attachment-2-bid-2935-25.pdf

PDF 403 KB Posted

Attached to
CONTRACT: NHCFW Boiler Heating System Repair Services
Solicitation number
Bid 2935-25
Issued by
Merrimack County, Concord City, New Hampshire

About this file

NHCFW Boiler Heating System Repair Services - Technical Specifications Summary

This is a technical specifications document for the New Hampshire Department of Administrative Services' contract solicitation for Boiler Heating System Repair Services at the New Hampshire Correctional Facility for Women (NHCFW) in Concord. The specifications detail comprehensive HVAC system requirements including heating water supply and return piping, valves, pumps, meters, gauges, hangers and supports, insulation, direct digital controls, hydronic piping and specialties, water treatment, and electrical power conductors and cables. The project involves emergency domestic hot water heating system upgrades with installation, testing, and balancing of hydronic systems. The pre-bid walkthrough is scheduled for July 16, 2024, with bid submissions due July 31, 2024, at 10:00 AM Eastern Time. The anticipated contract term runs from September 27, 2024, through August 30, 2025, with a $13,000 allowance for contingencies related to modifications or unknown conditions.

The specifications establish technical requirements aligned with ASME, ASTM, AWWA, MSS, and other industry standards for all materials and equipment, including positive displacement meters, ball and butterfly valves, check valves, gate valves, pipe supports, glass fiber insulation, and DDC system components. All materials must be new except where specifically permitted, with asbestos-containing materials prohibited. The document mandates testing and adjusting of hydronic systems to within plus or minus 10 percent of design per AABC National Standards or ASHRAE Standard 111, with system balancing conducted by AABC-certified agencies and technicians. Contractors must comply with manufacturer's instructions for installation, maintain proper storage and handling procedures, and submit product data, shop drawings, and warranties. The specifications require independent support for piping from building structure, prohibition of aluminum conductors in favor of copper only, and comprehensive system cleaning and treatment procedures using specified chemical treatments prior to operation.

View the file

Other files

File Type Posted
attachment-4-bid-2935-25-0.pdf PDF
attachment-1-bid-2935-25.pdf PDF
addendum_1_bid_2935_25.pdf.pdf PDF
attachment-3-bid-2935-25.pdf PDF
addendum-2-bid-2935-25.pdf PDF
bid_2935_25.pdf-0.pdf PDF
attachment-5-bid-2935-25.pdf PDF
bid-2935-25-award.pdf PDF
attachment_3_bid_2935_25.pdf PDF
attachment_2_bid_2935_25.pdf PDF
bid_2935_25.pdf PDF
attachment_4_bid_2935_25.pdf PDF
attachment_1_bid_2935_25.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

81309 Contract B NHCFW Boiler Heating System Repairs 02/06/24

Product Requirements 01600 - 1

SECTION 01600

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

E. Product substitution procedures.

F. Equipment electrical characteristics and components.

1.2 PRODUCTS

A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.

B. All materials and equipment shall be new, except as specifically permitted by Contract Documents.

C. Furnish interchangeable components from same manufacturer for components being replaced.

D. The use of asbestos containing materials shall be prohibited.

1.3 PRODUCT DELIVERY REQUIREMENTS

A. Transport and handle products in accordance with manufacturer's instructions.

B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.

1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products in accordance with manufacturers' instructions.

B. Store with seals and labels intact and legible.

01600 - 2

C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.

D. For exterior storage of fabricated products, place on sloped supports above ground.

E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection only with prior approval from the Contract Administrator.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1.5 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers with or without provision for substitutions: Products of one of manufacturers named and meeting specifications, no options or substitutions allowed. Submit request for substitution for any manufacturer not named in accordance with the following article.

1.6 PRODUCT SUBSTITUTION PROCEDURES

A. Where Bidding Documents stipulate particular Products, substitution requests will ONLY be considered before receipt of Bids. Submit requests per the requirements specified in this section.

1. All requests shall be submitted to the Contract Administrator not later than eight

(8) working days before the hour and day set for bid opening. Incomplete requests or requests received after this deadline will not be considered.

2. All requests that are approved and are acceptable to the Department will be issued as part of an Addendum to each Bidder who has received a set of bidding documents, so that all Bidders may avail themselves of the change in submitting their Proposals.

B. Substitutions [may] be considered after bid opening when a product becomes unavailable through no fault of the Contractor. The Contractor shall apply to the Contract Administrator, in writing, within ten (10) days of his realizing his inability to furnish the article specified, describing completely the substitution he desires to make. The Contractor shall include a dated written statement from the manufacturer outlining an explanation for the unavailability of the product. Substitutions for reasons of lead times, i.e., the time between when the Contractor orders necessary materials from the vendor

01600 - 3 and anticipated delivery, will only be reviewed if the lead time is more than the length of the contract time. The Department may extend the contract time to accommodate the product specified. No additional costs from the Contractor will be considered due to the fact that the Contractor shall verify lead times and coordinate with contract time during the bidding phase.

C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.

D. A request constitutes a representation that Bidder:

1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.

2. Will provide same warranty for Substitution as for specified product.

3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the State.

4. Waives claims for additional costs or time extension which may subsequently become apparent.

5. Will reimburse Department and Architect and/or Engineer for review or redesign services associated with re-approval by authorities having jurisdiction.

E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents.

F. Substitution Submittal Procedure:

1. Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.

2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.

3. The Department will notify Bidders in writing of decision to accept by issuing an addendum.

PART 2 PRODUCTS

2.1 EQUIPMENT ELECTRICAL CHARACTERISTICS AND COMPONENTS

A. Wiring Terminations: Furnish terminal lugs to match branch circuit conductor quantities, sizes, and materials indicated. Include lugs for terminal box.

B. Cord and Plug: Furnish minimum 6 foot (2 m) cord and plug including grounding connector for connection to electric wiring system. Cord of longer length is specified in individual specification sections.

END OF SECTION

METERS AND GAUGES FOR HVAC PIPING

23 0519 - 1

SECTION 23 0519

METERS AND GAUGES FOR HVAC PIPING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Positive displacement meters.

1.02 REFERENCE STANDARDS

A. AWWA C700 - Cold-Water Meters -- Displacement Type, Metal Alloy Main Case;

2015.

B. AWWA M6 - Water Meters -- Selection, Installation, Testing, and Maintenance; 2012, with Addendum (2018).

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide list that indicates use, operating range, total range and location for manufactured components.

PART 2 PRODUCTS

2.01 POSITIVE DISPLACEMENT METERS (LIQUID)

A. Basis of Design:

1. Neptune Technology Group; T-10 with Tricon/E3 Transmitter:

www.neptunetg.com.

B. Other Manufacturers:

1. Badger Meter: www.badgermeter.com.

2. Niagara Meters: www.niagarameters.com.

3. Veris Industries: www.veris.com.

C. AWWA C700, positive displacement disc type suitable for fluid with metal alloy main case and cast iron frost-proof, breakaway bottom cap, hermetically sealed register, remote reading.

D. Meter: Brass body turbine meter with magnetic drive register.

1. Service: Makeup water, 122 degrees F.

2. Nominal Flow: 10 gpm.

3. Pressure Drop at Nominal Flow: 2 psi.

4. Maximum Flow: 20 gpm.

5. Accuracy: 1-1/2 percent.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Install positive displacement meters with isolating valves on inlet and outlet to AWWA

M6. Provide full line size valved bypass with globe valve for liquid service meters.

GENERAL-DUTY VALVES FOR HVAC PIPING

23 0523 - 1

SECTION 23 0523

GENERAL-DUTY VALVES FOR HVAC PIPING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Ball valves.

B. Butterfly valves.

C. Check valves.

D. Gate valves.

E. Chainwheels.

1.02 ABBREVIATIONS AND ACRONYMS

A. CWP: Cold working pressure.

B. EPDM: Ethylene propylene copolymer rubber.

C. NBR: Acrylonitrile-butadiene, Buna-N, or nitrile rubber.

D. NRS: Nonrising stem.

E. OS&Y: Outside screw and yoke.

F. PTFE: Polytetrafluoroethylene.

G. RS: Rising stem.

H. TFE: Tetrafluoroethylene.

I. WOG: Water, oil, and gas.

1.03 REFERENCE STANDARDS

A. ASME B1.20.1 - Pipe Threads, General Purpose, Inch; 2013 (Reaffirmed 2018).

B. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250;

2020.

C. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings; 2018.

D. ASME B16.34 - Valves - Flanged, Threaded and Welding End; 2017.

E. ASME B31.9 - Building Services Piping; 2017.

F. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, Flanges, and

Pipe Fittings; 2004 (Reapproved 2023).

G. ASTM A216/A216M - Standard Specification for Steel Castings, Carbon, Suitable for

Fusion Welding, for High-Temperature Service; 2021.

H. ASTM A536 - Standard Specification for Ductile Iron Castings; 1984 (Reapproved

2014).

I. ASTM B62 - Standard Specification for Composition Bronze or Ounce Metal Castings;

2017.

J. AWWA C606 - Grooved and Shouldered Joints; 2015.

K. MSS SP-67 - Butterfly Valves; 2022.

23 0523 - 2

L. MSS SP-68 - High Pressure Butterfly Valves with Offset Design; 2021.

M. MSS SP-70 - Gray Iron Gate Valves, Flanged and Threaded Ends; 2011.

N. MSS SP-80 - Bronze Gate, Globe, Angle, and Check Valves; 2019.

O. MSS SP-110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and

Flared Ends; 2010, with Errata .

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Product Data: Provide data on valves including manufacturers catalog information.

Submit performance ratings, rough-in details, weights, support requirements, and piping connections.

C. Warranty: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

D. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, maintenance and repair data, and parts listings.

