Attachment 1 PERFORMANCE REQUIREMENTS SUMMARY.pdf

PDF 123 KB Posted

Attached to
MSC Underway Replenishment Training Center (MUTC) Service Federal contract opportunity
Solicitation number
N3220522R4039
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines twelve key performance requirements for a federal contract to provide instructor personnel support and equipment maintenance for the Military Sealift Command's Underway Replenishment Training Center. The requirements address ensuring qualified instructors for scheduled courses, collecting and addressing student surveys, issuing completion certificates and notifications, conducting classroom and simulator training using required materials, maintaining inventory of government property, reviewing and updating curriculum, providing operational instructor computers, using subject matter experts as instructors who meet Navy high risk training qualifications, and fully complying with trafficking in persons prohibitions. Non-compliance with the performance thresholds, such as having instructors who are less than 100% qualified, could impact mission success. The related federal contract opportunity is solicitation number N3220522R4039 for MSC Underway Replenishment Training Center service, providing instructor support for in-house and exportable Military Sealift Command training courses at two Virginia locations.

View the file

Other files for this federal contract opportunity

Other files attached to MSC Underway Replenishment Training Center (MUTC) Service, newest first.
File Type Posted
Amendment 0004 N3220522R4039.pdf PDF
MUTC_Questions_and_Answers_05.pdf PDF
MUTC_Questions_and_Answers_04.pdf PDF
Attachment_14 _Pricing_Worksheet.xlsx XLSX spreadsheet
Amendment_0002_N3220522R4039.pdf PDF
Notional_Travel_Schedule_Attachment_17.xlsx XLSX spreadsheet
Pricing_Worksheet_REV_Attachment_14 _Pricing_Worksheet.xlsx XLSX spreadsheet
Questions and Answers 03 -N3220522R4039.pdf PDF
Questions and Answers 02 -N3220522R4039.pdf PDF
Questions and Answers 01.xlsx XLSX spreadsheet
Questions and Answers 01.xlsx XLSX spreadsheet
Attachment 14 Price Worksheet.xlsx XLSX spreadsheet
Amendment 0001 N3220522R4039.pdf PDF
Attachment 4 MUTC COURSE LISTING TECHNICAL.pdf PDF
CDRL MUTC Contract Report Item 15 MUTC SOTS.pdf PDF
CDRL MUTC Contract Report Item 7 Curriculum Review As required.pdf PDF
CDRL MUTC Contract Report Item 5 Equipment Supply Inventory Monthly.pdf PDF
CDRL MUTC Contract Report Item 2 Training course reports As required.pdf PDF
CDRL MUTC Contract Report Item 1 Facility Training Progress Report.pdf PDF
Attachment 105 Equipment Supply Inventory Report.xlsx XLSX spreadsheet
Attachment 14 Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 12 MUTC Historical Student Throughput.pdf PDF
Attachment 11 Part 2 FY 22 MUTC Course Schedule.pdf PDF
Attachment 101 Facility Training Progress Reports.pdf PDF
CDRL MUTC Contract Report Item 14 MUTC Web Page on Portal.pdf PDF
Attachment 107 Curriculum Review Report.pdf PDF
Attachment 15 GFE and GFM Equipment Inventory.xlsx XLSX spreadsheet
Attachment 8 NON-DISCLOSURE AGREEMENT - CORPORATE.pdf PDF
Attachment 4 MUTC COURSE LISTING TECHNICAL ATTACHMENT - COURSE DESCRIPTIONS FOR RESIDENT AND EXPORTABLE COURSES.pdf PDF
Attachment 2 DELIVERABLES SCHEDULE.pdf PDF
Attachment 10 MUTC FY 22 Schedule Sep 21-Dec22)_MUTC.pdf PDF
CDRL MUTC Contract Report Item 9 Forklift Daily.pdf PDF
CDRL MUTC Contract Report Item 6 Safety Reports Quarterly and as Required.pdf PDF
CDRL MUTC Contract Report Item 3 Student Muster Report Each Course.pdf PDF
Attachment 108 Curriculum Change Request Memo.pdf PDF
Attachment 106 Safety Mishap Report.pdf PDF
Attachment 104 Course and Instrutor Reviews Critiques.pdf PDF
Attachment 13 DD254.pdf PDF
Attachment 6 PERFORMANCE ASSESMENT PLAN (PAP).pdf PDF
Attachment 5 POTENTIAL NON-RESIDENT COURSE LOCATIONS.pdf PDF
Attachment 3 ESTIMATED WORKLOAD DATA.pdf PDF
SOLICITATION N3220522R4039.pdf PDF
CDRL MUTC Contract Report Item 13 Fork Truck Battery Record form.pdf PDF
CDRL MUTC Contract Report Item 12 Fork Truck Maintenance Inspection Form.pdf PDF
CDRL MUTC Contract Report Item 11 MHE Quarterly Safety Report.pdf PDF
CDRL MUTC Contract Report Item 10 Quarterly Forklift Equipment Management and Control System Report.pdf PDF
CDRL MUTC Contract Report Item 8 Curriculum Change As required.pdf PDF
CDRL MUTC Contract Report Item 4 Course and Instructor Evaluation reports As required.pdf PDF
Attachment 103 Student Muster Report.pdf PDF
Attachment 102 Student Training and Course Report.pdf PDF
Show all 50

MSC Underway Replenishment Training Center (MUTC) Service has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1:

PERFORMANCE REQUIREMENTS SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance

Threshold

Method of

Surveillance

PRS # 1. Provide qualified instructors to each scheduled training course

All instructors 100% qualified

Zero deviation from standard.

Observation and instructor qualification folders

PRS # 2 Student surveys

98% student surveys shall meet satisfactory or above ratings or are addressed adequately

98% timely delivered within two

(2) business days of completion of course

100% Inspection:

COR reviews all survey for constructive feedback.

Adverse comments and rating of satisfactory or less will be addressed with the

Contractor

PRS # 3 Student certificates of completion

Notification indicated all applicable students 98% accuracy

98% timely delivery on the same business day of completion of course

100% Inspection:

Site Administrator reviews all student certificates for completion and accuracy

PRS # 4 Notification of unsuccessful completion (PWS 1.3.11.1)

Explanation of unsuccessful completion adequately addresses attempts to assist students.

98% timely delivery within seven (7) business days of completion of course

100% Inspection:

Site Administrator and COR reviews all e-mails and ensures timeliness via student’s certificates

PRS # 5 Students not expected to receive a certificate notification (PWS 1.3.11.1)

Notification indicated all applicable students 98% accuracy

98% timely e-mail delivery within (7) days of course completion date

100% Inspection:

Site Administrator and COR reviews all e-mail notification for timeliness.

PRS # 6 Classroom, practical training exercises & simulator training

Training must include all sections of the PWS.

PowerPoints and

Student Guides.

Delivered on time

100% of the time

Periodic

Inspection:

Government may observe classroom

& simulator training at any time.

PRS # 7 Equipment /Supply Inventory report and Equipment

Storage Status

Maintain 100% inventory of

GFE and GFM Government

Property

Delivered on time

100% of the time

100% Inspection:

Site Administrator reviews of the reports

PRS # 8 Curriculum review report

Complete a 100% curriculum review using update technical manuals and student course critiques

Delivered on time

100% of the time

100% Inspection:

Site Administrator and COR reviews of the reports

PRS # 9 Classroom non-NMCI Instructor Computer

Computers operational 100% for training courses

Delivered on time

100% of the time

Periodic

Inspection:

Government may observe classroom

PRS #10 Instructors shall be subject Matter experts on courses assigned to instruct

Instructors shall be 100% subject matter experts on the course material and equipment assigned to instruct

In Writing by the

Contractor

Contractor shall report compliance upon assignment.

Government personnel shall periodically observation of course sessions

PRS #11 Instructors shall meet all requirements of the MSC and

Navy High Risk Training programs upon assignment

Instructors shall be 100% qualified under the program guidelines

In Writing by the

Contractor

Contractor shall report compliance upon assignment.

Government personnel shall periodically observation of course sessions

PRS# 12 Traffic in Persons Contract Clause: (FAR 52.222-50)

Combating Trafficking in Persons

100% compliance required as per US Zero tolerance policy

In writing or as specified by FAR

52.222-50

Periodic

Inspection of the requirements of

FAR 52.222-50

File details come from the government source that posted it. Updated .