This is a specifications document for EHRM (Electronic Health Records Management) system upgrades at the White River Junction, VT Veterans Affairs facility. The specifications detail technical requirements for hardware and software infrastructure improvements to support enhanced electronic health records capabilities at this VA medical center. The document outlines system architecture requirements, including server specifications, storage capacity, network infrastructure upgrades, security protocols, and integration standards necessary to support the existing VA EHR platforms and ensure seamless data migration and operational continuity.

The specifications encompass data center equipment standards, redundancy and backup systems, cybersecurity compliance measures aligned with VA and federal requirements, performance benchmarks for system responsiveness, and compatibility requirements with existing VA information systems. The document establishes the technical baseline that qualified contractors must meet in their proposals, including hardware procurement specifications, installation requirements, testing protocols, and post-implementation support expectations to ensure the White River Junction facility achieves the modernized health records infrastructure necessary for improved patient care delivery and operational efficiency.

View the file

Other files

File Type Posted
S05_RFIs.docx DOCX document
Addendum_Metal Fabrication.pdf PDF
Addendum_Architectural Cutsheets.pdf PDF
Utility Shutdown Request Form.pdf PDF
Addendum_Architectural Spec.pdf PDF
Off Hours Work Request Form.pdf PDF
36C77626R0092 0003.docx DOCX document
36C77626R0092 0002.docx DOCX document
S04_Site Walk Sign-in Sheet.pdf PDF
36C77626R0092 0001.docx DOCX document
Attachment 15_Site Visit Instructions.docx DOCX document
Attachment 03_Plans Vol 2.pdf PDF
Attachment 02_Plans Vol 1.pdf PDF
Attachment 11_DavisBacon_Windsor Co. VT 05.18.26.pdf PDF
Attachment 09_Asbestos and Lead Report.pdf PDF
Attachment 08_Utility Locate.pdf PDF
Attachment 06_Electrical cut sheets.pdf PDF
Attachment 16_Project Experience.docx DOCX document
Attachment 14_ PPQ.docx DOCX document
Attachment 12_Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 13_Limitations on Subcontracting.docx DOCX document
Attachment 10_Brand Name Justification.pdf PDF
Attachment 07_Mechanical cut sheets.pdf PDF
Attachment 05_Plans Addendum.pdf PDF
Attachment 04_Plans Vol 3.pdf PDF
36C77626R0092.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17 NOVEMBER 2025

EHRM

INFRASTRUCTURE

UPGRADES

PROJECT #: 405-22-700

VA MEDICAL CENTER WHITE RIVER JUNCTION,

WHITE RIVER JUNCTION, VT

SPECIFICATIONS:

TABLE OF

CONTENTS

100% SUBMITTAL

CONSTRUCTION DOCUMENT 2

EHRM INFRASTRUCTURE UPGRADES PROJECT #: 405-22-700

WHITE RIVER JUNCTION, VT VAMC

SEALS PAGE 00 01 07 - 01

SECTION 00 01 07

SEALS PAGE

CERTIFICATION

The technical material and data contained in these Contract Documents were prepared under the supervision and direction of the undersigned, whose seal, as a licensed professional to practice as such, is affixed below.

Matt King, LEED AP BD&C Registered Architect Division 0, 1, 4 & 6-10

Joshua Wood, P.E.

Mechanical Engineer Division 22-23

L. Ryan Litzko, P.E.

Electrical Engineer Division 26

Kris Good

RCDD

Division 27-28 (No Fire alarm)

/1

7/

Division 26 Division 27-28 (No Fire alarm)

WHITE RIVER JUNCTION, VT VAMC

SEALS PAGE 00 01 07 - 02

Dante Valdez, S.E.

Structural Engineering Division 5, 13

Peter Bailey, P.E.

Civil Engineering Division 3, 31-33

Greg Kimble, PE Fire Protection Engineer Division 21, 28 (Fire alarm)

IN

WRJ VA MEDICAL CENTER – WHITE RIVER JUNCTION, VT PUB. DATE: 2025-06

TABLE OF CONTENTS 00 01 10 - 01

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 23 Shop Drawings, Product Data, and Samples 06-21

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 01-21

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 55 11 Gypsum Concrete Floor Decks 01-21

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 40 00 Cold-Formed Metal Framing 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

TABLE OF CONTENTS 00 01 10 - 02

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 34 53 Security Doors & Frames 01-21

08 71 00 Door Hardware 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 05-18

09 66 00 Static Dissipative Sealer for Concrete Substrates 01-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 26 00 Wall and Door Protection 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint for Non-Structural Components 01-21

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 12 General Motor Requirements for Plumbing Equipment 09-20

22 05 19 Meters and Gauges for Plumbing Piping 09-20

TABLE OF CONTENTS 00 01 10 - 03

SECTION NO. DIVISION AND SECTION TITLES DATE

22 05 23 General Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 11 23 Domestic Water Pumps 09-15

22 13 00 Facility Sanitary and Vent Piping 09-20

22 67 19.16 Reverse Osmosis Water Equipment 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 03-23

23 05 93 Tab for HVAC 03-23

23 07 11 HVAC Insulation 03-23

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 21 13 Hydronic Piping 03-23

23 22 13 Steam and Condensate Heating Piping 03-24

23 23 00 Refrigerant Piping 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 37 00 Air Outlets and Inlets 03-23

23 40 00 HVAC Air Cleaning Devices 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-23

23 81 23 Computer-Room Air-Conditioners 03-23

23 81 43 Air-Source Unitary Heat Pumps 03-23

23 82 00 Convection Heating and Cooling Units 03-23

23 82 16 Air Coils 03-23

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 11-20

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 23 00 Low-Voltage Switchgear 11-22

TABLE OF CONTENTS 00 01 10 - 04

SECTION NO. DIVISION AND SECTION TITLES DATE

26 24 13 Distribution Switchboards 11-22

26 24 16 Panelboards 01-18

26 25 11 Busways 01-18

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 33 53 Static Uninterruptible Power Supply 01-17

26 36 23 Automatic Transfer Switches 01-17

26 41 00 Facility Lightning Protection 11-22

26 43 13 Surge Protective Devices 01-23

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Conduits and Backboxes for Communications Systems 12-22

27 05 36 Cable Trays for Communications Systems 11-21

27 05 53 Identification for Communications Systems 11-21

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 11-21

27 11 19 Communications Termination Blocks and Patch Panels 06-15

27 11 26 Communications Rack Mounted Power Protection and Power Strips 11-21

27 13 23 Communications Optical Fiber Backbone Cabling 06-15

27 13 23.13 Communications Optical Fiber Splicing and Terminations 12-22

27 15 13 Communications Copper Horizontal Cabling 11-21

27 16 19 Communications Patch Cords, Station Cords, & Cross Connect Wire 06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11

28 13 00 Physical Access Control System 10-11

28 13 53 Security Access Detection 09-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 09-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

31 23 19 Dewatering 10-12

TABLE OF CONTENTS 00 01 10 - 05

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

33 10 00 Water Utilities 03-17

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

EHRM INFRASTRUCTURE UPGRADES PROJECT#405-22-700

VA MEDICAL CENTER – WHITE RIVER JUNCTION, VT PUB. DATE: 2020-05

LIST OF DRAWINGS SHEETS 00 01 15 - 01

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G-001 COVER PAGE

G-002 SHEET INDEX

G-003 SHEET INDEX

CIVIL

C-001 CIVIL SHEET INDEX AND GENERAL NOTES

C-002 GENERAL NOTES AND LEGEND

CS100 OVERALL CIVIL SITE PLAN

CG100 OVERALL EROSION CONTROL PLAN

CG101 EROSION CONTROL GENERAL NOTES AND DETAILS

CU300 OVERALL FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

CU301 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

CU302 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

CU303 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

CU304 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

CU500 COMMUNICATION DUCTBANK DETAILS

CU501 COMMUNICATION TRENCHING DETAILS

STRUCTURAL

01S-001 STRUCTURAL GENERAL NOTES

01S-002 ABREVIATIONS AND SYMBOLS

01S-103 BLDG 001 - LVL 03 - STRUCTURAL PLAN

01S-401 LVL 03 MCR ENLARGED PLAN - PHASE 1

01S-402 LVL 03 MCR ENLARGED PLAN - PHASE 2

01S-403 LVL 03 MCR ENLARGED PLAN - PHASE 3

LIST OF DRAWINGS SHEETS 00 01 15 - 02

01S-511 STRUCTURAL STEEL DETAILS

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

A-002 APPLICABLE CODES/STANDARDS & ARCHITECTURAL GENERAL

NOTES

AE421 INTERIOR ELEVATIONS & TR PLAN VIEW & WINDOW DETAIL

AS101 ICRA TYPICAL DETAILS

AS102 ICRA STANDARDS

AS103 PCRA STANDARDS

AS-100 ARCHITECTURAL SITE PLAN

001A-100 BLDG 001-LVL 00-ARCH OVERALL PLN

001A-101 BLDG 001-LVL 01-ARCH OVERALL PLN

001A-102 BLDG 001-LVL 02-ARCH OVERALL PLN

001A-103 BLDG 001-LVL 03-ARCH OVERALL PLN

001A-104 BLDG 001-ATTIC-ARCH OVERALL PLN

001AS100 BLDG 001-LVL 00-PHASING PLN

001AS101 BLDG 001-LVL 01-PHASING PLN

001AS102 BLDG 001-LVL 02-PHASING PLN

001AS103 BLDG 001-LVL 03-PHASING PLN

001AS104 BLDG 001-ATTIC-PHASING PLN

001A-400 BLDG 001-LVL 00-DEMO

001A-401 BLDG 001-LVL 01-DEMO FLR PLN & RCPS

001A-402 BLDG 001-LVL 02-DEMO FLR PLN & RCPS

001A-403a BLDG 001-LVL 03-DEMO FLR PLN & RCPS

001A-403b BLDG 001-DATA CENTER-ENLARGED PHASE 01 DEMO FLR PLN &

RCP

001A-403c BLDG 001-DATA CENTER-ENLARGED PHASE 01 PROP. FLR PLN &

RCP

001A-403d BLDG 001-DATA CENTER-ENLARGED PHASE 02 DEMO FLR PLN &

RCP

001A-403e BLDG 001-DATA CENTER-ENLARGED PHASE 02 PROP. FLR PLN &

RCP

LIST OF DRAWINGS SHEETS 00 01 15 - 03

001A-403f BLDG 001-DATA CENTER-ENLARGED PHASE 03 DEMO FLR PLN &

RCP

001A-403g BLDG 001-DATA CENTER-ENLARGED PHASE 03 PROP. FLR PLN &

RCP

001A-403h BLDG 001-DATA CENTER-ENLARGED PHASE 03 - INT ELEV

001A-403i BLDG 001-DATA CENTER-ENLARGED PHASE 03 - INT ELEV

001A-403j BUILDING 31 TO BUILDING 01 CONNECTING CORRIDOR ROOF

002A-101 BLDG 002 - LVL 01 - ARCH OVERALL PLN

002AS101 BLDG 002 - LVL 01 - PHASING PLN

002A-401 BLDG 002 - LVL 01 - DEMO FLR PLN & RCPS

004A-100 BLDG 004 - LVLS 00 - 01 -02 - ARCH OVERALL PLN

004AS100 BLDG 004 - LVLS 00 - 01 - 02 - PHASING PLN

004A-401 BLDG 004 - LVL 01 - DEMO FLR PLN & RCPS

006A-100 BLDG 006 - LVLS 00 - 01 -02 - ARCH OVERALL PLN

006AS100 BLDG 006 - LVLS 00 - 01 - 02 - PHASING PLN

006A-400 BLDG 006 - LVL 00 - DEMO FLR PLN & RCPS

007A-100 BLDG 007 - LVLS 00 - 01 - 02 - ARCH OVERALL PLN

007AS100 BLDG 007 - LVLS 00 - 01 02 - PHASING PLN

007A-400 BLDG 007 - LVL 00 - DEMO FLR PLN & RCPS

008A-100 BLDG 008 - LVL 00 - ARCH OVERALL PLN

008A-101 BLDG 008 - LVL 01 - ARCH OVERALL PLN

008A-102 BLDG 008 - LVL 02 - ARCH OVERALL PLN

009A-100 BLDG 009 - LVL 00 - 01 - 02 - ARCH OVERALL PLN

009AS100 BLDG 009 - LVLS 00 - 01 - 02 - PHASING PLN

009A-401 BLDG 009 - LVL 01 - DEMO FLR PLN & RCPS

028A-100G BLDG 028 - LVL 00G - ARCH OVERALL PLN

028A-101 BLDG 028 - LVL 01 - ARCH OVERALL PLN

028A-102 BLDG 028 - LVL 02 - ARCH OVERALL PLN

028AS100B BLDG 028 - LVL 00B - PHASING PLN

028AS100G BLDG 028 - LVL 00G - PHASING PLN

028AS101 BLDG 028 - LVL 01 - PHASING PLN

028AS102 BLDG 028 - LVL 02 - PHASING PLN

028AS103 BLDG 028 - ATTIC - PHASING PLN

LIST OF DRAWINGS SHEETS 00 01 15 - 04

028A-400G BLDG 028 - LVL 00G - DEMO FLR PLN & RCPS

028A-401 BLDG 028 - LVL 01 - DEMO FLR PLN & RCPS

028A-402 BLDG 028 - LVL 02 - DEMO FLR PLN & RCPS

031A-100B BLDG 031 - LVL 00B - ARCH OVERALL PLN

031A-100G BLDG 031 - LVL 00G - ARCH OVERALL PLN

031A-101 BLDG 031 - LVL 01 - ARCH OVERALL PLN

031A-102 BLDG 031 - LVL 02 - ARCH OVERALL PLN

031AS100B BLDG 031 - LVL 00B - PHASING PLN

031AS100G BLDG 031 - LVL 00G - PHASING PLN

031AS101 BLDG 031 - LVL 01 - PHASING PLN

031AS102 BLDG 031 - LVL 02 - PHASING PLN

031AS103 BLDG 031 - PENTHOUSE A - PHASING PLN

031A-400B BLDG 031 - LVL 00B - DEMO FLR PLN & RCPS

031A-400G BLDG 031 - LVL 00G - DEMO FLR PLN & RCPS

031A-402 BLDG 031 - LVL 02 - DEMO FLR PLN & RCPS

037A-101 BLDG 037 - LVL 01 - ARCH OVERALL PLN

037A-102 BLDG 037 - LVL 02 - ARCH OVERALL PLN

037AS101 BLDG 037 - LVL 01 - PHASING PLN

037AS102 BLDG 037 - LVL 02 - PHASING PLN

037A-402 BLDG 037 - LVL 02 - DEMO FLR PLN & RCPS

039A-100 BLDG 039 - LVL 00 - ARCH OVERALL PLN

039A-101 BLDG 039 - LVL 01 - ARCH OVERALL PLN

039A-102 BLDG 039 - LVL 02 - ARCH OVERALL PLN

039A-103 BLDG 039 - LVL 03 - ARCH OVERALL PLN

039A-104 BLDG 039 - PENTHOUSE A - ARCH OVERALL PLN

039AS100 BLDG 039 - LVL 00 - PHASING PLN

039AS101 BLDG 039 - LVL 01 - PHASING PLN

039AS102 BLDG 039 - LVL 02 - PHASING PLN

039AS103 BLDG 039 - LVL 03 - PHASING PLN

039AS104 BLDG 039 - PENTHOUSE A - PHASING PLN

039A-400 BLDG 039 - LVL 00 - DEMO FLR PLN & RCPS

039A-401 BLDG 039 - LVL 01 - DEMO FLR PLN & RCPS

039A-402 BLDG 039 - LVL 02 - DEMO FLR PLN & RCPS

LIST OF DRAWINGS SHEETS 00 01 15 - 05

039A-403 BLDG 039 - LVL 03 - DEMO FLR PLN & RCPS

044A-100 BLDG 044 - LVL 00 - ARCH OVERALL PLN

044A-101 BLDG 044 - LVL 01 - ARCH OVERALL PLN

044A-102 BLDG 044 - LVL 02 - ARCH OVERALL PLN

044A-103 BLDG 044 - PENTHOUSE - ARCH OVERALL PLN

044AS100 BLDG 044 - LVL 00 - PHASING PLN

044AS101 BLDG 044 - LVL 01 - PHASING PLN

044AS102 BLDG 044 - LVL 02 - PHASING PLN

044AS103 BLDG 044 - PENTHOUSE - PHASING PLN

044A-400 BLDG 044 - LVL 00 - DEMO FLR PLN & RCPS

044A-401 BLDG 044 - LVL 01 - DEMO FLR PLN & RCPS

044A-402 BLDG 044 - LVL 02 - DEMO FLR PLN & RCPS

T58A-101 BLDG T58 - LVLS 01 - 02 - ARCH OVERALL PLN

T58AS101 BLDG T58 - LVLS 01 - 02 - PHASING PLN

T59A-101 BLDG T59 - LVLS 01 - 02 - ARCH OVERALL PLN

T59AS101 BLDG T59 - LVLS 01 - 02 - PHASING PLN

T59A-402 BLDG T59 - LVL 02 - DEMO FLR PLN & RCPS

T60A-101 BLDG T60 - LVLS 01 - 02 - ARCH OVERALL PLN

T60AS101 BLDG T60 - LVLS 01 - 02 - PHASING PLN

T61A-101 BLDG T61 - LVLS 01 - 02 - ARCH OVERALL PLN

T61AS101 BLDG T61 - LVLS 01 - 02 - PHASING PLN

T62A-100 BLDG T62 - LVLS 00 - 01 - 02 - ARCH OVERALL PLN

T62AS100 BLDG T62 - LVLS 00 - 01 -B 02 - PHASING PLN

T62A-400 BLDG T62 - LVL 00 - DEMO FLR PLN & RCPS

T63A-100 BLDG T63 - LVLS 00 - 01-02 - ARCH OVERALL PLN

T63AS100 BLDG T63 - LVLS 00- 01 - 02 - PHASING PLN

T63A-400 BLDG T63 - LVL 00 - DEMO FLR PLN & RCPS

065A-101 BLDG 065 - LVL 01 - ARCH OVERALL PLN

065A-102 BLDG 065 - LVL 02 - ARCH OVERALL PLN

065AS101 BLDG 065 - LVL 01 - PHASING PLN

065AS102 BLDG 065 - LVL 02 - PHASING PLN

065A-401 BLDG 065 - LVL 01 - DEMO FLR PLN & RCPS

066A-100 BLDG 066 - LVL 00 - ARCH OVERALL PLN

LIST OF DRAWINGS SHEETS 00 01 15 - 06

066A-101 BLDG 066 - LVL 01 - ARCH OVERALL PLN

066AS100 BLDG 066 - LVL 00 - PHASING PLN

066AS101 BLDG 066 - LVL 01 - PHASING PLN

066A-401 BLDG 066 - LVL 01 - DEMO FLR PLN & RCPS

067A-100B BLDG 067 - LVL 00B - ARCH OVERALL PLN

067A-100G BLDG 067 - LVL 00G - ARCH OVERALL PLN

067A-101 BLDG 067 - LVL 01 - ARCH OVERALL PLN

067A-102 BLDG 067 - LVL 02 - ARCH OVERALL PLN

067AS100B BLDG 067 - LVL 00B - PHASING PLN

067AS100G BLDG 067 - LVL 00G - PHASING PLN

067AS101 BLDG 067 - LVL 01 - PHASING PLN

067AS102 BLDG 067 - LVL 02 - PHASING PLN

067A-401 BLDG 067 - LVL 01 - DEMO FLR PLN & RCPS

088A-100 BLDG 088 - LVL 00 - ARCH OVERALL PLN

088A-101 BLDG 088 - LVL 01 - ARCH OVERALL PLN

088AS100 BLDG 088 - LVL 00 - PHASING PLN

088AS101 BLDG 088 - LVL 01 - PHASING PLN

088A-400 BLDG 088 - LVL 00 - DEMO FLR PLN & RCPS

088A-401 BLDG 088 - LVL 01 - DEMO FLR PLN & RCPS

A-601 TYPICAL DETAILS

A-602 WALL TYPES & DETAILS

A-603 DOOR SCHEDULE

A-603.a DOOR DETAILS

A-604 ROOM FINISH SCHEDULE

AW001 IN-03.01 - ROOM NUMBER SIGN & SIGNAGE SCHEDULE

MECHANICAL

F-001 FIRE PROTECTION GENERAL NOTES, SYMBOLS AND

ABBREVIATION

M-001 MECHANICAL GENERAL NOTES

M-002 MECHANICAL ABBREVIATIONS & LEGENDS

001F-101 BLDG 001 - LVL 03 - FIRE PROTECTION OVERALL PLAN

001M-101 BLDG 001 - LVL 00 - MECHANICAL OVERALL PLAN

LIST OF DRAWINGS SHEETS 00 01 15 - 07

001M-102 BLDG 001 - LVL 01 - MECHANICAL OVERALL PLAN

001M-103 BLDG 001 - LVL 02 - MECHANICAL OVERALL PLAN

001M-104 BLDG 001 - LVL 03 - MECHANICAL OVERALL PLAN

001M-105 BLDG 001 - ATTIC - MECHANICAL OVERALL PLAN

002M-101 BLDG 002 - LVL 01 - MECHANICAL OVERALL PLAN

004M-101 BLDG 004 - LVL 01 - OVERALL MECHANICAL PLAN

006M-101 BLDG 006 - LVL 00 - OVERALL MECHANICAL PLAN

007M-101 BLDG 007 - LVL 00 - MECHANICAL OVERALL PLAN

009M-101 BLDG 009 - LVL 01 - OVERALL MECHANICAL PLAN

028M-101 BLDG 028 - LVL 00B - OVERALL MECHANICAL PLAN

028M-102 BLDG 028 - LVL 00G - OVERALL MECHANICAL PLAN

028M-103 BLDG 028 - LVL 01 - OVERALL MECHANICAL PLAN

028M-104 BLDG 028 - LVL 02 - OVERALL MECHANICAL PLAN

028M-105 BLDG 028 - LVL ATTIC - OVERALL MECHANICAL PLAN

031M-101 BLDG 031 - LVL 00B - OVERALL MECHANICAL PLAN

031M-102 BLDG 031 - LVL 00G - OVERALL MECHANICAL PLAN

031M-103 BLDG 031 - LVL 01 - OVERALL MECHANICAL PLAN

031M-104 BLDG 031 - LVL 02 - OVERALL MECHANICAL PLAN

031M-105 BLDG 031 - PENTHOUSE A - OVERALL MECHANICAL PLAN

037M-101 BLDG 037 - LVL 02 - OVERALL MECHANICAL PLAN

039M-101 BLDG 039 - LVL 00 - OVERALL MECHANICAL PLAN

039M-102 BLDG 039 - LVL 01 - OVERALL MECHANICAL PLAN

039M-103 BLDG 039 - LVL 02 - OVERALL MECHANICAL PLAN

039M-104 BLDG 039 - LVL 03 - OVERALL MECHANICAL PLAN

039M-105 BLDG 039 - PENTHOUSE - OVERALL MECHANICAL PLAN

044M-101 BLDG 044 - LVL 00 - OVERALL MECHANICAL PLAN

044M-102 BLDG 044 - LVL 01 - OVERALL MECHANICAL PLAN

044M-103 BLDG 044 - LVL 02 - OVERALL MECHANICAL PLAN

044M-104 BLDG 044 - PENTHOUSE - OVERALL MECHANICAL PLAN

065M-101 BLDG 065 - LVL 01 - OVERALL MECHANICAL PLAN

066M-101 BLDG 066 - LVL 01 - OVERALL MECHANICAL PLAN

067M-101 BLDG 067 - LVL 00G - OVERALL MECHANICAL PLAN

067M-102 BLDG 067 - LVL 01 - OVERALL MECHANICAL PLAN

LIST OF DRAWINGS SHEETS 00 01 15 - 08

088M-101 BLDG 088 - LVL 00 - OVERALL MECHANICAL PLAN

088M-102 BLDG 088 - LVL 01 - OVERALL MECHANICAL PLAN

T59M-101 BLDG T59 - LVL 01 - OVERALL MECHANICAL PLAN

T59M-102 BLDG T59 - LVL 02 - OVERALL MECHANICAL PLAN

T62M-101 BLDG T62- LVL 00 - OVERALL MECHANICAL PLAN

T63M-101 BLDG T63 - LVL 00 - OVERALL MECHANICAL PLAN

001F-401 BLDG 001 - LVL 03 - ENLARGED DEMOLITION FIRE PROTECTION

PLAN - RM 336A-336F - PHASE 01

001F-402 BLDG 001 - LVL 03 - ENLARGED FIRE PROTECTION PLAN - RM

336A-336F - PHASE 01

001F-403 BLDG 001 - LVL 03 - ENLARGED DEMOLITION FIRE PROTECTION

MECHANICAL PLAN - RM 336A-336F - PHASE 02

001F-404 BLDG 001 - LVL 03 - ENLARGED FIRE PROTECTION PLAN - RM

336A-336F - PHASE 02

001F-405 BLDG 001 - LVL 03 - ENLARGED DEMOLITION FIRE PROTECTION

PLAN - RM 336A-336F - PHASE 03

001F-406 BLDG 001 - LVL 03 - ENLARGED FIRE PROTECTION PLAN - RM

336A-336F - PHASE 03

001M-401 BLDG 001 - LVL 00 - ENLARGED MECHANICAL PLAN - RM 10A

001M-402 BLDG 001 - LVL 00 - PARTIAL MECHANICAL PLAN - RM 13

001M-403 BLDG 001 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 113

001M-404 BLDG 001 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 201

001M-405 BLDG 001 - LVL 03 - ENLARGED MECHANICAL PLAN - RM 331-

001M-406 BLDG 001 - LVL 03 - ENLARGED DEMOLITION MECHANICAL

PLAN - RM 336A-336F - PHASE 01

001M-407 BLDG 001 - LVL 03 - ENLARGED MECHANICAL PLAN - RM 336A-

336F - PHASE 01

001M-408 BLDG 001 - LVL 03 - ENLARGED DEMOLITION MECHANICAL

PLAN - RM 336A-336F - PHASE 02

001M-409 BLDG 001 - LVL 03 - ENLARGED MECHANICAL PLAN - RM 336A-

336F - PHASE 02

001M-410 BLDG 001 - LVL 03 - ENLARGED DEMOLITION MECHANICAL

LIST OF DRAWINGS SHEETS 00 01 15 - 09

PLAN - RM

336A-336F - PHASE 03

001M-411 BLDG 001 - LVL 03 - ENLARGED MECHANICAL PLAN - RM 336A-

336F - PHASE 03

001M-412 BLDG 001 - ATTIC - PARTIAL MECHANICAL PLAN - PHASE 01

001M-413 BLDG 001 - ATTIC - PARTIAL MECHANICAL PLAN - PHASE 02

002M-401 BLDG 002 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 107

004M-401 BLDG 004 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 105

006M-401 BLDG 006 - LVL 00 - ENLARGED MECHANICAL PLAN - RM B1A

007M-401 BLDG 007 - LVL 00 - ENLARGED MECHANICAL PLAN - RM B3

009M-401 BLDG 009 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 103

028M-401 BLDG 028 - LVL 00B - ENLARGED MECHANICAL PLAN - RM 03

028M-402 BLDG 028 - LVL 00G - ENLARGED MECHANICAL PLAN - RM G31

028M-403 BLDG 028 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 115A

028M-404 BLDG 028 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 219

028M-405 BLDG 028 - LVL ATTIC - ENLARGED MECHANICAL PLAN - RM 29

031M-401 BLDG 031 - LVL 00B - ENLARGED MECHANICAL PLAN - RM B-19B

031M-402 BLDG 031 - LVL 00B - FLOOR MECHANICAL PLAN - RM B-13

031M-403 BLDG 031 - LVL 00G - ENLARGED MECHANICAL PLAN - RM G12

031M-404 BLDG 031 - LVL 01 - ENLARGED MECHANICAL PLAN - PIPE

ROUTING

031M-405 BLDG 031 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 226

031M-406 BLDG 031 - PENTHOUSE A - ENLARGED MECHANICAL PLAN –

PHASE 01

031MD-407 BLDG 031 - PENTHOUSE A - ENLARGED MECHANICAL

DEMOLITION PLAN – PHASE 02

031MD-408 BLDG 031 - PENTHOUSE A - ENLARGED MECHANICAL

DEMOLITION PLAN - PHASE 03

037M-401 BLDG 037 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 200A

037M-402 BLDG 037 - LVL 02 - ENLARGED MECHANICAL PLAN - PARTIAL

PLAN

039M-401 BLDG 039 - LVL 00 - ENLARGED MECHANICAL PLAN - RM G05

039M-402 BLDG 039 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 132

039M-403 BLDG 039 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 200A

LIST OF DRAWINGS SHEETS 00 01 15 - 10

039M-404 BLDG 039 - LVL 03 - ENLARGED MECHANICAL PLAN - RM 387

039M-405 BLDG 039 - LVL 03 - ENLARGED MECHANICAL PLAN -

PENTHOUSE

044M-401 BLDG 044 - LVL 00 - ENLARGED MECHANICAL PLAN - RM G-115

044M-402 BLDG 044 - LVL 00 - ENLARGED MECHANICAL PLAN - PARTIAL

PLAN

044M-403 BLDG 044 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 1-118

044M-404 BLDG 044 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 2-114B

044M-405 BLDG 044 - PENTHOUSE - ENLARGED MECHANICAL PARTIAL

PLAN

065M-401 BLDG 065 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 119

066M-401 BLDG 066 - LVL 01 - ENLARGED MECHANICAL PLAN - RM B1007

067M-401 BLDG 067 - LVL 00G - ENLARGED MECHANICAL PLAN - PARTIAL

PLAN

067M-402 BLDG 067 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 1109

088M-401 BLDG 088 - LVL 00 - ENLARGED MECHANICAL PLAN - RM G123

088M-402 BLDG 088 - LVL 01 - ENLARGED MECHANICAL PLAN - RM 1105A

T59M-401 BLDG T59 - LVL 01 - ENLARGED MECHANICAL PLAN - PARTIAL

PLAN

T59M-402 BLDG T59 - LVL 02 - ENLARGED MECHANICAL PLAN - RM 205

T62M-401 BLDG T62- LVL 00 - ENLARGED MECHANICAL PLAN - RM B100

T63M-401 BLDG T63 - LVL 00 - ENLARGED MECHANICAL PLAN - RM B01

F-501 FIRE PROTECTION DETAILS I

M-501 MECHANICAL DETAILS I

M-502 MECHANICAL DETAILS II

M-503 MECHANICAL DETAILS III

M-504 MECHANICAL DETAILS IV

M-601 MECHANICAL SCHEDULES I

M-602 MECHANICAL SCHEDULES II

M-701 MECHANICAL CONTROLS I

M-702 MECHANICAL CONTROLS II

M-703 MECHANICAL CONTROLS III

ELECTRICAL

EPG001 ABBREVIATIONS AND GENERAL NOTES

LIST OF DRAWINGS SHEETS 00 01 15 - 11

EPG002 ELECTRICAL LEGENDS

001EP100 BLDG 001 - LEVEL 00 - ELECTRICAL PLAN

001EP101 BLDG 001 - LEVEL 01 - ELECTRICAL PLAN

001EP102 BLDG 001 - LEVEL 02 - ELECTRICAL PLAN

001EP103 BLDG 001 - LEVEL 03 - ELECTRICAL PLAN

001EP400a BLDG 001 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

001EP400b BLDG 001 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

001EP401 BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

001EP402 BLDG 001 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

001EP403 BLDG 001 - LEVEL 03 - ENLARGED ELECTRICAL PLANS

001EL403a BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 LIGHTING PLANS

001EL403b BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 LIGHTING PLANS

001EL403c BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 LIGHTING PLANS

001EP403a BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 POWER PLANS

001EP403b BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 POWER PLANS

001EP403c BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 POWER PLANS

001EP403d BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 MECHANICAL

POWER PLANS

001EP403e BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 MECHANICAL

POWER PLANS

001EP403f BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 MECHANICAL

POWER PLANS

001EP403g BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 RECEPTACLE PLANS

001EP403h BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 RECEPTACLE PLANS

001EP403i BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 RECEPTACLE PLANS

001EB403a BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 ELECTRICAL

BONDING PLANS

001EB403b BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 ELECTRICAL

BONDING PLANS

001EB403c BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 ELECTRICAL

BONDING PLANS

001EF403a BLDG 001 - LEVEL 03 - ENLARGED PHASE 01 FIRE ALARM PLANS

001EF403b BLDG 001 - LEVEL 03 - ENLARGED PHASE 02 FIRE ALARM PLANS

001EF403c BLDG 001 - LEVEL 03 - ENLARGED PHASE 03 FIRE ALARM PLANS

002EP101 BLDG 002 - LEVEL 01 - ELECTRICAL PLAN

LIST OF DRAWINGS SHEETS 00 01 15 - 12

002EP401 BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

004EP100 BLDG 004 - LEVEL 00 - 01 & 02 - ELECTRICAL PLAN

004EP400 BLDG 004 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

004EP401 BLDG 004 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

006EP100 BLDG 006 - LEVEL 00 - 01 & 02 - ELECTRICAL PLAN

006EP400 BLDG 006 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

007EP400 BLDG 007 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

009EP100 BLDG 009 - LEVEL 00 - 01 & 02 - ELECTRICAL PLAN

009EP401 BLDG 009 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

028EP100B BLDG 028 - LEVEL 00B - ELECTRICAL PLAN

028EP102 BLDG 028 - LEVEL 02 - ELECTRICAL PLAN

028EP103 BLDG 028 - ATTIC - ELECTRICAL PLAN

028EP400B BLDG 028 - LEVEL 00B - ENLARGED ELECTRICAL PLANS

028EP400G BLDG 028 - LEVEL 00G - ENLARGED ELECTRICAL PLANS

028EP401 BLDG 028 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

028EP402 BLDG 028 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

031EP100B BLDG 031 - LEVEL 00B - ELECTRICAL PLAN

031EP100G BLDG 031 - LEVEL 00G - ELECTRICAL PLAN

031EP101 BLDG 031 - LEVEL 01 - ELECTRICAL PLAN

031EP102 BLDG 031 - LEVEL 02 - ELECTRICAL PLAN

031EP103 BLDG 031 - PENTHOUSE A - ELECTRICAL PLAN

031EP400Ba BLDG 031 - LEVEL 00B - ENLARGED ELECTRICAL PLANS

031EP400Bb BLDG 031 - LEVEL 00B - ENLARGED ELECTRICAL PLANS

031EP400G BLDG 031 - LEVEL 00G - ENLARGED ELECTRICAL PLANS

031EP402 BLDG 031 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

037EP102 BLDG 037 - LEVEL 02 - ELECTRICAL PLAN

037EP402 BLDG 037 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

039EP100 BLDG 039 - LEVEL 00 - ELECTRICAL PLAN

039EP101 BLDG 039 - LEVEL 01 - ELECTRICAL PLAN

039EP102 BLDG 039 - LEVEL 02 - ELECTRICAL PLAN

039EP103 BLDG 039 - LEVEL 03 - ELECTRICAL PLAN

039EP104 BLDG 039 - PENTHOUSE - ELECTRICAL PLAN

039EP400a BLDG 039 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

LIST OF DRAWINGS SHEETS 00 01 15 - 13

039EP400b BLDG 039 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

039EP401 BLDG 039 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

039EP402 BLDG 039 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

039EP403 BLDG 039 - LEVEL 03 - ENLARGED ELECTRICAL PLANS

044EP100 BLDG 044 - LEVEL 00 - ELECTRICAL PLAN

044EP101 BLDG 044 - LEVEL 01 - ELECTRICAL PLAN

044EP102 BLDG 044 - LEVEL 02 - ELECTRICAL PLAN

044EP103 BLDG 044 - PENTHOUSE - ELECTRICAL PLAN

044EP400a BLDG 044 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

044EP400b BLDG 044 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

044EP401 BLDG 044 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

044EP402 BLDG 044 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

065EP101 BLDG 065 - LEVEL 01 - ELECTRICAL PLAN

065EP401 BLDG 065 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

066EP100 BLDG 066 - LEVEL 00 - ELECTRICAL PLAN

066EP101 BLDG 066 - LEVEL 01 - ELECTRICAL PLAN

066EP401 BLDG 066 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

067EP100G BLDG 067 - LEVEL 00G - ELECTRICAL PLAN

067EP401 BLDG 067 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

088EP100 BLDG 088 - LEVEL 00 - ELECTRICAL PLAN

088EP400 BLDG 088 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

088EP401 BLDG 088 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

T59EP101 BLDG T59 - LEVEL 01 - ELECTRICAL PLAN

T59EP402 BLDG T59 - LEVEL 02 - ENLARGED ELECTRICAL PLANS

T62EP100 BLDG T62 - LEVEL 00 - ELECTRICAL PLAN

T62EP400 BLDG T62 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

T63EP100 BLDG T63 - LVL 00 - 01 & 02 - ELECTRICAL PLANS

T63EP400 BLDG T63 - LEVEL 00 - ENLARGED ELECTRICAL PLANS

T63EP401 BLDG T63 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

EP501 ELECTRICAL DETAILS

EP502 ELECTRICAL DETAILS

EP503 ELECTRICAL DETAILS

EP504 ELECTRICAL DETAILS

LIST OF DRAWINGS SHEETS 00 01 15 - 14

EP505 ELECTRICAL DETAILS

EP506 ELECTRICAL DETAILS

EP507 ELECTRICAL DETAILS

EP508 ELECTRICAL DETAILS

EP509 ELECTRICAL DETAILS

EP510 ELECTRICAL DETAILS

EF601 FIRE ALARM RISER DIAGRAM

EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM

EG602 TELECOMMUNICATIONS BONDING RISER DIAGRAM

000EP601 MEDIUM VOLTAGE - ONE-LINE DIAGRAM

001EP601 BLDG 001 - ONE-LINE DIAGRAM - PART 1 OF 5

001EP602 BLDG 001 - ONE-LINE DIAGRAM - PART 2 OF 5

001EP603 BLDG 001 - ONE-LINE DIAGRAM - PART 3 OF 5

001EP604 BLDG 001 - ONE-LINE DIAGRAM - PART 4 OF 5 - DATA CENTER

001EP605 BLDG 001 - ONE-LINE DIAGRAM - PART 5 OF 5 - DATA CENTER

002EP601 BLDG 002 - ONE-LINE DIAGRAM

004EP611 BLDG 004 - ONE-LINE DIAGRAMS

006EP601 BLDG 006 - ONE-LINE DIAGRAMS

007EP601 BLDG 007 - ONE-LINE DIAGRAMS

009EP601 BLDG 009 - ONE-LINE DIAGRAM

028EP601 BLDG 028 - ONE-LINE DIAGRAM

031EP601 BLDG 031 - ONE-LINE DIAGRAM - PART 1 OF 4

031EP602 BLDG 031 - ONE-LINE DIAGRAM - PART 2 OF 4

031EP603 BLDG 031 - ONE-LINE DIAGRAM - PART 3 OF 4

031EP604 BLDG 031 - ONE-LINE DIAGRAM - PART 4 OF 4

037EP601 BLDG 037 - ONE-LINE DIAGRAM

039EP601 BLDG 039 - ONE-LINE DIAGRAM

044EP601 BLDG 044 - ONE-LINE DIAGRAM - EXISTING

044EP611 BLDG 044 - ONE-LINE DIAGRAM - REVISED

065EP601 BLDG 065 - ONE-LINE DIAGRAM

066EP601 BLDG 066 - ONE-LINE DIAGRAMS

067EP601 BLDG 067 - ONE-LINE DIAGRAM

088EP601 BLDG 088 - ONE-LINE DIAGRAM

LIST OF DRAWINGS SHEETS 00 01 15 - 15

T59EP601 BLDG T59 - ONE-LINE DIAGRAM

T62EP601 BLDG T62 - ONE-LINE DIAGRAM

T63EP601 BLDG T63 - ONE-LINE DIAGRAMS

EP701 ELECTRICAL SCHEDULES

001EP701 BLDG 001 - ELECTRICAL SCHEDULES

001EP702 BLDG 001 - ELECTRICAL SCHEDULES

001EP703 BLDG 001 - ELECTRICAL SCHEDULES

001EP704 BLDG 001 - ELECTRICAL SCHEDULES

001EP705 BLDG 001 - ELECTRICAL SCHEDULES

002EP701 BLDG 002 - ELECTRICAL SCHEDULES

004EP701 BLDG 004 - ELECTRICAL SCHEDULES

006EP701 BLDG 006 - ELECTRICAL SCHEDULES

007EP701 BLDG 007 - ELECTRICAL SCHEDULES

009EP701 BLDG 009 - ELECTRICAL SCHEDULES

028EP701 BLDG 028 - ELECTRICAL SCHEDULES

028EP702 BLDG 028 - ELECTRICAL SCHEDULES

031EP701 BLDG 031 - ELECTRICAL SCHEDULES

031EP702 BLDG 031 - ELECTRICAL SCHEDULES

037EP701 BLDG 037 - ELECTRICAL SCHEDULES

039EP701 BLDG 039 - ELECTRICAL SCHEDULES

039EP702 BLDG 039 - ELECTRICAL SCHEDULES

044EP701 BLDG 044 - ELECTRICAL SCHEDULES

044EP702 BLDG 044 - ELECTRICAL SCHEDULES

065EP701 BLDG 065 - ELECTRICAL SCHEDULES

066EP701 BLDG 066 - ELECTRICAL SCHEDULES

067EP701 BLDG 067 - ELECTRICAL SCHEDULES

088EP701 BLDG 088 - ELECTRICAL SCHEDULES

T59EP701 BLDG T59 - ELECTRICAL SCHEDULES

T62EP701 BLDG T62 - ELECTRICAL SCHEDULES

T63EP701 BLDG T63 - ELECTRICAL SCHEDULES

LIST OF DRAWINGS SHEETS 00 01 15 - 16

TELECOMMUNICATIONS

TNG001 ABBREVIATIONS AND GENERAL NOTES

TNG002 TELECOMMUNICATIONS LEGENDS

001TN100 BLDG 001 - LEVEL 00 - TELECOMMUNICATIONS PLAN

001TN101 BLDG 001 - LEVEL 01 - TELECOMMUNICATIONS PLAN

001TN102 BLDG 001 - LEVEL 02 - TELECOMMUNICATIONS PLAN

001TN103 BLDG 001 - LEVEL 03 - TELECOMMUNICATIONS PLAN

001TN400a BLDG 001 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN400b BLDG 001 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN401 BLDG 001 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN402a BLDG 001 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN402b BLDG 001 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN403a BLDG 001 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN403b BLDG 001 - LEVEL 03 - ENLARGED PHASE 01

TELECOMMUNICATIONS PLANS

001TN403c BLDG 001 - LEVEL 03 - ENLARGED PHASE 01

TELECOMMUNICATIONS PLANS

001TN403d BLDG 001 - LEVEL 03 - ENLARGED PHASE 01

TELECOMMUNICATIONS PLANS

001TN403e BLDG 001 - LEVEL 03 - ENLARGED PHASE 02

TELECOMMUNICATIONS PLANS

001TN403f BLDG 001 - LEVEL 03 - ENLARGED PHASE 02

TELECOMMUNICATIONS PLANS

001TN403g BLDG 001 - LEVEL 03 - ENLARGED PHASE 02

TELECOMMUNICATIONS PLANS

001TN403h BLDG 001 - LEVEL 03 - ENLARGED PHASE 03

TELECOMMUNICATIONS PLANS

LIST OF DRAWINGS SHEETS 00 01 15 - 17

001TN403i BLDG 001 - LEVEL 03 - ENLARGED PHASE 03

TELECOMMUNICATIONS PLANS

001TN403j BLDG 001 - LEVEL 03 - ENLARGED PHASE 03

TELECOMMUNICATIONS PLANS

001TN403k BLDG 001 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS

PLANS

001TN403l BLDG 001 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS

PLANS

002TN101 BLDG 002 - LEVEL 01 - TELECOMMUNICATIONS PLAN

002TN401 BLDG 002 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

004TN100 BLDG 004 - LEVEL 00 -01 & LEVEL 02 - TELECOMMUNICATIONS

PLANS

004TN401 BLDG 004 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

006TN100 BLDG 006 - LEVEL 00 -01 & LEVEL 02 - TELECOMMUNICATIONS

PLANS

006TN400 BLDG 006 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

007TN100 BLDG 007 - LEVEL 00 -01 & LEVEL 02 - TELECOMMUNICATIONS

PLANS

007TN400 BLDG 007- LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

008TN100 BLDG 008 - LEVEL 00 - TELECOMMUNICATIONS PLAN

008TN101 BLDG 008 - LEVEL 01 - TELECOMMUNICATIONS PLAN

008TN102 BLDG 008 - LEVEL 02 - TELECOMMUNICATIONS PLAN

08ATN100 BLDG 08A - LEVEL 00 - TELECOMMUNICATIONS PLAN

009TN100 BLDG 009 - LEVEL 00 -01 & LEVEL 02 - TELECOMMUNICATIONS

PLANS

009TN400 BLDG 009 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

009TN401 BLDG 009 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

LIST OF DRAWINGS SHEETS 00 01 15 - 18

028TN100B BLDG 028 - LEVEL 00B - TELECOMMUNICATIONS PLAN

028TN100G BLDG 028 - LEVEL 00G - TELECOMMUNICATIONS PLAN

028TN101 BLDG 028 - LEVEL 01 - TELECOMMUNICATIONS PLAN

028TN102 BLDG 028 - LEVEL 02 - TELECOMMUNICATIONS PLAN

028TN103 BLDG 028 - ATTIC - TELECOMMUNICATIONS PLAN

028TN400G BLDG 028 - LEVEL 00G - ENLARGED TELECOMMUNICATIONS

PLANS

028TN401a BLDG 028 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

028TN401b BLDG 028 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

028TN402a BLDG 028 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

028TN402b BLDG 028 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

031TN100B BLDG 031 - LEVEL 00B - TELECOMMUNICATIONS PLAN

031TN100G BLDG 031 - LEVEL 00G - TELECOMMUNICATIONS PLAN

031TN101 BLDG 031 - LEVEL 01 - TELECOMMUNICATIONS PLAN

031TN102 BLDG 031 - LEVEL 02 - TELECOMMUNICATIONS PLAN

031TN103 BLDG 031 - PENTHOUSE A - TELECOMMUNICATIONS PLAN

031TN400Ba BLDG 031 - LEVEL 00B - ENLARGED TELECOMMUNICATIONS

PLANS

031TN400Bb BLDG 031 - LEVEL 00B - ENLARGED TELECOMMUNICATIONS

PLANS

031TN400Bc BLDG 031 - LEVEL 00B - ENLARGED TELECOMMUNICATIONS

PLANS

031TN400Ga BLDG 031 - LEVEL 00G - ENLARGED TELECOMMUNICATIONS

PLANS

031TN400Gb BLDG 031 - LEVEL 00G - ENLARGED TELECOMMUNICATIONS

PLANS

031TN401 BLDG 031 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

031TN402 BLDG 031 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

LIST OF DRAWINGS SHEETS 00 01 15 - 19

037TN101 BLDG 037 - LEVEL 01 - TELECOMMUNICATIONS PLAN

037TN102 BLDG 037 - LEVEL 02 - TELECOMMUNICATIONS PLAN

037TN402 BLDG 037 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS pants

039TN100 BLDG 039 - LEVEL 00 - TELECOMMUNICATIONS PLAN

039TN101 BLDG 039 - LEVEL 01 - TELECOMMUNICATIONS PLAN

039TN102 BLDG 039 - LEVEL 02 - TELECOMMUNICATIONS PLAN

039TN103 BLDG 039 - LEVEL 03 - TELECOMMUNICATIONS PLAN

039TN400 BLDG 039 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN401a BLDG 039 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN401b BLDG 039 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN401c BLDG 039 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN402a BLDG 039 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN402b BLDG 039 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

039TN403 BLDG 039 - LEVEL 03 - ENLARGED TELECOMMUNICATIONS

PLANS

044TN100 BLDG 044 - LEVEL 00 - TELECOMMUNICATIONS PLAN

044TN101 BLDG 044 - LEVEL 01 - TELECOMMUNICATIONS PLAN

044TN102 BLDG 044 - LEVEL 02 - TELECOMMUNICATIONS PLAN

044TN103 BLDG 044 - PENTHOUSE - TELECOMMUNICATIONS PLAN

044TN400a BLDG 044 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS PLANS

044TN400b BLDG 044 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

044TN401a BLDG 044 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

044TN401b BLDG 044 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

LIST OF DRAWINGS SHEETS 00 01 15 - 20

044TN402a BLDG 044 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

044TN402b BLDG 044 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

065TN101 BLDG 065 - LEVEL 01 - TELECOMMUNICATIONS PLAN

065TN102 BLDG 065 - LEVEL 02 - TELECOMMUNICATIONS PLAN

065TN401 BLDG 065 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

066TN100 BLDG 066 - LEVEL 00 - TELECOMMUNICATIONS PLAN

066TN101 BLDG 066 - LEVEL 01 - TELECOMMUNICATIONS PLAN

066TN401 BLDG 066 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

067TN100G BLDG 067 - LEVEL 00G - TELECOMMUNICATIONS PLAN

067TN101 BLDG 067 - LEVEL 01 - TELECOMMUNICATIONS PLAN

067TN102 BLDG 067 - LEVEL 02 - TELECOMMUNICATIONS PLAN

067TN401a BLDG 067 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

067TN401b BLDG 067 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

088TN100 BLDG 088 - LEVEL 00 - TELECOMMUNICATIONS PLAN

088TN101 BLDG 088 - LEVEL 01 - TELECOMMUNICATIONS PLAN

088TN400 BLDG 088 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

088TN401a BLDG 088 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

088TN401b BLDG 088 - LEVEL 01 - ENLARGED TELECOMMUNICATIONS

PLANS

T58TN100 BLDG T58 - LEVEL 01 & 02 - TELECOMMUNICATIONS PLANS

T59TN101 BLDG T59 - LEVEL 01 - TELECOMMUNICATIONS PLANS

T59TN402 BLDG T59 - LEVEL 02 - ENLARGED TELECOMMUNICATIONS

PLANS

T60TN100 ` BLDG T60 - LEVEL 01 & 02 - TELECOMMUNICATIONS PLANS

T61TN101 BLDG T61 - LEVEL 01 & 02 - TELECOMMUNICATIONS

LIST OF DRAWINGS SHEETS 00 01 15 - 21

T62TN100 BLDG T62 - LEVEL 00 -01 & 02 - TELECOMMUNICATIONS PLANS

T62TN400 BLDG T62 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

T63TN100 BLDG T63 - LVL 00 - 01 & 02 - TELECOMMUNICATIONS PLANS

T63TN400 BLDG T63 - LEVEL 00 - ENLARGED TELECOMMUNICATIONS

PLANS

TN501 TELECOMMUNICATIONS DETAILS

TN502 TELECOMMUNICATIONS DETAILS

TN503 TELECOMMUNICATIONS DETAILS

TN504 TELECOMMUNICATIONS DETAILS

TN505 TELECOMMUNICATIONS DETAILS

TN506 TELECOMMUNICATIONS DETAILS

TN507 TELECOMMUNICATIONS DETAILS

TN508 TELECOMMUNICATIONS DETAILS

TN601 A-SIDE FIBER RISER DIAGRAM

TN602 A-SIDE FIBER RISER DIAGRAM

TN603 A-SIDE FIBER RISER DIAGRAM

TN604 A-SIDE FIBER RISER DIAGRAM

TN605 A-SIDE FIBER RISER DIAGRAM

TN606 B-SIDE FIBER RISER DIAGRAM

TN607 B-SIDE FIBER RISER DIAGRAM

TN608 B-SIDE FIBER RISER DIAGRAM

TN609 B-SIDE FIBER RISER DIAGRAM

TN610 B-SIDE FIBER RISER DIAGRAM

TN701 TELECOMMUNICATIONS SCHEDULE

- - - E N D - - -

VA MEDICAL CENTER – WHITE RIVER JUNCTION, VT PUB. DATE: 2021-11

GENERAL REQUIREMENTS 01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.10 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.11 NOISE PROTECTION

A. Schedule operations that involve the use of equipment with output of high noise levels (i.e., jackhammers, air compressors, and explosive-actuated devices) for after duty working hours.

Use of any such equipment must be approved in writing by the Contracting Officer prior to commencement of work.

1.12 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM

INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes but is not limited to the following infrastructure upgrades: facility fiber throughout the buildings to each Telecommunications Room (TR); provide a redundant fiber run throughout the facility to each TR; provide redundant fiber mains to the demarcation room from the provider point; install needed data drops in quantities as shown on the contract documents; install new electrical outlets throughout the facility in quantities as shown on the contract documents; provide additional power in each TR; upgrade facility power distribution as required; upgrade facility

HVAC distribution as required; physical security assessment and upgrades; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); data center work – upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and hazardous material abatement. Project scope includes Buildings 1, 2, 4, 6, 7, 8, 9, 28, 31, 37, 39, 44, T-58, T-59, T-60, T-61, T-62, T-63, 65, 66, 67, 88, and visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer (CO).

B. Offices of Spees Design Build, as Architect Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by

Contracting Officer or his duly authorized representative.

GENERAL REQUIREMENTS 01 00 00 -2

C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.13 STATEMENT OF BID ITEM(S)

A. ITEM I, EHRM INFRASTRUCTURE UPGRADES: Work includes all general, safety, and management requirements depicted in the contract documents.

B. ITEM II, GENERAL CONSTRUCTION: Work includes general construction, alterations, and selective demolition depicted in the contract documents.

C. ITEM III, ELECTRICAL WORK: Work includes all labor, materials, equipment, and supervision to perform the required electrical construction work on this project as depicted in the contract documents.

D. ITEM IV, MECHANICAL WORK: Work includes all labor, material, equipment, and supervision to perform the required mechanical construction work on this project depicted in the contract documents.

E. ITEM V, TELECOMMUNICATIONS WORK: Work includes all labor, material, equipment, and supervision to perform the required telecommunications construction work on this project depicted in the contract documents.

F. ITEM VI, STRUCTURAL WORK: Work includes all labor, material, equipment, and supervision to perform the required structural construction work on this project depicted in the contract documents.

G. ITEM VII, SITE AND CIVIL WORK: Work includes all labor, material, equipment, and supervision to perform the required site and civil construction work on this project depicted in the contract documents.

H. ITEM VIII, ENVIRONMENTAL WORK: Work includes all labor, material, equipment, and supervision to perform the required environmental remediation work on this project depicted in the contract documents.

1.14 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.15 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

GENERAL REQUIREMENTS 01 00 00 -3

1. Physical security of the construction site and installations will meet requirements depicted in the next paragraph “Security Procedures,” the VA Design Manual “Physical Security Design

Manual for VA Life-Safety Protected Facilities,” and any other applicable VA documentation.

2. The Contractor is responsible for determining the security plan that will define both physical and administrative security procedures. Once approved by the VA, these procedures will remain effective for the entire duration of the project.

3. The General Contractor is responsible for assuring that all subcontractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge.

They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting

Officer so that security escort and/or arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting

Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall install all permanent cores at completion of the work. See

Section 08 71 00 DOOR HARDWARE and coordinate with the VA COR.

D. Document Control

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

GENERAL REQUIREMENTS 01 00 00 -4

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law

Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.16 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Limited amounts of well-organized and unobtrusive materials and tools may be kept in the construction area interior to the buildings during construction. The VA Medical Center COR may request items be relocated at any points. Contractor designated material storage areas are to

GENERAL REQUIREMENTS 01 00 00 -5

meet all jobsite safety standards and material storage areas are to be returned to their original appearance and function upon completion of work in each work area.

C. Limited amounts of well-organized and unobtrusive materials and tools may be kept in construction exterior lay down areas during construction. The VA Medical Center COR may request items be relocated at any point. Lay down areas are to meet all jobsite safety standards and lay down areas are to be returned to their original appearance and function upon completion of work in each work area.

D. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the

Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the

Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

Possible locations and requirements will be discussed and determined by the COR during the post-bid, pre-construction meeting.

E. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation.

When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

F. Working space and space available for storing materials shall be as determined by the COR.

G. Workers are subject to the rules of the VA Medical Center that are applicable to their conduct.

H. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

I. Execute work so as to interfere as little as possible with normal functioning of the VA Medical

Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that

GENERAL REQUIREMENTS 01 00 00 -6

are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working or storage areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

J. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of…

This is the start of the file's text. The full file is on GovTribe.