This document provides a Quality Assurance Surveillance Plan (QASP) for logistics and maritime support services at the South Florida Ocean Measurement Facility. The QASP identifies performance standards and procedures for monitoring contractor performance to ensure services meet requirements. Key personnel must meet minimum qualifications, and performance will be evaluated through methods such as inspections, deliverable reviews, and customer feedback. Performance objectives include level of effort, deliverable content, personnel requirements, and cost control. The contractor must perform tasks and analyze issues commensurate with qualifications, and follow data description formats and submission deadlines. All personnel must have proper security badges and complete mandatory training. Invoicing must be timely and sufficiently detailed, with actual costs commensurate with work performed within total estimated costs and funding limitations.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 QASP

N00167-22-R-0008 Source Selection Information See FAR 2.101 & 3.104 A1-1

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

LOGISTICS AND MARITIME SUPPORT SERVICES (LMSS)

July 2021

1.0 BACKGROUND

The Quality Assurance Surveillance Plan (QASP) identifies procedures to help ensure that the contractor is performing in accordance with the Statement of Work (SOW). The QASP and associated performance standards are identified prior to contract award to ensure that the

Government receives the quality of services required and pays only for services meeting an acceptable level. Authority for issuance of this QASP is identified in Section E – “Inspection and Acceptance” of the contract, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Procuring Contracting

Officer (PCO).

2.0 PURPOSE

This QASP provides the performance standards for the Logistics and Maritime Support Services effort and identifies the procedures by which the Government plans to monitor contract performance. It is intended that the QASP be a tool to guide the Contracting Officer's

Representative (COR) and Technical Advisors (TAs) in assessing contractor performance. To ensure contractor performance is appropriately monitored, the performance, timing, and frequency of inspections are determined at the discretion of the Government. As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently exceptional or consistently unsatisfactory. The Government retains the right to utilize a variety of surveillance methods and/or Quality Assurance (QA) procedures; or to increase/decrease the degree of surveillance efforts at any time to support contract compliance.

The contractor is responsible for management and quality control actions to meet the terms of the contract. The contractor shall measure quality through its own Quality Control Plan (QCP). The contractor’s responsibility for ensuring quality control applies to all work performed under this contract, regardless of whether the effort is performed by the contractor or by subcontractors.

The contractor’s QCP shall set forth the procedures for how the contractor will self-inspect the quality, timeliness, responsiveness, customer satisfaction, problem resolution, communication, and other performance requirements of all work performed under this contract. This QASP is not intended to replace the contractor’s QCP, but is provided only for informational purposes.

3.0 PERFORMANCE OF QUALITY ASSURANCE

Contractor performance may be monitored by the Government through various surveillance methods including 100% inspection, periodic inspection, and/or customer feedback. When surveillance indicates that performance is not in compliance with the contract requirements, the

COR/TA will determine whether the deficiency is a result of the actions of the contractor. If the

N00167-22-R-0008 Source Selection Information See FAR 2.101 & 3.104 A1-2 cause of the defect is due to action/inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

Adjectival ratings, the same or similar to those identified in the table below, will be utilized when evaluating contractor performance.

RATING PERFORMANCE STANDARD/CRITERIA

Exceptional Performance meets contractual requirements and exceeds many requirements to the Government’s benefit.

Very Good Performance meets contractual requirements and exceeds some requirements to the Government’s benefit.

Satisfactory Performance meets contractual requirements.

Marginal

Performance does not meet some contractual requirements.

The element being assessed reflects a serious problem for which the contractor has not yet implemented satisfactory corrective measures.

Unsatisfactory

Performance does not meet contractual requirements and recovery is not likely in a timely manner. Contractor’s corrective actions to-date are non-existent or ineffective.

4.0 PERFORMANCE EVALUATIONS

Annual performance evaluations will be completed by the COR for this contract unless extraordinary circumstances warrant an interim evaluation. Informal performance reviews will be completed on a monthly basis and submitted as part of the COR Monthly Status Report to the

PCO for review. Formal evaluations will be completed via the Contractor Performance

Assessment Reporting System (CPARS) at the end of each year of performance. The CPARS evaluations may also be a deciding factor in the Government’s determination as to whether it elects to exercise options under this contract. For this contract, the Government will address the quality of product/service, schedule, cost control, management, and regulatory compliance areas in the formal CPARS report. The Government may use QASP surveillance to assist in a CPARS evaluation.

5.0 PERFORMANCE OBJECTIVES & STANDARDS

The performance objectives, performance standards, acceptable quality levels (AQLs), and potential monitoring methods utilized when evaluating contractor performance are identified in the following table. These measures apply to all functional areas of the SOW and also apply to any/all contract provisions with which the contractor must comply. Detailed metrics, standards, and surveillance methods may vary depending on the task or subtask being adjudicated.

N00167-22-R-0008 Source Selection Information See FAR 2.101 & 3.104 A1-3

OBJECTIVE PERFORMANCE

STANDARD

ACCEPTABLE QUALITY

LEVEL

MONITORING

METHODS

LEVEL OF

EFFORT

(LOE) TASK

PERFORMA

NCE

Performance of SOW tasks are commensurate with the specialized experience and labor categories set forth in the contract

Key personnel meet the education, qualifications, and experience specified in the contract (whether specifically stated or incorporated by reference via the contractor’s proposal).

Organizational structure provides for qualified personnel assigned with duties, responsibilities, and authority necessary to achieve project goals

Lines of communication facilitate timely exchange of information, both technical and contractual, in order to meet project goals

Any Government Oversight

Team (COR/TA) inspections support a rating of satisfactory or above with respect to performance standards, with major and minor issues/problems resolved as follows:

Evidence of qualifications, certifications, experience provided for Key personnel meets minimum requirements and performance is commensurate with the same

No major performance issues are identified, or, if major performance issues are identified, they are immediately addressed by the contractor and the contractor develops and communicates to the Government an adequate plan to resolve the issue(s) within two weeks

Direct observation of performance

Periodic inspection of performance and/or draft deliverables

100% inspection of invoices, final deliverables, and/or stringent requirements

(tasks required by law, safety, or security)

Customer Feedback

DELIVERABL

E

CONTENT

Deliverable reports are technically accurate, grammatically correct, clear, and concise

Deliverables follow Data

Item Description (DID) format/content requirements and are delivered on time, per the Contract Data

Requirements Lists

(CDRLs) under the contract

Discrepancies are minor

Analyses, reports, and

Minor issues are easily correctable

Repeated minor issue(s) identified over two (or more) consecutive months, that continue to recur will be raised to a major issue level

Any CDRL deliverable requiring Government approval shall require no more than two review/comment/approval

N00167-22-R-0008 Source Selection Information See FAR 2.101 & 3.104 A1-4 drawings include adequate depth and breadth to clearly identify and qualify issues cycles to be determined as acceptable to the Government

PERSONNEL

REQUIREM

ENTS

All contractor/subcontractor personnel have proper security badges (e.g., site badge and Common Access

Card (CAC)), announce themselves when entering

Government offices, and identify themselves as contractors in e-mail and other communications

Badging requirements are submitted no later than 30 days prior to badge expiration

DD 254 requirements are followed

Navy provided, mandatory training (e.g., Information

Assurance (IA), etc.) is completed by, or prior to, the specified due dates

COST / COST

CONTROL

The level of effort is performed within the total estimated cost and limitation of funds on the contract

Costs are commensurate with the cost of the work actually performed under the contract

Cost Vouchers/Invoices are prepared and submitted in accordance with the terms and conditions set forth in the contract (e.g., WAWF

Clause, Pricing Structure in

Section B of the contract)

Invoicing is submitted timely (prior to the expiration of funds)

Invoices contain sufficient detail to allow the

Government to monitor cost related to performance

Performance and reported or billed costs NEVER exceed the amount of funds on the contract

Minor issues are easily correctable

Repeated minor issue(s) identified over two (or more) consecutive months, that continue to recur will be raised to a major issue level

Government approval shall require no more than two review/comment/approval cycles to be determined as acceptable to the Government

N00167-22-R-0008 Source Selection Information See FAR 2.101 & 3.104 A1-5