This document package includes construction drawings and notes for a fire protection system renovation project. The project involves modifying an existing sprinkler system within the limit of construction at a Veterans Affairs medical facility. Work includes installing temporary upright sprinkler heads to protect spaces where ceilings are removed, verifying coverage meets NFPA 13 requirements, and adding sprinkler heads as needed. Drawings show demolition plans, sprinkler locations, and details. Notes specify sprinkler types, piping requirements, supports and seals for fire barriers. The solicitation seeks bids for project 36C24823R0162 to expand an interventional radiology suite at a Veterans Affairs medical center.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
FIRE PROTECTION NOTES
AND LEGENDS
F-001
A. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMIT OF CONSTRUCTION AS
INDICATED ON THE CONTRACT DRAWINGS FOR THIS PROJECT. PROVIDE TEMPORARY
UPRIGHT SPRINKLER HEADS TO PROTECT SPACES WHERE CEILINGS ARE REMOVED
FOR CONSTRUCTION AND UNTIL NEW CEILINGS ARE INSTALLED AND NEW DROPS TO
NEW PENDENT SPRINKLERS ARE INSTALLED. CONTRACTOR SHALL REVIEW
COVERAGE REQUIREMENTS OF NFPA 13 ARE MET, PROVIDE ADDITIONAL UPRIGHT
SPRINKLER HEADS WHERE COVERAGE IS NOT ADEQUATE. UNLESS OTHERWISE
INDICATED EXISTING FIRE PROTECTIONS SYSTEMS AND EQUIPMENT ARE TO REMAIN.
REFER THE ARCHITECTURAL DRAWINGS FOR PHASING AND WALL CONSTRUCTION.
B. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR THE
FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM APPROVED
PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE HYDRAULIC
CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT NECESSARY TO
COMPLETE THE INSTALLATION AND COMPLY WITH THE SPECIFICATIONS AND ALL
APPLICABLE CODES AND CRITERIA.
C. ALL FIRE PROTECTION WORK SHALL MEET ALL THE REQUIREMENTS OF NFPA 13, 14,
AND 101, VA FIRE PROTECTION DESIGN MANUAL, INTERNATIONAL BUILDING CODE
2021, AND APPLICABLE OSHA AND EPA REGULATIONS AND GUIDELINES. WHERE
CONFLICTS BETWEEN CODE AND CONSTRUCTION DOCUMENTS OCCUR, THE MOST
RESTRICTIVE REQUIREMENTS SHALL GOVERN.
D. THE CONTRACTOR SHALL SUBMIT A SEPARATE PERMIT APPLICATION AND PLANS FOR
REVIEW ACCORDING TO NFPA 1 (2021 EDITION), SECTION 1.14.
E. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE COMPLETED IN
ACCORDANCE WITH NFPA 13 AND FORWARDED TO THE OWNERS REPRESENTATIVE.
F. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK DONE SHALL BE
DONE IN A THOROUGH AND WORKMANLIKE MANNER. THE WORK, MATERIALS AND
TEST SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF NFPA 13,
LATEST EDITION.
G. THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT THE
CONTRACTOR HAS FAMILIARIZED THEMSELVES WITH THE PLANS AND BUILDING SITE.
CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR
BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF THEY
COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN MADE.
H. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, BARRIERS,
CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL PENETRATIONS THROUGH RATED
ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH UL REQUIREMENTS TO
MAINTAIN THE ASSEMBLY RATING. REFER TO ARCHITECTURAL DOCUMENTS FOR
LOCATIONS OF SMOKE AND/OR FIRE RATED WALLS; REFER TO PENETRATION DETAILS
FOR FIRE PROTECTION PIPING PENETRATIONS THROUGH RATED ASSEMBLIES.
I. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE
REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL WHO
HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO ARE
REGULARLY EMPLOYED TO DO SUCH WORK.
J. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF RISERS.
CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL OTHER TRADE
SYSTEMS TO AVOID CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF THE
BUILDING.
K. PIPE HANGERS SHALL BE SPACED AND LOCATED IN ACCORDING TO NFPA 13.
L. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1" MINIMUM, UNLESS
OTHERWISE NOTED.
M. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS, SPACING, AND
OBSTRUCTION REQUIREMENTS.
N. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH ARCHITECTURAL
FINISHED, CEILING, LIGHTING, DUCTS, PIPING, OTHER CEILING MOUNTED DEVICES,
AND STRUCTURAL COMPONENTS.
O. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD ADDITIONAL
SPRINKLERS AT NO ADDITIONAL COST AND AS NECESSARY TO MEET COVERAGE
REQUIREMENTS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION DESIGN
MANUAL.
P. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN POSSIBLE. PROVIDE
RETURN BENDS AT ALL SPRINKLER LOCATIONS TO ALLOW FIELD ADJUSTMENT.
Q. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF SPRINKLERS AFTER
EQUIPMENT AND DUCTWORK ARE INSTALLED. PROVIDE ADDITIONAL SPRINKLERS, IF
NECESSARY, TO P[PROVIDE ADEQUATE COVERAGE IN ACCORDANCE WITH NFPA 13.
R. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS ARE
SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS, ELECTRICAL
ROOMS, IT ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL
SPRINKLERS INSTALLED BELOW 7'-0".
S. PIPING: SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE AND FITTINGS
CONFORMING TO ASTM A53. MINIMUM SIZE IS 1". THREADED JOINTS ARE ALLOWED
ON PIPING UP TO 2". GROOVED PIPING MAY BE USED ON PIPING 2-1/2" AND LARGER.
MECHANICAL TEES AND WELD-O-LETS ARE PERMITTED. DO NOT THREAD THINWALL
PIPE. SADDLE TAPS AND FLEXIBLE CONNECTIONS ARE NOT PERMITTED.
T. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER ACCESSORIES OF
AN APPROVED TYPE AND IN SUFFICIENT NUMBER TO PROPERLY SUPPORT ALL
PIPING. PIPING SHALL BE SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED
ADJUSTABLE HANGERS.
U. SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE IN ALL AREAS EXCEPT
WHERE SPECIFICALLY PROHIBITED. IN COMPLIANCE WITH VA GUIDELINES AND NFPA
REQUIREMENTS.
V. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE RATING EXCEPT
WHERE EXCESSIVE TEMPERATURES ARE ANTICIPATED. IN THESE LOCATIONS
PROVIDE HIGH TEMPERATURE SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA
13.
W. SPRINKLERS SHALL HAVE A K FACTOR OF 5.6 UNLESS NOTED OTHERWISE.
X. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE BETWEEN THE
BOTTOM OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE, FILES, ETC.
Y. ALL EXPOSED SPRINKLER PIPING SHALL BE RED IN COLOR AND LABELED EVERY 10
FEET IN THE DIRECTION OF FLOW.
FIRE PROTECTION NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE
PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT. DRAWINGS
SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER
WHICH THEY SHALL OPERATE AND VERIFY THE EXTENT OF WORK REQUIRED TO
COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT
SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR
INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO
DETERMINE ANY NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND
LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY
HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING
DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE
REQUIREMENTS:
· INTERNATIONAL BUILDING CODE (IBC) 2020
· INTERNATIONAL EXISTING BUILDING CODE 2020
· IBC MECHANICAL 2020
· IBC PLUMBING 2020
· IBC ENERGY CONSERVATION 2020
· NFPA 1-2018, THE UNIFORM FIRE CODE
· NFPA 101-2018, THE LIFE SAFETY CODE
· NFPA 51B-2014, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING
AND OTHER HOT WORK
· NFPA 13-2016, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
· NFPA 70-2017, NATIONAL ELECTRICAL CODE
· NFPA 90A-2018, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND
VENTING SYSTEMS.
· NFPA 99-2018, STANDARD FOR HEALTH CARE FACILITIES
· NFPA 241-2013, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION
AND DEMOLITION OPERATIONS.
· ALL APPLICABLE VA DESIGN MANUALS
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND
CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF
WORK UNDER THIS CONTRACT. DISMANTLE AND REASSEMBLE EQUIPMENT AS
NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL
UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN
UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE
TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS,
CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES
WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO MAINTAIN
THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE
AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND
SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES DURING
CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS
FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF
CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN
APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S
APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF
RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN
THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE
INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS,
CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS
DATA, ETC. PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF
CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT
CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE
ALL CONTRACT CHANGES, MODIFICATIONS, AND CLARIFICATIONS. THIS SET ALONG
WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER
AFTER CONSTRUCTION COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND
UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED
TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC
IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL
REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND
SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE
OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE
TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT
AND MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN
CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
GENERAL NOTES
SPRINKLERS IN GRID CEILING SYSTEMS SHALL BE LOCATED AT THE
MIDPOINT OR QUARTERPOINT OF THE FOUR FOOT (4') DIMENSION AND THE
MIDPOINT OF THE TWO (2') DIMENSION. WHERE A CONFLICT OCCURS,
SYMMETRY ABOUT THE AXIS SHALL BE MAINTAINED.
EQ
. E
Q
EQ.EQ.EQ.EQ.
EQ
. E
Q
EQ
. E
Q
EQ.EQ.
EQ
. E
Q
.EQ. EQ.
EQ
. E
Q
EQ. EQ.
SPRINKLER
SPEAKER OR
OTHER DEVICE
AIR DEVICE OR
LIGHT FIXTURE
CEILING LEGEND
SPRINKLER MOUNTING DETAIL NTS
FOR HEAD TYPES,
SEE FLOOR PLANS
AND HEAD DETAILS
1" X 1/2" R.C.
DROP
90 EL.
ARMOVER (NOTE 1)
RISER NIPPLE
BRANCHLINE
SUSPENDED CEILING
RETURN BEND ASSEMBLY DETAIL NTS
NOTE:
1. PROVIDE HANGER FOR ARMOVERS
GREATER THAN 24" IN LENGTH.
2"
1" MAX.
3/8" MIN.
REDUCING COUPLING
DISTANCE TO BE
WITHIN 1/8" ACROSS
ALL HEADS.
RECESSED PENDENT HEAD DETAIL NTS
RADIOGRAPHIC
CONTROL
A-105
ROOM
HOUSE-
KEEPINGKEEPING
HOUSE-
A-112A-112 A-111A-111
A-104
58.60n.s.f.
77.16n.s.f.
299.00n.s.f.
C O
R R
I D
O R
A V O
A V O
A V O
A V O
C O
R R
I D
O R
C
-1
R/F ROOM
MULTIPURPOSE
ASSISTANT
BATHROOM
A-116p
AUTOMATION
OFFICE
A-116q
F.H.
I.R.
OFFICE
PREP/RECOVERY
PREP/RECOVERY
PREP/RECOVERY
READING
AREA
PREP/RECOVERY
SOILED
LINEN
CATHETERS
SUPPLY
PREP/RECOVERY
SCRUB AREA
NURSE
STATION
LINEN
STORAGE
RECLINERS /
OUTPROCESSING100
ENTRY
C-RENO
CORRIDOR
RADIOGRAPHIC
CONTROL
A-105
ROOM
HOUSE-
KEEPINGKEEPING
HOUSE-
A-112A-112 A-111A-111
C O R R I D O R
A-104
A-103
57.43n.s.f.
C O
R R
I D
O R
OFFICE
NO.1
OFFICE
NO.2
ULTRASOUND
ROOM NO.1
A V O
A V O
A V O
A V O
BILLING
OFFICE
A-101a
A-101b
A-101c
C-109
A-112a C
O R
R I
D O
R
C
-1ROOM
RECOVERY
HOLDING
R/F ROOM
MULTIPURPOSE
A-102
STORAGE
ASSISTANT
BATHROOM
A-116p
AUTOMATION
OFFICE
A-116q
F.H.
ROOM
READING
SUPERVISOR
OFFICE
I.R.
OFFICE
SCRUBING
AREA
SOILED
LINEN
ROOM
CLEAN
LINEN
ROOM
LOCKER
ROOM
U.S. Department of Veterans Affairs strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
MES Group, Inc.
550 North Reo Street, Suite 203 Tampa, FL, 33609 813.289.4700 mes group
COA # 8304
FIRE PROTECTION
RENOVATION PLAN
GENERAL NOTES
A. THESE DRAWINGS ARE ISSUED FOR REFERENCE ONLY.
B. ALL FIRE SPRINKLER WORK, INCLUDING CHANGES, ADDITIONS,
RELOCATIONS, IMPROVEMENTS AND/OR MODIFICATIONS TO THE FIRE
PROTECTIONS SYSTEM, SHALL MEET THE REQUIREMENTS OF NFPA13
2016 EDITION AND MUST BE DONE BY A LICENSED FIRE PROTECTION
CONTRACTOR WITH SEPARATE PERMIT AND PLANS. REFER TO
DELEGATED DESIGN REQUIREMENTS ON F-001.
C. FIRE SPRINKLER SYSTEM SHALL MEET THE REQUIREMENTS OF NFPA 241
2013 EDITION SECTION 108, FIRE PROTECTION DURING DEMOLITION.
MODIFY EXISTING PENDANT HEADS TO BE UPRIGHT HEADS AS REQUIRED
DUE TO SUSPENDED CEILING DEMOLITION. CONTRACTOR SHALL OBTAIN
FIRE SPRINKLER PERMIT PRIOR TO BUILDING PERMIT APPROVAL.
D. ALL SERVICE INTERRUPTIONS TO THIS EXISTING FACILITY MUST BE
SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGE
REQUIREMENTS WITH THE VA/COR.
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE HAZARD HATCH HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION SPRINKLER TYPE NOTES
GPM/SQFT SQFT SQFT FT MINUTES GPM
GENERAL EXCEPT
AS LISTED BELOW LIGHT HAZARD WET PIPE 0.10 1500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, UL LISTED
1,2
STORAGE ORDINARY HAZARD
GROUP 2 WET PIPE 0.15 1500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE, UL
LISTED
1,2
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
2. REMOVE AND ADD SPRINKLER HEADS AS REQUIRED WITH NEW CIEILING LAYOUT.
FP100
KEYNOTES
1. SPRINKLER HEADS IN THIS AREA TO BE REMOVED FROM CEILING AND
TURNED UPRIGHT DURING DEMOLITION. EXISTING PIPING TO REMAIN.
X
| F-001 FIRE PROTECTION NOTES AND LEGENDS |
| FD100 FIRE PROTECTION DEMOLITION PLAN |
| FP100 FIRE PROTECTION RENOVATION PLAN |
File details come from the government source that posted it. Updated .