Attachment 09_Asbestos and Lead Report.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--EHRM Upgrades - White River Junction, VT
- Solicitation number
- 36C77626R0092
About this file
This is an Asbestos and Lead Inspection Report prepared by APEX Environmental Solutions, LLC for the EHRM design upgrade project at White River Junction VA Medical Center in White River Junction, Vermont. The inspection was conducted December 16-18, 2024, and submitted January 10, 2025, to determine the presence of asbestos-containing materials (ACM) and lead-based painted materials in work areas scheduled for renovation.
The inspection identified asbestos contamination in 128 bulk samples across 273 layers, with positive results exceeding the 1% threshold found in drywall systems (white surfaced compound containing 2-3% chrysotile), floor tiles (12x12 tiles in various colors containing 2-3% chrysotile), black mastic adhesive (4% chrysotile), duct sealant (3% chrysotile), and carpet mastic (2% chrysotile) distributed across multiple rooms and buildings. Lead-based paint testing using XRF analysis on 465 readings identified 26 samples exceeding the 1.0 mg/cm² EPA/HUD threshold, with contamination found on window systems (sills, aprons, casings), plaster walls, door components, and ceramic sink surfaces, with the highest concentration at 37.0 mg/cm² on a ceramic sink in Room 103. The report recommends that a Vermont-licensed asbestos and lead abatement contractor remove all identified materials before any demolition or renovation activities that could impact these materials. Appendices include detailed sample location drawings identifying positive and negative results by building and room, homogeneous area quantities, and complete analytical results from CA Labs, an NVLAP-accredited laboratory.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 1 | 6
533 Pebble Drive Haughton, LA 71037
PH: 318.540.6876
www.apex-enviro.com
Asbestos & Lead Inspection Report
White River Junction VA Medical Center
163 Veterans Drive
White River Junction, Vermont 05009
January 10, 2025
Prepared for
Spees Design Build
P.O. Box 791774
New Orleans, Louisiana 70179
By
Haughton, Louisiana 71037
(318) 540-6876
APEX Field Inspector:
Bradley Kennon
Certified Asbestos Inspector – DI182667
Certified Lead Inspector – MI182667
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 2 | 6
Haughton, LA 71037
PH: 318.540.6876
Asbestos & Lead Inspection Report
White River Junction VA Medical Center
White River Junction, Vermont 05009
1.0 INTRODUCTION
APEX Environmental Solutions, LLC performed asbestos and lead inspections for the EHRM design upgrade project located at White River Junction VA Medical Center in Vermont. This investigation was requested to determine if asbestos-containing materials and/or lead-based painted materials were present in the work areas.
APEX Industrial Hygiene Manager, Bradley Kennon and Vermont Asbestos Inspector, Barrett Long
(000105) conducted the inspections and sampling on December 16-18, 2024, and provides the following report based on the observations made and sampling conducted.
2.0 PROCEDURES
2.1 Asbestos Inspection
Asbestos can only be positively identified using microscopical techniques. Samples collected in this survey were analyzed using Polarized Light Microscopy (PLM). CA Labs, L.L.C. located in Baton Rouge, Louisiana, analyzed the samples from this assessment. CA Labs is a National Voluntary Laboratory
Accredited Program (NVLAP) and is certified by the Louisiana Environmental Laboratory Accreditation
Program (LELAP).
The analysis procedure followed for asbestos determination was published in Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-193/116 (1993). This method is referred to as the
“Improved Method” and is recommended by the EPA as a preferred substitute to the Interim Method. Based on these guidelines, suspect material was considered not to contain ACM only if the results of all samples required to be collected from the homogeneous area were determined to have asbestos in amounts of 1% or less. Those materials analyzed and determined to contain greater than 1% were considered ACM.
2.2 Lead-Based Paint Inspection
An SciAps X-Ray Fluorescence (XRF) Analyzer X-550 (Serial # 02044), an instrument that determines the amount of lead in each area of a painted surface was used for this inspection. An XRF reading of 1.0 mg/cm2 is considered lead-based paint according to the EPA and HUD guidelines.
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 3 | 6
Haughton, LA 71037
PH: 318.540.6876
3.0 RESULTS
3.1 Asbestos Results
One Hundred Twenty-Eight (128) bulk samples with Two Hundred Seventy-Three (273) layers were collected at the White River Junction VA Medical Center, Vermont to verify the visual assessment, and submitted for analysis. The positive results of the testing are provided in the table below:
TABLE 1
Asbestos Sampling Results
White River Junction, VT 05009
Sample ID Material Description Results
(10) – A1
Drywall System
White Surfaced White
Compound – 3% Chrysotile
(10) – A2
Drywall System
Compound – 3% Chrysotile
113-A1 Drywall System
Compound – 2% Chrysotile
113-A2 Drywall System
Compound – 2% Chrysotile
113-B1 Black Mastic 4% Chrysotile
113-B2 Black Mastic 4% Chrysotile
201-A1 Yellow 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
201-A2 Yellow 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
201-D1 Gray Duct Sealant 3% Chrysotile
201-D2 Gray Duct Sealant 3% Chrysotile
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 4 | 6
Haughton, LA 71037
PH: 318.540.6876
www.apex-enviro.com
Sample ID Material Description Results
331-B1 Black Mastic 4% Chrysotile
331-B2 Black Mastic 4% Chrysotile
336-D1 Green 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
336-D2 Green 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
103-A1 Tan Mastic 2% Chrysotile
G31A-A1 12x12 Brown Floor Tile 2% Chrysotile
G31A-A2 12x12 Brown Floor Tile 2% Chrysotile
115A-A1 Yellow/Black Carpet Mastic 2% Chrysotile
115A-A2 Yellow/Black Carpet Mastic 2% Chrysotile
B19B-A1 Cream 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
B19B-A2 Cream 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
B18-B1 Gray 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
B18-B2 Gray 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
115-A1 Tan 12x12 Floor Tile with Black Mastic Floor Tile – 3% Chrysotile
Black Mastic – 4% Chrysotile
115-A2 Tan 12x12 Floor Tile with Black Mastic Floor Tile – 3% Chrysotile
Black Mastic – 4% Chrysotile
226-A1 White 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 5 | 6
Haughton, LA 71037
PH: 318.540.6876
www.apex-enviro.com
Sample ID Material Description Results
226-A2 White 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile
Black Mastic – 4% Chrysotile
G05-B1 Black Mastic 4% Chrysotile
G05-B2 Black Mastic 4% Chrysotile
Located in Appendix C are copies of the asbestos laboratory analytical results.
3.2 Lead Results
During the inspection, a total of 465 readings, including calibrations, were taken during the lead-based paint inspection using the XRF equipment. Of those readings taken, twenty-six (26) resulted in concentrations above 1.0 mg/cm2. The table below represents those samples that were above the acceptable HUD concentration level.
Reading No.
XRF Result (mg/cm2)
Component Substrate Location
52 4.7 Window Sill Metal Office 331
53 4.7 Window Apron Metal Office 331
54 4.8 Window Casing Metal Office 331
73 4.2 Window Casing Metal Office 333
76 3.2 Plaster Wall Plaster Office 333
77 8.1 Plaster Wall Plaster Office 333
78 9.0 Plaster Wall Plaster Office 333
100 2.1 Window Sill Metal 336-B
101 3.2 Window Apron Metal 336-B
102 3.2 Window Casing Metal 336-B
111 2.1 Window Sill Metal 336-C
112 2.1 Window Apron Metal 336-C
113 3.2 Window Casing Metal 336-C
121 2.8 Window Sill Metal 336-D
122 4.7 Window Apron Metal 336-D
123 4.7 Window Casing Metal 336-D
134 6.2 Window Casing Metal 336-E
147 5.2 Window Casing Metal 336-F
173 7.4 Door Casing Metal Bedroom 105
174 4.5 Door Jamb Metal Bedroom 105
Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 6 | 6
Haughton, LA 71037
PH: 318.540.6876
www.apex-enviro.com
Reading No.
XRF Result (mg/cm2)
Component Substrate Location
175 3.8 Window Sill Metal Bedroom 105
184 6.3 Window Casing Metal Bedroom 105
205 37.0 Sink Ceramic Room 103
209 3.7 Door Jamb Metal Room 104
212 1.3 Window Casing Metal Room 104
289 1.0 Door Metal Room G12
4.0 CONCLUSIONS & RECOMMENDATIONS
The results from the asbestos sampling indicate the drywall system, 12x12 flooring with black mastic, duct sealant and carpet mastic in several work areas (rooms) are asbestos containing. Located in Appendix
B are drawings of the work areas with positive locations.
The results from the lead-based paint inspection indicated the window systems, plaster wall, sink and door in several work areas (rooms) are considered positive for lead in concentrations above 1.0 mg/cm². Located in Appendix B are drawings of the work areas (rooms) with positive locations.
APEX recommends a Vermont licensed asbestos & lead abatement contractor remove these materials before any demolition or renovation activities occur which may impact the materials.
5.0 STANDARD OF CARE
The environmental services performed by APEX have been conducted with the degree of care and skill ordinarily exercised under similar circumstances by reputable members of its industry practicing in the same locality under similar budget and time constraints. No other warranty, expressed or implied, is made.
The microbial analytical results represent the concentrations found at the time of the survey and are expected to vary over time.
APEX also will treat the results of this study as strictly confidential. No information or recommendations have been released to other parties, federal agencies, or other government bodies.
6.0 APPENDICES
A. Sample Location Drawings
B. Homogenous Drawings & Quantities
C. Asbestos Laboratory Analytical Results
D. Certifications
APPENDIX A
SAMPLE LOCATIONS
ICRA/PHASING NOTES
462 SF
STORAGE
643 SF
CORRIDOR
C-B-3
314 SF
DAV OFFICE
225 SF
STAIR
S-1
10-A1 10-A2 10-B1
10-B2
10-C1 10-C2
Figure
BUILDING #1
ROOM #10
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
ENLARGED AREA
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
ASBESTOS SAMPLING
##-## NEGATIVE for ACM
##-## POSITIVE for ACM
10-A1 White Surfaced Compound 10-A2 White Surfaced Compound
10' - 0"
114 SF
IRM VOICE/DATA
RM
126 SF
OFFICE
230 SF
RECEPTION,
FILES
371 SF
FILE RM
647 SF
CORRIDOR
112-B1
112-A2
113-C3 113-B2
112-B2
112-A1
113-D2 113-A1
113-A2
113-C1 113-C2
113-D1
113-B1
Figure
BUILDING #1
ROOM #112-#113
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
ENLARGED AREA
KEY PLAN
ASBESTOS SAMPLING
##-## NEGATIVE for ACM
##-## POSITIVE for ACM
113-A1 White Surfaced Compound 113-A2 White Surfaced Compound 113-B1 Black Mastic 113-B2 Black Mastic
INTERIOR LINE OF
NEW WALL
10' - 0"
347 SF
CLERK
77 SF
LAB STORAGE
215 SF
LAB
202A
44 SF
STORAGE
201A
361 SF
PORCH
14S
OFFICE STAFF
110 SF
OFFICE
RESIDENT
259B
844 SF
CORRIDOR
C-2-3
201-B1
201-E1
201-G1
201-A2
201-D1
201-C1201-F2
201-A1 201-B2
** NOTE: Same Floor Tile in 201 & 201A
201-E2
201-G2
201-D2
201-C2 201-F1
201-F3
Figure
BUILDING #1
ROOM #201
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
201-A1 Ylw FT w/Blk Mastic 201-A2 Ylw FT w/Blk Mastic 201-D1 Gray Sealant 201-D2 Gray Sealant
137 SF
OFFICE
181 SF
OFFICE SECY
116 SF
FEMALE TOILET
534 SF
CORRIDOR
14E
127 SF
SOCIAL WORKER
OFFICE
± 10' - 7" (EXIST.)
331-C1
** NOTE: Plaster Above Ceiling Tiles
** NOTE: Same Building Materials as 331 & 332 331-A1
331-B2
331-D1 331-E1
331-E2
332-B2
332-A1
332-C1
332-A3
331-C2 331-C3
331-A2 331-B1
331-D2
332-B1
332-A2
332-C2
Boxes from Floor to Ceiling in ** NOTE: Room Contained Stored Computer
Most of Room.
Figure
BUILDING #1
ROOM #331, 332, 333
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
331-B1 Blk Mastic 331-B2 Blk Mastic
336-A3
336-C1
336-D1
336-A4
336D-B2
336D-B1
336-A2
336E-B1
336-A5
336E-A1
336E-A2
336-A7
336-A1
336A-A1 336E-B2
336F-A1
336F-C1 336-A6
336A-B2
336-D2
336-C2 336F-A2
336-C (Beneath Carpet), 336-A.
** NOTE: Green Floor Tile in Hallway, White Tile in 336B (Beneath Carpet), *336-C
336-B
*336-A
336-D
336-E
336F
336-E.
Tile Removed and Residual Mastic in Rooms 336D & 336F.
336-B1
336A-A2
336A-B1
336F-C2
Figure
BUILDING #1
ROOM #336A - 336F
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM
##-## POSITIVE for ACM
336-D1 Green FT w/Blk Mastic 336-D2 Green FT w/Blk Mastic
108 SF
1463 SF
MECH RM
No Suspect Materials Observed ** NOTE: Walls & Ceiling are Panted Plywood
Figure
BUILDING #2
ROOM #107
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM
##-## POSITIVE for ACM
128 SF
BED RM
CORRIDOR
C110
11 SF
105A
11 SF
106A
** NOTE: Ceiling & Walls are Same
105-C1 105-A1
105-B2
105-B1
105-C2
Figure
BUILDING #4
ROOM #105
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
INTERIOR LINE
OF NEW WALL
58 SF
IRM
582 SF
STORAGE
B1
B1A
B1A-A2
B1A-A1
Figure
BUILDING #6
ROOM #B1A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
6'
4"
128 SF
TEL
B3
729 SF
STORAGE
B1
± 9' - 6" (EXIST.)
EX
IS
T.
Figure
BUILDING #7
ROOM #B3
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
** NOTE: No Suspect Materials Observed
ASBESTOS SAMPLING
8' - 0"
NEW WALL
35 SF
HAC
196 SF
96 SF
CORRIDOR
98 SF
CORRIDOR
104-B1
104-A1
103-A1
103-A2
104-B3 104-B2
104-A2
Figure
BUILDING #9
ROOM #104 & #103
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
INTERIOR LINE
OF NEW WALL
8'
0"
315 SF
SERVER RM
G31
133 SF
AMERICAN
LEGION OFFICE
G32
252 SF
CORRIDOR
125 SF
STAIR
ST-G
109 SF
CORRIDOR
G19
126 SF
TR
G31A
G31A-B2
G31A-B1
G31A-D1
G31A-C2
G31A-A2
G31A-A1
G31A-D2
G31A-C1
Figure
BUILDING #28
ROOM #G31A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
G31A-A1 Tan FT G31A-A2 Tan FT
9' - 6 7/32" 4' - 3"
113 SF
115B
90 SF
PATIENT SAFETY
MGR OFFICE
115A
996 SF
LIBRARY
608 SF
CORRIDOR
642 SF
CORRIDOR
129 SF
STAIR
52 SF
HAC
121 SF
MENS TOILET
92 SF
ELEVATOR
115A-B3 115A-B2
115A-E2
115A-F1 115A-F2
115A-C2
115A-D1 115A-E1
115A-D2
115A-A2
115A-A1
115A-B1
115A-C1
Figure
BUILDING #28
ROOM #115A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
115A-A1 Blk & Tan Mastic 115A-A2 Blk & Tan Mastic
145 SF
144 SF
OFFICE
294 SF
CORRIDOR
200N
130 SF
STAIR
50 SF
HAC
WOMENS TOILET
9'
3/ 4"
(E
XI
ST
219-B2
219-B1
219-E1
219-E2
219-D1
219-D2
219-D3
219-C1 219-C2
219-A1
219-A2
Figure
BUILDING #28
ROOM #219
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
10' - 0"
INTERIOR LINE
OF NEW WALL
EQ
EQ
233 SF
MECH RM
B-19A
640 SF
B-19
318 SF
NEW TELEPHONE
EQUIP RM
B-18
1283 SF
CORRIDOR
10' - 0" (CLR.)
