Attachment 3 Statement of Work.pdf

PDF 101 KB Posted

Attached to
Commercial Inspection Facility - Construction Federal contract opportunity
Solicitation number
W50S8U-22-R-0001
Issued by
Department of the Army National Guard

About this file

This statement of work and related federal contract opportunity are for construction of a Commercial Inspection Facility for the Tulsa Air National Guard in Oklahoma. Key requirements include providing all labor, materials, equipment and transportation to complete the project; disposing of all debris off-base; complying with base security and antiterrorism training policies; and inputting project data in the BUILDER SMS template. Optional line items include replacing asphalt with concrete pavement, adding a visitor parking area, upgrading the perimeter fencing, and installing mow strips. The solicitation number is W50S8U-22-R-0001 and was issued by the Department of the Army National Guard for the $1-5M project. The NAICS code is 236220 for commercial and institutional building construction. The acquisition is set aside 100% for small businesses and the pre-proposal conference is strongly encouraged for interested offerors to attend. Award will be based on best value. Funding is not presently available but is expected to be appropriated before contract award.

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Inspection Facility - Construction, newest first.
File Type Posted
Pre-Bid RFI CIF_1August22.pdf PDF
Brand_Name_Justification (Cisco_infrastructure) 1.0_Redacted.pdf PDF
Brand_Name_Justification (Corning_FODP) 1.0 s_Redacted.pdf PDF
Brand_Name_Justification Ameristar 1.1_Redacted.pdf PDF
ADDENDUM 2.pdf PDF
Brand_Name_Justification Gibralter 1.1_Redacted.pdf PDF
Brand_Name_Justification ALC 1.0_Redacted.pdf PDF
Brand_Name_Justification (Bosch_Camera) 1.0_Redacted.pdf PDF
Brand_Name_Justification (Aruba_Wireless) 1.0_Redacted.pdf PDF
W50S8U-22-R-0001 Amend 03 QA Extend Proposal Due Date.pdf PDF
Brand_Name_Justification (Telecor_PA) 1.0_Redacted.pdf PDF
Pre-Proposal RFI CIF_26July22.pdf PDF
Brand_Name_Justification Delta Scientific 1.1_Redacted.pdf PDF
Brand_Name_Justification Panduit_infrastructure) 1.0_Redacted.pdf PDF
Addendum 1.pdf PDF
Pre-Bid RFI CIF_20July22.pdf PDF
W50S8U-22-R-0001 Amend 01 Proposal Due Dates.pdf PDF
W50S8U-22-R-0001 Amend 02 Extend Proposal Due Date.pdf PDF
Pre-Proposal RFI CIF_7July22.pdf PDF
CIF Pre-proposal slides.pptx PPTX presentation
PreProposal Site Visit Minutes.pdf PDF
CIF Pre-proposal Attendance Sheet 23Jun22_Redacted.pdf PDF
EXHIBIT_D_Letter of Commitment.docx DOCX document
Attachment 1c Final Design Submittal Specs.pdf PDF
Attachment 2 Commercial Inspection Facility Drawings.pdf PDF
Attachment 1a Electronic Submittals-Addendum 1.pdf PDF
Attachment 1d Final Design Submittal Specs from Pages 29-30.pdf PDF
Attachment 1b Electronic Submittals-Addendum 2.pdf PDF
EXHIBIT_A_Performance_Questionnaire.doc DOC document
EXHIBIT_B_Subktr_InfoandConsent.doc DOC document
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
W50S8U-22-R-0001 Solicitation.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Commercial Inspection Facility

PROJECT XHZG159052

18 October 2021

1. The contractor shall provide all labor, material, tools, equipment and transportation necessary to complete the work identified in this Statement of Work.

2. All debris is to be disposed of off Base with proper documentation in accordance with the waste plan generated by the contractor after the project is awarded.

3. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency

Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection

Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

a. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index

(NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4. All contractor employees, to include subcontractor employees, requiring access to Government

Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism

Representative.

5. This project is to be in accordance with the current version of the EMS Environmental Protection

Statement. A copy of this document will be provided to bidding contractors via beta.sam.gov as an attachment.

6. This This project is to be in accordance with the current version of the 138FW Safety and Accident

Prevention Guide. A copy of this document will be provided to bidding contractors via https://sam.gov as an attachment.

7. The contractor shall apply all environmental health and safety procedures required by local, state and federal regulations.

8. All work to be performed 7:00 AM to 5:30 PM Monday thru Thursday in accordance with the general conditions stated in the general conditions of the specifications. If alternate work schedule is desired, it must be requested in writing and approved by CE and Security 48 hours prior to the desired schedule.

9. The contractor is required to provide an AF Form 103 (Dig Permit) prior to any earthwork.

10. The contractor is responsible for marking/locating all underground utilities. All base underground utilities are not covered by the Call OKIE service, contractor will be responsible for locating and marking those utilities as well. The only utilities that Call OKIE service will mark is Natural gas and

Cox communications. All other utilities to include base communications fiber optic lines, electric, sewer and water will be the contractor’s responsibility to mark. Contractor must have all utilities marked in an area before a dig permit is issued.

11. If a utility is damaged, the contractor will repair per current code specifications.

12. Prior to any work, the contractor shall submit for approval by CE, one electronic copy of technical literature for all products to be used. Provide Safety Data Sheets for all appropriate products. Provide form 889 for all equipment/items that can need maintenance or repairs where parts will need to be purchased to maintain or repair the equipment at a later date.

13. All DBIDS Contractor passes will be approved by the BCE and issued by SFS after completion of required background checks. Final payment to the general contractor will not be made at the completion of the construction project until all contractor badges have been returned or the continuing need is validated and documented in writing by SFS and BCE personnel.

14. Contractor will be responsible for keeping a log of all debris disposed of off base to include tonnage, volume, and disposal site. This data will need to be readily available through the project for semi-annual data calls or inspections.

15. Contractor will be responsible for submitting an interim 1354 when project is 50% completed and a final 1354 when the project is 100% complete as part of closeout documents.

CLIN 1 BASE BID

16. Perform all work stated or shown in plan set marked Commercial Inspection Facility and

Specifications marked OKANG Commercial Inspection Facility posted on beta.sam.gov with this solicitation.

a. Note options below are to be priced separately and are not to be included in CLIN 1 Base Bid pricing

17. In support of the Air Force/Air National Guard objective of capturing all built infrastructure in the

BUILDER Sustainment Management System (SMS), the contractor shall input data in the provided

Template for SMS BUILDER inputs. All data input will be in accordance with UNIFORMAT II structure. The contractor shall provide detail down to the component section level but include sufficient detail in the section sub-types and section name. Contractor shall provide data for columns

D-X. Any deviation will require concurrence from the government. If further options are exercised under the prescribed CLIN structure, contractor shall perform the same data input on the provided

Template for SMS BUILDER inputs.

CLIN 2 OPTION 1

18. SEE OPTION #1 on sheet CA101. All pavement shown as asphalt to be 6”PCC see detail 1 on sheet

CP 501 for the 6”PCC detail.

CLIN 3 OPTION 2

19. See OPTION #2 on sheet CA101. Addition of a visitor’s parking area NW of gates.

CLIN 4 OPTION 3

20. See OPTION # 3 on sheet CA101. Addition of Ameristar Impasse II fence with barrier cable at front entry in lieu of standard fence that is shown in details on sheet CS502.

CLIN 5 OPTION 4

21. See OPTION # 4 on sheet CA101. Mow Strip under all fencing and passive barrier throughout the project site.