This is an Asbestos and Lead Inspection Report prepared by APEX Environmental Solutions, LLC for the EHRM design upgrade project at White River Junction VA Medical Center in White River Junction, Vermont. The inspection was conducted December 16-18, 2024, and submitted January 10, 2025, to determine the presence of asbestos-containing materials (ACM) and lead-based painted materials in work areas scheduled for renovation.

The inspection identified asbestos contamination in 128 bulk samples across 273 layers, with positive results exceeding the 1% threshold found in drywall systems (white surfaced compound containing 2-3% chrysotile), floor tiles (12x12 tiles in various colors containing 2-3% chrysotile), black mastic adhesive (4% chrysotile), duct sealant (3% chrysotile), and carpet mastic (2% chrysotile) distributed across multiple rooms and buildings. Lead-based paint testing using XRF analysis on 465 readings identified 26 samples exceeding the 1.0 mg/cm² EPA/HUD threshold, with contamination found on window systems (sills, aprons, casings), plaster walls, door components, and ceramic sink surfaces, with the highest concentration at 37.0 mg/cm² on a ceramic sink in Room 103. The report recommends that a Vermont-licensed asbestos and lead abatement contractor remove all identified materials before any demolition or renovation activities that could impact these materials. Appendices include detailed sample location drawings identifying positive and negative results by building and room, homogeneous area quantities, and complete analytical results from CA Labs, an NVLAP-accredited laboratory.

View the file

Other files

File Type Posted
S05_RFIs.docx DOCX document
Addendum_Architectural Cutsheets.pdf PDF
Addendum_Metal Fabrication.pdf PDF
Utility Shutdown Request Form.pdf PDF
Addendum_Architectural Spec.pdf PDF
Off Hours Work Request Form.pdf PDF
36C77626R0092 0003.docx DOCX document
36C77626R0092 0002.docx DOCX document
S04_Site Walk Sign-in Sheet.pdf PDF
36C77626R0092 0001.docx DOCX document
Attachment 11_DavisBacon_Windsor Co. VT 05.18.26.pdf PDF
Attachment 08_Utility Locate.pdf PDF
Attachment 06_Electrical cut sheets.pdf PDF
Attachment 15_Site Visit Instructions.docx DOCX document
Attachment 03_Plans Vol 2.pdf PDF
Attachment 02_Plans Vol 1.pdf PDF
Attachment 01_Specs.pdf PDF
Attachment 16_Project Experience.docx DOCX document
Attachment 14_ PPQ.docx DOCX document
Attachment 12_Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 13_Limitations on Subcontracting.docx DOCX document
Attachment 10_Brand Name Justification.pdf PDF
Attachment 07_Mechanical cut sheets.pdf PDF
Attachment 05_Plans Addendum.pdf PDF
Attachment 04_Plans Vol 3.pdf PDF
36C77626R0092.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 1 | 6

533 Pebble Drive Haughton, LA 71037

PH: 318.540.6876

www.apex-enviro.com

Asbestos & Lead Inspection Report

White River Junction VA Medical Center

163 Veterans Drive

White River Junction, Vermont 05009

January 10, 2025

Prepared for

Spees Design Build

P.O. Box 791774

New Orleans, Louisiana 70179

By

Haughton, Louisiana 71037

(318) 540-6876

APEX Field Inspector:

Bradley Kennon

Certified Asbestos Inspector – DI182667

Certified Lead Inspector – MI182667

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 2 | 6

Haughton, LA 71037

PH: 318.540.6876

Asbestos & Lead Inspection Report

White River Junction VA Medical Center

White River Junction, Vermont 05009

1.0 INTRODUCTION

APEX Environmental Solutions, LLC performed asbestos and lead inspections for the EHRM design upgrade project located at White River Junction VA Medical Center in Vermont. This investigation was requested to determine if asbestos-containing materials and/or lead-based painted materials were present in the work areas.

APEX Industrial Hygiene Manager, Bradley Kennon and Vermont Asbestos Inspector, Barrett Long

(000105) conducted the inspections and sampling on December 16-18, 2024, and provides the following report based on the observations made and sampling conducted.

2.0 PROCEDURES

2.1 Asbestos Inspection

Asbestos can only be positively identified using microscopical techniques. Samples collected in this survey were analyzed using Polarized Light Microscopy (PLM). CA Labs, L.L.C. located in Baton Rouge, Louisiana, analyzed the samples from this assessment. CA Labs is a National Voluntary Laboratory

Accredited Program (NVLAP) and is certified by the Louisiana Environmental Laboratory Accreditation

Program (LELAP).

The analysis procedure followed for asbestos determination was published in Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-193/116 (1993). This method is referred to as the

“Improved Method” and is recommended by the EPA as a preferred substitute to the Interim Method. Based on these guidelines, suspect material was considered not to contain ACM only if the results of all samples required to be collected from the homogeneous area were determined to have asbestos in amounts of 1% or less. Those materials analyzed and determined to contain greater than 1% were considered ACM.

2.2 Lead-Based Paint Inspection

An SciAps X-Ray Fluorescence (XRF) Analyzer X-550 (Serial # 02044), an instrument that determines the amount of lead in each area of a painted surface was used for this inspection. An XRF reading of 1.0 mg/cm2 is considered lead-based paint according to the EPA and HUD guidelines.