PART 2 PRODUCTS

2.01 APPLICATIONS

A. Listed pipe sizes shown using nominal pipe sizes (NPS) and nominal diameter (DN).

B. Provide the following valves for the applications if not indicated on drawings:

1. Isolation (Shutoff): Butterfly, Gate, and Ball.

C. Required Valve End Connections for Non-Wafer Types:

1. Steel Pipe:

a. Size 2 inch and Smaller: Threaded ends.

b. Size 2-1/2 inch and Larger: Grooved ends.

2. Copper Tube:

a. Size 2 inch and Smaller: Threaded ends, except solder-joint valve-ends.

b. Size 2-1/2 inch and Larger: Grooved ends.

D. Heating Hot Water Valves:

1. Size 2 inch and Smaller, Brass and Bronze Valves:

a. Threaded ends.

b. Ball: Full port, one piece, brass trim.

c. Swing Check: Bronze disc, Class 125.

d. Gate: NRS, Class 125.

2. Size 2-1/2 inch and Larger, Iron Valves:

a. 2-1/2 inch to 4 inch: Flanged ends.

b. Single-Flange Butterfly: 2-1/2 inch to 12 inch, stainless steel disc, EPDM seat, 200 CWP.

c. Grooved-End Butterfly: 2-1/2 inch to 12 inch, 175 CWP.

d. Butterfly: High performance, single flange, Class 150.

23 0523 - 3

2.02 GENERAL REQUIREMENTS

A. Valve Pressure and Temperature Ratings: No less than rating indicated; as required for system pressures and temperatures.

B. Valve Sizes: Match upstream piping unless otherwise indicated.

C. Valve Actuator Types:

1. Handwheel: Valves other than quarter-turn types.

2. Hand Lever: Quarter-turn valves 6 inch and smaller.

3. Chainwheel: Device for attachment to valve handwheel, stem, or other actuator, of size and with chain for mounting height, as indicated in the "Valve Installation" Article.

D. Valves in Insulated Piping: Provide 2 inch stem extensions and the following features:

1. Gate Valves: Rising stem.

2. Ball Valves: Extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation.

3. Butterfly Valves: Extended neck.

4. Memory Stops: Fully adjustable after insulation is installed.

E. Valve-End Connections:

1. Threaded End Valves: ASME B1.20.1.

2. Flanges on Iron Valves: ASME B16.1 for flanges on iron valves.

3. Solder Joint Connections: ASME B16.18.

4. Grooved End Connections: AWWA C606.

F. General ASME Compliance:

1. Building Services Piping Valves: ASME B31.9.

2.03 BRONZE, BALL VALVES

A. General:

1. Fabricate from dezincification resistant material.

2. Copper alloys containing more than 15 percent zinc are not permitted.

B. Two Piece, Full Port with Bronze or Brass Trim:

1. Comply with MSS SP-110.

2. WSP Rating: 150 psi.

3. WOG Rating: 400 psi.

4. Body: Forged bronze or dezincified-brass alloy.

5. End Connections: Pipe thread or solder.

6. Seats: PTFE.

7. Stem: Bronze or brass.

8. Ball: Stainless steel, vented.

9. Operator: Provide lockable handle and stem extension.

2.04 IRON, SINGLE FLANGE BUTTERFLY VALVES

A. Wafer Style:

1. Comply with MSS SP-67, Type I.

23 0523 - 4

2. Wafer Style, CWP Ratings:

a. Sizes 2 to 12 inch: 200 psi.

b. Sizes 14 to 24 inch: 150 psi.

c. Vacuum Service: Down to 29.9 in-Hg.

3. Body Material: ASTM A126 cast iron or ASTM A536 ductile iron.

4. Stem: One or two-piece stainless steel.

5. Seat: NBR.

6. Disc: Aluminum-bronze.

2.05 IRON, GROOVED-END BUTTERFLY VALVES

A. CWP Rating: 175 psi.

1. Comply with MSS SP-67, Type I.

2. Body: Coated ductile iron.

3. Stem: Two-piece stainless steel.

4. Disc: Coated ductile iron.

5. Disc Seal: EPDM.

2.06 HIGH-PERFORMANCE, SINGLE FLANGE BUTTERFLY VALVES

A. Lug type; Bidirectional dead end service without downstream flange:

1. Comply with MSS SP-68.

2. Class 150: CWP Rating: 285 psi at 100 degrees F.

3. Body: Provide carbon steel, cast iron, ductile Iron, or stainless steel.

4. Seat: Metal or reinforced PTFE.

5. Offset stem: Stainless steel.

6. Disc: Carbon steel.

2.07 BRASS, INLINE CHECK VALVES

A. Class 150: CWP Rating: 200 psi .

B. Maximum Service Temperature: 250 degreess F.

C. Body: Forged brass.

D. Disc: Forged brass.

E. Seal: PTFE, bubble tight.

F. End-Connections: Press.

2.08 BRASS, HORIZONTAL SWING CHECK VALVES

A. Threaded End-Connections:

1. Class 125: CWP Rating: 200 psi.

2. Body: Forged brass.

3. Disc: Forged brass.

4. Hinge-Pin, Screw, and Cap: Forged brass.

B. Press End-Connections:

1. Class 125: WOG Rating: 200 psi.

2. Body: Forged brass.

3. Disc: Forged brass.

23 0523 - 5

4. Hinge-Pin, Screw, and Cap: Forged brass.

2.09 BRONZE, SWING CHECK VALVES

2.10 BRONZE, GATE VALVES

A. Rising Stem or OS&Y:

1. Pressure-Temperature Range: MSS SP-80, Type I.

2. Body: ASTM B62, bronze with integral seat and screw-in bonnet.

3. End Connections: Threaded or solder.

4. Stem: Bronze.

5. Disc: Solid wedge; bronze.

6. Packing: Asbestos free.

7. Handwheel Operator: Malleable iron, bronze, or aluminum.

B. Nonrising Stem or NRS:

1. Pressure-Temperature Range: MSS SP-80, Type I.

2. Class 125:

3. Class 150: CWP Rating; 300 psi.

4. Body: ASTM B62, bronze with integral seat and screw-in bonnet.

5. Ends Connections: Threaded or solder.

6. Stem: Bronze.

7. Disc: Solid wedge; bronze.

8. Packing: Asbestos free.

9. Handwheel Operator: Malleable iron, bronze, or aluminum.

2.11 IRON, GATE VALVES

A. NRS or OS&Y:

1. Comply with MSS SP-70, Type I.

2. Body Material: Gray iron with bolted bonnet.

3. Ends: Flanged.

4. Trim: Bronze.

5. Disc: Solid wedge.

6. Packing and Gasket: Asbestos free.

2.12 CARBON STEEL, GATE VALVES

A. Class 150:

1. Body and Disc: ASTM A216/A216M.

2. CWP Rating: 150 psi.

3. Bolted Bonnet: OS&Y; Rising Stem.

4. End Connections: Flanged.

5. Packing and Gasket: Asbestos free.

6. Pressure and Temperature Rating: ASME B16.34.

2.13 CHAINWHEELS

A. Description: Valve actuation assembly with sprocket rim, brackets, and chain.

1. Brackets: Type, number, size, and fasteners required to mount actuator on valve.

2. Attachment: For connection to ball, butterfly, and plug valve stems.

23 0523 - 6

3. Sprocket Rim with Chain Guides: Ductile iron include zinc coating.

4. Chain: Hot-dip galvanized steel. Sized to fit sprocket rim.

PART 3 EXECUTION

3.01 EXAMINATION

A. Discard all packing materials and verify that valve interior, including threads and flanges, are completely clean without signs of damage or degradation that could result in leakage.

B. Verify valve parts to be fully operational in all positions from closed to fully open.

C. Confirm gasket material to be suitable for the service, to be of correct size, and without defects that could compromise effectiveness.

D. Should valve is determined to be defective, replace with new valve.

3.02 INSTALLATION

A. Provide unions or flanges with valves to facilitate equipment removal and maintenance while maintaining system operation and full accessibility for servicing.

B. Provide separate valve support as required and locate valve with stem at or above center of piping, maintaining unimpeded stem movement.

C. Provide chainwheels on operators for valves 4 NPS and larger where located 96 NPS or more above finished floor, terminating 60 NPS above finished floor.

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 0529 - 1

SECTION 23 0529

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Support and attachment components.

1.02 REFERENCE STANDARDS

A. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2017.

B. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2023.

C. ASTM A181/A181M - Standard Specification for Carbon Steel Forgings, for General-Purpose Piping; 2023.

D. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2019.

E. ASTM A47/A47M - Standard Specification for Ferritic Malleable Iron Castings; 1999, with Editorial Revision (2022).

F. ASTM A283/A283M - Standard Specification for Low and Intermediate Tensile

Strength Carbon Steel Plates; 2018.

G. ASTM A395/A395M - Standard Specification for Ferritic Ductile Iron

Pressure-Retaining Castings for Use at Elevated Temperatures; 1999 (Reapproved 2022).

H. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2023.

I. ASTM A1011/A1011M - Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength; 2023.

J. ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel; 2023.

K. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2023c.

L. FM (AG) - FM Approval Guide; current edition.

M. MFMA-4 - Metal Framing Standards Publication; 2004.

N. MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation; 2018.

O. UL (DIR) - Online Certifications Directory; Current Edition.

P. UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials;

Current Edition, Including All Revisions.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

23 0529 - 2

B. Product Data: Provide manufacturer's standard catalog pages and data sheets for channel (strut) framing systems, nonpenetrating rooftop supports, post-installed concrete and masonry anchors, and thermal insulated pipe supports.

C. Shop Drawings: Include details for fabricated hangers and supports where materials or methods other than those indicated are proposed for substitution.

1.04 QUALITY ASSURANCE

A. Comply with applicable building code.

PART 2 PRODUCTS

2.01 SUPPORT AND ATTACHMENT COMPONENTS

A. General Requirements:

1. Provide all required hangers, supports, anchors, fasteners, fittings, accessories, and hardware as necessary for the complete installation of plumbing work.

