Attachment 04 - Base Offer Price Breakdown (1 Page).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DB--Expand Interventional Radiology Suite Federal contract opportunity
Solicitation number
36C24823R0162
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document contains a base offer price breakdown template for a federal construction contract opportunity to expand an interventional radiology suite. The template requires offerors to provide labor and material costs by construction division using a standardized work breakdown structure. It also specifies fields for overhead, profit and bond percentages to apply to the division subtotals to calculate a total base offer price. The related federal contract opportunity is solicitation number 36C24823R0162 to expand an interventional radiology suite issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. Offerors must apply the appropriate overhead, profit and bond rates to the division subtotals in the template to derive a total proposed price for the government's price analysis of the construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DB--Expand Interventional Radiology Suite, newest first.
File Type Posted
672-20-107 Third Party Asbestos Monitor Specs (2 pages).pdf PDF
36C24823R0162 0001 (RFI Update SOW and Extend Due Date).docx DOCX document
Asbestos Free Areas_IR Suite area (1 page).pdf PDF
672-20-107 Construction SOW Updated 7-21-2023 (4 pages).pdf PDF
Attachment 13 - Infection Control Guidelines on Construction and Renovation 11B-17-05 (11 pages).pdf PDF
Attachment 12 - Past Performance Survey (3 pages).docx DOCX document
Attachment 09 - Specialized Experience Form (3 pages).pdf PDF
Attachment 06 - Letter of Commitment Key Subcontractors (1 page).pdf PDF
Attachment 05 - Safety or Environmental Violations and Experience Modification Rate EMR Form (1 page).pdf PDF
Attachment 03 - Cover Sheet-G-001 (1 page).pdf PDF
Attachment 08 - Key Personnel Resume Form (1 page).pdf PDF
Attachment 03c - Plumbing Combined (5 pages).pdf PDF
Attachment 03b - Fire Protection Combined (2 pages).pdf PDF
Attachment 02 - Specifications Part 2 of 2 (749 pages).pdf PDF
Attachment 02 - Specifications Part 1 of 2 (856 pages).pdf PDF
36C24823R0162 Solicitation (BB 672-23-107).docx DOCX document
Attachment 03d - Mechanical Combined (4 pages).pdf PDF
Attachment 14 - 852.219-75 VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023) (2 pages).doc DOC document
Attachment 10 - Subcontractor Past Performance Consent Form (1 page).pdf PDF
Attachment 07 - Letter of Commitment for Key Personnel (1 page).pdf PDF
Attachment 03e - Electrical Combined (10 pages).pdf PDF
Attachment 03a - Architectual Combined (16 pages).pdf PDF
Attachment 01 - Site Plan (1 Page).pdf PDF
Attachment 11 - Past Performance Questionnaire (4 pages).pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis