attachment_4_bid_2935_25.pdf
PDF 3 MB Posted
- Solicitation number
- Bid 2935-25
- Issued by
- Merrimack County, Concord City, New Hampshire
About this file
This document is a set of construction drawings and specifications for the New Hampshire Correctional Facility for Women (NHCFW) Boiler Heating System Repairs project. The project is being managed by the New Hampshire Department of Administrative Services Division of Public Works Design & Construction, with the New Hampshire Department of Corrections as the client agency.
The scope of work includes emergency domestic hot water heating system upgrades, new heating water supply and return piping, and modifications to the building's direct digital controls system. Key work items include installing new valves, pumps, and a chemical pot feeder, as well as providing water meters and integrating them with the building automation system. The drawings provide details on the mechanical equipment layout and heating system schematic. The project is scheduled to be issued for bid on February 6, 2024, with no specific bid due date or award date provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Administrative erv1ces
DIVISION OF PUBLIC WORKS DESIGN & CONSTRUCTION
ire ....... orrec 1ona
01 airs
42 Perimeter R __ I Concord, NH 1
1309 ~ontract B
NH DEPART ENT RRECTIONS
CIVIL ELECTRICAL
I Sheet No. I ·
Sheet List Sheet Name
G-000 COVER SHEET
G-010 LEGEND, NOTES AND ABBREVIATIONS
M-300 ENLARGED MECHANICAL ROOM PLAN
M-500 HVAC SCHEMATIC
MECHANICAL
McFarland Johnson 49 Court Street, Suite 240 Binghamton, New York, 13901
p. 607-723-9421
f. 607-723-4979
e. PPapathomopoulos@mjinc.com
DIVISION OF
PUBLIC WORKS
Design & Construction b u i I d i n g 1/,w, ~~
7 Hazen Drive PO Box 483 Room 250
Concord, New Hampshire 03301 p 603 - 271-3516 f603 - 271 - 3515
COMMISSIONER-DEPARTMENT OF ADMINISTRATIVE SERVICES
SIGNATURE DATE
t DMINISTRATOR-DIVISION OF PUBLIC WORKS
SIGNATURE DATE
COMMISSIONER-DEPARTMENT OF CORRECTIONS
SIGNATURE
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
DATE
DESCRIPTION
SYMBOL
SYMBOL
SYMBOL
PROJECT NAME
DATE
New Hampshire Correctional Facility for Women (NHCFW) Boiler Heating System
Repairs
PROJECT NUMBER
81309 B
ISSUE DATE
02/06/2024
SHEET NUMBER
G-000 SHEET l OF 4
E
53 REGIONAL DRIVE
CONCORD, NEW HAMPSHIRE 03301
TEL (603) 225-2978
FAX (603) 225-0095
www.mjinc.com
PLACE STAMP HERE SHEET:
DESCRIPTION
REVISIONS
No DATE
OF
JOHN O. MORTON BUILDING
7 HAZEN DRIVE BOX 483 ROOM 250
CONCORD, NEW HAMPSHIRE 03302-0483
(603) 271-3516 FAX(603) 271-3515
DRAWN BY: SCALE: DATE:ENGINEER/ARCHITECT: DESIGNED BY: APPROVED BY: CHECKED BY:
MCFARLAND JOHNSON
STATE OF NEW HAMPSHIRE
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF PUBLIC WORKS DESIGN & CONSTRUCTION
McFarland Johnson PROJECT No:
CONTRACT:
MJ Project No: DEN PP PP PP 02/06/2024
81309 B
New Hampshire Correctional Facility for Women (NHCFW) Boiler Heating System Repairs
42 Perimeter Rd, Concord, NH 03301
NH DEPARTMENT OF CORRECTIONS
G-010
LEGEND, NOTES AND ABBREVIATIONS
2 418888.14
HW
VD
VD
VD
HWR
HWS
HWR
HWS
CONTRACTOR NOTES
WIRING AND INSTALLATION.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPERATURE CONTROL DEVICES,
WHETHER SHOWN OR NOT TO PROVIDE A COMPLETE, SAFE AND DURABLE SYSTEM.
11. THE CONTRACTOR SHALL INSTALL ALL NECESSARY STIFFENERS, BRACES, STRUTS, ETC.
10. ALL DUCT SIZES, INCLUDED LINED DUCTS, ARE NET FREE INSIDE DIMENSIONS.
9. PROVIDE ALL REQUIRED DUCT AND PIPE HANGERS.
8. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS.
7. FIELD VERIFY ALL DIMENSIONS BEFORE FABRICATION.
FLOORS, WALLS, FOUNDATIONS, AND CEILINGS. PATCH AND PAINT ALL REPAIRED SURFACES TO
REQUIRED TO CONSTRUCT THE WORK AS SHOWN ON THESE DRAWINGS, INCLUDING
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND REPAIR WORK AS
DURING PERFORMANCE OF WORK COVERED BY THIS CONTRACT.
AND ALL DAMAGES TO BUILDING SURFACES, EQUIPMENT AND FURNISHINGS CAUSED
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR TO ORIGINAL CONDITION ANY
TRADES AND OTHER CONTRACTS.
4. ALL WORK COVERED BY THIS CONTRACT SHALL BE COORDINATED WITH THE OTHER
ACCOMPLISH THE WORK AS SPECIFIED AND SHOWN ON THE DRAWINGS.
3. THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION NECESSARY TO
TO BIDDING.
LOCATIONS, DIMENSIONS AND COUNTS AS SHOWN AND NOTED ON THE DRAWINGS PRIOR
2. THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL CONDITIONS,
UTILITY REGULATIONS.
1. ALL WORK SHALL BE IN ACCORDANCE WITH NFPA, STATE AND LOCAL CODES AND 1. THE CONTRACTOR SHALL VISIT JOB SITE AND FAMILIARIZE
HIMSELF WITH THE CONDITIONS PRIOR TO BIDDING.
2. THE OWNER HAS THE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT
REMOVED UNDER THIS CONTRACT. CONTRACTOR TO DISPOSE OF ALL
UNWANTED ITEMS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING WORK AS
REQUIRED TO COMPLETE THE WORK SHOWN ON THESE DRAWINGS
INCLUDING FLOORS, WALLS AND CEILING AND REPAIR OF SURFACES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER DISPOSAL OF
ALL DEBRIS REMOVED UNDER HIS CONTRACT.
5. ALL WORK COVERED BY THIS CONTRACT SHALL BE COORDINATED
WITH THE OWNER AND ALL OTHER TRADES TO MINIMIZE DISRUPTION
OF ROUTINE.
MATCH ADJACENT SURFACE CONDITIONS.
w R
PIPE BREAK
PIPE DROP
PIPE RISE
EXPANSION JOINT
ANCHOR
PIPE GUIDE
SIZE - SEE SPEC.)
FLANGE
END CAP
SAFTEY RELIEF VALVE
PRESSURE REDUCING VALVE
ANGLE VALVE (SECTION VIEW)
2 WAY CONTROL VALVE,
STRAINER W/BALL VALVE, HOSE BIBB & CAP
CHECK VALVE
BALANCING VALVE
SHUTOFF VALVE
TS
H
(GATE VALVE FOR STEAM)
MODULATING ACTUATOR
UNION (AS INDICATED BY PIPE
T
VAV BOX W/
SOUND
ATTENUATOR &
HEATING COIL
OPEN END
DUCT W/
1/4"x1/4" WMS
SIDEWALL
DUCT MTD.
REG./GRILLE
SA. OR EXH.
CEILING
DUCT
MTD.
GRILLE
CEILING
DUCT MTD.
DIFF/GRILLE
TAKEOFF TO
SUPPLY
DIFFUSER
DUCT
TRANSITION
ELBOW W/
TURNING
VANES
RETURN/EXHAUST DUCT DOWN
RETURN/EXHAUST DUCT UP
SPLIT TAKE-OFF
W/
BRANCH
DAMPERS
SUPPLY
STANDARD RADIUS
ELBOW
( R = W )
SUPPLY/RETURN/EXHAUS
T
SUPPLY DUCT DOWN
SUPPLY DUCT UP
BACKDRAFT DAMPER
COMBINATION SMOKE/FIRE
DAMPER
W/ACCESS DOOR
SELF-CLOSING FIRE DAMPER
W/ACCESS
DOOR
MANUAL VOLUME DAMPER
MOTORIZED DAMPER
ROOF EXHAUST FAN SHOWN ON ROOF
ROOF EXHAUST FAN SHOWN ON
FLOOR
PLAN
RETURN OR EXHAUST AIR FLOW
SUPPLY AIR FLOW
TEMPERATURE SENSOR
HUMIDITY SENSOR OR HUMDISTAT
THERMOSTATTRIPLE DUTY VALVE
OPEN BALL VALVE
CLOSED BALL VALVE
EXISTING DUCTWORK BEING REMOVED
NEW DUCTWORK
EXISTING DUCTWORK TO REMAIN
BI BINARY INPUT
BO BINARY OUTPUT
AI ANALOG INPUT
AO ANALOG OUTPUT
T
M
CT
T
WATER FLOW METER
MOTOR
CURRENT TRANSDUCER
M
VFD
H L
H
M T T
T
T
N.O. NORMALLY OPEN
N.C. NORMALLY CLOSED
HUMIDITY SENSOR
FREEZSTAT
S
SA SUPPLY AIR
RA RETURN AIR
EA EXHAUST AIR
OA OUTSIDE AIR
AIRLFOW SENSOR
MOTORIZED DAMPER
SMOKE DETECTOR
TWO-WAY CONTROL VALVE
ZONE THERMOSTAT
ZONE SENSOR
CIRCULATING PUMP
CO
CO2
OUTSIDE AIR
TEMPERATURE
SENSOR
WITH SUN SHIELD
HOT WATER COIL
FAN
DIRECT
EXPANSION
COIL
STARTER MOTOR STARTER
HOT WATER BOILER
AIR FILTER
GAS FURNACE
VARIABLE AIR
FLOW
TERMINAL DAMPER
H
OUTSIDE AIR
HUMIDITY
SENSOR
S
2-POSITION DAMPER
END SWITCH
PUSH BUTTON
TOGGLE SWITCH
NO2
T AQUASTAT
WATER
TEMPERATURE
SENSOR
AIR
TEMPERATURE
SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE
SENSOR
NITROGEN DIOXIDE
SENSOR
DIFFERENTIAL
PRESSURE
SENSOR
VARIABLE
FREQUENCY
DRIVE
POINT OF CONNECTION/DISCONNECTION
EXISTING HOT WATER RETURN PIPING
EXISTING HOT WATER SUPPLY PIPING
NEW HOT WATER RETURN PIPING
NEW HOT WATER SUPPLY PIPING
SFD
BD
VD
FD
MOD
PIPING LEGEND AIR DISTRIBUTION LEGEND
VARIABLE VOLUME EXHAUST AIR TERMINAL
VARIABLE VOLUME SUPPLY AIR TERMINAL
LCP
LAT
HWS
IN
KW
HWUH
HZ
HV
HR
HWR
HW
HC
HD
HGT
HP
LOCAL CONTROL PANEL
LEAVING AIR TEMPERATURE
HOT WATER SUPPLY
INCHES
KILOWATT
HOT WATER UNIT HEATER
HERTZ
HEATING & VENTILATING UNIT
HOT WATER RETURN
HOT WATER
HOUR
HEAD
HORSEPOWER
HEIGHT
HEATING COIL
GA
GRD
GWB
H
GIV
GALV
GC
GRV
GAL
FURN
FT
FPM
FOP
FCU
FG
FCV
FD
FLRDR
FLEX
FB
FAI
FA
F
ESP
ET
EXP
EXH
EWT
ER
EF
EG
EFF
ELEC
EMER
ELEV
GAUGE
GRADE (GROUND)
GYPSUM WALL BOARD
HUMIDIFIER
GRAVITY INTAKE VENT
GRAVITY RELIEF VENT
GENERAL CONTRACTOR
GALVANIZED
GALLONS
FIREFIGHTERS OVERRIDE PANEL
FURNISHED
FEET
FEET PER MINUTE
W/O WITHOUT
WITH RESPECT TOW.R.T.
VENT
VOLUME DAMPER
WITH
WIDTH
WATER GAUGE
WIRE MESH SCREEN
VARIABLE FREQUENCY DRIVE
WET BULB TEMPERATURE
W/
WG
WMS
WB
W
VAV
VVE
VFD
V
VD
FIRE DAMPER (W/ ACCESS DOOR)
FAN COIL UNIT
FLOW CONTROL VALVE
FIBERGLASS
FLOOR DRAIN
FLEXIBLE
FRESH AIR INTAKE
FAN BOX
FREE AREA
FAN
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
EXPANSION TANK
EXHAUST REGISTER
EXPANSION
EXHAUST
EXHAUST FAN
EXHAUST GRILLE
ELECTRICAL
EMERGENCY
ELEVATION
EFFICIENCY
TEMPERATURETEMP
TOP OF PIPE
TOP OF DUCT
TYPICAL
TRANSFER
TRANSFER GRILLE
UNIT HEATER
UNDERCUT DOOR
UH
UC
TYP
TR
TOP
TOD
TG
STANDBY POWER
STAINLESS STEEL
SUPPLY
SUPPLY REGISTER
TELEPHONE
THROW-AWAY
TEMPERATURE
THERMOSTATIC AIR VENTTAV
TEL
TA
T
SUP
STDBY
SS
SR
POUNDS PER SQUARE INCH DIFFERENTIAL
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAUGE
REFRIGERANT DISCHARGE (HOT GAS)
BOILER FEED PUMPBFP
DDC
DU
DX
EAT
EA
DIA
DDCFP
DOV
DN
DIM
DIFF
DB
D
CUF
CUH
CVE
CV
CHEM
COL
CONN
CONC
CP
CONTR
CL
CLG
CO
CFM
CF
CD
CC
BLDG
BHP
BOP
BOD
BSMT
REQUIREDREQ'D
DIRECT DIGITAL CONTROL
ENTERING AIR TEMPERATURE
DIRECT DIGITAL CONTROL FIELD PANEL
DEAERATOR UNIT
DIRECT EXPANSION
EACH
DRAIN OFF VALVE
DIMENSION
DOWN
DIFFUSER
DIAMETER
CONSTANT VOLUME EXHAUST AIR TERMINAL
CONSTANT VOLUME SUPPLY AIR TERMINAL
DRY BULB TEMPERATURE
DRAIN
CABINET UNIT HEATER
CUBIC FEET
SUPPLY FAN
SMOKE DETECTOR
SUPPLY DIFFUSER
SCREEN
SCHEDULE
SQUARE
SPECIFICATIONS
SUPPLY GRILLE
SLIDE GATE DAMPER
SOUND ATTENUATOR
SQUARE FEET
SGD
SQ
SPECS
SQFT
SG
SD
SF
SDET
SCR
SCH
SA
REQUIREMENTS
RETURN FAN
REHEAT COIL
RELATIVE HUMIDITY
RETURN GRILLE
ROOM
ROOF TOP UNIT
RETURN REGISTER
RELIEF
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION
REFRIGERANT LIQUID
RS
RTU
RR
RPM
RM
RHC
RL
RH
RLF
REQ'S
RF
RG
CHEMICAL FEED
COLUMN
CONDENSATE PUMP
CONTRACTOR
CONNECTION
CONCRETE
CEILING
CENTERLINE
CLEAN-OUT
COOLING COIL
CEILING DIFFUSER
CUBIC FEET PER MINUTE
CEILING FAN
BOTTOM OF PIPE
BOTTOM OF DUCT
BRAKE HORSEPOWER
BASEMENT
BUILDING
PREHEAT COILPHC
PLUMBING
RETURN
PRESSURE REDUCING STATION
PSID
RD
RET
PSIG
PSIA
PLBG
PRS
OUTSIDE DIAMETER
OUTSIDE AIR
PUMP
OPEN ENDED DUCT
PRESSURE DROP
POUNDS PER CUBIC FOOT
PUMPED CONDENSATE
OUTSIDE AIR INTAKE
PCF
PC
PD
P
OD
OAI
OED
OA
GENERAL ABBREVIATIONS
BDT
BDP
BBD
BF
B
AS
ARCH
AAV
ATV
ATC
AVS
AD
ADL
AFF
AF
ADD'L
AP
AC
ACCU
ACV
AIR VOLUME TRAVERSE STATION
AUTOMATIC TEMPERATURE CONTROL
BOILER FEED WATER SYSTEM
BLOWDOWN TANK
BACKDRAFT DAMPER
BOILER BLOW DOWN
BOILER
AIR SEPARATOR
AUTOMATIC AIR VENT
ATMOSPHERIC VENT
ARCHITECT
AIR COOLED CONDENSING UNIT
AUTOMATIC CONTROL VALVE
ACCESS DOOR
ACOUSTICAL DUCT LINER
ABOVE FINISHED FLOOR
ACCESS PANEL
AIR FILTER
ADDITIONAL
AIR CONDITIONING
MANUAL AIR VENT
MOUNTED
MAKEUP WATER
NORMALLY OPEN
NOT IN CONTRACT
NORMALLY CLOSED
NOT APPLICABLE
NOT TO SCALE
NUMBER
NIC
NO
NTS
NO.
N/A N.C.
MTD
MAV
MU
LINEAR FEET
LOUVERED DOOR
MEZZANINE
MECHANICAL
LOUVER
MINIMUM
MANUFACTURER
MOTOR CONTROL CENTER
LEAVING WATER TEMPERATURELWT
MECH
MEZZ
MIN
MF'R
MCC
LVDR
LUVR
LF
LINEAR DIFFUSERLD
MOTOR OPERATED DAMPERMOD
HRH HYDRONIC RADIANT HEATER
MAU MAKE UP AIR UNIT
STL STEEL
POINT OF CONNECTION/DISCONNECTION
CONTROLS LEGEND
BAS BUILDING AUTOMATION SYSTEM
EXISTING PIPING BEING REMOVED
HX HEAT EXCHANGER
SNOW MELT SUPPLY AND RETURN PIPESMS/R
LOW PRESSURE CONDENSATELPC
LOW PRESSURE STEAMLPS
HPS HIGH PRESSURE STEAM
HWH HOT WATER HEATER
FTR FIN TUBE RADIATION
PROVIDED BY OTHER SECTIONPOS
GWS/R GLYCOL WATER SUPPLY AND RETURN
(E) EXISTING
CONTRACTOR REMOVAL NOTES
44 1212
ACAC
ABAB
77 1010
PROVIDE
3" HWR
4" HWS
4" HWR (E)
3/4" HWS (E)
3/4" HWR (E)
4" HWS (E)
4" HWS (E)
2" HWS (E)
3" HWS (E)
3" HWR (E)
4" HWR (E)
PROVIDE
3" HWS
2" HWS (E)
PLACE STAMP HERE SHEET:
DESCRIPTION
REVISIONS
No DATE
OF
JOHN O. MORTON BUILDING
7 HAZEN DRIVE BOX 483 ROOM 250
CONCORD, NEW HAMPSHIRE 03302-0483
(603) 271-3516 FAX(603) 271-3515
DRAWN BY: SCALE: DATE:ENGINEER/ARCHITECT: DESIGNED BY: APPROVED BY: CHECKED BY:
MCFARLAND JOHNSON
STATE OF NEW HAMPSHIRE
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF PUBLIC WORKS DESIGN & CONSTRUCTION
PROJECT No:
CONTRACT:
1/4" = 1'-0"DEN PP PP PP 02/06/2024
81309 B
New Hampshire Correctional Facility for Women (NHCFW) Boiler Heating System Repairs
42 Perimeter Rd, Concord, NH 03301
NH DEPARTMENT OF CORRECTIONS
M-300
ENLARGED MECHANICAL ROOM PLAN
3 4
SCALE: 1/4" = 1'-0"1 ENLARGED MECHANICAL EQUIPMENT ROOM PLAN
KEYED NOTES
DEMO EXISTING 4" HWS LINE AS NECESSARY AND PROVIDE A 4x4x3 TEE.
DEMO EXISTING 4" HWR LINE AS NECESSARY AND PROVIDE A 4x4x3 TEE.
DEMO EXISTING 3" HWS LINE AS NECESSARY AND PROVIDE A 3x3x3 TEE.
DEMO EXISTING 3" HWR LINE AS NECESSARY AND PROVIDE A 3x3x3 TEE.
PROVIDE 3" BALANCING VALVE AND BALANCE TO 144 GPM.
PROVIDE 3" SHUTOFF VALVE (N.C.)
SCOPE OF WORK
1.
A.
B.
C.
D.
2.
3.
EMERGENCY DOMESTIC HOT WATER (DHW) HEATING OPERATION:
PROVIDE A 3" HWS AND A 3" HWR LINE FROM THE EXISTING BUILDING HOT WATER HEATING
LOOP TO THE EXISTING DOMESTIC WATER HEATING LOOP.
PROVIDE 3" ISOLATION VALVES THAT WILL BE MANUALLY OPERATED IN THE EVENT OF AN
EMERGENCY.
PROVIDE BALNCING VALVE ON THE 3" HWR LINE.
MODIFY DDC CONTROLS AS NOTED IN THE REVISED SEQUENCE OF OPERATION ON M-500.
PROVIDE A CHEMICAL POT FEEDER AND ASSOCIATED VALVES AS SHOWN ON DETAIL 2/M-300 FOR
THE DOMESTIC HOT WATER HEATING LOOP.
PROVIDE A WATER METER FOR THE DOMESTIC WATER BOILER MAKEUP WATER LINE AND ONE FOR THE HEATING HOT WATER BOILERS MAKEUP WATER LINE. TIE WATER METER TO THE EXISTING DDC
SYSTEM AND PROGRAM ALARMS TO ALLERT MAINTENANCE STAFF OF POTENTIAL LEAKS IN THE
SYSTEM(S).
53 REGIONAL DRIVE
CONCORD, NEW HAMPSHIRE 03301
TEL (603) 225-2978
FAX (603) 225-0095
www.mjinc.com
McFarland Johnson
MJ Project No: 18888.14
B 2B
P
HC
P 1A
P 1B
AS
ET
P 2A
P 2B
TO EXISTING BUILDING LOADS
FROM EXISTING BUILDING LOADS
2" HWR (E)
HX
FR
O
M E
XI
ST
IN
G
D H
W
R
EC
IR
C
L O
O P
TO
E
XI
ST
IN
G
D
IR
C
L O
O P
VFD
VFD
VFD
VFD
3" HWR (E)
PS
3" HWS
3" HWR
DHW
SHUT OFF
VALVE N.C.
(TYP)
3" HWS (E)
P-2A GPM: 155 P-2B GPM: 155
P-1B GPM: 300
P-1A GPM: 300
B-1 MBH:
IN: 2702 @ 30 PSI
OUT: 2508
B-2 MBH:
IN: 2702 @ 30 PSI
OUT: 2508
4" HWR (E)
4" HWS (E)
3" HWS (E)3" HWR (E)
4" HWR (E)
3" HWS (E)
3" HWR (E)
1"
4" HWS (E)
4" HWS (E)
4" HWS (E)
DWH-1 MBH:
IN: 3373
BALANCING
VALVE
BALANCE
AT 144 GPM
4" HWR (E)4" HWS (E)
2" HWS (E) 2" HWR (E)
HX
FR
O
M E
XI
ST
IN
G
D
IR
C
L O
O P
TO
E
XI
ST
IN
G
D
IR
C
L O
O P
2" HWS (E)
RP
RP-4 GPM: 144RP
RP-3 GPM: 144
M
PROVIDE WATER METER ON EXISTING
DHW MAKEUP WATER LINE
53 REGIONAL DRIVE
CONCORD, NEW HAMPSHIRE 03301
TEL (603) 225-2978
FAX (603) 225-0095
www.mjinc.com
PLACE STAMP HERE SHEET:
DESCRIPTION
REVISIONS
No DATE
OF
JOHN O. MORTON BUILDING
7 HAZEN DRIVE BOX 483 ROOM 250
CONCORD, NEW HAMPSHIRE 03302-0483
(603) 271-3516 FAX(603) 271-3515
DRAWN BY: SCALE: DATE:ENGINEER/ARCHITECT: DESIGNED BY: APPROVED BY: CHECKED BY:
MCFARLAND JOHNSON
STATE OF NEW HAMPSHIRE
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF PUBLIC WORKS DESIGN & CONSTRUCTION
McFarland Johnson PROJECT No:
CONTRACT:
MJ Project No: NOT TO SCALEDEN PP PP PP 02/06/2024
81309 B
New Hampshire Correctional Facility for Women (NHCFW) Boiler Heating System Repairs
42 Perimeter Rd, Concord, NH 03301
NH DEPARTMENT OF CORRECTIONS
M-500
HVAC SCHEMATIC
4 418888.14
SCALE: NOT TO SCALE1 HEATING SYSTEM SCHEMATIC
A.
1.
2.
B.
1.
2.
3.
a.
b.
C.
1.
2.
3.
4.
D.
1.
2.
E.
1.
2.
3.
4.
5.
EXISTING HEATING SEQUENCE OF OPERATION (FOR REFERENCE):EXISTING HEATING SEQUENCE OF OPERATION (FOR REFERENCE):
GENERAL
THE EXISTING BOILER HOT WATER CONTROL SYSTEM COORDINATES THE OPERATION OF TWO FULLY MODULATING HOT WATER BOILERS AND THEIR ASSOCIATED BOILER PRIMARY CIRCULATING PUMPS IN ORDER TO MAINTAIN HOT WATER SUPPLY (HWS) TEMPERATURE AT
SETPOINT.
THE BUILDING MANAGEMENT SYSTEM (BMS) CONTROLS THE SECONDARY PUMPS, PROVIDES PLANT ENABLE/DISABLE CONTROL, HWS TEMPERATURE SETPOINT, AND OA RESET CONTROL OUTPUTS TO THE BOILER PLANT CONTROLLER. THE BMS MONITORS BOILER OPERATION
AND DISPLAYS BOILER STATUS AT THE USER'S WORKSTATION.
APPLICATION
BOILER BURNER CONTROL: WITH THE BOILER CONTROL SYSTEM BMS INTERFACE SET TO ACTIVE, THE MODULATION OF THE BOILER IS CONTROLLED THROUGH A 0-10V OR 4-20 MA DC (AS REQUIRED BY THE BOILER) BMS INPUT. THE BMS MONITORS THE HWS SYSTEM TEMPERATURE AND COMPARES IT TO THE ACTIVE SETPOINT TO ESTABLISH A TARGET BOILER FIRING RATE. IF AN INDIVIDUAL BOILER OUTLET TEMPERATURE EXCEEDS A PRE-SET MAXIMUM SETPOINT, THAT BOILER'S FIRING RATE SHALL BE AUTOMATICALLY CUT BACK BY A PID LOOP TO PREVENT A HIGH TEMPERATURE TRIP. MODULATION SIGNALS ARE ELECTRICALLY ISOLATED CHANNEL-CHANNEL AND CHANNEL-
GROUND.
HOT WATER SUPPLY (HWS) TEMPERATURE SETPOINT: WHEN THE BOILER CONTROL SYSTEM BMS INTERFACE IS SET TO (ACTIVE), THE BMS CALCULATES AN OUTSIDE AIR TEMPERATURE RESET SETPOINT. WHEN IN (INACTIVE) MODE THE OPERATOR MAY SET THE HWS
TEMPERATURE VIA THE FRONT PANEL DISPLAY.
TEMPERATURE RESET SCHEDULE:
HWS=140 DEG. F AT 0 DEG. F OUTSIDE AIR TEMPERATURE.
HWS=110 DEG F AT 60 DEG. F OUTSIDE AIR TEMPERATURE.
BOILER SEQUENCE:
THE BOILER CONTROL SYSTEM INCORPORATES A (LEAD/LAG) CASCADE CONTROL SCHEME FOR OPERATION. THE CONTROLLER UTILIZES BOTH HWS TEMPERATURE, AS SENSED AT TS-1, AND BOILER FIRING RATE PERCENT TO START AND STOP THE BOILERS AND MINIMIZE THE TOTAL NUMBER OF BOILERS IN OPERATION. THE CONTROLLER STARTS AND STOPS BOILERS WHEN THE HWS TEMPERATURE IS OUTSIDE THE
ADJUSTABLE TEMPERATURE LIMIT FOR LONGER THAN THE ADJUSTABLE TIME DELAY.
IN ORDER TO MINIMIZE HEADER TEMPERATURE DEVIATIONS THE CONTROL SYSTEM STARTS AND STOPS THE NEXT BOILER WHEN THE "LEAD" BOILER IS AT AN ADJUSTABLE FIRING RATE LIMIT FOR LONGER THAN THE ADJUSTABLE TIME DELAY. THE CONTROL SYSTEM MONITORS BOTH BOILER LOCKOUT AND LIMIT CIRCUITS TO AUTOMATICALLY SKIP OVER BOILERS THAT ARE POWERED DOWN FOR MAINTENANCE, TRIPPED OR
OTHERWISE WILL NOT START.
THE LEAD BOILER EITHER AUTOMATICALLY ROTATES EVERY 7 DAYS OR IS MANUALLY SELECTED BY THE OPERATOR.
THE BOILER RUNS AT LOW FIRE FOR WARM-UP FOR A PRESET LOW FIRE HOLD TIME. THE CONTROL SYSTEM REDUCES THE FIRING RATE TO A
MINIMUM BEFORE STOPPING A BOILER TO PREVENT ACCUMULATION OF FUEL IN THE FURNACE.
BOILER PRIMARY PUMP SEQUENCE: (P-2A, P-2B):
THE BOILER CONTROL SYSTEM INCLUDES INDEPENDENTLY OPERATED PRIMARY WATER PUMP CONTROL. ON A CALL FOR HEAT, THE BOILER CONTROL SYSTEM CONFIRMS GAS PRESSURE AT GAS HIGH AND LOW PRESSURE SWITCHES, AND SENDS A SIGNAL TO THE ASSOCIATED CIRCULATING PUMP TO START. FLOW IS PROVEN AT THE FLOW SWITCH PRIOR TO BOILER FIRING. PRIMARY PUMPS SHALL OPERATE
WHENEVER THE ASSOCIATED BOILER IS FIRING.
PUMP SPEED IS MODULATED FROM A 0-10V SYSTEM OUTPUT TO MAINTAIN A MIMINUM TEMPERATURE DIFFERENCE ACROSS THE HEAT EXCHANGER. THE SYSTEM MUST KEEP AT LEAST ONE PUMP RUNNING TO ENSURE WATER IS ALWAYS MOVING PAST THE HEADER TEMPERATURE SENSOR. THERE ARE AVAILABLE SEQUENCES TO WARM UP COLD BOILERS, AND ADJUSTABLE COOL DOWN PERIOD AFTER THE BOILER HAS STOPPED. THE PUMP STOPS IMMEDIATELY IF ANY TRIPS OCCUR DURING PRE-PURGE, PILOT, OR MAIN FLAME TRIAL FOR
IGNITION.
SECONDARY PUMP CONTROL (P-1A & 1B)
THE LEAD SECONDARY CIRCULATING PUMP RUNS CONTINUOUSLY WHEN THE HEATING PLANT IS ENABLED. A REMOTE DIFFERENTIAL PRESSURE TRANSMITTER IS CONNECTED TO THE SUPPLY AND RETURN LINES. PUMP VFD MODULATES AS REQUIRED TO MAINTAIN SYSTEM
DIFFERENTIAL PRESSURE AS 2-WAY VALVES OPEN AND CLOSE.
IF THE LEAD PUMP CANNOT MAINTAIN SECONDARY SYSTEM PRESSURE DIFFERENTIAL, IT MODULATES OFF AND BOTH THE LEAD AND LAG
PUMPS MODULATE ON SIMULTANEOUSLY TO MAINTAIN SYSTEM DP.
IF BOTH PUMPS ARE AT MINIMUM VFD SPEED AND THE SYSTEM DP IS ABOVE SETPOINT, THE LAG PUMP IS DE-ENERGIZED AND THE LEAD
PUMP IS MODULATED TO MAINTAIN SETPOINT.
THE SCHEDULE AUTOMATICALLY ROTATES THE LEAD/LAG PUMPS.
THE PUMPS ARE MONITORED AND ALARMED IF ONE OF THEM FAILS. IF THE LEAD PUMP FAILS, THE LAG PUMP IS ENERGIZED.
A.
1.
2.
B.
1.
2.
3.
4.
EMERGENCY DOMESTIC WATER HEATING OPERATION:
GENERAL:
IN THE EVENT OF DOMESTIC HOT WATER FAILURE THE MAINTENANCE STAFF SHALL BE ABLE TO MANUALY ENABLE AN EMERGENCY DOMESTIC HOT WATER MODE THROUGH THE EXSITING BUILDING MANAGEMENT SYSTEM (BMS).
CONTRACTOR SHALL PROVIDE PROGRAMING AND CONTROL DEVICES NECESSARY TO IMPLEMENT THE SEQUENCE
DESCRIBED HEREIN.
EMERGENCY DOMESTIC HOT WATER (DHW) SEQUENCE:
WHEN THE EMERGENCY DHW SEQUENCE IS ACTIVATED, THE BMS SHALL ENABLE BOTH SECONDARY LOOP PUMPS (P-1A & P-1B).
THE LEAD PUMP SHALL RUN CONTINUOUSLY AND THE PUMP VFD SHALL MODULATE THE PUMP TO MAINTAIN THE
DIFFERENTIAL PRESSURE (DP) SETPOINT.
IF THE PUMP IS UNABLE TO MAINTAIN THE SETPOINT, BOTH PUMPS SHALL BE STARTED AND THEIR SPEED WILL MODULATE VIA THEIR RESPECTIVE VFDs. BOTH PUMPS SHALL RUN AT THE SAME SPEED.
IF BOTH PUMPS ARE AT MINIMUM VFD SPEED AND THE SYSTEM DP IS ABOVE SETPOINT, THE LAG PUMP IS DE-ENERGIZED
AND THE LEAD PUMP IS MODULATED TO MAINTAIN SETPOINT.
| G-000 - COVER SHEET |
| G-010 - LEGEND, NOTES AND ABBREVIATIONS |
| M-300 - ENLARGED MECHANICAL ROOM PLAN |
| M-500 - HVAC SCHEMATIC |
File details come from the government source that posted it. Updated .