100 SF
TR
B-19B
** NOTE: Fireproofing Sprayed on Roof Deck and Metal Support Beams in Room B-18
B19B-B1
B19B-A1
B19B-A2
B19B-C1
B-18-B1 B-18-A1
B-18B-A3
B-18-A2
B19B-B2
B19B-C2
B-18-B2
Figure
BUILDING #31
ROOM #B19B
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
B-18-B1 Gray FT w/Blk Mastic B-18-B2 Gray FT w/Blk Mastic B19B-A1 Tan FT w/Blk Mastic B19B-A2 Tan FT w/Blk Mastic
414 SF
WAITING
G15
162 SF
VOLUNTARY
SVCS
G12
849 SF
CORRIDOR
CG2
14 SF
CLOSET
99 SF
OFFICE
G17
60 SF
HOUSEKEEPING
G19
53 SF
MENS TOILET
G11
/4
EX
IS
T.
G-12-C1
G-12-C2
G-12-B2
G-12-D2 G-12-A2
G-12-A1
G-12-B1
G-12-D1
Figure
BUILDING #31
ROOM #G12
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
100 SF
TR (EXISTING)
54 SF
IRM CLOSET
84 SF
OFFICE
124 SF
CORRIDOR
C-2-4
95 SF
STORAGE
82 SF
OR - DIRTY TILITY
ROOM
226-A1
226-A2
226-B1
226-B2
226-C1
226-C2
226-D1 226-D2
Figure
BUILDING #31
ROOM #226
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
226-A1 Gray FT w/Blk Mastic 226-A2 Gray FT w/Blk Mastic
INTERIOR LINE
OF NEW WALL
4126 SF
SHOP AREA
46 SF
VESTIBULE
65 SF
X
227 SF
X1
102 SF
TR
200A
200A-A1
200A-A2
Figure
BUILDING #37
ROOM #200A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
107 SF
HEAD NURSE
G06
118 SF
MENTAL HEALTH
G23
211 SF
OFFICE 1
G24
131 SF
CORRIDOR
C-G3
194 SF
CORRIDOR
C-G4
88 SF
DATA
G05G05-A1
G05-C1
G05-B1
G05-D1 G05-B2
G05-C2
G05-D2
G05-A2
Figure
BUILDING #39
ROOM #G05
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
##-## NEGATIVE for ACM ##-## POSITIVE for ACM
G05-B1 Blk Mastic G05-B2 Blk Mastic
267 SF
MVP CLINICAL
RESEARCH
OFFICE
132 104 SF
DUCT SHAFT
70 SF
OFFICE
132B
114 SF
EXAM RM
117 SF
OFFICE
74 SF
ELEVATOR
NO. 2
89 SF
EXAM RM
108D
132-C1 132-D2
132-D1
132-B1
132-A1 132-C2
132-B2
132-A2
Figure
BUILDING #39
ROOM #132
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
109 SF
DATA
99 SF
PSYCH EXAM
92 SF
ELECTRICAL
200E
224 SF
CORRIDOR
A-200C
538 SF
CORRIDOR
C-201
DATA4 - A1
DATA4 - B1
DATA4 - A3
DATA4 - A2
DATA4 - B2
Figure
BUILDING #39
ROOM DATA 4
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
42 SF
TOILET
122 SF
ENT EXAM
36 SF
HAC CUSTODIAL
71 SF
DATA RM
198 SF
WAITING
73 SF
CORRIDOR
C-320
387 - A1
386 - B2
386 - B1
386 - A2
387-C1
387-B1
387-C2 387-A2
387-B2
386 - A1
Figure
BUILDING #39
ROOM #387
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
G-115
145 SF
OFFICE
G-114
683 SF
CORRIDOR
CG-8
271 SF
PIPE SHAFT/BULB
STORAGE
G-116
G115 - D1
G115 - B1
G115 - A1
G115 - A2
G115 - B2
G115 - C1
G115 - C2 G115 - D2
Figure
BUILDING #44
ROOM #G115
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
59 SF
WALK IN REF
1-118
109 SF
FILM
DEVELOPING RM
1-119
670 SF
CORRIDOR
C1-7
80 SF
WASTE DISPOSE
1-117
1-118-A1 1-118-A2
1-119-A3
1-119-A2
1-119-A1 Figure
BUILDING #44
ROOM #1-118
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
103 SF
TISSUE CULTURE
2-114B
407 SF
LAB UNIT-4
2-114
95 SF
OFFICE
INVESTIGATOR
2-114A
96 SF
COMM INST
2-115
1033 SF
CORRIDOR
C2-8
2-114B-B1
2-114B-C2
2-114B-B2 2-114B-A1 2-114B-D2
2-114B-A1
2-114B-E2 2-114B-E1
2-114B-D1
2-114B-C1
Figure
BUILDING #44
ROOM #2-114B
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
64 SF
Room
136 SF
OFFICE
79 SF
TOILET
56 SF
CORRIDOR
203-A2
203-A1
** NOTE: Walls and Ceilings are Same HA.
Figure
BUILDING #T59
ROOM #205
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGE AREA
ASBESTOS SAMPLING
1022 SF
FMS SPACE
B100
B100-B2
B100-A1
B100-A2
B100-B1
Figure
BUILDING #T62
ROOM #B100
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
84 SF
TEL
908 SF
STORAGE
B01-A1
B01-A2 B01-B1
B01-A3
B01-B2
Figure
BUILDING #T63
ROOM #B01
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
72 SF
IRM
26 SF
STORAGE
120A
74 SF
CORRIDOR
C106
238 SF
KITCHEN
119-B2 119-D1
119-C2
119-C1
119-D2
119-A1 119-A2
119-B1
Figure
BUILDING #65
ROOM #119
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED
AREA
ASBESTOS SAMPLING
UP
1931 SF
CHIP
PROCESSING
B1000
B1000-A1
B1000-B2
B1000-B1
B1000-A2
** NOTE: Wall and Drywall Ceilings are Same HA.
Figure
BUILDING #66
ROOM #B1000
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
87 SF
JANITOR
66 SF
IT ROOM
328 SF
BREAK ROOM
805 SF
LOBBY
C1101
164 SF
MENS LOCKERS
1109-A2
1109-B2
1109-C1 1109-D1
1109-D2
1109-A1
1109-B1
1109-C2
Figure
BUILDING #67
ROOM #1109
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
187 SF
IRM
G123
707 SF
MECH
G124
78 SF
ELEVATOR MACH
RM
G122
531 SF
CORRIDOR
CG000B
G123A-A1 G123A-A2
G123A-B1 G123A-B2
Figure
BUILDING #88
ROOM #G123A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
243 SF
STAFF LOUNGE
1105A55 SF
STAFF MALE
TOILET
90 SF
STORAGE
253 SF
CLASS RM
1105B
996 SF
CORRIDOR
C1000A
21 SF
ELECTRICAL
CLOSET
1105A-C2
1105A-A1
1105A-B1 1105A-B21105A-C1
1105A-A2
Figure
BUILDING #88
ROOM #1105C
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS SAMPLING
STORAGE
643 SF
CORRIDOR
C-B-3
314 SF
DAV OFFICE
225 SF
STAIR
S-1
Figure
BUILDING #1
ROOM #10
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
ENLARGED AREA
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
Lead Based Paint
### NEGATIVE for LBP ### POSITIVE for LBP
IRM VOICE/DATA
RM
126 SF
OFFICE
230 SF
RECEPTION,
FILES
371 SF
FILE RM
647 SF
CORRIDOR
Figure
BUILDING #1
ROOM #112-#113
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
ENLARGED AREA
KEY PLAN
Lead Based Paint
10' - 0"
347 SF
CLERK
77 SF
LAB STORAGE
215 SF
LAB
202A
44 SF
STORAGE
201A
361 SF
PORCH
14S
OFFICE STAFF
110 SF
OFFICE
RESIDENT
259B
844 SF
CORRIDOR
C-2-3
034 035
Figure
BUILDING #1
ROOM #201
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
181 SF
OFFICE SECY
116 SF
FEMALE TOILET
534 SF
CORRIDOR
14E
127 SF
SOCIAL WORKER
OFFICE
± 10' - 7" (EXIST.)
060 061
062 065
Figure
BUILDING #1
ROOM #331, 332, 333
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
### NEGATIVE for LBP ### POSITIVE for LBP
052 4.7 - Window Sill 053 4.7 - Window Apron 054 4.8 - Window Casing 073 4.2 - Window Casing 076 3.2 - Plaster Wall 077 8.1 - Plaster Wall 078 9.0 - Plaster Wall
*336-C
336-B
*336-A
336-D
336-E
336F
099100
Figure
BUILDING #1
ROOM #336A - 336F
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
### NEGATIVE for LBP ### POSITIVE for LBP
100 2.1 - Window Sill 101 3.2 - Window Apron 102 3.2 - Window Casing 111 2.1 - Window Sill 112 2.1 - Window Apron 113 3.2 - Window Casing 121 2.8 - Window Sill 122 4.7 - Window Apron 123 4.7 - Window Casing 134 6.2 - Window Casing 147 5.2 - Window Casing
108 SF
1463 SF
MECH RM
165166
Figure
BUILDING #2
ROOM #107
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ENLARGED AREA
Lead Based Paint
CORRIDOR
C110
11 SF
105A
11 SF
106A
181182
Figure
BUILDING #4
ROOM #105
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
### NEGATIVE for LBP ### POSITIVE for LBP
173 7.4 - Door Casing 174 4.5 - Door Jamb 175 3.8 - Window Sill 184 6.3 - Window Casing
INTERIOR LINE
OF NEW WALL
58 SF
IRM
582 SF
STORAGE
B1
B1A
Figure
BUILDING #6
ROOM #B1A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
6'
4"
128 SF
TEL
B3
729 SF
STORAGE
B1
± 9' - 6" (EXIST.)
EX
IS
T.
Figure
BUILDING #7
ROOM #B3
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
NEW WALL
35 SF
HAC
196 SF
96 SF
CORRIDOR
98 SF
CORRIDOR
Figure
BUILDING #9
ROOM #104 & #103
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
### NEGATIVE for LBP ### POSITIVE for LBP
205 37.0 - Sink 209 3.7 - Door Jamb 212 1.3 - Window Casing
8'
0"
315 SF
SERVER RM
G31
133 SF
AMERICAN
LEGION OFFICE
G32
252 SF
CORRIDOR
125 SF
STAIR
ST-G
109 SF
CORRIDOR
G19
126 SF
TR
G31A
Figure
BUILDING #28
ROOM #G31A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
9' - 6 7/32" 4' - 3"
113 SF
115B
90 SF
PATIENT SAFETY
MGR OFFICE
115A
996 SF
LIBRARY
608 SF
CORRIDOR
642 SF
CORRIDOR
129 SF
STAIR
52 SF
HAC
121 SF
MENS TOILET
92 SF
ELEVATOR
Figure
BUILDING #28
ROOM #115A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
145 SF
144 SF
OFFICE
294 SF
CORRIDOR
200N
130 SF
STAIR
50 SF
HAC
WOMENS TOILET
9'
3/ 4"
(E
XI
ST
Figure
BUILDING #28
ROOM #219
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
10' - 0"
INTERIOR LINE
OF NEW WALL
EQ
EQ
233 SF
MECH RM
B-19A
640 SF
B-19
318 SF
NEW TELEPHONE
EQUIP RM
B-18
1283 SF
CORRIDOR
10' - 0" (CLR.)
100 SF
TR
B-19B
Figure
BUILDING #31
ROOM #B19B
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
G15
162 SF
VOLUNTARY
SVCS
G12
849 SF
CORRIDOR
CG2
14 SF
CLOSET
99 SF
OFFICE
G17
60 SF
HOUSEKEEPING
G19
53 SF
MENS TOILET
G11
/4
EX
IS
T.
Figure
BUILDING #31
ROOM #G12
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
### NEGATIVE for LBP
289 1.0 - Door
100 SF
TR (EXISTING)
54 SF
IRM CLOSET
84 SF
OFFICE
124 SF
CORRIDOR
C-2-4
95 SF
STORAGE
82 SF
OR - DIRTY TILITY
ROOM
Figure
BUILDING #31
ROOM #226
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
INTERIOR LINE
OF NEW WALL
4126 SF
SHOP AREA
46 SF
VESTIBULE
65 SF
X
227 SF
X1
102 SF
TR
200A
Figure
BUILDING #37
ROOM #200A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
G06
118 SF
MENTAL HEALTH
G23
211 SF
OFFICE 1
G24
131 SF
CORRIDOR
C-G3
194 SF
CORRIDOR
C-G4
88 SF
DATA
G05
Figure
BUILDING #39
ROOM #G05
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
267 SF
MVP CLINICAL
RESEARCH
OFFICE
132 104 SF
DUCT SHAFT
70 SF
OFFICE
132B
114 SF
EXAM RM
117 SF
OFFICE
74 SF
ELEVATOR
NO. 2
89 SF
EXAM RM
108D
Figure
BUILDING #39
ROOM #132
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
DATA
99 SF
PSYCH EXAM
92 SF
ELECTRICAL
200E
224 SF
CORRIDOR
A-200C
538 SF
CORRIDOR
C-201
Figure
BUILDING #39
ROOM DATA 4
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
42 SF
TOILET
122 SF
ENT EXAM
36 SF
HAC CUSTODIAL
71 SF
DATA RM
198 SF
WAITING
73 SF
CORRIDOR
C-320
329330
336337
Figure
BUILDING #39
ROOM #387
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
G-115
145 SF
OFFICE
G-114
683 SF
CORRIDOR
CG-8
271 SF
PIPE SHAFT/BULB
STORAGE
G-116
Figure
BUILDING #44
ROOM #G115
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
59 SF
WALK IN REF
1-118
109 SF
FILM
DEVELOPING RM
1-119
670 SF
CORRIDOR
C1-7
80 SF
WASTE DISPOSE
1-117
360 362
Figure
BUILDING #44
ROOM #1-118
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
103 SF
TISSUE CULTURE
2-114B
407 SF
LAB UNIT-4
2-114
95 SF
OFFICE
INVESTIGATOR
2-114A
96 SF
COMM INST
2-115
1033 SF
CORRIDOR
C2-8
Figure
BUILDING #44
ROOM #2-114B
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
64 SF
Room
136 SF
OFFICE
79 SF
TOILET
56 SF
CORRIDOR
383384
Figure
BUILDING #T59
ROOM #205
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGE AREA
Lead Based Paint
1022 SF
FMS SPACE
B100
Figure
BUILDING #T62
ROOM #B100
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
84 SF
TEL
908 SF
STORAGE
- 397
Figure
BUILDING #T63
ROOM #B01
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
72 SF
IRM
26 SF
STORAGE
120A
74 SF
CORRIDOR
C106
238 SF
KITCHEN
Figure
BUILDING #65
ROOM #119
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED
AREA
Lead Based Paint
UP
1931 SF
CHIP
PROCESSING
B1000 413 414
416 417 418
Figure
BUILDING #66
ROOM #B1000
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
87 SF
JANITOR
66 SF
IT ROOM
328 SF
BREAK ROOM
805 SF
LOBBY
C1101
164 SF
MENS LOCKERS
Figure
BUILDING #67
ROOM #1109
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
187 SF
IRM
G123
707 SF
MECH
G124
78 SF
ELEVATOR MACH
RM
G122
531 SF
CORRIDOR
CG000B
Figure
BUILDING #88
ROOM #G123A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
243 SF
STAFF LOUNGE
1105A55 SF
STAFF MALE
TOILET
90 SF
STORAGE
253 SF
CLASS RM
1105B
996 SF
CORRIDOR
C1000A
21 SF
ELECTRICAL
CLOSET
Figure
BUILDING #88
ROOM #1105C
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
Lead Based Paint
APPENDIX B
HOMOGENEOUS DRAWINGS & QUANTITIES
STORAGE
643 SF
CORRIDOR
C-B-3
314 SF
DAV OFFICE
225 SF
STAIR
S-1
Figure
BUILDING #1
ROOM #10
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
ENLARGED AREA
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
ASBESTOS HMA
DryWall - 37 linear Feet
IRM VOICE/DATA
RM
126 SF
OFFICE
230 SF
RECEPTION,
FILES
371 SF
FILE RM
647 SF
CORRIDOR
Figure
BUILDING #1
ROOM #112-#113
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
Approximate Scale in Feet
0 3' 6'
ENLARGED AREA
KEY PLAN
ASBESTOS HMA
DryWall - 37 linear Feet
Blk Mastic - 110 Sq. Ft.
10' - 0"
347 SF
CLERK
77 SF
LAB STORAGE
215 SF
LAB
202A
44 SF
STORAGE
201A
361 SF
PORCH
14S
OFFICE STAFF
110 SF
OFFICE
RESIDENT
259B
844 SF
CORRIDOR
C-2-3
Figure
BUILDING #1
ROOM #201
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Ductwork Sealant Ylw FT w/Blk Mastic 121 Sq. Ft.
181 SF
OFFICE SECY
116 SF
FEMALE TOILET
534 SF
CORRIDOR
14E
127 SF
SOCIAL WORKER
OFFICE
± 10' - 7" (EXIST.)
Figure
BUILDING #1
ROOM #331, 332, 333
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Grn FT w/Blk Mastic 127 Sq. Ft.
*336-A
336-D
336-E
336F
Figure
BUILDING #1
ROOM #336A - 336F
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Grn FT w/Blk Mastic 350 Sq. Ft.
NEW WALL
35 SF
HAC
196 SF
96 SF
CORRIDOR
98 SF
CORRIDOR
Figure
BUILDING #9
ROOM #104 & #103
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Tan FT w/Blk Mastic 35 Sq. Ft.
8'
0"
315 SF
SERVER RM
G31
133 SF
AMERICAN
LEGION OFFICE
G32
252 SF
CORRIDOR
125 SF
STAIR
ST-G
109 SF
CORRIDOR
G19
126 SF
TR
G31A
Figure
BUILDING #28
ROOM #G31A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Brown FT w/Blk Mastic 315 Sq. Ft.
9' - 6 7/32" 4' - 3"
113 SF
115B
90 SF
PATIENT SAFETY
MGR OFFICE
115A
996 SF
LIBRARY
608 SF
CORRIDOR
642 SF
CORRIDOR
129 SF
STAIR
52 SF
HAC
121 SF
MENS TOILET
92 SF
ELEVATOR
- 8
Figure
BUILDING #28
ROOM #115A
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Mastic under Carpet 375 Sq. Ft.
10' - 0"
INTERIOR LINE
OF NEW WALL
EQ
EQ
233 SF
MECH RM
B-19A
640 SF
B-19
318 SF
NEW TELEPHONE
EQUIP RM
B-18
1283 SF
CORRIDOR
10' - 0" (CLR.)
100 SF
TR
B-19B
Figure
BUILDING #31
ROOM #B19B
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Tan FT w/Blk Mastic 100 Sq. Ft.
Gray FT w/Blk Mastic 318 Sq. Ft.
100 SF
TR (EXISTING)
54 SF
IRM CLOSET
84 SF
OFFICE
124 SF
CORRIDOR
C-2-4
95 SF
STORAGE
82 SF
OR - DIRTY TILITY
ROOM
Figure
BUILDING #31
ROOM #226
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Gray FT w/Blk Mastic 120 Sq. Ft.
G06
118 SF
MENTAL HEALTH
G23
211 SF
OFFICE 1
G24
131 SF
CORRIDOR
C-G3
194 SF
CORRIDOR
C-G4
88 SF
DATA
G05
Figure
BUILDING #39
ROOM #G05
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
ASBESTOS HMA
Cream FT w/Blk Mastic 88 Sq. Ft.
181 SF
OFFICE SECY
116 SF
FEMALE TOILET
534 SF
CORRIDOR
14E
127 SF
SOCIAL WORKER
OFFICE
± 10' - 7" (EXIST.)
Figure
BUILDING #1
ROOM #331, 332, 333
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
LEAD HMA
Sill, Casing, Apron Casing
Plaster Wall - 34 Linear Ft.
*336-A
336-D
336-E
336F
Figure
BUILDING #1
ROOM #336A - 336F
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
LEAD HMA
Sill, Casing, Apron
CORRIDOR
C110
11 SF
105A
11 SF
106A
Figure
BUILDING #4
ROOM #105
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
LEAD HMA
Sill, Casing Casing & Jamb
NEW WALL
35 SF
HAC
196 SF
96 SF
CORRIDOR
98 SF
CORRIDOR
Figure
BUILDING #9
ROOM #104 & #103
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
LEAD HMA
Sill, Casing, Apron
Sink
G15
162 SF
VOLUNTARY
SVCS
G12
849 SF
CORRIDOR
CG2
14 SF
CLOSET
99 SF
OFFICE
G17
60 SF
HOUSEKEEPING
G19
53 SF
MENS TOILET
G11
/4
EX
IS
T.
Figure
BUILDING #31
ROOM #G12
VA - VT White River Junction
Project No. 24-202 Drawn By GC 12-11-24 Approved By
Checked By
Rev #: Date:
Rev #: Date:
Rev #: Date:
163 Veterans Drive White River Junction, VT
05009
KEY PLAN
ENLARGED AREA
LEAD HMA
Door
APPENDIX C
ANALYTICAL RESULTS
Attn:
Customer Project:
Reference #: Date: 12/26/2024
Analysis and Method
Discussion
Qualifications
Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be detectable by PLM analysis and should be analyzed by TEM bulk protocols.
A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.
Quantification of <1% will actually be reported as <=1% (allowable variance close to 1% is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.
CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. This report is not covered by the scope of AIHA accreditation. Analysis performed at CA Labs, LLC 12232 Industriplex, Suite 32 Baton Rouge, LA 70809.
533 Pebble Drive
Haughton, LA 71037 EHRM Infrastructure Upgrades Design
CBR24129482
Summary of polarizing light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763
Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereomicroscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).
Vermiculite containing samples may have trace amounts of actinolite-tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.
Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light
Apex Environmental Solutions Brad Kennon
Labs
A
C
Overview of Project Sample Material Containing Asbestos
Customer Project: EHRM Infrastructure Upgrades Design CA Labs Project #: CBR24129482
White Surfaced White Compound
Black Mastic
Yellow Floor Tile
Gray Sealant
Green Floor Tile
No Sample Submitted
Tan Mastic
Tan Floor Tile
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
201.A
1-2 Black Mastic 4% Chrysotile
113-B2 113.B
2-2 Black Mastic 4% Chrysotile
201-A1 201.A
1-1 Yellow Floor Tile 2% Chrysotile
113-A2 113.A
2-1
White Surfaced White
Compound 2% Chrysotile
113-B1 113.B
1-2 Black Mastic 4% Chrysotile
(10)-A2 (10)A
2-1
White Surfaced White
Compound 3% Chrysotile
113-A1 113.A
1-1
White Surfaced White
Compound 2% Chrysotile
(10)-A1 (10)A
1-1
White Surfaced White
Compound 3% Chrysotile
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Sample # Layer
Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected Building
Material Types
Labs
A
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
336.D
1-2 Black Mastic 4% Chrysotile
331-B2 331.B
2-3 Black Mastic 4% Chrysotile
336-D1 336.D
1-1 Green Floor Tile 2% Chrysotile
201-D2 201.D
2-1 Gray Sealant 3% Chrysotile
331-B1 331.B
1-2 Black Mastic 4% Chrysotile
201.A
2-2 Black Mastic 4% Chrysotile
201-D1 201.D
1-1 Gray Sealant 3% Chrysotile
201-A2 201.A
2-1 Yellow Floor Tile 2% Chrysotile
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Sample # Layer
Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected Building
Material Types
Labs
A
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
115A-A1 115A.
A1-1 Black and Tan Mastic 2% Chrysotile
G31A-A1 G31A
.A1-1 Tan Floor Tile 2% Chrysotile
G31A-A2 G31A
.A2-1 Tan Floor Tile 2% Chrysotile
336A-B2 336A.
B2-1 No Sample Submitted
103-A1 103.A
1-2 Tan Mastic 2% Chrysotile
336.D
2-2 Black Mastic 4% Chrysotile
336A-A2 336A.
A2-1 No Sample Submitted
336-D2 336.D
2-1 Green Floor Tile 2% Chrysotile
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Sample # Layer
Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected Building
Material Types
Labs
A
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .