Attachment 0011 Risk Management Scoring Criteria and Reporting Template.xlsx

XLSX spreadsheet 158 KB Posted

Attached to
Type I Family of All Terrain Crane Solicitation Amendment 0009
Solicitation number
W56HZV-19-R-0118
Issued by

About this file

This document contains a risk management template and scoring criteria to be used for a federal contract solicitation for Type I Family of All Terrain Cranes (FOATC). The template includes sections for tracking active risks, top risks, issues, retired risks, and provides risk analysis rubrics. Key details include categories for risk level assessments of probability, severity, and current risk ranking on technical performance, cost, and schedule. It also includes fields to track risk identification, mitigation plans, progress, and expiry milestones. The document appears to be an attachment to a risk management plan providing guidance and templates for offerors to propose risk mitigation strategies for the FOATC contract.

View the file

Other files

File Type Posted
W56HZV-19-R-0118 Conformed Copy Thru AMD 0009.pdf PDF
Solic Amend W56HZV-19-R-0118 0009.pdf PDF
Attachment 0041_ Pricing Attachment.xlsx XLSX spreadsheet
FOATC T1 Industry Q and_A on RFP 25May2021.pdf PDF
FOATC T1 Industry Q and_A on RFP 11MAY2021.pdf PDF
Attachment 0004 Operator and Maintainer Technical Supplementation Requirements.pdf PDF
Attachment 0041 - Pricing Attachment .xlsx XLSX spreadsheet
ATTACH 0047 TABLE A-II TM Req Matrix10.pdf PDF
Solic Amend W56HZV-19-R-0118 0008.pdf PDF
ATTACH 0018 TABLE A-IV TM Req Matrix23.pdf PDF
Solic Amend W56HZV-19-R-0118 0007.pdf PDF
Solic Amend W56HZV-19-R-0118 0006.pdf PDF
Attachment 0041 Pricing Attachment.xlsx XLSX spreadsheet
Solic Amend W56HZV-19-R-0118 0005.pdf PDF
FOATC T1 Industry Q and A on RFP 24 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0004.pdf PDF
Attachment 0042 Small Business Participation Factor Workbook 03Mar2021.xlsx XLSX spreadsheet
Attachment 0001 AT-PRF-0001 Type I FOATC PD v1.5.pdf PDF
Solic Amend W56HZV-19-R-0118 0003.pdf PDF
FOATC T1 Industry Q and A on Draft RFP Updated 12 Mar 2021.pdf PDF
FOATC T1 Industry Q and A on RFP 12 March 2021.pdf PDF
Solic Amend W56HZV-19-R-0118 0002.pdf PDF
W56HZV-19-R-0118 Signed.pdf PDF
Solic Amend W56HZV-19-R-0118 0001.pdf PDF
Attachment 0028 - GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0044 Certification Form.pdf PDF
Attachment 0041 - Pricing Attachment.xlsx XLSX spreadsheet
Attachment 0006 Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0007 Type I FOATC Point of Contact (POC) List.pdf PDF
Attachment 0010 Type I FOATC Program Risk Management Plan (RMP).PDF PDF
Attachment 0026 LMI Summary Worksheet NMWR Data.pdf PDF
Attachment 0043 Small Business Participation Factor Workbook Instructions.pdf PDF
Attachment 0033 Incoming Format Transaction.pdf PDF
Solicitation W56HZV-19-R-0118.pdf PDF
Attachment 0003 DA Form 2028 Recommended Changes to Publications and Blank Forms.pdf PDF
Attachment 0013 Hazardous Materials Management Report HMMR.XLSX XLSX spreadsheet
Attachment 0025 NMWR Special Instructions.pdf PDF
Attachment 0012 Prohibited Materials Waiver.pdf PDF
Attachment 0004 COTS Publications Requirements.pdf PDF
Attachment 0015 - Level of Repair Analysis (LORA).pdf PDF
Attachment 0030 Critical Stockage List.pdf PDF
Attachment 0029 LMI Data Products Worksheet.pdf PDF
Attachment 0040 Transportability for Better Deployability SDDC TEA Pamphlet 70-1.pdf PDF
Attachment 0009 LMI Summary Worksheet Maintenance Analysis.pdf PDF
Attachment 0008 Provisioning Requirements Statement.pdf PDF
Attachment 0031 Sample of DLA Approved EDFP Drawings.pdf PDF
Attachment 0014 - Treatment And Finish Requirements.pdf PDF
Attachment 0017 - General Publications Requirements for Page-Based TMs.pdf PDF
Attachment 0045 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0002 DD Form 1692.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Active Risks

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk Ranking

&G Response to Solicitation No. W56HZV-15-R-0187 Risk Register and Mitigation

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Top Risks

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Issues

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Retired Risks

Type I FOATC
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone

PDR

CDR

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressAssessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

Mitigated, Retired, or Expired Risks

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Rank Rubrics

Maneuver Support Vessel (Light)
Risk Register and Mitigation
Risk Analysis per Government Risk Management Plan, Contract Attachment 0005
Notes:Risk Analysis per Government Draft Risk Issue Opportunity Management Plan
1. Risk expiry is program milestone after which risk mitigation has been completed or risk is no longer valid.
2. Use table below to rank level of likelihood:Qualitative Risk Analysis
Probability of
OccurrenceDescriptionProbability
PercentageLikelihood/Probability
Near
CertaintyEA risk item is nearly certain to occur.> 90%High – Risks weighted 20-25 are greater than 70% likelihood/probability of occurrence
Highly
LikelyDA risk item is probable but may be avoided.> 65% to 90%Medium – Risk weighted 12-19 are between 30% and 70% likelihood/probability of occurrence
ModerateCA risk item is equally likely to occur or not occur.> 40% to 65%Low – Risks weighted 1-11 are below 30% likelihood/probability of occurrence
LowBA risk item is possible by will likely be avoided.10% to 40%
Not
LikelyAA risk item is unlikely to occur.< 10%Consequence/Impact
3. Use guidance below to rank level of technical (performance), schedule and severity.High – (4/5) Risk that has the potential to greatly impact program cost, program schedule or performance
Severity LevelRisk TypeMedium – (3/4) Risk that has the potential to slightly impact program cost, program schedule or performance
Performance
Referring to all requirements designated in the PD and SOW.ScheduleCost
Referring to APB Cost ParametersLow – (1/2) Risk that has relatively little impact on cost, schedule or performance
CatastrophicProgram Success Jeopardized5Potentially fails KPP.Cannot meet next major Milestone (A, B, C, FRP, IOC, FOC).Impacted ≥ 10%
CriticalProgram Success in Doubt4Potentially fails KSA or shorts a critical mission need but expect no breech of KPP.Cannot meet next major Program Event (including, but not limited to, CDR, TRR, vehicle delivery).Impacted

5% ≤ X ≤ 10% Moderate Limited Impact on Program Success 3 Performance below goal; moderate changes required. Schedule slip impacting another IPT and/or subsystem, with no impact to a major Program Event or Milestone. Impacted 2% ≤ X ≤ 5% Marginal Minor Impact on Program Success 2 Remedy will require minor performance trades. Schedule slip with no impact to another IPT and/or subsystem, with no impact to a major Program Event or Milestone. Impacted 1% ≤ X ≤ 2% Negligible No Impact on Program Success 1 Minimal consequence in technical performance. Minor schedule slip with minimal or no impact. Impacted < 1%

Risk Rank Table from Government Original Risk Plan
Severity of Consequence
NegligibleMarginalModerateCriticalCatastrophic
12345
Probability of OccurrenceNear CertaintyE916202325
Highly LikelyD613182224
ModerateC410151921
LowB27111417
Not LikelyA135812

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P image1.jpeg image2.png

File details come from the government source that posted it. Updated .