2. Provide products listed, classified, and labeled as suitable for the purpose intended, where applicable.

3. Where support and attachment component types and sizes are not indicated, select in accordance with manufacturer's application criteria as required for the load to be supported. Include consideration for vibration, equipment operation, and shock loads where applicable.

4. Do not use wire, chain, perforated pipe strap, or wood for permanent supports unless specifically indicated or permitted.

5. Steel Components: Use corrosion resistant materials suitable for the environment where installed.

a. Zinc-Plated Steel: Electroplated in accordance with ASTM B633.

b. Galvanized Steel: Hot-dip galvanized after fabrication in accordance with

ASTM A123/A123M or ASTM A153/A153M.

B. Prefabricated Trapeze-Framed Metal Strut Systems:

1. MFMA-4 compliant, pre-fabricated, MSS SP-58 type 59 continuous-slot metal strut channel with associated tracks, fittings, and related accessories.

2. Strut Channel or Bracket Material:

3. Accessories: Provide bracket covers, cable basket clips, cable tray clips, clamps, conduit clamps, fire-retarding brackets, j-hooks, protectors, and vibration dampeners.

C. Hanger Rods:

1. Threaded zinc-plated steel unless otherwise indicated.

2. Minimum Size, Unless Otherwise Indicated or Required:

a. Equipment Supports: 1/2 inch diameter.

b. Piping up to 1 inch: 1/4 inch diameter.

c. Piping larger than 1 inch: 3/8 inch diameter.

d. Trapeze Support for Multiple Pipes: 3/8 inch diameter.

D. Pipe Supports:

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M

23 0529 - 3

1. Material: ASTM A395/A395M ductile iron, ASTM A36/A36M carbon steel, ASTM A47/A47M malleable iron, ASTM A181/A181M forged steel, or ASTM A283/A283M steel.

2. Liquid Temperatures Up To 122 degrees F:

a. Overhead Support: MSS SP-58 Types 1, 3 through 12.

b. Support From Below: MSS SP-58 Types 35 through 38.

3. Operating Temperatures from 122 to 446 degrees F:

a. Overhead Support: MSS SP-58 Type 1 or 3 through 12, with appropriate saddle of MSS SP-58 Type 40 for insulated pipe.

b. Roller Support: MSS SP-58 Types 41 or 43 through 46, with appropriate saddle of MSS SP-58 Type 39 for insulated pipe.

c. Sliding Support: MSS SP-58 Types 35 through 38.

E. Roller Chairs:

1. MSS SP-58 type 43 based on required load, nonconductive and corrosion resistant.

2. Steel Yoke Type: MSS SP-58 type 44, vertically adjustable, nonconductive, and corrosion resistant.

3. Material: Zinc plated ASTM A36/A36M carbon steel or ASTM A47/A47M malleable iron.

F. Beam Clamps:

1. MSS SP-58 types 19 through 23, 25 or 27 through 30 based on required load.

2. Beam C-Clamp: MSS SP-58 type 23, malleable iron and steel with plain, stainless steel, and zinc finish.

3. Small or Junior Beam Clamp: MSS SP-58 type 19, malleable iron with plain finish. For inverted usage provide manufacturer listed size(s).

4. Wide Mouth Beam Clamp: MSS SP-58 type 19, malleable iron with plain finish.

5. Centerload Beam Clamp with Extension Piece: MSS SP-58 type 30, malleable iron with plain finish.

6. FM (AG) and UL (DIR) Approved Beam Clamp: MSS SP-58 type 19, plain finish,

7. Provide clamps with hardened steel cup-point set screws and lock-nuts for anchoring in place.

8. Material: ASTM A395/A395M ductile iron, ASTM A36/A36M carbon steel, ASTM A47/A47M malleable iron, ASTM A181/A181M forged steel, or ASTM A283/A283M steel.

G. U-Bolts:

1. MSS SP-58 Type 24, carbon steel u-bolt for pipe support or anchoring.

H. Strut Clamps:

1. Pipe Clamp: Two-piece rigid, universal, or outer diameter type, carbon steel with epoxy copper or zinc finish.

I. Insulation Clamps:

1. Two bolt-type clamps designed for installation under insulation.

2. Material: Carbon steel with epoxy copper or zinc finish.

J. Pipe Hangers:

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A123/A123M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A47/A47M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A47/A47M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M

23 0529 - 4

1. Split Ring Hangers:

a. Provide hinged split ring and yoke roller hanger with epoxy copper or plain finish.

b. Material: ASTM A47/A47M malleable iron or ASTM A36/A36M carbon steel.

c. Provide hanger rod and nuts of the same type and material for a given pipe run.

d. Provide coated or plated hangers to isolate steel hangers from dissimilar metal tube or pipe.

2. Band Hangers, Adjustable:

a. MSS SP-58 Type 7 or 9, Zinc-plated ASTM A1011/A1011M steel or ASTM A653/A653M carbon steel.

3. Swivel Ring Hangers, Adjustable:

a. MSS SP-58 Type 10, epoxy-painted, zinc-colored.

b. Material: ASTM A395/A395M ductile iron, ASTM A36/A36M carbon steel, ASTM A47/A47M malleable iron, ASTM A181/A181M forged steel, or ASTM A283/A283M steel.

c. FM (AG) and UL (DIR) listed for specific pipe size runs and loads.

4. Clevis Hangers, Adjustable:

a. Copper Tube: MSS SP-58 Type 1, epoxy-plated copper.

K. Dielectric Barriers: Provide between metallic supports and metallic piping and associated items of dissimilar type; acceptable dielectric barriers include rubber or plastic sheets or coatings attached securely to pipe or item.

L. Pipe Shields for Insulated Piping:

1. General Construction and Requirements:

a. Surface Burning Characteristics: Comply with ASTM E84 or UL 723.

b. Shields Material: UV-resistant polypropylene with glass fill.

c. Maximum Insulated Pipe Outer Diameter: 12-5/8 inch.

d. Minimum Service Temperature: Minus 40 degrees F.

e. Maximum Service Temperature: 178 degrees F.

f. Pipe shields to be provided at hanger, support, and guide locations on pipe requiring insulation or additional support.

M. Anchors and Fasteners:

1. Unless otherwise indicated and where not otherwise restricted, use the anchor and fastener types indicated for the specified applications.

2. Concrete: Use preset concrete inserts, expansion anchors, or screw anchors.

3. Hollow Masonry: Use toggle bolts.

4. Hollow Stud Walls: Use toggle bolts.

5. Steel: Use beam-ceiling clamps, beam clamps, machine bolts, or welded threaded studs.

6. Preset Concrete Inserts: Continuous metal channel (strut) and spot inserts specifically designed to be cast in concrete ceilings, walls, and floors.

a. Comply with MFMA-4.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A47/A47M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M

23 0529 - 5

b. Channel Material: Use galvanized steel.

c. Manufacturer: Same as manufacturer of metal channel (strut) framing system.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install products in accordance with manufacturer's instructions.

B. Provide independent support from building structure. Do not provide support from piping, ductwork, conduit, or other systems.

C. Unless specifically indicated or approved by Architect, do not provide support from suspended ceiling support system or ceiling grid.

D. Unless specifically indicated or approved by Architect, do not provide support from roof deck.

E. Do not penetrate or otherwise notch or cut structural members without approval of

Structural Engineer.

F. Equipment Support and Attachment:

1. Use metal fabricated supports or supports assembled from metal channel (strut) to support equipment as required.

2. Use metal channel (strut) secured to studs to support equipment surface-mounted on hollow stud walls when wall strength is not sufficient to resist pull-out.

3. Use metal channel (strut) to support surface-mounted equipment in wet or damp locations to provide space between equipment and mounting surface.

4. Securely fasten floor-mounted equipment. Do not install equipment such that it relies on its own weight for support.

G. Preset Concrete Inserts: Use manufacturer-provided closure strips to inhibit concrete seepage during concrete pour.

H. Secure fasteners according to manufacturer's recommended torque settings.

I. Remove temporary supports.

END OF SECTION

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A283/A283M

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 0553 - 1

SECTION 23 0553

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Pipe markers.

1.02 REFERENCE STANDARDS

A. ASME A13.1 - Scheme for the Identification of Piping Systems; 2023.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Product Data: Provide manufacturers catalog literature for each product required.

PART 2 PRODUCTS

2.01 IDENTIFICATION APPLICATIONS

A. Piping: Pipe markers.

2.02 PIPE MARKERS

A. Color: Comply with ASME A13.1.

B. Plastic Tape Pipe Markers: Flexible, vinyl film tape with pressure-sensitive adhesive backing and printed markings.

C. Color code as follows:

1. Heating, Cooling, and Boiler Feedwater: Green with white letters.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install plastic tape pipe markers complete around pipe in accordance with manufacturer's instructions.

TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 0593 - 1

SECTION 23 0593

TESTING, ADJUSTING, AND BALANCING FOR HVAC

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Testing, adjustment, and balancing of hydronic systems.

1.02 REFERENCE STANDARDS

A. AABC (NSTSB) - AABC National Standards for Total System Balance, 7th Edition;

2016.

B. ASHRAE Std 111 - Measurement, Testing, Adjusting, and Balancing of Building HVAC Systems; 2008, with Errata (2019).

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. TAB Plan: Submit a written plan indicating the testing, adjusting, and balancing standard to be followed and the specific approach for each system and component.

1. Include at least the following in the plan:

a. List of all air flow, water flow, sound level, system capacity and efficiency measurements to be performed and a description of specific test procedures, parameters, formulas to be used.

b. Copy of field checkout sheets and logs to be used, listing each piece of equipment to be tested, adjusted and balanced with the data cells to be gathered for each.

c. Discussion of what notations and markings will be made on the duct and piping drawings during the process.

d. Final test report forms to be used.

e. Procedures for formal deficiency reports, including scope, frequency and distribution.

C. Final Report: Indicate deficiencies in systems that would prevent proper testing, adjusting, and balancing of systems and equipment to achieve specified performance.

1. Revise TAB plan to reflect actual procedures and submit as part of final report.

2. Submit draft copies of report for review prior to final acceptance of Project.

Provide final copies for Architect and for inclusion in operating and maintenance manuals.

3. Include actual instrument list, with manufacturer name, serial number, and date of calibration.

4. Form of Test Reports: Where the TAB standard being followed recommends a report format use that; otherwise, follow ASHRAE Std 111.

5. Units of Measure: Report data in both I-P (inch-pound) and SI (metric) units.

23 0593 - 2

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 GENERAL REQUIREMENTS

A. Perform total system balance in accordance with one of the following:

1. AABC (NSTSB), AABC National Standards for Total System Balance.

B. Begin work after completion of systems to be tested, adjusted, or balanced and complete work prior to Substantial Completion of the project.

C. TAB Agency Qualifications:

1. Company specializing in the testing, adjusting, and balancing of systems specified in this section.

2. Certified by one of the following:

a. AABC, Associated Air Balance Council: www.aabc.com/#sle; upon completion submit AABC National Performance Guaranty.

D. TAB Supervisor and Technician Qualifications: Certified by same organization as TAB agency.

3.02 EXAMINATION

A. Verify that systems are complete and operable before commencing work. Ensure the following conditions:

1. Systems are started and operating in a safe and normal condition.

2. Temperature control systems are installed complete and operable.

3. Hydronic systems are flushed, filled, and vented.

4. Pumps are rotating correctly.

5. Proper strainer baskets are clean and in place.

6. Service and balance valves are open.

B. Submit field reports. Report defects and deficiencies that will or could prevent proper system balance.

C. Beginning of work means acceptance of existing conditions.

3.03 ADJUSTMENT TOLERANCES

A. Hydronic Systems: Adjust to within plus or minus 10 percent of design.

3.04 RECORDING AND ADJUSTING

A. Ensure recorded data represents actual measured or observed conditions.

B. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.

C. After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified.

D. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.

3.05 WATER SYSTEM PROCEDURE

A. Adjust water systems to provide required or design quantities.

23 0593 - 3

B. Use calibrated Venturi tubes, orifices, or other metered fittings and pressure gauges to determine flow rates for system balance. Where flow metering devices are not installed, base flow balance on temperature difference across various heat transfer elements in the system.

C. Adjust systems to provide specified pressure drops and flows through heat transfer elements prior to thermal testing. Perform balancing by measurement of temperature differential in conjunction with air balancing.

HVAC PIPING INSULATION

23 0719 - 1

SECTION 23 0719

HVAC PIPING INSULATION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Piping insulation.

B. Flexible removable and reusable blanket insulation.

1.02 RELATED REQUIREMENTS

A. Section 07 8400 - Firestopping.

1.03 REFERENCE STANDARDS

A. ASTM C177 - Standard Test Method for Steady-State Heat Flux Measurements and

Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus; 2019, with Editorial Revision (2023).

B. ASTM C547 - Standard Specification for Mineral Fiber Pipe Insulation; 2022a.

C. ASTM C795 - Standard Specification for Thermal Insulation for Use in Contact with

Austenitic Stainless Steel; 2008 (Reapproved 2023).

D. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building

Materials; 2023c.

E. ASTM E96/E96M - Standard Test Methods for Gravimetric Determination of Water

Vapor Transmission Rate of Materials; 2022a, with Editorial Revision (2023).

F. UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials;

Current Edition, Including All Revisions.

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Product Data: Provide product description, thermal characteristics, list of materials and thickness for each service, and locations.

PART 2 PRODUCTS

2.01 REGULATORY REQUIREMENTS

A. Surface Burning Characteristics: Flame spread index/Smoke developed index of 25/50, maximum, when tested in accordance with ASTM E84 or UL 723.

2.02 GLASS FIBER, RIGID

A. Insulation: ASTM C547 and ASTM C795; rigid molded, noncombustible, with wicking material to transport condensed water to the outside of the system for evaporation to the atmosphere.

1. K Value: ASTM C177, 0.23 at 75 degrees F.

2. Maximum Service Temperature: 220 degrees F.

3. Maximum Moisture Absorption: 0.2 percent by volume.

HVAC PIPING INSULATION

23 0719 - 2

B. Vapor Barrier Jacket: White kraft paper with glass fiber yarn, bonded to aluminized film; moisture vapor transmission when tested in accordance with ASTM E96/E96M of

0.02 perm-inches.

C. Vapor Barrier Lap Adhesive: Compatible with insulation.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Exposed Piping: Locate insulation and cover seams in least visible locations.

C. For hot piping conveying fluids 140 degrees F or less, do not insulate flanges and unions at equipment, but bevel and seal ends of insulation.

D. For hot piping conveying fluids over 140 degrees F, insulate flanges and unions at equipment.

E. Glass Fiber Insulated Pipes Conveying Fluids Above Ambient Temperature:

1. Provide standard jackets, with or without vapor barrier, factory-applied, or field-applied. Secure with self-sealing longitudinal laps and butt strips with pressure-sensitive adhesive. Secure with outward clinch expanding staples.

2. Insulate fittings, joints, and valves with insulation of like material and thickness as adjoining pipe. Finish with glass cloth and adhesive or PVC fitting covers.

F. Inserts and Shields:

1. Application: Piping 1-1/2 inches diameter or larger.

2. Shields: Galvanized steel between pipe hangers or pipe hanger rolls and inserts.

3. Insert location: Between support shield and piping and under the finish jacket.

4. Insert Configuration: Minimum 6 inches long, of same thickness and contour as adjoining insulation; may be factory fabricated.

5. Insert Material: Hydrous calcium silicate insulation or other heavy density insulating material suitable for the planned temperature range.

G. Continue insulation through walls, sleeves, pipe hangers, and other pipe penetrations.

Finish at supports, protrusions, and interruptions. At fire separations, see Section 07 8400.

3.02 SCHEDULE

A. Heating Systems:

1. Heating Water Supply and Return: Glass Fiber-Rigid, 1.5-inch.

2. Glycol Heating Supply and Return: Glass Fiber-Rigid, 1.5-inch.

3. Boiler Feed Water: Glass Fiber-Rigid, 1-inch.

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

23 0923 - 1

SECTION 23 0923

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

PART 1 GENERAL

1.01 SECTION INCLUDES

A. System description.

B. Controllers.

C. Power supplies and line filtering.

1.02 REFERENCE STANDARDS

A. MIL-STD-810 - Environmental Engineering Considerations and Laboratory Tests;

2019h.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Product Data: Provide data for each system component and software module.

C. Shop Drawings:

1. Indicate trunk cable schematic showing programmable control unit locations, and trunk data conductors.

2. Indicate system graphics indicating monitored systems, data (connected and calculated) point addresses, and operator notations. Provide demonstration digital media containing graphics.

3. Show system configuration with peripheral devices, batteries, power supplies, diagrams, modems, and interconnections.

4. Indicate description and sequence of operation of operating, user, and application software.

PART 2 PRODUCTS

2.01 SYSTEM DESCRIPTION

A. Automatic temperature control field monitoring and control system using field programmable micro-processor based units.

B. Base system on distributed system of fully intelligent, stand-alone controllers, operating in a multi-tasking, multi-user environment on token passing network, with central and remote hardware, software, and interconnecting wire and conduit.

C. Include computer software and hardware, operator input/output devices, control units, local area networks (LAN), sensors, control devices, actuators.

D. Controls for variable air volume terminals, radiation, reheat coils, unit heaters, fan coils, and the like when directly connected to the control units. Individual terminal unit control is specified in Section 23 0913.

E. Provide control systems consisting of thermostats, control valves, dampers and operators, indicating devices, interface equipment and other apparatus and accessories required to operate mechanical systems, and to perform functions specified.

23 0923 - 2

F. Include installation and calibration, supervision, adjustments, and fine tuning necessary for complete and fully operational system.

2.02 CONTROLLERS

A. Input/Output Interface:

1. Hardwired inputs and outputs tie into the DDC system through building, custom application, or application specific controllers.

2. All Input/Output Points:

a. Protect controller from damage resulting from any point short-circuiting or grounding and from voltage up to 24 volts of any duration.

b. Provide universal type for building and custom application controllers where input or output is software designated as either binary or analog type with appropriate properties.

3. Binary Inputs:

a. Allow monitoring of On/Off signals from remote devices.

b. Provide wetting current of 12 mA minimum, compatible with commonly available control devices and protected against the effects of contact bounce and noise.

c. Sense dry contact closure with power provided only by the controller.

4. Pulse Accumulation Input Objects: Comply with all requirements of binary input objects and accept up to 10 pulses per second.

5. Analog Inputs:

a. Allow for monitoring of low voltage 0 to 10 VDC, 4 to 20 mA current, or resistance signals (thermistor, RTD).

b. Compatible with and field configurable to commonly available sensing devices.

6. Binary Outputs:

a. Used for On/Off operation or a pulsed low-voltage signal for pulse width modulation control.

b. Outputs provided with three position (On/Off/Auto) override switches.

c. Status lights for building and custom application controllers to be selectable for normally open or normally closed operation.

7. Analog Outputs:

a. Monitoring signal provides a 0 to 10 VDC or a 4 to 20 mA output signal for end device control.

b. Provide status lights and two position (AUTO/MANUAL) switch for building and custom application controllers with manually adjustable potentiometer for manual override on building and custom application controllers.

c. Drift to not exceed 0.4 percent of range per year.

8. System Object Capacity:

a. System size to be expandable to twice the number of input output objects required by providing additional controllers, including associated devices and wiring.

23 0923 - 3

b. Hardware additions or software revisions for the installed operator interfaces are not to be required for future, system expansions.

2.03 POWER SUPPLIES AND LINE FILTERING

A. Power Supplies:

1. Provide UL listed control transformers with Class 2 current limiting type or over-current protection…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .