Attachment 0003 Resource Distribution Table - 102025 revision.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
DRAFT Request for Proposal Project Management Mounted Armored Vehicle Logistic Fielding Support Services
Solicitation number
W912CH-25-R-0182
Issued by

About this file

This is a Resource Distribution Table (RDT) template and instruction document for the PM Mounted Armored Vehicles (MAV) Logistic Fielding Support Services contract (Solicitation W912CH-25-R-0182). The template serves as a CDRL (Contract Data Requirements List) deliverable that contractors must complete to report resource distribution across prime contractor and subcontractor efforts.

The RDT requires contractors to provide detailed metadata about the contract, program, and preparing organization, then populate a data worksheet breaking down total contract price by prime contractor internal costs and individual subcontractor costs (for subcontractors exceeding $20 million anticipated value). For each major subcontractor, contractors must identify the subcontractor name and location, allocate costs across a comprehensive Work Breakdown Structure (WBS) that covers logistics fielding support services including unit-level maintenance, operations, training, maintenance consumables, depot-level reparables, intermediate and depot maintenance, sustaining support, and continuing system improvements. Contractors must also mark which WBS elements each subcontractor supports and optionally provide percentages for commercially available and competitively sourced items. The document includes detailed instructions on data entry requirements, worksheet structure, and optional fields for commerciality assessments and competitive sourcing documentation, with all contractor-entered data restricted to yellow-highlighted cells unless otherwise specified.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDT Instructions

CUI

Metadata Reference
File Name1.aERROR:#VALUE!
Reference Attachment2.aAttachment 0003
Contract Number2.b0
Last Updated MOD2.c0
Instructions1The contractor shall utilize the worksheets titled "Metadata" and "RDT Data" within this attachment as a template to provide the Resource Distribution Table deliverable.
2Other than cells marked, "(optional)" the contractor shall enter data in all yellow highlighted cells as indicated on each worksheet and in accordance with these instructions.
3Fill in the required data on the worksheet titled "Metadata" which provides data about the contract, the CDRL deliverable, who prepared the CDRL deliverable, and when the CDRL deliverable was prepared.
4Fill in the required data on the worksheet titled "RDT Data" as instructed below (see the NOTONAL EXAMPLE in columns E and F on "RDT Data" worksheet for two example subcontractor columns):
a)The total of the "Price" row (5.c) shall equal the contractor's total contract price when all options are exercised.
b)Total contract price (row 5.c) shall be broken down into:
i.Costs plus profit/fee incurred to preform work internally by the prime contractor, reported in "Prime Contractor" column.
ii.Costs incurred to pay subcontractors to provide hardware, software, or other services, reported in columns "All Other Subcontractors" thru "Subcontractor n".
iii.Subcontractor costs shall be provided for each subcontractor (row 5.c, columns "Subcontractor 1" thru "Subcontractor n") if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised). Insert and label additional columns between "Subcontractor 1" and "Subcontractor n" as required to provide data for each subcontractor.

A subcontract is any agreement, purchase order, or instrument other than a prime contract calling for work or for the material required for the performance of one or more prime contracts. It usually covers procurement of major components or subsystems that require the subcontractor to do extensive design, development, engineering, and testing to meet a prime contractor’s procurement specifications. (Via DoD Manual 5000.04 - Cost and Software Data Reporting (CSDR) Manual)

iv.Costs associated with all subcontractors not anticipated to exceed $20M may be combined and reported in the row labeled 5.c, column "All Other Subcontractors".
c)The following information is required, by subcontractor, if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised).
i.In the row labeled 5.a, enter the company name of the subcontractor who will be providing the part, software, or service. If the subcontractor is not yet known, enter "TBD".
ii.In the row labeled 5.b, enter the city and state (and country if not the United States) the subcontract is located in. If the subcontractor has multiple locations, enter the location the part or software is produced or the service is being completed. If the subcontractor is not yet known, enter "TBD".
iii.For each WBS identified in section 5.g and for each of the "Subcontractor 1" thru "Subcontractor n" columns, enter an "X" in the cell at the subcontractor-WBS intersection if the subcontractor identified in the column is completing work associated with the WBS identified in the row. If the subcontractor is not completing work associated with the WBS, enter "-".
iv.(Optional) In row labeled 5.d, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a commercially available item, according to the contractor's assessment (note: only the government's Procuring Contractor Officer makes all final commerciality assessments). The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of commercial items divided by price of all items) not as a function of quantity.

For more info on commerciality, see "https://www.acq.osd.mil/dpap/dars/pgi/docs/DoD_Guidebook_PartA_Commercial_Item_Determination_07_10_19.pdf"

v.(Optional) In row labeled 5.e, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a competitively sourced item. An item is considered competitively sourced if the prime contractor has received two or more quotes from independent subcontracts in order to provide the item. The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of competitively sourced items divided by price of all items) not as a function of quantity.
vi.USG USE ONLY: In row 5.f, enter the OSD(CAPE) Waiver Number associated with the subcontractor and commercial product in question if a waiver has been previously issued by OSD(CAPE).
CUI

Formatting

CUI

Metadata Reference
File Name1.aERROR:#VALUE!
Reference Attachment2.aAttachment 0003
Contract Number2.b0
Last Updated MOD2.c0

The Contractor shall only enter values in cells that are colored light yellow (as shown here) unless otherwise noted:

Cells formatted in this color require contractor input unless otherwise noted.

CUI

Change Log

CUI

This worksheet documents changes to this attachment between contract modifications (except changes to the 'Change Log' itself, which are self-evident).

Change # Date MOD Number Range Changed Change Description

CUI

Revision Log

CUI

Metadata Reference
File Name1.aERROR:#VALUE!
Reference Attachment2.aAttachment 0003
Contract Number2.b0
Last Updated MOD2.c0
Complete one row per submission.
Submission NumberResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.DateChange Description
(1…n)(0…n)(YYYY-MM-DD)(Description of changes)
(add additional rows as necessary)
CUI

Metadata

CUI

1. Deliverable Metadata1.aFile NameERROR:#VALUE!
1.bWorksheet TitleERROR:#VALUE!
1.cData TypeRDT
1.dReport As of Date(YYYY-MM-DD)
1.eReport Submission Date(YYYY-MM-DD)
1.fSubmission Number(1…n)
1.gResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.(0…n)
1.hSubmission Remarks
1.iProprietary Markings and/or Disclosures
1.jDistribution StatementD
1.kContains Proprietary DataYes
1.lSecurity ClassificationUnclassified
1.mData Version2024_2
2. Contract & Program Metadata2.aReference AttachmentAttachment 0003
2.bContract Number
2.cLast Updated MOD
2.dSolicitation NumberW912CH-25-R-0182
2.eReference SOWC.4.5
2.fReference CDRLA005
2.gReference DIDDI-FNCL-81565C
2.hApproved CSDR Plan NumberTBD
2.iProgram NamePM Mounted Armored Vehicles (MAV) (AMPV, Bradley, M113, M88 FoV)
2.jProgram PhasePROC & O&S
2.kPrime Mission ProductPM MAV Logistics Fielding System Support
3. Preparation Metadata3.aReporting Organization Type

Author: - Enter "Contractor" if the reporiting entity is the prime contractor.

- Enter "Subcontractor" if the reporting entity is a subcontractor.

3.bOrganization Name
3.cOrganization Address Line 1
3.dOrganization Address Line 2 (optional)
3.eOrganization Address City
3.fOrganization Address State
3.gOrganization Address Zip
3.hDivision Name (optional)
3.iDivision Address Line 1 (optional)
3.jDivision Address Line 2 (optional)
3.kDivision Address City (optional)
3.lDivision Address State (optional)
3.mDivision Address Zip (optional)
3.nPrincipal Preparer Name
3.oPrincipal Preparer Phone
3.pPrincipal Preparer Email
4. Additional Fields4.a(Custom Field 01 (optional))
4.b(Custom Field 02 (optional))
4.c(Custom Field 03 (optional))
4.d(Custom Field 04 (optional))
4.e(Custom Field 05 (optional))
4.f(Custom Field 06 (optional))
4.g(Custom Field 07 (optional))
4.h(Custom Field 08 (optional))
4.i(Custom Field 09 (optional))
4.j(Custom Field 10 (optional))
CUI

RDT Data

CUI

Worksheet Metadata1.aFile NameERROR:#VALUE!
2.aReference AttachmentAttachment 0003
2.bContract Number0
2.cLast Updated MOD0
--- NOTIONAL EXAMPLE DATA ---
5. RDT DataSubcontractor 1Subcontractor 2Prime ContractorAll Other SubcontractorsSubcontractor 1Subcontractor 2…Subcontractor n
5.aSubcontractor NameVandelay IndustriesKruger Industrial SmoothingN/AVarious
5.bSubcontractor LocationNew York, NYNew York, NYN/AVarious
5.cPrice$ 21,000,000.00$ 25,000,000.00
5.dPercent Commercially Available (optional)50.0%45.0%N/A
5.ePercent Competitively Sourced (optional)90.0%40.0%N/A
5.fOSD(CAPE) Subcontractor Waiver NumberN/AN/A
5.gWBS ELEMENT CODEWBS REPORTING ELEMENTS
1.0PM MAV Logistic Fielding Support Services (LFSS)--
1.1Unit-Level Manpower--
1.1.1Operations--
1.1.2Unit-Level MaintenanceX-
1.1.3Other Unit-Level (1...n Specify)--
1.2Unit Operations--
1.2.1Energy (Fuel, Petroleum, Oil and Electricity)--
1.2.1.1Fuel--
1.2.1.2Petroleum, Oil and Lubricants (POL)--
1.2.1.3Electricity--
1.2.2Training Munitions and Expendable Stores--
1.2.2.1Ammunition--
1.2.2.2BombsX-
1.2.2.3Rockets--
1.2.2.4Training Missiles--
1.2.2.5Sonobuoys--
1.2.2.6Pyrotechnics--
1.2.2.7Other Munitions--
1.2.3Support Services-X
1.2.3.1Non-Maintenance Field Service Reps--
1.2.3.2Communication Services--
1.2.3.3Facility/Storage Services--
1.2.3.4Transportation Services--
1.2.3.5Other Support Services--
1.2.4Temporary Duty (TDY) Travel--
1.2.5Second Destination Transportation--
1.3Maintenance--
1.3.1Consumables--
1.3.1.1Airframe/Hull/Vehicle Consumables and Repair Parts--
1.3.1.2Propulsion Consumables and Repair Parts--
1.3.1.3Electronics/Avionics Consumables and Repair Parts--
1.3.1.4Other Major Subsystem Consumables and Repair Parts 1..n (Specify)--
1.3.1.5Other Consumables and Repair Parts--
1.3.2Depot Level Reparables (DLRs)--
1.3.2.1Airframe/Hull/Vehicle DLRs--
1.3.2.2Propulsion DLRsX-
1.3.2.3Electronics/Avionics DLRs--
1.3.2.4Other Major Subsystems DLRs 1..n (Specify)--
1.3.2.5Other DLRs--
1.3.3Intermediate Maintenance (External to Unit-Level)--
1.3.3.1Intermediate Maintenance Consumable Materials and Repair Parts--
1.3.3.2Intermediate-Level Government Maintenance--
1.3.3.3Intermediate-Level Contractor Maintenance--
1.3.3.4Other Intermediate-Level Maintenance--
1.3.4Depot Maintenance--
1.3.4.1Scheduled Depot Maintenance--
1.3.4.1.1Airframe/Hull/Vehicle Scheduled OverhaulX-
1.3.4.1.2Propulsion Scheduled Overhaul--
1.3.4.1.3Electronics/Avionics Scheduled Overhaul--
1.3.4.1.4Other Major Subsystems Scheduled Overhaul 1..n (Specify)--
1.3.4.1.5Other Scheduled Overhaul--
1.3.4.2Unscheduled Depot Maintenance--
1.3.4.2.1Airframe/Hull/Vehicle Unscheduled Overhaul-X
1.3.4.2.2Propulsion Unscheduled Overhaul--
1.3.4.2.3Electronics/Avionics Unscheduled Overhaul--
1.3.4.2.4Other Major Subsystems Unscheduled Overhaul 1..n (Specify)--
1.3.4.2.5Other Unscheduled Unscheduled Overhaul--
1.4Sustaining Support--
1.4.1System-Specific Training--
1.4.1.1System-Specific Operator Training--
1.4.1.2System-Specific Maintenance Training--
1.4.2Support Equipment Replacement and Repair--
1.4.2.1Support Equipment Replacement--
1.4.2.2Support Equipment Repair--
1.4.3Sustaining/Systems Engineering--
1.4.3.1Reliability And Maintainability Engineering--
1.4.3.2Logistics Engineering (LSA Updates, Logistics Analysis)--
1.4.3.3Supply Analysis Efforts--
1.4.3.4Safety/Human Systems Integration Engineering--
1.4.3.5Affordability Engineering--
1.4.3.6Obsolescence Engineering--
1.4.3.7Availability Management--
1.4.3.8Product Engineering Support--
1.4.3.9Certification and Accreditation--
1.4.3.10Configuration Management--
1.4.3.11System Performance Analysis--
1.4.3.12Supply--
1.4.3.13Data Analysis--
1.4.3.14Physical Security--
1.4.4Program Management--
1.4.4.1Contractor Logistics Support (CLS) Management--
1.4.4.2CLS Supply Management--
1.4.4.3Financial/Schedule Planning and Reporting--
1.4.4.4Transition to Lead Service--
1.4.4.5Quality Assurance (Program Level)--
1.4.4.6Administrative Security--
1.4.4.7Transition to Performance Based Logistics (PBL)--
1.4.4.8Risk Mitigation--
1.4.4.9CSDR Reporting--
1.4.5Data and Technical Publications--
1.4.5.1Data Management--
1.4.5.2Technical Publications--
1.4.5.2.1Integrated Electronic Technical Manuals (IETMS)--
1.4.5.2.2Traditional Paper Technical Manuals--
1.4.5.3Drawings--
1.4.5.4Software Change Documentation--
1.4.6Simulator Operations and Repair--
1.4.6.1Simulator/Training Device Operations--
1.4.6.2Simulator/Training Device Hardware Repair and Replace--
1.4.6.3Simulator/Training Device Software Support--
1.4.7Other Sustaining Support 1...n (Specify)--
1.5Continuing System Improvements--
1.5.1Hardware Modifications--
1.5.1.1Mod Kit Development--
1.5.1.2Mod Kit Procurement--
1.5.1.3Mod Kit Initial Spares--
1.5.1.4Mod Kit Installation--
1.5.2Software Maintenance--
1.5.2.1Software Changes--
1.5.2.1.1Release 1...n (Specify)--
1.5.2.1.1.1WBS Name 1...n (Specify)--
1.5.2.1.1.1.1Correction of Deficiencies--
1.5.2.1.1.1.2Enhancements--
1.5.2.2Software Program Management--
1.5.2.3Software Sustaining Engineering--
1.5.2.4System Facilities--
1.5.2.5Field Service Engineers--
1.5.2.6Certification and Accreditation--
1.5.2.7HelpDesk--
1.5.2.8Hosting--
1.5.2.9Software Licenses--

CUI

File details come from the government source that posted it. Updated .