NO CONSIDERATION WILL BE GIVEN TO CLAIMS BASED ON A
DIFFERENCE BETWEEN ACTUAL AND ASSUMED CONDITIONS. COORDINATE ALL SITE
INSPECTIONS WITH OWNER'S REPRESENTATIVES.
2. TAKE FIELD MEASUREMENTS, VERIFY FIELD CONDITIONS AND CAREFULLY COMPARE
SUCH FIELD MEASUREMENTS AND CONDITIONS AND OTHER INFORMATION KNOWN TO
THE CONTRACTOR BEFORE COMMENCING ACTIVITIES. FIELD MEASUREMENTS MUST BE
TAKEN. DESTRUCTIVE ANALYSIS DURING THE BID PREPARATION IS ALLOWABLE TO FIELD
VERIFY ALL CONDITIONS. CONTRACTORS SHALL BE RESPONSIBLE FOR EFFECTIVELY
REPAIRING ANY FIELD CUTS THE SAME DAY OF INSPECTION TO OWNER'S SATISFACTION.
COORDINATE ALL ACTIVITIES WITH OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL COSTS ASSOCIATED WITH DESTRUCTIVE TESTING.
3. DRAWINGS FROM ORIGINAL CONSTRUCTION ARE NOT AVAILABLE FOR THIS PROJECT.
OWNER NOR CONSULTANT ARE RESPONSIBLE FOR ERRORS OR MISINTERPRETATIONS
RESULTING FROM THE USE OF BID DOCUMENTS OR PROVIDED CONSTRUCTION
DRAWINGS.
GENERAL REQUIREMENTS
A. GENERAL:
1. WORK INCLUDES ALL SPECIFIED WORK CALLED OUT IN MINIMUM PERFORMANCE
REQUIREMENT SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL SPECIFIED REQUIREMENTS
NECESSARY TO PROVIDE FOR COMPLETED WORK BEING SOUND, DURABLE AND
WATERTIGHT.
3. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL CONTRACTED WORK IN
STRICT ACCORDANCE WITH PROJECT REQUIREMENTS AND/OR MANUFACTURER
REQUIREMENTS WHICHEVER IS MORE STRINGENT.
4. THE DRAWINGS REPRESENT THE FINAL REMEDIAL REPAIR PROJECT. THE CONSULTANT
OR OWNER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS,
TECHNIQUES, OR SEQUENCES FOR PROCEDURE OF CONSTRUCTION.
5. NOT ALL DETAILS ARE CUT ON DRAWINGS. WHEN NOT PRESENT, USE MANUFACTURER
DETAILS OR SUBMIT CUSTOM DETAIL FOR APPROVAL.
C. PROJECT CONDITIONS:
1. PROTECT THE BUILDING, THE PROPERTY, THE BUILDING OCCUPANTS AND THEIR
PROPERTY.
2. PROVIDE PROTECTIVE BARRICADES, ENCLOSURES, DIRECTIONAL AND WARNING
SIGNAGE AND OTHER METHODS TO ASSURE SAFE PASSAGE OF PEDESTRIANS AND
VEHICLES IN, NEAR AND AFFECTED BY AREAS OF THE WORK.
3. DO NOT DISRUPT SERVICES OR BLOCK EGRESS. THERE SHALL BE NO INTERFERENCE
WITH LIFE SAFETY FEATURES.
4. IN CASE OF A STORM EVENT OR OTHER NATURAL OCCURRENCES, CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL REMOVAL OF CONSTRUCTION EQUIPMENT AND MATERIALS
FROM PROJECT SITE AND/OR SUFFICIENTLY STORED AT LOCATIONS ACCEPTABLE TO
OWNER(S).
5. ALL CONSTRUCTION ACTIVITIES APPROVED BY OWNER SHALL BE CONDUCTED AT TIMES
PRE-APPROVED BY THE OWNER IN ACCORDANCE WITH THE APPROVED PROJECT
SCHEDULE. CONTRACTOR SHALL PROVIDE SUFFICIENT MANPOWER AND EQUIPMENT TO
COMPLETE CONTRACTED WORK WITHIN ALLOTTED SCHEDULE.
6. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE
STRUCTURE DURING CONSTRUCTION, SUCH MEASURES SHALL INCLUDE, BUT NOT
LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
OR THE SAFETY PRECAUTIONS AND THE PROGRAMS INCIDENT THERETO (NOR SHALL
OBSERVATION VISITS TO THE SITE INCLUDE INSPECTION OF THESE ITEMS.)
SUMMARY OF WORK
THIS SUMMARY OF WORK IS PROVIDED AS A GENERAL PERFORMANCE OUTLINE AND IS NOT
INTENDED TO BE ALL-INCLUSIVE. REFER TO THIS PROJECT MANUAL AND PROJECT DRAWINGS FOR
FURTHER DESCRIPTIONS.
A. MOBILIZATION:
INCLUDE DELIVERY AND SET UP OF ALL MATERIALS, EQUIPMENT AND INCIDENTAL ITEMS NECESSARY TO SAFELY ACCESS AREAS OF WORK TO COMPLETE SPECIFIED ROOFING WORK. PROPERLY STORE
ALL MATERIALS AND EQUIPMENT IN DESIGNATED PROJECT STAGING AREAS AS APPROVED BY
OWNER. CONTRACTORS SHALL BE RESPONSIBLE FOR MOBILIZATION AND MAINTAINING
SCAFFOLDING, SAFETY BARRICADES, OVERHEAD PROTECTION, BUILDING PROTECTION, LANDSCAPE
PROTECTION AND PROJECT SIGNAGE REQUIRED FOR THE PROJECT FOR THE FULL DURATION OF
THE PROJECT. COORDINATE ALL MOBILIZATION OF EQUIPMENT, MATERIALS AND INCIDENTAL ITEMS
WITH OWNER AND LOCAL GOVERNING AUTHORITIES IN ACCORDANCE WITH PRE-APPROVED
PROJECT SCHEDULE.
1. PRESSURE WASH ALL CANOPY ROOF METAL PANELS (TOP AND UNDERSIDE) AND THE
UNDERSIDE STRUCTURAL MEMBERS.
2. AS OUTLINED ALL WEATHERED OR MECHANICALLY DAMAGED ROOF PANELS SHALL BE REMOVED
AND REPLACED WITH NEW PANELS.
a. INCLUDE THIRTY FOUR (34) METAL PANELS IN A BASE BID. SPECIFICALLY SIX (6) PANELS IN
THE FIELD, TWENTY EIGHT (28) IN THE VALLEY SECTIONS.
b. INDIVIDUAL PANELS ARE DEFINED AS SEMICIRCULAR PANELS 36" WIDE, 29' IN LENGTH.
c. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS.
d. SUBMIT PRODUCT DATA TO ENGINEER FOR APPROVAL.
3. REMOVE AND REPLACE ALL METAL PANELS IN THE VALLEY SECTIONS.
4. REMOVE AND REPLACE DESIGNATED METAL ROOF PANELS IN THE FIELD SECTIONS.
5. REMOVE AND REPLACE ALL CORRODED AND WEATHERED MECHANICAL FASTENERS
6. CLEAN AND PREPARE ALL METAL ROOF PANELS AND STRUCTURAL MEMBERS PER COATING
MANUFACTURER REQUIREMENTS.
7. SEAL MECHANICAL FASTENERS, METAL ROOF PANELS LAPS, ROOF PANEL-TO-VERTICAL WALL
TRANSITIONS PER COATING MANUFACTURER REQUIREMENTS.
8. APPLY COATINGS AT THE PRE-SELECTED MOCK-UP SECTIONS.
a. MANUFACTURER TECHNICAL REPRESENTATIVE SHALL PERFORM THE SPECIFIED ADHESION
TEST AT EACH LAYER OF THE COATING SYSTEM AND SUBSTRATE THAT COATING WILL BE
APPLIED TO PRIOR TO INSTALLATION IN SMALL AREAS TO CONFIRM ADHESION.
9. APPLY COATINGS TO THE ENTIRE TOP OF ALL METAL ROOF PANELS (NEW AND EXISTING) IN
STRICT ACCORDANCE WITH THE MANUFACTURER PUBLISHED GUIDELINES FOR METAL ROOF
PANELS (TOP AND UNDERSIDE) AND THE UNDERSIDE STRUCTURAL MEMBERS.
a. COATING SYSTEM SHALL MEET OR EXCEED THE TREMCO SOLARGARD ASSEMBLIES FOR
THE TOP OF THE METAL ROOF PANELS.
10. PROVIDE PAYMENT AND PERFORMANCE BONDS AS REQUIRED BY OWNER.
11. ALL WORK TO MEET REQUIREMENTS OF FLORIDA BUILDING CODE 2023.
12. PROVIDE QUANTITIES IN BASE BID.
a. SEALANT REMOVAL AND REPLACEMENT - 450 LINEAR FEET
b. METAL ROOF PANEL REMOVAL AND REPLACEMENT - 3,840 SQUARE FEET
c. NEW ROOF COATING APPLICATION - 32,575 SQUARE FEET
d. NEW INTERIOR COATING APPLICATION - 32,575 SQUARE FEET
e. INCLUDE IN BASE BID A REFUNDABLE, IF NOT USED, CONTINGENCY OF $5,000
13. PROVIDE ALTERNATIVE PRICING
a. METAL SUBSTRUCTURE COATING REPAIRS
b. METAL SUBSTRUCTURE STEEL REPAIRS
14. PROVIDE ENGINEERING LETTER SIGNED AND SEALED BY A FLORIDA PROFESSIONAL ENGINEER
WITH PROPOSED INSTALLATION FOR THE NEW REPLACED METAL ROOF PANELS.
15. INSPECT EXISTING CONDITIONS OF THE METAL ROOFING SYSTEMS AND ALL SURFACES TO
RECEIVE NEW ROOF COATING SYSTEM OR DAMAGE AND OR DETERIORATION. REPORT TO
ENGINEER ALL UNSATISFACTORY CONDITIONS.
16. INSTALL NEW SHEET METAL FLASHINGS, COUNTER FLASHINGS AND ALL ASSOCIATED MATERIALS
REQUIRED TO PROVIDE COMPLETE WATERTIGHT ROOFING SYSTEM.
17. PROVIDE COATING MANUFACTURER'S 12 YEAR NO DOLLAR LIMIT WARRANTY (NDL) AND
CONTRACTOR'S 5 YEAR WATERTIGHT WARRANTY.
18. DISPOSE OF ALL DEBRIS IN A LEGAL MANNER.
19. A PRE-BID WILL BE CONDUCTED TO REVIEW THE REPAIR/REMEDIATION SCOPE OF WORK, THIS
MEETING WILL ALSO SERVE AS A PRE-CONSTRUCTION MEETING, FOR THE SUCCESSFUL BIDDER.
THIS PROJECT ENCOMPASSES A VARIETY OF CONDITIONS AND ASSOCIATED REPAIR TYPES AND
PROCEDURES. BECAUSE OF THIS THE SUBMITTAL PROCESS IS VITAL FOR A QUALITY
INSTALLATION AND SUCCESSFUL PROJECT. SUBMITTALS PROVIDED FROM THE SUCCESSFUL
BIDDER SHALL BE THOROUGH AND DETAILED AS TO WHAT PRODUCTS AND METHODS OF REPAIR
WILL BE USED AND PERFORMED.
B. SUBSTITUTIONS:
1. PRODUCTS AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS
AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS "SPECIFIED
STANDARD" OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR
WRITTEN APPROVAL OF THE CONSULTANT.
C. CODES AND STANDARDS:
1. ALL WORK SHALL BE IN STRICT COMPLIANCE WITH THE 2020 FLORIDA
BUILDING CODE AND AUTHORITIES HAVING JURISDICTION.
2. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INSPECTIONS AND
PAY ALL FEES.
D. PRODUCTS:
1. ALL PRODUCTS, ETC., SHALL BE NEW UNLESS OTHERWISE NOTED, AND AS
SPECIFIED FREE OF DEFECTS AS SHOWN ON THE DRAWINGS AND AS
INDICATED IN THESE SPECIFICATIONS.
2. EXISTING COATED SURFACES PRIMER - SOLARGARD FLUOROPRIME PRIMER
IF THE ROOF IS KYNAR COATED. ADHESION TEST RECOMMENDED PRIOR.
3. EXISTING RUSTED SURFACES - SOLARGARD RUST PRIMER.
4. SEAMS AND FASTENERS HEADS DETAILING SEALED - SOLARGARD SEAM
SEALER WITH PERMAFAB FABRIC WHERE APPLICABLE.
5. BASE COAT - SOLARGARD 6083 BASE COAT AT 1 GAL SQ (16 WET MILS).
6. FINISH COAT - SOLARGARD ACRYTHANE AT 1 GAL SQ (16 WET MILS) IN TWO
COATS (8 MILS EACH).
7. WALL TERMINATION FLASHINGS - DOW CPS HYBRID SEALANT.
E. WORKMANSHIP:
1. ALL MATERIALS SHALL BE FABRICATED AND INSTALLED IN A NEAT AND
WORKMANLIKE MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES
TO AVOID INTERFERENCES AND DELAY DUE TO LACK OF COORDINATION. NO
ALLOWANCES WILL BE MADE FOR REWORK DUE TO COORDINATION
DIFFICULTIES OR INTERFERENCES BETWEEN INVOLVED TRADES.
G-002
Project Info
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
CANOPY SECTION 6:
1. BUILDING 1, 2, 3, 4 - CONNECTOR CANOPY
2. TOTAL ROOF AREA SIZE: 14,821 SF
3. TOTAL OF TWELVE (12) VALLEY SECTIONS TO BE REPLACED = UP TO 15 PANELS.
4. TOTAL OF TWELVE (12) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 120 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
CANOPY SECTION 1:
1. BUILDING 7 - SOUTH CANOPY
2. TOTAL ROOF AREA SIZE: 2,822 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 40 LF OF SEALANT REPLACEMENT AT THE WALL-TO ROOF TRANSITION.
CANOPY SECTION 2:
1. BUILDING 7 - WEST CANOPY
2. TOTAL ROOF AREA SIZE: 3,419 SF
3. TOTAL OF THREE (3) VALLEY SECTIONS TO BE REPLACED = UP TO 4 PANELS.
4. TOTAL OF THREE (3) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 40 LF OF SEALANT REPLACEMENT AT THE WALL-TO ROOF TRANSITION.
6. TOTAL OF TWO (2) FULL PANEL REPLACEMENTS IN THE FIELD DUE TO HOLES IN PANELS.
CANOPY SECTION 3:
1. BUILDING 7 TO 6 - CANOPY
2. TOTAL ROOF AREA SIZE: 5,920 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF FOUR (4) FULL PANEL REPLACEMENTS IN THE FIELD DUE TO HOLES IN PANELS.
CANOPY SECTION 4:
1. BUILDING 6 - CANOPY
2. TOTAL ROOF AREA SIZE: 1,494 SF
3. TOTAL OF 160 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
CANOPY SECTION 5:
1. BUILDING 4, 5, 6 - CONNECTOR CANOPY
2. TOTAL ROOF AREA SIZE: 1,137 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 80 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
BUILDING 7
BUILDING 8
CANOPY 1
CANOPY 1 Roof Plan Canopy 1
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-100
ROOF PLAN
1 SCALE: 1/16" = 1'
N
CANOPY SECTION 1:
1. BUILDING 7 - SOUTH CANOPY
2. TOTAL ROOF AREA SIZE: 2,822 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 40 LF OF SEALANT REPLACEMENT AT THE WALL-TO ROOF TRANSITION.
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
A-201
TYP.
A-200
TYP.
A-201
TYP.
A-200
TYP.
BUILDING 7
BUILDING 8
CANOPY 2
CANOPY 2
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
Roof Plan Canopy 2
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-101
ROOF PLAN
1 SCALE: 1/16" = 1'
N
CANOPY SECTION 2:
1. BUILDING 7 - WEST CANOPY
2. TOTAL ROOF AREA SIZE: 3,419 SF
3. TOTAL OF THREE (3) VALLEY SECTIONS TO BE REPLACED = UP TO 4 PANELS.
4. TOTAL OF THREE (3) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 40 LF OF SEALANT REPLACEMENT AT THE WALL-TO ROOF TRANSITION.
6. TOTAL OF TWO (2) FULL PANEL REPLACEMENTS IN THE FIELD DUE TO HOLES IN PANELS.
VALLEY PANEL
REPLACEMENT
FULL METAL PANEL REPLACEMENT
DUE TO HOLE IN PANEL
FULL METAL PANEL REPLACEMENT
DUE TO HOLE IN PANEL
SEALANT AND WALL METAL
FLASHING REPLACEMENT
A-201
TYP.
A-200
TYP.
A-201
TYP.
A-200TYP.
A-201
TYP.
CANOPY 3
CANOPY 3
BUILDING 7
BUILDING 6
FULL METAL PANEL REPLACEMENT
DUE TO HOLE IN PANEL
Roof Plan Canopy 3
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-102
ROOF PLAN
1 SCALE: 1/64" = 1'
N
CANOPY SECTION 3:
1. BUILDING 7 TO 6 - CANOPY
2. TOTAL ROOF AREA SIZE: 5,920 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF FOUR (4) FULL PANEL REPLACEMENTS IN THE FIELD DUE TO HOLES IN PANELS.
VALLEY PANEL
REPLACEMENT
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
TOTAL VALLEY LENGTH: 16 LF
TOTAL EAVES LENGTH: 750 LF
A-200
TYP.
A-200TYP.
A-201TYP.
A-200
TYP.
A-201
CANOPY 4
CANOPY 4
BUILDING 6
BUILDING 4
BUILDING 5
SEALANT AT WALL METAL
FLASHING REPLACEMENT
Roof Plan Canopy 4
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-103
ROOF PLAN
1 SCALE: 1/16" = 1'
N
CANOPY SECTION 4:
1. BUILDING 6 - CANOPY
2. TOTAL ROOF AREA SIZE: 1,494 SF
3. TOTAL OF 160 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
SEALANT AND WALL METAL
FLASHING REPLACEMENT
A-200
TYP.
A-200TYP.
A-200TYP.
A-201TYP.
CANOPY 5
CANOPY 5
BUILDING 4
BUILDING 5
BUILDING 6
SEALANT AT WALL METAL
FLASHING REPLACEMENT
Roof Plan Canopy 5
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-104
ROOF PLAN
1 SCALE: 1/16" = 1'
N
CANOPY SECTION 5:
1. BUILDING 4, 5, 6 - CONNECTOR CANOPY
2. TOTAL ROOF AREA SIZE: 1,137 SF
3. TOTAL OF TWO (2) VALLEY SECTIONS TO BE REPLACED = UP TO 3 PANELS TOTAL.
4. TOTAL OF TWO (2) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 80 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
A-200TYP.
A-201TYP.
A-200
TYP.
A-200
TYP.
A-200
TYP.
A-201
CANOPY 6
BUILDING 3
BUILDING 2
BUILDING 1
CANOPY 6
Roof Plan Canopy 6
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
ROOF PLAN
2 SCALE: 1/64" = 1'
N
KEY PLAN:
N
A-105
ROOF PLAN
1 SCALE: 1/64" = 1'
N
CANOPY SECTION 6:
1. BUILDING 1, 2, 3, 4 - CONNECTOR CANOPY
2. TOTAL ROOF AREA SIZE: 14,821 SF
3. TOTAL OF TWELVE (12) VALLEY SECTIONS TO BE REPLACED = UP TO 15 PANELS.
4. TOTAL OF TWELVE (12) VALLEY FLASHING GUTTER REPLACEMENTS.
5. TOTAL OF 120 LF OF SEALANT REPLACEMENT AT THE ROOF-TO-WALL TRANSITION.
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
SEALANT AND WALL METAL
FLASHING REPLACEMENT
SEALANT AND WALL METAL
FLASHING REPLACEMENT
VALLEY PANEL
REPLACEMENT
VALLEY PANEL
REPLACEMENT
VALLEY PANEL
REPLACEMENT
VALLEY PANEL
REPLACEMENT
VALLEY PANEL
REPLACEMENT
A-201
TYP.
A-200
TYP.
SEALANT AND WALL METAL
FLASHING REPLACEMENT
A-201
TYP.
A-200
TYP.
A-200
TYP.
A-201
TYP.
LAPS WITH CONTINUOUS
NEW EAVE FLASHING, 4" END
NEW PANEL FASTENER WITH METAL
NEW 900 PANELS
F = FINISH SIDE
EAVE FLASHING
EXISTING EAVE STRUT
20" O.C. MAX.
NEW FASTENERS,
1/2
BACKED NEOPRENE WASHER
CAULK AT LAPS
TOP AND BOTTOM
WITH TAPE SEALER
NEW INSIDE FOAM CLOSURE
BACKED NEOPRENE WASHER
NEW FASTENER WITH METAL
20" O.C.
F = FINISH SIDE
NEW CONTINUOUS BEAD OF CAULK
NEW 900 PANEL
SUB FLASHING
NEOPRENE WASHER 20" O.C.
NEW FASTENER WITH METAL BACKED
EXISTING PURLIN
COUNTER FLASHING
F = FINISH SIDE
F
OUTSIDE CORNER CAP
NEW FASTENER WITH METAL
BACKED NEOPRENE WASHER
BACKED NEOPRENE WASHER
NEW PANEL FASTENER WITH METAL
20" O.C.
WITH CONTINUOUS CAULK AT LAPS
NEW OUTSIDE CORNER CAP; 4" END LAPS
OF CAULK
NEW CONTINUOUS BEAD
NEW 900 PANEL
EXISTING GIRTS
SUB-FLASHING
COUNTERFLASHING
NEW 900 PANEL
CONTINUOUS CAULK AT LAPS
NEW SUB-FLASHING; 4" END LAPS WITH
WITH CONTINUOUS CAULK AT LAPS.
NEW COUNTERFLASHING; 4" END LAPS
NEW FASTENERS; 20" O.C. MAX.
WITH CONTINUOUS CAULK AT LAPS
EXISTING REGLET FLASHING; 4" END LAPS
REGLET FLASHING
WITH METAL BACKED
NEW PANEL FASTENERS
OF CAULK
NEW CONTINUOUS BEAD
AT REGLET
NEW CONTINUOUS CAULK
EXISTING REGLET
1/2"
WITH TAPE SEALER TOP
NEW OUTSIDE FOAM CLOSURE
NEOPRENE WASHER.
WITH METAL BACKED
NEOPRENE WASHER.
NEW FASTENERS
20" O.C.
AND BOTTOM.
NEW CONTINUOUS BEAD OF CAULK
NEW COUNTER FLASHING 4"
END LAPS WITH CONTINUOUS
CAULK AT LAPS
NEW SUB FLASHING
NEW FASTENERS
20" O.C. MAX
NOTE:
· CONTRACTOR TO FIELD VERIFY
MEASUREMENTS FOR THE EAVE
FLASHING TO MATCH EXISTING.
EXISTING REGLET FLASHING; 4" END
LAPS WITH CONTINUOUS CAULK LAPS
NOTE:
· CONTRACTOR TO FIELD VERIFY
MEASUREMENTS FOR THE SUB FLASHING AND
COUNTER FLASHING TO MATCH EXISTING.
· REPLACE SEALANT IF METAL ROOF PANEL IS
NOT PROPOSED FOR REPLACEMENT.
NOTE:
· CONTRACTOR TO FIELD VERIFY
MEASUREMENTS FOR THE OUTSIDE
COVER CAP TO MATCH EXISTING.
EXISTING GIRTS
NOTE:
· CONTRACTOR TO FIELD VERIFY
MEASUREMENTS FOR THE SUB FLASHING AND
COUNTER FLASHING TO MATCH EXISTING.
· REPLACE SEALANT IF METAL ROOF PANEL IS
NOT PROPOSED FOR REPLACEMENT.
NEW CONTINUOUS CAULK AT REGLET
A-200
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
Details
3 SCALE: N.T.S.
OUTSIDE CORNER DETAIL
2 SCALE: N.T.S.
RAKE WALL DETAIL
1 SCALE: N.T.S.
EAVE DETAIL
4 SCALE: N.T.S.
WALL FLASHING DETAIL
NEW FLAT SHEET VALLEY
SUB-FLASHING
R
ID
G E
SLOPE
EA
VE
EXISTING PURLINS
SL
O
PE
ROOFS WITH A SLOPE OF 4:12
OR LESS 6'-0" MIN.
ROOFS ABOVE 4:12 3'-0" MIN.
EACH
SID
E
RUN RIDGE TO EAVE
NEW FLAT SHEET VALLEY SUB-FLASHING
BETWEEN VALLEY FLASHING
NEW CONTINUOUS BEAD OF CAULK
NEW FASTENERS 20" O.C. MAX.
NEW EXPANDABLE FOAM
SEALER TOP AND BOTTOM
CLOSURE WITH TAPE
METAL BACKED NEOPRENE
WASHER
NEW PANEL FASTENER WITH
SIDE LAP DETAIL (TYPICAL)
NEW 900 PANEL
1.5"
35.4"
1.42"
2.94"5.9"
NEW 900 PANEL NEW SCREW WITH STEEL AND
NEOPRENE WASHER
NEW 1" TAPE SEALER CONTINUOUS
NEW VALLEY FLASHING 12" END
LAPS WITH (2) CONTINUOUS
BEADS OF CAULK AT LAPS
NOTE:
· CONTRACTOR TO FIELD VERIFY
MEASUREMENTS FOR THE VALLEY
FLASHING TO MATCH EXISTING.
A-201
Va le nc ia
C ol le ge
E as t C am pu s
W al kw ay
C ov er in gs
C an op ie s
Project No.:
10109-0523129
E.
E co nl oc kh at ch ee T ra il
O rla nd o, F lo rid a
Client:
Drawn: SAS
Checked: SD / JS
Date: 02/07/2024
Sheet Title:
Sheet No.
PROFESSIONAL SEAL /COA
N or th la ke B ou le va rd
, S ui te
Al ta m on te
S pr in gs
, F L
7.
2.
w w w .u sa no va .c om
Valencia College 701 N.
Econlockhatchee Trail Orlando, FL
Details
1 SCALE: N.T.S.
VALLEY DETAIL
2 SCALE: N.T.S.
900 PANEL DETAIL
| Sheets and Views |
| Valencia East Campus - Walkway Repair Design SD-G-000 Cover |
| Valencia East Campus - Walkway Repair Design SD-G-001 Project Info |
| Valencia East Campus - Walkway Repair Design SD-G-002 Project Info |
| Valencia East Campus - Walkway Repair Design SD-A-100 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-101 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-102 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-103 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-104 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-105 Roof Plan |
| Valencia East Campus - Walkway Repair Design SD-A-200 Details |
| Valencia East Campus - Walkway Repair Design SD-A-201 Details |
| 2024-02-07T15:08:12-0500 | |
| Jacob S Kelln |
File details come from the government source that posted it. Updated .