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 3 | 6

Haughton, LA 71037

PH: 318.540.6876

3.0 RESULTS

3.1 Asbestos Results

One Hundred Twenty-Eight (128) bulk samples with Two Hundred Seventy-Three (273) layers were collected at the White River Junction VA Medical Center, Vermont to verify the visual assessment, and submitted for analysis. The positive results of the testing are provided in the table below:

TABLE 1

Asbestos Sampling Results

White River Junction, VT 05009

Sample ID Material Description Results

(10) – A1

Drywall System

White Surfaced White

Compound – 3% Chrysotile

(10) – A2

Drywall System

Compound – 3% Chrysotile

113-A1 Drywall System

Compound – 2% Chrysotile

113-A2 Drywall System

Compound – 2% Chrysotile

113-B1 Black Mastic 4% Chrysotile

113-B2 Black Mastic 4% Chrysotile

201-A1 Yellow 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

201-A2 Yellow 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

201-D1 Gray Duct Sealant 3% Chrysotile

201-D2 Gray Duct Sealant 3% Chrysotile

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 4 | 6

Haughton, LA 71037

PH: 318.540.6876

www.apex-enviro.com

Sample ID Material Description Results

331-B1 Black Mastic 4% Chrysotile

331-B2 Black Mastic 4% Chrysotile

336-D1 Green 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

336-D2 Green 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

103-A1 Tan Mastic 2% Chrysotile

G31A-A1 12x12 Brown Floor Tile 2% Chrysotile

G31A-A2 12x12 Brown Floor Tile 2% Chrysotile

115A-A1 Yellow/Black Carpet Mastic 2% Chrysotile

115A-A2 Yellow/Black Carpet Mastic 2% Chrysotile

B19B-A1 Cream 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

B19B-A2 Cream 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

B18-B1 Gray 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

B18-B2 Gray 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

115-A1 Tan 12x12 Floor Tile with Black Mastic Floor Tile – 3% Chrysotile

Black Mastic – 4% Chrysotile

115-A2 Tan 12x12 Floor Tile with Black Mastic Floor Tile – 3% Chrysotile

Black Mastic – 4% Chrysotile

226-A1 White 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 5 | 6

Haughton, LA 71037

PH: 318.540.6876

www.apex-enviro.com

Sample ID Material Description Results

226-A2 White 12x12 Floor Tile with Black Mastic Floor Tile – 2% Chrysotile

Black Mastic – 4% Chrysotile

G05-B1 Black Mastic 4% Chrysotile

G05-B2 Black Mastic 4% Chrysotile

Located in Appendix C are copies of the asbestos laboratory analytical results.

3.2 Lead Results

During the inspection, a total of 465 readings, including calibrations, were taken during the lead-based paint inspection using the XRF equipment. Of those readings taken, twenty-six (26) resulted in concentrations above 1.0 mg/cm2. The table below represents those samples that were above the acceptable HUD concentration level.

Reading No.

XRF Result (mg/cm2)

Component Substrate Location

52 4.7 Window Sill Metal Office 331

53 4.7 Window Apron Metal Office 331

54 4.8 Window Casing Metal Office 331

73 4.2 Window Casing Metal Office 333

76 3.2 Plaster Wall Plaster Office 333

77 8.1 Plaster Wall Plaster Office 333

78 9.0 Plaster Wall Plaster Office 333

100 2.1 Window Sill Metal 336-B

101 3.2 Window Apron Metal 336-B

102 3.2 Window Casing Metal 336-B

111 2.1 Window Sill Metal 336-C

112 2.1 Window Apron Metal 336-C

113 3.2 Window Casing Metal 336-C

121 2.8 Window Sill Metal 336-D

122 4.7 Window Apron Metal 336-D

123 4.7 Window Casing Metal 336-D

134 6.2 Window Casing Metal 336-E

147 5.2 Window Casing Metal 336-F

173 7.4 Door Casing Metal Bedroom 105

174 4.5 Door Jamb Metal Bedroom 105

Asbestos & Lead Inspection Report - White River Junction VA Medical Center P a g e 6 | 6

Haughton, LA 71037

PH: 318.540.6876

www.apex-enviro.com

Reading No.

XRF Result (mg/cm2)

Component Substrate Location

175 3.8 Window Sill Metal Bedroom 105

184 6.3 Window Casing Metal Bedroom 105

205 37.0 Sink Ceramic Room 103

209 3.7 Door Jamb Metal Room 104

212 1.3 Window Casing Metal Room 104

289 1.0 Door Metal Room G12

4.0 CONCLUSIONS & RECOMMENDATIONS

The results from the asbestos sampling indicate the drywall system, 12x12 flooring with black mastic, duct sealant and carpet mastic in several work areas (rooms) are asbestos containing. Located in Appendix

B are drawings of the work areas with positive locations.

The results from the lead-based paint inspection indicated the window systems, plaster wall, sink and door in several work areas (rooms) are considered positive for lead in concentrations above 1.0 mg/cm². Located in Appendix B are drawings of the work areas (rooms) with positive locations.

APEX recommends a Vermont licensed asbestos & lead abatement contractor remove these materials before any demolition or renovation activities occur which may impact the materials.

5.0 STANDARD OF CARE

The environmental services performed by APEX have been conducted with the degree of care and skill ordinarily exercised under similar circumstances by reputable members of its industry practicing in the same locality under similar budget and time constraints. No other warranty, expressed or implied, is made.

The microbial analytical results represent the concentrations found at the time of the survey and are expected to vary over time.

APEX also will treat the results of this study as strictly confidential. No information or recommendations have been released to other parties, federal agencies, or other government bodies.

6.0 APPENDICES

A. Sample Location Drawings

B. Homogenous Drawings & Quantities

C. Asbestos Laboratory Analytical Results

D. Certifications

APPENDIX A

SAMPLE LOCATIONS

ICRA/PHASING NOTES

462 SF

STORAGE

643 SF

CORRIDOR

C-B-3

314 SF

DAV OFFICE

225 SF

STAIR

S-1

10-A1 10-A2 10-B1

10-B2

10-C1 10-C2

Figure

BUILDING #1

ROOM #10

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

ENLARGED AREA

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

ASBESTOS SAMPLING

##-## NEGATIVE for ACM

##-## POSITIVE for ACM

10-A1 White Surfaced Compound 10-A2 White Surfaced Compound

10' - 0"

114 SF

IRM VOICE/DATA

RM

126 SF

OFFICE

230 SF

RECEPTION,

FILES

371 SF

FILE RM

647 SF

CORRIDOR

112-B1

112-A2

113-C3 113-B2

112-B2

112-A1

113-D2 113-A1

113-A2

113-C1 113-C2

113-D1

113-B1

Figure

BUILDING #1

ROOM #112-#113

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

ENLARGED AREA

KEY PLAN

ASBESTOS SAMPLING

##-## NEGATIVE for ACM

##-## POSITIVE for ACM

113-A1 White Surfaced Compound 113-A2 White Surfaced Compound 113-B1 Black Mastic 113-B2 Black Mastic

INTERIOR LINE OF

NEW WALL

10' - 0"

347 SF

CLERK

77 SF

LAB STORAGE

215 SF

LAB

202A

44 SF

STORAGE

201A

361 SF

PORCH

14S

OFFICE STAFF

110 SF

OFFICE

RESIDENT

259B

844 SF

CORRIDOR

C-2-3

201-B1

201-E1

201-G1

201-A2

201-D1

201-C1201-F2

201-A1 201-B2

** NOTE: Same Floor Tile in 201 & 201A

201-E2

201-G2

201-D2

201-C2 201-F1

201-F3

Figure

BUILDING #1

ROOM #201

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

201-A1 Ylw FT w/Blk Mastic 201-A2 Ylw FT w/Blk Mastic 201-D1 Gray Sealant 201-D2 Gray Sealant

137 SF

OFFICE

181 SF

OFFICE SECY

116 SF

FEMALE TOILET

534 SF

CORRIDOR

14E

127 SF

SOCIAL WORKER

OFFICE

± 10' - 7" (EXIST.)

331-C1

** NOTE: Plaster Above Ceiling Tiles

** NOTE: Same Building Materials as 331 & 332 331-A1

331-B2

331-D1 331-E1

331-E2

332-B2

332-A1

332-C1

332-A3

331-C2 331-C3

331-A2 331-B1

331-D2

332-B1

332-A2

332-C2

Boxes from Floor to Ceiling in ** NOTE: Room Contained Stored Computer

Most of Room.

Figure

BUILDING #1

ROOM #331, 332, 333

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

331-B1 Blk Mastic 331-B2 Blk Mastic

336-A3

336-C1

336-D1

336-A4

336D-B2

336D-B1

336-A2

336E-B1

336-A5

336E-A1

336E-A2

336-A7

336-A1

336A-A1 336E-B2

336F-A1

336F-C1 336-A6

336A-B2

336-D2

336-C2 336F-A2

336-C (Beneath Carpet), 336-A.

** NOTE: Green Floor Tile in Hallway, White Tile in 336B (Beneath Carpet), *336-C

336-B

*336-A

336-D

336-E

336F

336-E.

Tile Removed and Residual Mastic in Rooms 336D & 336F.

336-B1

336A-A2

336A-B1

336F-C2

Figure

BUILDING #1

ROOM #336A - 336F

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM

##-## POSITIVE for ACM

336-D1 Green FT w/Blk Mastic 336-D2 Green FT w/Blk Mastic

108 SF

1463 SF

MECH RM

No Suspect Materials Observed ** NOTE: Walls & Ceiling are Panted Plywood

Figure

BUILDING #2

ROOM #107

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM

##-## POSITIVE for ACM

128 SF

BED RM

CORRIDOR

C110

11 SF

105A

11 SF

106A

** NOTE: Ceiling & Walls are Same

105-C1 105-A1

105-B2

105-B1

105-C2

Figure

BUILDING #4

ROOM #105

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

INTERIOR LINE

OF NEW WALL

58 SF

IRM

582 SF

STORAGE

B1

B1A

B1A-A2

B1A-A1

Figure

BUILDING #6

ROOM #B1A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

6'

4"

128 SF

TEL

B3

729 SF

STORAGE

B1

± 9' - 6" (EXIST.)

EX

IS

T.

Figure

BUILDING #7

ROOM #B3

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

** NOTE: No Suspect Materials Observed

ASBESTOS SAMPLING

8' - 0"

NEW WALL

35 SF

HAC

196 SF

96 SF

CORRIDOR

98 SF

CORRIDOR

104-B1

104-A1

103-A1

103-A2

104-B3 104-B2

104-A2

Figure

BUILDING #9

ROOM #104 & #103

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

INTERIOR LINE

OF NEW WALL

8'

0"

315 SF

SERVER RM

G31

133 SF

AMERICAN

LEGION OFFICE

G32

252 SF

CORRIDOR

125 SF

STAIR

ST-G

109 SF

CORRIDOR

G19

126 SF

TR

G31A

G31A-B2

G31A-B1

G31A-D1

G31A-C2

G31A-A2

G31A-A1

G31A-D2

G31A-C1

Figure

BUILDING #28

ROOM #G31A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

G31A-A1 Tan FT G31A-A2 Tan FT

9' - 6 7/32" 4' - 3"

113 SF

115B

90 SF

PATIENT SAFETY

MGR OFFICE

115A

996 SF

LIBRARY

608 SF

CORRIDOR

642 SF

CORRIDOR

129 SF

STAIR

52 SF

HAC

121 SF

MENS TOILET

92 SF

ELEVATOR

115A-B3 115A-B2

115A-E2

115A-F1 115A-F2

115A-C2

115A-D1 115A-E1

115A-D2

115A-A2

115A-A1

115A-B1

115A-C1

Figure

BUILDING #28

ROOM #115A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

115A-A1 Blk & Tan Mastic 115A-A2 Blk & Tan Mastic

145 SF

144 SF

OFFICE

294 SF

CORRIDOR

200N

130 SF

STAIR

50 SF

HAC

WOMENS TOILET

9'

3/ 4"

(E

XI

ST

219-B2

219-B1

219-E1

219-E2

219-D1

219-D2

219-D3

219-C1 219-C2

219-A1

219-A2

Figure

BUILDING #28

ROOM #219

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

10' - 0"

INTERIOR LINE

OF NEW WALL

EQ

EQ

233 SF

MECH RM

B-19A

640 SF

B-19

318 SF

NEW TELEPHONE

EQUIP RM

B-18

1283 SF

CORRIDOR

10' - 0" (CLR.)

100 SF

TR

B-19B

** NOTE: Fireproofing Sprayed on Roof Deck and Metal Support Beams in Room B-18

B19B-B1

B19B-A1

B19B-A2

B19B-C1

B-18-B1 B-18-A1

B-18B-A3

B-18-A2

B19B-B2

B19B-C2

B-18-B2

Figure

BUILDING #31

ROOM #B19B

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

B-18-B1 Gray FT w/Blk Mastic B-18-B2 Gray FT w/Blk Mastic B19B-A1 Tan FT w/Blk Mastic B19B-A2 Tan FT w/Blk Mastic

414 SF

WAITING

G15

162 SF

VOLUNTARY

SVCS

G12

849 SF

CORRIDOR

CG2

14 SF

CLOSET

99 SF

OFFICE

G17

60 SF

HOUSEKEEPING

G19

53 SF

MENS TOILET

G11

/4

EX

IS

T.

G-12-C1

G-12-C2

G-12-B2

G-12-D2 G-12-A2

G-12-A1

G-12-B1

G-12-D1

Figure

BUILDING #31

ROOM #G12

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

100 SF

TR (EXISTING)

54 SF

IRM CLOSET

84 SF

OFFICE

124 SF

CORRIDOR

C-2-4

95 SF

STORAGE

82 SF

OR - DIRTY TILITY

ROOM

226-A1

226-A2

226-B1

226-B2

226-C1

226-C2

226-D1 226-D2

Figure

BUILDING #31

ROOM #226

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

226-A1 Gray FT w/Blk Mastic 226-A2 Gray FT w/Blk Mastic

INTERIOR LINE

OF NEW WALL

4126 SF

SHOP AREA

46 SF

VESTIBULE

65 SF

X

227 SF

X1

102 SF

TR

200A

200A-A1

200A-A2

Figure

BUILDING #37

ROOM #200A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

107 SF

HEAD NURSE

G06

118 SF

MENTAL HEALTH

G23

211 SF

OFFICE 1

G24

131 SF

CORRIDOR

C-G3

194 SF

CORRIDOR

C-G4

88 SF

DATA

G05G05-A1

G05-C1

G05-B1

G05-D1 G05-B2

G05-C2

G05-D2

G05-A2

Figure

BUILDING #39

ROOM #G05

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

##-## NEGATIVE for ACM ##-## POSITIVE for ACM

G05-B1 Blk Mastic G05-B2 Blk Mastic

267 SF

MVP CLINICAL

RESEARCH

OFFICE

132 104 SF

DUCT SHAFT

70 SF

OFFICE

132B

114 SF

EXAM RM

117 SF

OFFICE

74 SF

ELEVATOR

NO. 2

89 SF

EXAM RM

108D

132-C1 132-D2

132-D1

132-B1

132-A1 132-C2

132-B2

132-A2

Figure

BUILDING #39

ROOM #132

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

109 SF

DATA

99 SF

PSYCH EXAM

92 SF

ELECTRICAL

200E

224 SF

CORRIDOR

A-200C

538 SF

CORRIDOR

C-201

DATA4 - A1

DATA4 - B1

DATA4 - A3

DATA4 - A2

DATA4 - B2

Figure

BUILDING #39

ROOM DATA 4

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

42 SF

TOILET

122 SF

ENT EXAM

36 SF

HAC CUSTODIAL

71 SF

DATA RM

198 SF

WAITING

73 SF

CORRIDOR

C-320

387 - A1

386 - B2

386 - B1

386 - A2

387-C1

387-B1

387-C2 387-A2

387-B2

386 - A1

Figure

BUILDING #39

ROOM #387

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

G-115

145 SF

OFFICE

G-114

683 SF

CORRIDOR

CG-8

271 SF

PIPE SHAFT/BULB

STORAGE

G-116

G115 - D1

G115 - B1

G115 - A1

G115 - A2

G115 - B2

G115 - C1

G115 - C2 G115 - D2

Figure

BUILDING #44

ROOM #G115

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

59 SF

WALK IN REF

1-118

109 SF

FILM

DEVELOPING RM

1-119

670 SF

CORRIDOR

C1-7

80 SF

WASTE DISPOSE

1-117

1-118-A1 1-118-A2

1-119-A3

1-119-A2

1-119-A1 Figure

BUILDING #44

ROOM #1-118

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

103 SF

TISSUE CULTURE

2-114B

407 SF

LAB UNIT-4

2-114

95 SF

OFFICE

INVESTIGATOR

2-114A

96 SF

COMM INST

2-115

1033 SF

CORRIDOR

C2-8

2-114B-B1

2-114B-C2

2-114B-B2 2-114B-A1 2-114B-D2

2-114B-A1

2-114B-E2 2-114B-E1

2-114B-D1

2-114B-C1

Figure

BUILDING #44

ROOM #2-114B

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

64 SF

Room

136 SF

OFFICE

79 SF

TOILET

56 SF

CORRIDOR

203-A2

203-A1

** NOTE: Walls and Ceilings are Same HA.

Figure

BUILDING #T59

ROOM #205

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGE AREA

ASBESTOS SAMPLING

1022 SF

FMS SPACE

B100

B100-B2

B100-A1

B100-A2

B100-B1

Figure

BUILDING #T62

ROOM #B100

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

84 SF

TEL

908 SF

STORAGE

B01-A1

B01-A2 B01-B1

B01-A3

B01-B2

Figure

BUILDING #T63

ROOM #B01

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

72 SF

IRM

26 SF

STORAGE

120A

74 SF

CORRIDOR

C106

238 SF

KITCHEN

119-B2 119-D1

119-C2

119-C1

119-D2

119-A1 119-A2

119-B1

Figure

BUILDING #65

ROOM #119

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED

AREA

ASBESTOS SAMPLING

UP

1931 SF

CHIP

PROCESSING

B1000

B1000-A1

B1000-B2

B1000-B1

B1000-A2

** NOTE: Wall and Drywall Ceilings are Same HA.

Figure

BUILDING #66

ROOM #B1000

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

87 SF

JANITOR

66 SF

IT ROOM

328 SF

BREAK ROOM

805 SF

LOBBY

C1101

164 SF

MENS LOCKERS

1109-A2

1109-B2

1109-C1 1109-D1

1109-D2

1109-A1

1109-B1

1109-C2

Figure

BUILDING #67

ROOM #1109

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

187 SF

IRM

G123

707 SF

MECH

G124

78 SF

ELEVATOR MACH

RM

G122

531 SF

CORRIDOR

CG000B

G123A-A1 G123A-A2

G123A-B1 G123A-B2

Figure

BUILDING #88

ROOM #G123A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

243 SF

STAFF LOUNGE

1105A55 SF

STAFF MALE

TOILET

90 SF

STORAGE

253 SF

CLASS RM

1105B

996 SF

CORRIDOR

C1000A

21 SF

ELECTRICAL

CLOSET

1105A-C2

1105A-A1

1105A-B1 1105A-B21105A-C1

1105A-A2

Figure

BUILDING #88

ROOM #1105C

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS SAMPLING

STORAGE

643 SF

CORRIDOR

C-B-3

314 SF

DAV OFFICE

225 SF

STAIR

S-1

Figure

BUILDING #1

ROOM #10

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

ENLARGED AREA

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

Lead Based Paint

### NEGATIVE for LBP ### POSITIVE for LBP

IRM VOICE/DATA

RM

126 SF

OFFICE

230 SF

RECEPTION,

FILES

371 SF

FILE RM

647 SF

CORRIDOR

Figure

BUILDING #1

ROOM #112-#113

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

ENLARGED AREA

KEY PLAN

Lead Based Paint

10' - 0"

347 SF

CLERK

77 SF

LAB STORAGE

215 SF

LAB

202A

44 SF

STORAGE

201A

361 SF

PORCH

14S

OFFICE STAFF

110 SF

OFFICE

RESIDENT

259B

844 SF

CORRIDOR

C-2-3

034 035

Figure

BUILDING #1

ROOM #201

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

181 SF

OFFICE SECY

116 SF

FEMALE TOILET

534 SF

CORRIDOR

14E

127 SF

SOCIAL WORKER

OFFICE

± 10' - 7" (EXIST.)

060 061

062 065

Figure

BUILDING #1

ROOM #331, 332, 333

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

### NEGATIVE for LBP ### POSITIVE for LBP

052 4.7 - Window Sill 053 4.7 - Window Apron 054 4.8 - Window Casing 073 4.2 - Window Casing 076 3.2 - Plaster Wall 077 8.1 - Plaster Wall 078 9.0 - Plaster Wall

*336-C

336-B

*336-A

336-D

336-E

336F

099100

Figure

BUILDING #1

ROOM #336A - 336F

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

### NEGATIVE for LBP ### POSITIVE for LBP

100 2.1 - Window Sill 101 3.2 - Window Apron 102 3.2 - Window Casing 111 2.1 - Window Sill 112 2.1 - Window Apron 113 3.2 - Window Casing 121 2.8 - Window Sill 122 4.7 - Window Apron 123 4.7 - Window Casing 134 6.2 - Window Casing 147 5.2 - Window Casing

108 SF

1463 SF

MECH RM

165166

Figure

BUILDING #2

ROOM #107

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ENLARGED AREA

Lead Based Paint

CORRIDOR

C110

11 SF

105A

11 SF

106A

181182

Figure

BUILDING #4

ROOM #105

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

### NEGATIVE for LBP ### POSITIVE for LBP

173 7.4 - Door Casing 174 4.5 - Door Jamb 175 3.8 - Window Sill 184 6.3 - Window Casing

INTERIOR LINE

OF NEW WALL

58 SF

IRM

582 SF

STORAGE

B1

B1A

Figure

BUILDING #6

ROOM #B1A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

6'

4"

128 SF

TEL

B3

729 SF

STORAGE

B1

± 9' - 6" (EXIST.)

EX

IS

T.

Figure

BUILDING #7

ROOM #B3

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

NEW WALL

35 SF

HAC

196 SF

96 SF

CORRIDOR

98 SF

CORRIDOR

Figure

BUILDING #9

ROOM #104 & #103

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

### NEGATIVE for LBP ### POSITIVE for LBP

205 37.0 - Sink 209 3.7 - Door Jamb 212 1.3 - Window Casing

8'

0"

315 SF

SERVER RM

G31

133 SF

AMERICAN

LEGION OFFICE

G32

252 SF

CORRIDOR

125 SF

STAIR

ST-G

109 SF

CORRIDOR

G19

126 SF

TR

G31A

Figure

BUILDING #28

ROOM #G31A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

9' - 6 7/32" 4' - 3"

113 SF

115B

90 SF

PATIENT SAFETY

MGR OFFICE

115A

996 SF

LIBRARY

608 SF

CORRIDOR

642 SF

CORRIDOR

129 SF

STAIR

52 SF

HAC

121 SF

MENS TOILET

92 SF

ELEVATOR

Figure

BUILDING #28

ROOM #115A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

145 SF

144 SF

OFFICE

294 SF

CORRIDOR

200N

130 SF

STAIR

50 SF

HAC

WOMENS TOILET

9'

3/ 4"

(E

XI

ST

Figure

BUILDING #28

ROOM #219

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

10' - 0"

INTERIOR LINE

OF NEW WALL

EQ

EQ

233 SF

MECH RM

B-19A

640 SF

B-19

318 SF

NEW TELEPHONE

EQUIP RM

B-18

1283 SF

CORRIDOR

10' - 0" (CLR.)

100 SF

TR

B-19B

Figure

BUILDING #31

ROOM #B19B

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

G15

162 SF

VOLUNTARY

SVCS

G12

849 SF

CORRIDOR

CG2

14 SF

CLOSET

99 SF

OFFICE

G17

60 SF

HOUSEKEEPING

G19

53 SF

MENS TOILET

G11

/4

EX

IS

T.

Figure

BUILDING #31

ROOM #G12

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

### NEGATIVE for LBP

289 1.0 - Door

100 SF

TR (EXISTING)

54 SF

IRM CLOSET

84 SF

OFFICE

124 SF

CORRIDOR

C-2-4

95 SF

STORAGE

82 SF

OR - DIRTY TILITY

ROOM

Figure

BUILDING #31

ROOM #226

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

INTERIOR LINE

OF NEW WALL

4126 SF

SHOP AREA

46 SF

VESTIBULE

65 SF

X

227 SF

X1

102 SF

TR

200A

Figure

BUILDING #37

ROOM #200A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

G06

118 SF

MENTAL HEALTH

G23

211 SF

OFFICE 1

G24

131 SF

CORRIDOR

C-G3

194 SF

CORRIDOR

C-G4

88 SF

DATA

G05

Figure

BUILDING #39

ROOM #G05

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

267 SF

MVP CLINICAL

RESEARCH

OFFICE

132 104 SF

DUCT SHAFT

70 SF

OFFICE

132B

114 SF

EXAM RM

117 SF

OFFICE

74 SF

ELEVATOR

NO. 2

89 SF

EXAM RM

108D

Figure

BUILDING #39

ROOM #132

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

DATA

99 SF

PSYCH EXAM

92 SF

ELECTRICAL

200E

224 SF

CORRIDOR

A-200C

538 SF

CORRIDOR

C-201

Figure

BUILDING #39

ROOM DATA 4

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

42 SF

TOILET

122 SF

ENT EXAM

36 SF

HAC CUSTODIAL

71 SF

DATA RM

198 SF

WAITING

73 SF

CORRIDOR

C-320

329330

336337

Figure

BUILDING #39

ROOM #387

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

G-115

145 SF

OFFICE

G-114

683 SF

CORRIDOR

CG-8

271 SF

PIPE SHAFT/BULB

STORAGE

G-116

Figure

BUILDING #44

ROOM #G115

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

59 SF

WALK IN REF

1-118

109 SF

FILM

DEVELOPING RM

1-119

670 SF

CORRIDOR

C1-7

80 SF

WASTE DISPOSE

1-117

360 362

Figure

BUILDING #44

ROOM #1-118

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

103 SF

TISSUE CULTURE

2-114B

407 SF

LAB UNIT-4

2-114

95 SF

OFFICE

INVESTIGATOR

2-114A

96 SF

COMM INST

2-115

1033 SF

CORRIDOR

C2-8

Figure

BUILDING #44

ROOM #2-114B

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

64 SF

Room

136 SF

OFFICE

79 SF

TOILET

56 SF

CORRIDOR

383384

Figure

BUILDING #T59

ROOM #205

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGE AREA

Lead Based Paint

1022 SF

FMS SPACE

B100

Figure

BUILDING #T62

ROOM #B100

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

84 SF

TEL

908 SF

STORAGE

- 397

Figure

BUILDING #T63

ROOM #B01

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

72 SF

IRM

26 SF

STORAGE

120A

74 SF

CORRIDOR

C106

238 SF

KITCHEN

Figure

BUILDING #65

ROOM #119

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED

AREA

Lead Based Paint

UP

1931 SF

CHIP

PROCESSING

B1000 413 414

416 417 418

Figure

BUILDING #66

ROOM #B1000

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

87 SF

JANITOR

66 SF

IT ROOM

328 SF

BREAK ROOM

805 SF

LOBBY

C1101

164 SF

MENS LOCKERS

Figure

BUILDING #67

ROOM #1109

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

187 SF

IRM

G123

707 SF

MECH

G124

78 SF

ELEVATOR MACH

RM

G122

531 SF

CORRIDOR

CG000B

Figure

BUILDING #88

ROOM #G123A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

243 SF

STAFF LOUNGE

1105A55 SF

STAFF MALE

TOILET

90 SF

STORAGE

253 SF

CLASS RM

1105B

996 SF

CORRIDOR

C1000A

21 SF

ELECTRICAL

CLOSET

Figure

BUILDING #88

ROOM #1105C

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

Lead Based Paint

APPENDIX B

HOMOGENEOUS DRAWINGS & QUANTITIES

STORAGE

643 SF

CORRIDOR

C-B-3

314 SF

DAV OFFICE

225 SF

STAIR

S-1

Figure

BUILDING #1

ROOM #10

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

ENLARGED AREA

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

ASBESTOS HMA

DryWall - 37 linear Feet

IRM VOICE/DATA

RM

126 SF

OFFICE

230 SF

RECEPTION,

FILES

371 SF

FILE RM

647 SF

CORRIDOR

Figure

BUILDING #1

ROOM #112-#113

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

Approximate Scale in Feet

0 3' 6'

ENLARGED AREA

KEY PLAN

ASBESTOS HMA

DryWall - 37 linear Feet

Blk Mastic - 110 Sq. Ft.

10' - 0"

347 SF

CLERK

77 SF

LAB STORAGE

215 SF

LAB

202A

44 SF

STORAGE

201A

361 SF

PORCH

14S

OFFICE STAFF

110 SF

OFFICE

RESIDENT

259B

844 SF

CORRIDOR

C-2-3

Figure

BUILDING #1

ROOM #201

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Ductwork Sealant Ylw FT w/Blk Mastic 121 Sq. Ft.

181 SF

OFFICE SECY

116 SF

FEMALE TOILET

534 SF

CORRIDOR

14E

127 SF

SOCIAL WORKER

OFFICE

± 10' - 7" (EXIST.)

Figure

BUILDING #1

ROOM #331, 332, 333

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Grn FT w/Blk Mastic 127 Sq. Ft.

*336-A

336-D

336-E

336F

Figure

BUILDING #1

ROOM #336A - 336F

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Grn FT w/Blk Mastic 350 Sq. Ft.

NEW WALL

35 SF

HAC

196 SF

96 SF

CORRIDOR

98 SF

CORRIDOR

Figure

BUILDING #9

ROOM #104 & #103

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Tan FT w/Blk Mastic 35 Sq. Ft.

8'

0"

315 SF

SERVER RM

G31

133 SF

AMERICAN

LEGION OFFICE

G32

252 SF

CORRIDOR

125 SF

STAIR

ST-G

109 SF

CORRIDOR

G19

126 SF

TR

G31A

Figure

BUILDING #28

ROOM #G31A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Brown FT w/Blk Mastic 315 Sq. Ft.

9' - 6 7/32" 4' - 3"

113 SF

115B

90 SF

PATIENT SAFETY

MGR OFFICE

115A

996 SF

LIBRARY

608 SF

CORRIDOR

642 SF

CORRIDOR

129 SF

STAIR

52 SF

HAC

121 SF

MENS TOILET

92 SF

ELEVATOR

- 8

Figure

BUILDING #28

ROOM #115A

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Mastic under Carpet 375 Sq. Ft.

10' - 0"

INTERIOR LINE

OF NEW WALL

EQ

EQ

233 SF

MECH RM

B-19A

640 SF

B-19

318 SF

NEW TELEPHONE

EQUIP RM

B-18

1283 SF

CORRIDOR

10' - 0" (CLR.)

100 SF

TR

B-19B

Figure

BUILDING #31

ROOM #B19B

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Tan FT w/Blk Mastic 100 Sq. Ft.

Gray FT w/Blk Mastic 318 Sq. Ft.

100 SF

TR (EXISTING)

54 SF

IRM CLOSET

84 SF

OFFICE

124 SF

CORRIDOR

C-2-4

95 SF

STORAGE

82 SF

OR - DIRTY TILITY

ROOM

Figure

BUILDING #31

ROOM #226

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Gray FT w/Blk Mastic 120 Sq. Ft.

G06

118 SF

MENTAL HEALTH

G23

211 SF

OFFICE 1

G24

131 SF

CORRIDOR

C-G3

194 SF

CORRIDOR

C-G4

88 SF

DATA

G05

Figure

BUILDING #39

ROOM #G05

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

ASBESTOS HMA

Cream FT w/Blk Mastic 88 Sq. Ft.

181 SF

OFFICE SECY

116 SF

FEMALE TOILET

534 SF

CORRIDOR

14E

127 SF

SOCIAL WORKER

OFFICE

± 10' - 7" (EXIST.)

Figure

BUILDING #1

ROOM #331, 332, 333

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

LEAD HMA

Sill, Casing, Apron Casing

Plaster Wall - 34 Linear Ft.

*336-A

336-D

336-E

336F

Figure

BUILDING #1

ROOM #336A - 336F

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

LEAD HMA

Sill, Casing, Apron

CORRIDOR

C110

11 SF

105A

11 SF

106A

Figure

BUILDING #4

ROOM #105

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

LEAD HMA

Sill, Casing Casing & Jamb

NEW WALL

35 SF

HAC

196 SF

96 SF

CORRIDOR

98 SF

CORRIDOR

Figure

BUILDING #9

ROOM #104 & #103

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

LEAD HMA

Sill, Casing, Apron

Sink

G15

162 SF

VOLUNTARY

SVCS

G12

849 SF

CORRIDOR

CG2

14 SF

CLOSET

99 SF

OFFICE

G17

60 SF

HOUSEKEEPING

G19

53 SF

MENS TOILET

G11

/4

EX

IS

T.

Figure

BUILDING #31

ROOM #G12

VA - VT White River Junction

Project No. 24-202 Drawn By GC 12-11-24 Approved By

Checked By

Rev #: Date:

Rev #: Date:

Rev #: Date:

163 Veterans Drive White River Junction, VT

05009

KEY PLAN

ENLARGED AREA

LEAD HMA

Door

APPENDIX C

ANALYTICAL RESULTS

Attn:

Customer Project:

Reference #: Date: 12/26/2024

Analysis and Method

Discussion

Qualifications

Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be detectable by PLM analysis and should be analyzed by TEM bulk protocols.

A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.

Quantification of <1% will actually be reported as <=1% (allowable variance close to 1% is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.

CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. This report is not covered by the scope of AIHA accreditation. Analysis performed at CA Labs, LLC 12232 Industriplex, Suite 32 Baton Rouge, LA 70809.

533 Pebble Drive

Haughton, LA 71037 EHRM Infrastructure Upgrades Design

CBR24129482

Summary of polarizing light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763

Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereomicroscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).

Vermiculite containing samples may have trace amounts of actinolite-tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.

Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light

Apex Environmental Solutions Brad Kennon

Labs

A

C

Overview of Project Sample Material Containing Asbestos

Customer Project: EHRM Infrastructure Upgrades Design CA Labs Project #: CBR24129482

White Surfaced White Compound

Black Mastic

Yellow Floor Tile

Gray Sealant

Green Floor Tile

No Sample Submitted

Tan Mastic

Tan Floor Tile

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

201.A

1-2 Black Mastic 4% Chrysotile

113-B2 113.B

2-2 Black Mastic 4% Chrysotile

201-A1 201.A

1-1 Yellow Floor Tile 2% Chrysotile

113-A2 113.A

2-1

White Surfaced White

Compound 2% Chrysotile

113-B1 113.B

1-2 Black Mastic 4% Chrysotile

(10)-A2 (10)A

2-1

White Surfaced White

Compound 3% Chrysotile

113-A1 113.A

1-1

White Surfaced White

Compound 2% Chrysotile

(10)-A1 (10)A

1-1

White Surfaced White

Compound 3% Chrysotile

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Sample # Layer

Analysts Physical Description of

Subsample

Asbestos type / calibrated visual estimate percent

List of Affected Building

Material Types

Labs

A

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

336.D

1-2 Black Mastic 4% Chrysotile

331-B2 331.B

2-3 Black Mastic 4% Chrysotile

336-D1 336.D

1-1 Green Floor Tile 2% Chrysotile

201-D2 201.D

2-1 Gray Sealant 3% Chrysotile

331-B1 331.B

1-2 Black Mastic 4% Chrysotile

201.A

2-2 Black Mastic 4% Chrysotile

201-D1 201.D

1-1 Gray Sealant 3% Chrysotile

201-A2 201.A

2-1 Yellow Floor Tile 2% Chrysotile

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Sample # Layer

Analysts Physical Description of

Subsample

Asbestos type / calibrated visual estimate percent

List of Affected Building

Material Types

Labs

A

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

115A-A1 115A.

A1-1 Black and Tan Mastic 2% Chrysotile

G31A-A1 G31A

.A1-1 Tan Floor Tile 2% Chrysotile

G31A-A2 G31A

.A2-1 Tan Floor Tile 2% Chrysotile

336A-B2 336A.

B2-1 No Sample Submitted

103-A1 103.A

1-2 Tan Mastic 2% Chrysotile

336.D

2-2 Black Mastic 4% Chrysotile

336A-A2 336A.

A2-1 No Sample Submitted

336-D2 336.D

2-1 Green Floor Tile 2% Chrysotile

CA Labs

Dedicated to

Quality

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

NVLAP #200772-0

TDSHS #300370

CDPHE #AL-18111

LELAP #03069

Sample # Layer

Analysts Physical Description of

Subsample

Asbestos type / calibrated visual estimate percent

List of Affected Building

Material Types

Labs

A

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .