This is a federal wage determination document (General Decision Number VT20260023) issued by the U.S. Department of Labor's Wage and Hour Division for construction work in Vermont counties of Windsor. The determination establishes prevailing wage rates for building construction projects and became effective with modifications on January 2, 2026, and May 18, 2026.

The wage determination lists prevailing wage rates and fringe benefits for multiple construction classifications, including carpenter (acoustical ceiling installation and industrial drywall hanging) at $20.69 per hour with $17.39 in fringes; electrician at $31.90 per hour with $10.95 in fringes; ironworker (reinforcing) at $33.65 per hour with $26.12 in fringes; and sheet metal worker (HVAC duct installation only) at $36.75 per hour with $18.63 in fringes. Additional rates are provided for sprinkler fitter, roofer, plumber, painter, operator, laborer, and carpenter with various specializations, each with corresponding fringe benefit amounts. Rate identifiers in the determination indicate whether rates are union negotiated rates, weighted union average rates, survey rates, or state-adopted rates. The document includes guidance on the Davis-Bacon Act requirements, Executive Order 13706 regarding paid sick leave, and Executive Order 13658 minimum wage provisions. The determination also contains an appeals process for wage determination matters, with initial requests directed to the WHD Branch of Wage Surveys and subsequent review available through the Wage and Hour Administrator and Administrative Review Board.

View the file

Other files

File Type Posted
S05_RFIs.docx DOCX document
Addendum_Metal Fabrication.pdf PDF
Addendum_Architectural Cutsheets.pdf PDF
Addendum_Architectural Spec.pdf PDF
Off Hours Work Request Form.pdf PDF
36C77626R0092 0003.docx DOCX document
Utility Shutdown Request Form.pdf PDF
36C77626R0092 0002.docx DOCX document
S04_Site Walk Sign-in Sheet.pdf PDF
36C77626R0092 0001.docx DOCX document
Attachment 15_Site Visit Instructions.docx DOCX document
Attachment 03_Plans Vol 2.pdf PDF
Attachment 02_Plans Vol 1.pdf PDF
Attachment 01_Specs.pdf PDF
Attachment 09_Asbestos and Lead Report.pdf PDF
Attachment 08_Utility Locate.pdf PDF
Attachment 06_Electrical cut sheets.pdf PDF
Attachment 13_Limitations on Subcontracting.docx DOCX document
Attachment 10_Brand Name Justification.pdf PDF
Attachment 07_Mechanical cut sheets.pdf PDF
Attachment 05_Plans Addendum.pdf PDF
Attachment 04_Plans Vol 3.pdf PDF
36C77626R0092.docx DOCX document
Attachment 16_Project Experience.docx DOCX document
Attachment 14_ PPQ.docx DOCX document
Attachment 12_Division Cost Breakdown.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .