Attachment 1a Electronic Submittals-Addendum 1.pdf

PDF 119 KB Posted

Attached to
Commercial Inspection Facility - Construction Federal contract opportunity
Solicitation number
W50S8U-22-R-0001
Issued by
Department of the Army National Guard

About this file

This document includes an attachment and related federal contract opportunity solicitation. The attachment requires contractors to use a web-based construction project collaboration website on projects valued between $1,000,000 to $5,000,000. Contractors must pay fees to use the system for submitting documents such as submittals, change orders, daily reports, meeting minutes, and photos. Contractors must maintain the website for six months past beneficial occupancy.

The related solicitation is from the Tulsa Air National Guard seeking proposals for construction of a Commercial Inspection Facility. The project is set aside 100% for small businesses. The work location is at the Tulsa Air National Guard Base in Tulsa, Oklahoma. The estimated value is between $1,000,000 to $5,000,000. Offerors are encouraged to attend a pre-proposal conference. Award will be made based on best value. Funds have been identified but are not presently available, and no award will be made until funds are appropriated.

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Inspection Facility - Construction, newest first.
File Type Posted
Pre-Bid RFI CIF_1August22.pdf PDF
Brand_Name_Justification (Cisco_infrastructure) 1.0_Redacted.pdf PDF
Brand_Name_Justification (Corning_FODP) 1.0 s_Redacted.pdf PDF
Brand_Name_Justification Ameristar 1.1_Redacted.pdf PDF
Pre-Proposal RFI CIF_26July22.pdf PDF
Brand_Name_Justification Delta Scientific 1.1_Redacted.pdf PDF
Brand_Name_Justification Panduit_infrastructure) 1.0_Redacted.pdf PDF
ADDENDUM 2.pdf PDF
Brand_Name_Justification Gibralter 1.1_Redacted.pdf PDF
Brand_Name_Justification ALC 1.0_Redacted.pdf PDF
Brand_Name_Justification (Bosch_Camera) 1.0_Redacted.pdf PDF
Brand_Name_Justification (Aruba_Wireless) 1.0_Redacted.pdf PDF
W50S8U-22-R-0001 Amend 03 QA Extend Proposal Due Date.pdf PDF
Brand_Name_Justification (Telecor_PA) 1.0_Redacted.pdf PDF
Addendum 1.pdf PDF
W50S8U-22-R-0001 Amend 01 Proposal Due Dates.pdf PDF
W50S8U-22-R-0001 Amend 02 Extend Proposal Due Date.pdf PDF
Pre-Bid RFI CIF_20July22.pdf PDF
Pre-Proposal RFI CIF_7July22.pdf PDF
PreProposal Site Visit Minutes.pdf PDF
CIF Pre-proposal Attendance Sheet 23Jun22_Redacted.pdf PDF
CIF Pre-proposal slides.pptx PPTX presentation
EXHIBIT_D_Letter of Commitment.docx DOCX document
Attachment 1c Final Design Submittal Specs.pdf PDF
Attachment 2 Commercial Inspection Facility Drawings.pdf PDF
Attachment 1d Final Design Submittal Specs from Pages 29-30.pdf PDF
Attachment 1b Electronic Submittals-Addendum 2.pdf PDF
EXHIBIT_A_Performance_Questionnaire.doc DOC document
EXHIBIT_B_Subktr_InfoandConsent.doc DOC document
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
W50S8U-22-R-0001 Solicitation.pdf PDF
Attachment 3 Statement of Work.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01 33 00.01 Page 1

SECTION 13 30 00.01

CONSTRUCTION PROJECT MANAGEMENT COLLABORATION WEBSITE

1. The Government REQUIRES the use of Web Based Construction Project Collaboration Website on this project. The Contractor will pay all fees associated with use of the system, including initial training, throughout the period of performance of the project. The Government will act as the project administrator. The software shall serve as a repository for all project related documents, except for base pass requests due to privacy act information required in those forms. The Contractor will upload submittals

(including technical, pre-construction, and administrative), change proposals, photographs, reports, draft pay requests, schedules, project team contact information, and related documents as may be required by the

Contracting Officer. Technical submittals, change orders, and other action documents will be processed through the system.

a. The contractor will establish this Web Based Construction Project Collaboration Website within 30 days of project approval and

Notice to Proceed.

b. The contractor will maintain this website for a minimum of 6 month past the date of beneficial occupancy. This is to facilitate submission of close out documentation, O&M Manuals, warranty letters, etc. Contractor shall notify govt 30 days prior to termination of the hosting to allow the government time to archive the data saved in the system.

2. The Web Based Construction Project Collaboration Website must have a DoD Certificate of Compliance to ensure that all functionality and usability on the Department of Defense Computer Systems. Websites that are not able to operate or are blocked by DoD Information Technology systems are not permitted to be used.

3. The Contractor will identify to the Contracting Officer its personnel that require access to the system. The following will be tracked in the system:

a. Project document repository

b. Administrative document repository (apprentice certifications, bond & insurance certificates, certified payrolls, SF1413s, subcontractor payment records)

c. Material testing and Special Inspection reports (concrete, pavement, steel, soil, etc.)

d. Commissioning (meeting minutes, test reports, action log)

e. HazMat Tracking (Authorization form, MSDS, Manifests, Monthly

Inventory, Closeout Certification)

f. Closeout Documents (As-builts, O&M Manuals, Warranties, Startup Certificates, Release of Claims, etc.)

g. Discussion Forum (optional)

h. Project Schedule

i. Meeting minutes (field meetings, progress meetings, QC meetings, special meetings)

j. Action List (deficiency action log, pre-final and final punchlist)

k. Requests for Information I. Submittals

m. Daily Field Reports (superintendent, CQC manager, safety)

n. A/E and Government Observation Reports

o. Photos (existing conditions, progress, closeout, etc.)

p. More or less project information as may be determined by the Contracting

Officer

-- End of Section --