This document package includes construction drawings, notes, and specifications for a plumbing renovation project at a Department of Veterans Affairs medical facility. The project scope involves demolishing some existing plumbing fixtures and installing new fixtures, relocating some medical gas outlets, and connecting to existing water and drainage systems. Specific items required include new barrier-free lavatories, service sinks, and a scrub sink. The drawings provide demolition plans, renovation plans, isometric diagrams, and construction details. Accompanying notes outline plumbing standards and codes, contractor responsibilities, submittal requirements, and commissioning procedures for anti-scald valves. The solicitation number listed is for expanding an interventional radiology suite.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING NOTES AND
LEGENDS
P-001
PIPE UP
PIPE DOWN
GCOOR
OR VTR VENT THRU ROOF
EQUIPMENT MARK
POINT OF NEW CONNECTION
DRAWING KEYNOTEX
BALL VALVE
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)
WCO
OR
CW COLD WATER PIPING
HW HOT WATER PIPING
HWR HOT WATER RECIRCULATION PIPING
SAN SANITARY PIPING
(E)CW EXISTING COLD WATER
(E)HWR EXISTING HOT WATER RETURN
(E)HW EXISTING HOT WATER PIPING
EXISTING PIPING TO BE REMOVED
(E)SAN EXISTING SANITARY PIPING
V SANITARY VENT PIPING
LIMIT OF DEMOLITION
GRADE CLEAN OUT (1-WAY OR 2-WAY)
PLUMBING LEGEND
PLUMBING ABBREVIATIONS
(E) EXISTING
CO PIPE CLEAN OUT
CTE CONNECT TO EXISTING
CW COLD WATER
DEMO DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
ETR EXISTING TO REMAIN
GPM GALLONS PER MINUTE
HW HOT WATER
IBC INTERNATIONAL BUILDING CODE
LAV LAVATORY
S SINK
SAN SANITARY
VTR VENT THROUGH ROOF
W WASTE
WCO WALL CLEAN OUT
WSFU WATER SUPPLY FIXTURE UNITS
1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL
PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.
2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER
ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.
3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.
4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT
SUPPLIES.
5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED
OTHERWISE.
6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.
FURNISH CUT-OUT TEMPLATES, FOR PLUMBING FIXTURES TO BE INSTALLED IN MILLWORK, TO THE GENERAL
CONTRACTOR.
7. MAKE PROPER HOT AND COLD WATER, WASTE AND VENT PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT
EVEN THOUGH ALL FITTINGS AND CONNECTIONS ARE NOT SHOWN ON DRAWINGS.
8. VERIFY LOCATION OF EXISTING WATER SERVICE AND THE LOCATION/INVERTS OF SANITARY PIPING PRIOR TO
INSTALLATION.
9. CUT AND PATCH CONCRETE AS REQUIRED.
10. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
11. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING. FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY UPON THAT CONTRACTOR.
12. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE INSTALLATION.
THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND REVIEWED BY THE
ARCHITECT/ENGINEER.
13. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN FOR BUILDING DIMENSIONS.
14. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS, ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER
EXAMINATION BEEN MADE.
15. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECTS WITH LOCAL UTILITIES AND/OR LANDLORD
(DOMESTIC WATER, SANITARY SEWER, GAS, ETC.).
16. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.
17. ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING, GAS, AND REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WITH ROOF SYSTEM MANUFACTURER'S GUIDELINES. COORDINATE WITH ARCHITECTURAL DETAILS
AND/OR MANUFACTURER FOR ROOF SYSTEM USED.
18. ALL PLUMBING VENTS IN EXTERIOR WALLS SHALL BE OFFSET A MINIMUM OF 3'-0" BEFORE ROOF PENETRATION.
19. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS ABOVE CEILING.
20. THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN ACCORDANCE WITH LOCAL REGULATIONS.
21. HOT AND COLD WATER SUPPLY BRANCHES FOR ALL SYSTEMS HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF EACH BRANCH AND AS
REQUIRED.
22. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR SWAY DURING OPERATION.
SUITABLE LATERAL SUPPORTS OR BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.
23. PROVIDE SHUTOFF BALL VALVES AND DIELECTRIC UNIONS FOR ALL EQUIPMENT HOT AND COLD WATER LINES.
PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT. COORDINATE WITH EQUIPMENT
SUPPLIER FOR EXACT REQUIREMENTS.
24. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES WITH ARCHITECTURAL PLANS.
25. PROVIDE COPPER INDIRECT WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZES AS REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL WHERE APPLICABLE. PROPERLY SECURE AS REQUIRED. COORDINATE WITH CASEWORK SUPPLIER FOR MAXIMUM
CLEARANCE UNDER CABINETS.
26. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.
27. INSTALL STORM AND CONDENSATE PIPING WITH MINIMUM SLOPE OF 1/8" PER FOOT. INSTALL SANITARY PIPING LESS THAN 3" AT 1/4" PER FOOT, 3" TO 6" AT 1/8" PER FOOT, AND 8" AND GREATER AT 1/16" PER FOOT. CONTRACTOR
IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.
28. ALL FLOOR DRAINS ARE TO BE PROVIDED WITH MINIMUM 3" DRAIN LINES, DEEP SEAL TRAPS, AND AUTOMATIC TRAP PRIMERS. TRAP PRIMERS SHALL BE LOCATED IN A SERVICEABLE LOCATION AND INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. HOLD TOP OF FLOOR DRAINS FLUSH WITH FINISHED FLOOR; SEE
ARCHITECTURAL SHEETS FOR FLOOR SLOPES AND PROPER FINISHED FLOOR ELEVATION.
29. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL EQUIPMENT, DUCTWORK, ELECTRICAL EQUIPMENT, AND LIGHTING. ALL VTR'S SHALL BE EXTENDED TO A MINIMUM OF 2" ABOVE PARAPET HEIGHT AND
MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.
30. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL AS THE MOST
CURRENT ADOPTED VERSION OF THE STATE AND LOCAL CODES.
31. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS, OR SYSTEMS AT CONTRACTOR'S EXPENSE, BEFORE
COMPLETION OF PROJECT.
32. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
33. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (UNLESS OTHERWISE NOTED). PROVIDE COMPLETE WITH ALL TRIM, STOPS, HANGERS, CARRIERS, SUPPORTS, ETC., INCLUDING PROVISIONS FOR BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE THEY MUST COMPLY WITH ALL FEDERAL A.D.A. REGULATIONS.
34. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT.
THE CONTRACTOR'S GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER ACCEPTANCE OF THE WORK
AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF ANY KIND.
35. ALL FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND NOT REQUIRE TIGHTGRASPING.
36. ALL BARRIER FREE WATER CLOSET CONTROLS SHALL BE LOCATED ON UNIT TOWARDS WIDE SIDE OF STALL.
VERIFY IF RIGHT OR LEFT SIDE LOCATION.
PLUMBING NOTES GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE
PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT. DRAWINGS
SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER
WHICH THEY SHALL OPERATE AND VERIFY THE EXTENT OF WORK REQUIRED TO
COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT
SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR
INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO
DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND
LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY
HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING
DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE
REQUIREMENTS:
· INTERNATIONAL BUILDING CODE (IBC) 2020
· INTERNATIONAL EXISTING BUILDING CODE 2020
· IBC MECHANICAL 2020
· IBC PLUMBING 2020
· IBC ENERGY CONSERVATION 2020
· NFPA 1-2018, THE UNIFORM FIRE CODE
· NFPA 101-2018, THE LIFE SAFETY CODE
· NFPA 51B-2014, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING
AND OTHER HOT WORK
· NFPA 13-2016, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
· NFPA 70-2017, NATIONAL ELECTRICAL CODE
· NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND
VENTING SYSTEMS.
· NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES
· NFPA 241-2013, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION
AND DEMOLITION OPERATIONS.
· ALL APPLICABLE VA DESIGN MANUALS
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND
CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF
WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS
NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL
UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN
UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE
TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES
WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN
THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE
AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND
SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING
CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS
FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF
CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN
APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S
APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF
RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN
THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE
INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS,
CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS
DATA, ETC. PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF
CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT
CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE
ALL CONTRACT CHANGES, MODIFICATIONS, AND CLARIFICATIONS. THIS SET ALONG
WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER
AFTER CONSTRUCTION COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND
UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED
TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC
IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL
REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND
SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE
OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE
TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT
AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN
CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
PLUMBING FIXTURE SCHEDULE
FIXTURE
MARK FIXTURE DESCRIPTION
ROUGH-IN PIPE SIZES WATER SUPPLY DURATION
COLD WATER
SUPPLY
HOT WATER
SUPPLY FIXTURE TRAP FIXTURE
DRAIN COLD WATER HOT WATER DRAINAGE
P-418
LAVATORY, BARRIER FREE, WALL HUNG,
20"X18",.VITREOUS CHINA, FAUCET HOLES AS
REQUIRED. 0.5 GPM.PROVIDE WITH ASSE 1070
ANTI-SCALD VALVE. REFER TO SPECIFICATION
SECTION 224000 FOR MORE INFORMATION.
1/2" 1/2" 1 1/4" 2" 0.5 0.5 1
P-505
SERVICE SINK, FLUSHING RIM, WALL HUNG,
24"X20", 2.5 GPM.PROVIDE SERVICE SINK
FAUCET WITH VACUUM BREAKER, INTEGRAL
STOPS, ADJUSTABLE WALL BRACE, AND 3/4"
HOSE THREADED OUTLET. PROVIDE WITH
HOSE, HOSE BRACKET, MOP HANGER, AND
ALUMINUM BUMPERGUARD. REFER TO
SPECIFICATION SECTION 224000 FOR MORE
INFORMATION.
1" 1" 3" 3" 1.5 0.5 2
P-520
SCRUB SINK - 28"X22"X12" DEEP, REFER TO
SPECIFICATION SECTION 224000 FOR MORE
INFORMATION.
1/2" 1/2" 1 1/4" 2" 1 1 1
NOTE: PLUMBING FIXTURES AND FINISHES ARE SELECTED/SPECIFIED BY ARCHITECT/INTERIOR DESIGNER. FURNISH AND INSTALLED BY PLUMBING CONTRACTOR.
X-XXX
RADIOGRAPHIC
CONTROL
A-105
ROOM
HOUSE-
KEEPINGKEEPING
HOUSE-
A-112A-112 A-111A-111
C O R R I D O R
A-104
A-103
57.43n.s.f.
C O
R R
I D
O R
OFFICE
NO.1
OFFICE
NO.2
ULTRASOUND
ROOM NO.1
A V O
A V O
A V O
A V O
BILLING
OFFICE
A-101a
A-101b
A-101c
C-109
A-112a
C O
R R
I D
O R
C
-1ROOM
RECOVERY
HOLDING
R/F ROOM
MULTIPURPOSE
A-102
STORAGE
ASSISTANT
BATHROOM
A-116p
AUTOMATION
OFFICE
A-116q
F.H.
ROOM
READING
SUPERVISOR
OFFICE
I.R.
OFFICE
SCRUBING
AREA
SOILED
LINEN
ROOM
CLEAN
LINEN
ROOM
LOCKER
ROOM
(E) P-501
(E) P-510
(E) 5/8" O
(E) 5/8" MA
(E) 3/4" V
(E) 3/4" MA
(E) 3/4" O
(E) 3/4" V
(E) 1" V
(E) 3/4" O
(E) 3/4" MA
3 4
(E) 3/4" O
(E) 3/4" MA
(E) 1" V
(E) 3/4" O
(E) 3/4" MA
(E) 1" V
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING DEMOLITION PLAN
GENERAL NOTES
A. EXISTING EQUIPMENT, PIPE ROUTING, AND ASSOCIATED COMPONENTS
SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS BASED ON
EXISTING DRAWINGS AND ARE PROVIDED FOR REFERENCE USE ONLY.
FIELD VERIFY AND COORDINATE WITH EXACT LOCATIONS, ELEVATIONS,
SIZES, AND CONDITIONS OF EXISTING COMPONENTS.
B. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE VA/COR.
C. ALL EXISTING PIPING TO BE REUSED SHALL BE PRESSURE TESTED,
THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE
CONTAMINATION.
D. PLUMBING CONTRACTOR SHALL ENSURE NO DEAD LEGS ARE LEFT IN
ANY PIPING WITHIN THE AREA OF WORK.
E. PLUMBING CONTRACTOR SHALL REVIEW OTHER DISCIPLINES DRAWINGS
AND SHALL DISCONNECT AND MAKE SAFE FOR REMOVAL OF ALL
EQUIPMENT SHOWN TO BE DEMOLISHED.
F. ALL DEMOLISHED EQUIPMENT SHALL BE PRESENTED TO VA FOR
FIRST RIGHT OF REFUSAL
KEYNOTES
1. REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE. SANITARY AND
WATER PIPING TO BE CAPPED BACK AT MAIN.
2. REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE. TEMPORARILY
CAP PIPING AT WALL.
3. EXISTING MEDICAL GAS OUTLET BOX TO BE RELOCATED. PIPING TO BE
CAPPED AT MAIN. SEE PL100 FOR NEW LOCATIONS.
4. EXISTING 4" SANITARY RISERS.
5. EXISTING MEDICAL GAS VALVE BOX AND ZONE ALARM TO BE PREPARED
FOR RELOCATION.
6. EXISTING PIPING TO REMAIN. PROTECT DURING DEMOLITION AND
CONSTRUCTION.
7. VALVE BOX AND ASSOCIATED PIPING TO BE RELOCATED. SEE PL100 FOR
NEW LOCATION.
X
PD100
RADIOGRAPHIC
ROOM
A-106
CONTROL
A-105
ROOM
HOUSE-
KEEPINGKEEPING
HOUSE-
A-112A-112 A-111A-111
A-104
58.60n.s.f.
77.16n.s.f.
299.00n.s.f.
C O
R R
I D
O R
A V O
A V O
A V O
A V O
C O
R R
I D
O R
C
-1
R/F ROOM
MULTIPURPOSE
ASSISTANT
BATHROOM
A-116p
AUTOMATION
OFFICE
A-116q
F.H.
I.R.
OFFICE
PREP/RECOVERY
PREP/RECOVERY
PREP/RECOVERY
READING
AREA
PREP/RECOVERY
SOILED
LINEN
CATHETERS
SUPPLY
PREP/RECOVERY
SCRUB AREA
NURSE
STATION
LINEN
STORAGE
RECLINERS /
OUTPROCESSING100
ENTRY
C-RENO
CORRIDOR
P-5201
P-418
P-505
(E) 3/4" MA
(E) 3/4" O
(E) 3/4" V
(E) 1" V
(E) 3/4" O
(E) 3/4" MA
(E) 5/8" O
(E) 5/8" MA
(E) 3/4" V
4 4
3" SAN
1" CW
1" HW
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING RENOVATION PLAN
KEYNOTES
1. INSTALL NEW PLUMBING FIXTURE AS INDICATED. CONNECT TO EXISTING
SANITARY, VENT, AND WATER PIPING, MODIFY PIPING AS REQUIRED.
VERIFY SIZE AND LOCATION.
2. CONNECT NEW 3" SANITARY PIPING TO EXISTING PIPING BELOW. FIELD
VERIFY EXACT LOCATION.
3. PROVIDE NEW MEDICAL GAS OUTLET BOX AT EACH PATIENT BED.
CONNECT NEW MEDICAL GAS PIPING TO EXISTING MAINS. FIELD VERIFY
EXACT LOCATIONS.
4. RELOCATED VALVE BOX AND ZONE ALARM.
5. RELOCATED VALVE BOX. EXTEND PIPING AS NECESSARY.
6. CONNECT NEW 1" DOMESTIC HOT AND COLD WATER PIPING TO EXISTING
PIPING. FIELD VERIFY EXACT LOCATION IN FIELD.
7. CONNECT NEW 2" VENT INTO EXISTING. FIELD VERIFY EXACT LOCATION
IN FIELD.
X
PL100
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING ISOMETRICS
PW301
(E) 3/4" MA
(E) 3/4" O
(E) 3/4" V
(E) 5/8" O
(E) 5/8" MA
(E) 3/4" V
P-505 P-418
3" SAN
1" CW
1" HW
P-505 P-418
2" VENT
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
PLUMBING DETAILS
P-501
- CPVC PIPING 1" DIAMETER AND SMALLER
SUPPORT MAXIMUM EVERY 3 FT.
- CPVC PIPING 1-1/4" DIAMETER AND LARGER
SUPPORT MAXIMUM EVERY 4 FT.
- TYPE "L" COPPER PIPE 1-1/4" OR SMALLER
SUPPORT MAXIMUM EVERY 6 FT.
- SCHEDULE 40 BLACK STEEL PIPE SUPPORT
MAXIMUM EVERY 12 FT.
DISTANCE BETWEEN SUPPORTS:
PER TABLE 308.5 OF THE FLORIDA
PLUMBING CODE 2017
C-CLAMP PIPE HANGER FOR
TOP ANGLE
3/8" ALL THREAD ROD
ADJUSTABLE SWIVEL
PIPE HANGER RING
BAR JOIST
NTSPIPE HANGER DETAILNTSWATER HAMMER ARRESTOR DETAIL
WATER HAMMER ARRESTOR.
INSTALL PER MANUFACTURERS
RECOMMENDATIONS.
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURE
WATER HAMMER ARRESTOR.
INSTALL PER MANUFACTURERS
RECOMMENDATIONS.
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURES
WATER HAMMER
ARRESTOR SIZE
MODEL CONNECTION
DIA
FIXTURE
UNITS
CROSS
REFERENCE
PDI
LF15M2-A 1/2 1-11 A
LF15M2-B 3/4 12-32 B
LF15M2-C 1 33-60 C
LF15M2-D 1 61-113 D
LF15M2-E 1 114-154 E
LF15M2-F 1 155-330 F
SIZING BASED ON WATTS SERIES LF15M2
4 2
NTSP-520 SURGEONS SCRUB SINK DETAIL5
NTSP-505 CLINIC SERVICE SINK ROUGH-IN DETAIL3
A.
B.
C.
D.
E.
F.
G.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
A.
B.
A.
B.
C.
D.
E.
F.
GENERAL REQUIREMENTS FOR ANTI SCALD VALVES (THERMOSTATIC MIXING VALVE):
MEET ASSE REQUIREMENTS FOR WATER TEMPERATURE CONTROL FOR INTEND USE
BE " LEAD FREE" COMPLYING WITH NSF 372 (ASSE 1071 TYPES EXCLUDED)
HAVE CAST BRONZE BODIES WITH CORROSION RESISTANT INTERNAL PARTS PREVENTING SCALE AND BIOFILM BUILD-UP HAVE INTERNAL PARTS ABLE TO WITHSTAND DISINFECTING OPERATIONS OF CHEMICAL AND THERMAL TREATMENT OF WATER
TEMPERATURE UPTO 82.2 DEG C (180 DEG F)
ALLOW EASY TEMPERATURE ADJUSTMENTS TO ALLOW HOT WATER CIRCULATIONS
HAVE INTEGRAL CHECK VALVES WITH SCREENS AND STOP
THE DEVICE SHALL HAVE AN INTEGRAL MEANS OF BYPASS TO ALLOW FOR THERMAL ERADICATION OF THE DOMESTIC HOT WATER
SYSTEM.
INSTALLATION OF THE ANTI-SCALD DEVICE
THE INSTALL SHOULD BE AWARE OF THEIR RESPONSIBILTY AND DUTY OF CARE TO ENSURE ALL ASPECTS OF THE INSTALLATION COMPLY
WITH CURRENT REGUALTIONS AND LEGISLATION.
ANTI-SCALD DEVICE SHOULD BE INSTALLED USING THE APPROPRIATE STANDARD, CODE OF PRACTICE AND LEGISLATION APPLICABLE TO
THE VETERANS HEALTH ADMINISTRATION.
THE ANTI-SCALD DEVICE MUST BE INSTALLED BY A LICENSED PLUMBER.
PRIOR TO INSTALLATION, THE SYSTEM MUST BE CHECKED TO ENSURE THAT THE SYSTEM OPERATING CONDITIONS FALL WITHIN THE RECOMMENDED OPERATING RANGE OF THE DEVICE. VERIFY SUPPLY TEMPERATURES, PRESSURE, RISK ASSESSMENTS, ETC.
THE SUPPLY SYSTEM INTO WHICH THE DEVICE IS TO BE INSTALLED MUST BE THOROUGHLY FLUSHED AND CLEANED TO REMOVE ANY DEBRIS WHICH MAY ACCUMULATE DURING INSTALLATION. FAILURE TO REMOVE DEBRIS WILL RESULT IN POOR PERFORMANCE .
THE DEVICE CAN BE INSTALLED IN ANY POSITION, VERTICALLY OR HORZIONTALLY. ENSURE ACCESS TO THE VALVE IS NOT OBSTRUCTED
FOR FUTURE MAINTENANCE.
HOT AND COLD WATER SUPPLIES MUST BE CONNECTED TO THE DEVICE STRICTLY IN ACCORDANCE WITH THE MARKINGS ON THE DEVICE.
INSTALL PRESSURE REDUCING VALVES AS NEEDED TO ENSURE THE PRESSURE(S) SUPPLIED TO THE DEVICE ARE WITHIN ACCEPTABLE
LIMITS.
ENSURE THE DEVICE COMES COMPLETE WITH CHECK VALVES AT HOT AND COLD INLETS.
THE TEMPERATURE OF THE HOT WATER SUPPLY AT THE POINT OF ENTRY TO THE DEVICE MUST BE A MINIMUM OF 18 DEGREES F HIGHER
THAN THE SET MIXED WATER DISCHARGE TEMPERATURE.
THE DEVICE SHALL BE INSTALLED AND SUPPORTED OR ANCHORED IN PLACE SUCH THAT THE PIPEWORK TO AND FROM THE DEVICE ARE
NOT USED TO SUPPORT THE WEIGHT OF THE DEVICE .
COMISSIONING OF THE ANTI-SCALD DEVICE
UPON COMPLETION OF THE INSTALLATION, THE DEVICE SHOULD BE TESTED AND COMMISSIONED PER PROCEDURE OUTLINED BELOW OR
AS SPECIFIED BY LOCAL AUTHORITY.
THE FOLLOWING INSTRUCTIONS SHOULD BE READ AND CAREFULLY UNDERSTOOD PRIOR TO COMMISSIONING THE DEVICE. ANY ASPECTS OF THE INSTALLATION/SYSTEM WHICH DO NOT COMPLY WITH THE INSTALLATION REQUIREMENTS OR SPECIFICATIONS MUST BE RECTIFIED
PRIOR TO BEGINNING THE COMMISSIONING PROCESS.
ENSURE THAT THE SYSTEM IS THOROUGHLY CLEAN AND FREE FROM DEBRIS.
ENSURE A SUITABLY CALIBRATED AND ACCURATE DIGITAL THERMOMETER IS USED. THE DEVICE IS COMMISSIONED BY
MEASURING THE MIXED WATER TEMPERATURE AT THE OUTLET.
IN ACCORDANCE WITH VHA DIRECTIVE 2009-009 DATED FEBRUARY 2009 AND POLICY MEMORANDUM 00-322 DATED APRIL
17 2016, MIXED WATER TEMPERATURE AT THE OUTLET MAY NOT EXCEED THE FOLLOWING:
FOR SINK TAPS: 110 DEG F
FOR FULL OR PARTIAL IMMERSION FIXTURES: 110 DEG
THE TEMPERATURE AT THE OUTLET OF EACH ANTI-SCALD DEVICE MUST BE SET TAING INTO CONSIDERATION ANY
FLUCTUATIONS WHICH MAY OCCUR WITHIN THE SYSTEM DUE TO SIMULTANEOUS DEMAND.
ONCE THE SUPPLY TEMPERATURE ARE STABILIZED AND THE NORMAL OPERATING CONDITIONS ARE ESTABLISHED, THE DEVICE CAN BE COMMISSIONED. FOLLOW THE SEQUENCE BELOR FOR COMMISSIONING THE DEVICE:
SET THE MIXED WATER DISCHARGE TEMPERATURE AS NEEDED.
MEASURE AND RECORD THE TEMPERATURE OF HOT AND COLD WATER SUPPLIES AT CONNECTIONS TO THE
VALVE.
MEASURE AND RECORD THE TEMPERATURE OF THE WATER DISCHARGING FROM THE LARGEST AND SMALLEST
VOLUME DRAW-OFF POINTS.
PERFORM THE THERMAL SHUT-OFF TEST. ISOLATE THE COLD WATER SUPPLY TO THE DEVICE AND MONITOR THE
MIXED WATER TEMPERATURE. THE OUTLET FLOW SHOULD QUICKLY CEASE FLOWING.
MEASURE AND RECORD THE MAXIMUM MIXED WATER TEMPERATURE. THE TEMPERATURE SHOULD NOT EXCEED
THE TEMPERATURE ALLOWED BY THE APPLICABLE VHA DIRECTIVE ABOVE.
RESTORE THE COLD WATER SUPPLY TO THE VALVE AND MEASURE AND RECORD THE OUTLET MIXED WATER TEMPERATURE AFTER THE MIXED WATER HAS STABILIZED. THE FINAL TEMPERATURE FOUND DURING THIS TEST
SHOULD NOT EXCEED THE PERMITTED VALUES +3 DEG F.
ONCE THE DESIRED TEMPERATURE HAS BEEN REACHED. LOCK ANY ADJUSTMENT CONTROLS ON THE DEVICE.
3. RECORD THE ABOVE INFORMATION IN A COMMISSIONING REPORT AND SUBMIT TO VA COR PRIOR TO FINAL ACCEPTANCE
4. TEMPERATURE OVERRIDE TEST:
PUT EACH ANTI-SCALD VALVE IN BYPASS MODE.
ENSURE HEAT EXCHANGER IS IN THERMAL ERADICATION MODE AND IS DISCHARGING 180F WATER.
ENSURE WATER IS STILL DISCHARGING FROM THE FAUCET. AND TEMPERATURE IS 180F.
PROVIDE AND INSTALL 3/8" O.D. MIXED
WATER CHROME COATED COPPER
TUBING, BEND IN SHAPE AS SHOWN. FLEX
HOSE NOT APPROVED.
PROVIDE AND INSTALL ANTI-SCALD
DEVICE. USE CHROME-PLATED BRASS
COMPRESSION FITTING TO CONNECT 3/8"
O.D. COPPER TUBING TO 1/2" NPT
CONNECTIONS ON DEVICE. COMMISSION
DEVICE PER INSTRUCTION ON SHEET
P-502.
PROVIDE AND INSTALL 3/8" O.D. HW CHROME
COATED COPPER TUBING, BEND IN SHAPE AS
SHOWN. FLEX HOSE NOT APPROVED.
CONNECT TO BRANCH PIPING STUBBED
THRU WALL. EXACT LOCATION OF EACH
STUB-IN MAY VARY FROM SINK TO SINK.
PROVIDE SHUTOFF VALVES IF DEFUNCT
OR DAMAGED DURING INSTALLATION.
PROVIDE AND INSTALL 3/8" O.D.
MIXED WATER CHROME COATED
COPPER TUBING, BEND IN
SHAPE AS SHOWN.
SANITARY LINE AND P-TRAP OF SINK
PROVIDE AND INSTALL ANTI-SCALD
DEVICE. PROPERLY SUPPORT PER
MANUFACTURER'S INSTRUCTIONS.
PROVIDE AND INSTALL 3/8" O.D. HW CHROME
COATED COPPER TUBING, BEND IN SHAPE AS
NEEDED.
CONNECT TO BRANCH PIPING STUBBED
THRU WALL. EXACT LOCATION OF EACH
STUB-IN MAY VARY FROM SINK TO SINK.
PROVIDE SHUTOFF VALVES IF DEFUNCT
OR DAMAGED DURING INSTALLATION.
SINK
FINISHED FLOOR
PROVIDE AND INSTALL CHROME-PLATED
BRASS COMPRESSION FITTING INTO T-
CONNECTOR.
SANITARY LINE AND P-TRAP OF SINK.
PROVIDE AND INSTALL 3/8" O.D. MIXED WATER
CHROME COATED COPPER TUBING, BEND IN
SHAPE AS SHOWN. FLEX HOSE NOT APPROVED.
18" WX24" H ACCESS PANEL ON REAR OF
WALL BEHIND SHOWER CONTROL VALVE
(TYP)
PROVIDE AND INSTALL 1/2" OR 3/4"
HW, CW SUPPLY
PROVIDE AND INSTALL 1/2" OR 3/4"
MIXED WATER SUPPLY PIPE TO
SHOWER CONTROL VALVE
1/2" OR 3/4" CW SUPPLY TO
SHOWER(TYP)
1/2" OR 3/4" HW, CW SUPPLY PIPING TO
FIRST & SECOND FLOORS. SECTION OF
PIPE INSULATION EXPOSED TO ACCESS
PANEL IS ABATED.
PROVIDE AND INSTALL ANTI-SCALD DEVICE
PROPERLY SUPPORT PER MANUFACTURER'S
INSTRUCTIONS.
SHUTOFF VALVES. PROVIDE AND INSTALL IF
DEFUNCT OR DAMAGED DURING
INSTALLATION. (TYP)
SINK FIXTURE
HEIGHT
VARIES
NTSANTI-SCALD DEVICE INSTALLATION DIAGRAMS (TYP)1
| P-001 PLUMBING NOTES AND LEGENDS |
| PD100 PLUMBING DEMOLITION PLAN |
| PL100 PLUMBING RENOVATION PLAN |
| PW301 PLUMBING ISOMETRICS |
| P-501 PLUMBING DETAILS |