672-20-107 Third Party Asbestos Monitor Specs (2 pages).pdf

PDF 74 KB Posted

Attached to
Y1DB--Expand Interventional Radiology Suite
Solicitation number
36C24823R0162
Issued by

About this file

This document outlines requirements for third party asbestos inspection and certification services for an expansion of an interventional radiology suite at a Veterans Affairs medical center. The selected contractor must employ an independent professional industrial hygienist consultant to perform air monitoring, inspection, testing and other support services during asbestos abatement projects to ensure patient, employee and visitor safety. The hygienist must meet American Industrial Hygiene Association and OSHA competency standards and have specific education and experience in asbestos abatement project management and supervision. On-site air sampling and analysis is required using Phase Contrast Microscopy and samples may require Transmission Electron Microscopy analysis at an accredited laboratory. The hygienist will establish baseline readings, inspect the regulated area, perform continuous outside air monitoring, make unannounced visits, support the VA with submittal reviews and issue certification of decontamination upon project completion. Related solicitation 36C24823R0162 was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 for the interventional radiology suite expansion project.

View the file

Other files

File Type Posted
672-20-107 Construction SOW Updated 7-21-2023 (4 pages).pdf PDF
36C24823R0162 0001 (RFI Update SOW and Extend Due Date).docx DOCX document
Asbestos Free Areas_IR Suite area (1 page).pdf PDF
Attachment 02 - Specifications Part 1 of 2 (856 pages).pdf PDF
Attachment 03d - Mechanical Combined (4 pages).pdf PDF
Attachment 10 - Subcontractor Past Performance Consent Form (1 page).pdf PDF
Attachment 11 - Past Performance Questionnaire (4 pages).pdf PDF
Attachment 03 - Cover Sheet-G-001 (1 page).pdf PDF
36C24823R0162 Solicitation (BB 672-23-107).docx DOCX document
Attachment 06 - Letter of Commitment Key Subcontractors (1 page).pdf PDF
Attachment 14 - 852.219-75 VA Notice of Limitation on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023) (2 pages).doc DOC document
Attachment 03b - Fire Protection Combined (2 pages).pdf PDF
Attachment 07 - Letter of Commitment for Key Personnel (1 page).pdf PDF
Attachment 13 - Infection Control Guidelines on Construction and Renovation 11B-17-05 (11 pages).pdf PDF
Attachment 05 - Safety or Environmental Violations and Experience Modification Rate EMR Form (1 page).pdf PDF
Attachment 09 - Specialized Experience Form (3 pages).pdf PDF
Attachment 03e - Electrical Combined (10 pages).pdf PDF
Attachment 03c - Plumbing Combined (5 pages).pdf PDF
Attachment 02 - Specifications Part 2 of 2 (749 pages).pdf PDF
Attachment 08 - Key Personnel Resume Form (1 page).pdf PDF
Attachment 12 - Past Performance Survey (3 pages).docx DOCX document
Attachment 01 - Site Plan (1 Page).pdf PDF
Attachment 04 - Base Offer Price Breakdown (1 Page).xlsx XLSX spreadsheet
Attachment 03a - Architectual Combined (16 pages).pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIRD PARTY ASBESTOS ABATEMENT INSPECTION AND CERTIFICATION FOR

PROJECT 672-20-107, EXPAND INTERVENTIONAL RADIOLOGY SUITE

Services Description:

The Contractor will employ an independent professional industrial hygienist (VPIH) consultant to perform various services during asbestos abatement projects on behalf of the VA.

The VPIH will perform the necessary monitoring, inspection, testing and other support services to ensure that VA patients, employees, and visitors will not be adversely affected by the abatement work, and that the abatement work proceeds in accordance with asbestos abatement specifications.

VA Professional Industrial Hygienist (VPIH) and Industrial Hygiene Technician (IHT)

Requirements:

A. The VPIH must meet the definition requirements of the American Industrial Hygiene

Association (AIHA) Professional IH and the definition requirements of OSHA as a “Competent

Person” under 29 CFR 1926.58(b); has completed two specialized EPA approved courses on management and supervision of asbestos abatement projects; has completed formal training in respiratory protection and waste disposal; has performed as IH in a minimum of four (4) asbestos abatement projects of which in at least three (3) has served as the supervisory IH; and has all required state and local licenses and permits.

B. The Industrial Hygiene Technician (IHT) shall be trained and have specialized field experience in air sampling and analysis. He/She must have completed a NIOSH 582 course or equivalent and show proof and must participate in the AIHA Asbestos Analysis Registry for fiber counting quality control assurance. The IHT must also be an accredited EPA/State

Supervisor and Building Inspector. He/She must have performed duties of principal assistant to a

Professional IH in at least five (5) asbestos abatement projects.

Abatement Inspection and Certification Services:

A. The VPIH will oversee the project to assure quality, resolve problems, prevent the spread of contamination beyond the regulated area and assure clearance at the end of the project.

He/She will perform the final inspection and testing to determine whether the regulated area or building has been adequately decontaminated. All air monitoring is to be done utilizing Phase

Contrast Microscopy (PCM)/Transmission Electron Microscopy (TEM).

B. The VPIH will perform the following tasks:

1. Establish background levels before abatement begins by collecting background samples. Samples must be retained for possible TEM analysis.

2. Inspect the regulated area prior to the commencement of abatement operations to ensure that abatement specifications requirements such as the following are met: enclosure integrity, location of personnel and equipment decontamination facilities, location of negative pressure machine(s), HEPA filtration, continuous pressure differential of -0.02 in wg, etc.

3. Perform continuous air monitoring, inspection and testing outside the regulated area during actual abatement work to detect any faults in the regulated area isolation and any adverse impact of surroundings from regulated area activities. Air samples must be analyzed on-site and results must be provided to the VA Representative the same day or at the beginning of the next working day (if abatement is conducted after working hours).

4. Perform unannounced visits to spot check overall compliance of work with contract/specifications. These visits may include any inspection, monitoring and testing inside and outside the regulated area and all aspects of the operation except personnel monitoring.

5. Provide support to the VA Facility representative such as evaluation of submittals from the Contractor, resolution of conflicts, interpretation of data, etc.

6. Perform, in the presence of the VA Facility representative, final inspection and testing of the decontaminated regulated area at the conclusion of the abatement to certify compliance with all the regulations and VA requirements/specifications. Final clearance air samples will be collected and analyzed in accordance with procedures outlined by AHERA. If work is less than 260 linear feet (lf)/160 square feet (sf), five (5) PCM samples may be collected for clearance. If work is equal to or more than 260 lf/160 sf, TEM sampling shall be done for clearance.

7. Issue a certificate of decontamination for each regulated area.

C. The monitoring and inspection results of the VPIH will be used by VACHS to issue any stop removal orders to the Contractor during abatement work and to accept or reject a regulated area or building as decontaminated.

D. The VPIH will make available to VACHS IH and Project Manager the plan for samples collection and analysis for the continuous monitoring outside and inside the regulated area and the plan for the final inspection and testing for each space prior to executing each plan.

The plan will include location for samples, name and qualification of person taking samples, methodology of analysis, laboratory information and qualification of the on-site analyst.

Laboratory Services:

A. IHTs performing on-site analysis of PCM samples must be board approved AIHA

Asbestos Analyst Registry (AAR) analysts and must belong to an ARR approved organization.

B. Samples analyzed by TEM shall be analyzed by an accredited laboratory.

C. Laboratory must be able to provide twenty-four hour turn-a-round time for air and/or bulk sample results.