Attachment 0002 DRAFT PM MAV LFSS CSDR Plan.xls

XLS spreadsheet 149 KB Posted

Attached to
DRAFT Request for Proposal Project Management Mounted Armored Vehicle Logistic Fielding Support Services
Solicitation number
W912CH-25-R-0182
Issued by

About this file

This is a Cost and Software Data Reporting (CSDR) Plan document (DD Form 2794) for the Project Manager Mounted Armored Vehicles (PM MAV) Logistic Fielding Support Services (LFSS) program. The plan establishes cost and software data reporting requirements for a sustainment acquisition covering multiple ground vehicle platforms including the Armored Multi-Purpose Vehicle (AMPV), M113, M88 Recovery Vehicle, and Bradley Fighting Vehicle variants. The program is classified as ACAT III with both C-LRIP (Controlled Low-Rate Initial Production) and C-FRP (Full-Rate Production) phases, funded through RDT&E, Procurement, and O&M appropriations. The government point of contact is Sarah R. Paccione at Detroit Arsenal, Michigan (586-306-5364).

The plan specifies a comprehensive Work Breakdown Structure (WBS) with 11 major cost categories including unit-level manpower, unit operations, maintenance (consumables, depot-level reparables, intermediate and depot maintenance), sustaining support (training, support equipment, engineering, program management, data/publications), and continuing system improvements. Reporting requirements include cumulative Cost and Hour Reports in FlexFile format with an initial submission 60 days after contract award (due December 31, 2026) and annual interim reports through 2031, with final submissions due October 31, 2031. Maintenance and Repair Parts Data Reports are required on the same schedule. The plan identifies three Work Directives (WD1, WD2, WD3) and 305 end-item configurations combining various AMPV, M113, Bradley, M88, and MLRS variants. A CSDR Readiness Review must occur within 60 days of contract award to establish final reporting requirements, subcontractor obligations, and accounting system compliance verification.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0671
The public reporting burden for this collection of information is estimated to average 57 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0671). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
PM Mounted Armored Vehicles (MAV) (AMPV, Bradley, M113, M88 FoV)
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
XC-FRP
XO&S
1c. PRIME MISSION PRODUCT
Sustainment
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
XACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Ground Vehicle - Sustainment
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Paccione, Sarah, R.
6b. ADDRESS (Include ZIP Code)
6501 E. 11 Mile Rd, Detroit Arsenal, MI 48397
6c. TELEPHONE NUMBER (Include Area Code)
(586) 306-5364
6d. E-MAIL ADDRESS
sarah.r.paccione.civ@army.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
PM-MAV
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
iii. LOCATION
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
CBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD
9c. APPROPRIATION (check all that apply)
XRDT&E
XPROCUREMENT
XO&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DD FORM 2794 (PAGE 1), METADATA, MAY 2024PREVIOUS EDITION IS OBSOLETE

sarah.r.paccione.civ@army.mil

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01PM MAV Logistic Fielding Support Services (LFSS)X
1.12Unit-Level ManpowerX
1.1.13OperationsXX
1.1.23Unit-Level MaintenanceXXX
1.1.33Other Unit-Level (1...n Specify)XXX
1.22Unit OperationsX
1.2.13Energy (Fuel, Petroleum, Oil and Electricity)X
1.2.1.14FuelXX
1.2.1.24Petroleum, Oil and Lubricants (POL)XX
1.2.1.34ElectricityXX
1.2.23Training Munitions and Expendable StoresX
1.2.2.14AmmunitionXX
1.2.2.24BombsXX
1.2.2.34RocketsXX
1.2.2.44Training MissilesXX
1.2.2.54SonobuoysXX
1.2.2.64PyrotechnicsXX
1.2.2.74Other MunitionsXX
1.2.33Support ServicesX
1.2.3.14Non-Maintenance Field Service RepsXX
1.2.3.24Communication ServicesXX
1.2.3.34Facility/Storage ServicesXX
1.2.3.44Transportation ServicesXX
1.2.3.54Other Support ServicesXX
1.2.43Temporary Duty (TDY) TravelXX
1.2.53Second Destination TransportationXX
1.32MaintenanceXX
1.3.13ConsumablesXX
1.3.1.14Airframe/Hull/Vehicle Consumables and Repair PartsXXX
1.3.1.24Propulsion Consumables and Repair PartsXXX
1.3.1.34Electronics/Avionics Consumables and Repair PartsXXX
1.3.1.44Other Major Subsystem Consumables and Repair Parts 1..n (Specify)XXX
1.3.1.54Other Consumables and Repair PartsXXX
1.3.23Depot Level Reparables (DLRs)XX
1.3.2.14Airframe/Hull/Vehicle DLRsXXX
1.3.2.24Propulsion DLRsXXX
1.3.2.34Electronics/Avionics DLRsXXX
1.3.2.44Other Major Subsystems DLRs 1..n (Specify)XXX
1.3.2.54Other DLRsXXX
1.3.33Intermediate Maintenance (External to Unit-Level)XX
1.3.3.14Intermediate Maintenance Consumable Materials and Repair PartsXXX
1.3.3.24Intermediate-Level Government MaintenanceXXX
1.3.3.34Intermediate-Level Contractor MaintenanceXXX
1.3.3.44Other Intermediate-Level MaintenanceXXX
1.3.43Depot MaintenanceXX
1.3.4.14Scheduled Depot MaintenanceXX
1.3.4.1.15Airframe/Hull/Vehicle Scheduled OverhaulXXX
1.3.4.1.25Propulsion Scheduled OverhaulXXX
1.3.4.1.35Electronics/Avionics Scheduled OverhaulXXX
1.3.4.1.45Other Major Subsystems Scheduled Overhaul 1..n (Specify)XXX
1.3.4.1.55Other Scheduled OverhaulXXX
1.3.4.24Unscheduled Depot MaintenanceXX
1.3.4.2.15Airframe/Hull/Vehicle Unscheduled OverhaulXXX
1.3.4.2.25Propulsion Unscheduled OverhaulXXX
1.3.4.2.35Electronics/Avionics Unscheduled OverhaulXXX
1.3.4.2.45Other Major Subsystems Unscheduled Overhaul 1..n (Specify)XXX
1.3.4.2.55Other Unscheduled Unscheduled OverhaulXXX
1.42Sustaining SupportX
1.4.13System-Specific TrainingX
1.4.1.14System-Specific Operator TrainingXX
1.4.1.24System-Specific Maintenance TrainingXX
1.4.23Support Equipment Replacement and RepairXX
1.4.2.14Support Equipment ReplacementXXX
1.4.2.24Support Equipment RepairXXX
1.4.33Sustaining/Systems EngineeringX
1.4.3.14Reliability And Maintainability EngineeringXX
1.4.3.24Logistics Engineering (LSA Updates, Logistics Analysis)XX
1.4.3.34Supply Analysis EffortsXX
1.4.3.44Safety/Human Systems Integration EngineeringXX
1.4.3.54Affordability EngineeringXX
1.4.3.64Obsolescence EngineeringXX
1.4.3.74Availability ManagementXX
1.4.3.84Product Engineering SupportXX
1.4.3.94Certification and AccreditationXX
1.4.3.104Configuration ManagementXX
1.4.3.114System Performance AnalysisXX
1.4.3.124SupplyXX
1.4.3.134Data AnalysisXX
1.4.3.144Physical SecurityXX
1.4.43Program ManagementX
1.4.4.14Contractor Logistics Support (CLS) ManagementXX
1.4.4.24CLS Supply ManagementXX
1.4.4.34Financial/Schedule Planning and ReportingXX
1.4.4.44Transition to Lead ServiceXX
1.4.4.54Quality Assurance (Program Level)XX
1.4.4.64Administrative SecurityXX
1.4.4.74Transition to Performance Based Logistics (PBL)XX
1.4.4.84Risk MitigationXX
1.4.4.94CSDR ReportingXX
1.4.53Data and Technical PublicationsX
1.4.5.14Data ManagementXX
1.4.5.24Technical PublicationsX
1.4.5.2.15Integrated Electronic Technical Manuals (IETMS)XX
1.4.5.2.25Traditional Paper Technical ManualsXX
1.4.5.34DrawingsXX
1.4.5.44Software Change DocumentationXX
1.4.63Simulator Operations and RepairX
1.4.6.14Simulator/Training Device OperationsXX
1.4.6.24Simulator/Training Device Hardware Repair and ReplaceXX
1.4.6.34Simulator/Training Device Software SupportXX
1.4.73Other Sustaining Support 1...n (Specify)XX
1.52Continuing System ImprovementsX
1.5.13Hardware ModificationsX
1.5.1.14Mod Kit DevelopmentXX
1.5.1.24Mod Kit ProcurementXX
1.5.1.34Mod Kit Initial SparesXX
1.5.1.44Mod Kit InstallationXX
1.5.23Software MaintenanceX
1.5.2.14Software ChangesX
1.5.2.1.15Release 1...n (Specify)X
1.5.2.1.1.16WBS Name 1...n (Specify)X
1.5.2.1.1.1.17Correction of DeficienciesXX
1.5.2.1.1.1.27EnhancementsXX
1.5.2.24Software Program ManagementXX
1.5.2.34Software Sustaining EngineeringXX
1.5.2.44System FacilitiesXX
1.5.2.54Field Service EngineersXX
1.5.2.64Certification and AccreditationXX
1.5.2.74HelpDeskXX
1.5.2.84HostingXX
1.5.2.94Software LicensesXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DD FORM 2794 (PAGE 2), REPORTING, MAY 2024

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile)Contract Award (plus 60 days)Initial2026103120261231
2Cost and Hour Report (FlexFile)Annual Report 1Interim2027083120271031
3Maintenance and Repair Parts Data ReportAnnual Report 1Interim2027083120271031
4Cost and Hour Report (FlexFile)Annual Report 2Interim2028083120281031
5Maintenance and Repair Parts Data ReportAnnual Report 2Interim2028083120281031
6Cost and Hour Report (FlexFile)Annual Report 3Interim2029083120291031
7Maintenance and Repair Parts Data ReportAnnual Report 3Interim2029083120291031
8Cost and Hour Report (FlexFile)Annual Report 4Interim2030083120301031
9Maintenance and Repair Parts Data ReportAnnual Report 4Interim2030083120301031
10Cost and Hour Report (FlexFile)Contract Complete ReportFinal2031083120311031
11Maintenance and Repair Parts Data ReportContract Complete ReportFinal2031083120311031
DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, MAY 2024PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b, irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or CLIN structure, including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc.
a. CSDR PLAN REMARKS & PREPARATION INSTRUCTIONS
1. Costs reported against this CSDR plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission’s “AS OF DATE” (block 14.e)).
i. WBS Element Names (block 11.c) Ending with "1...n (Contractor Shall Specify)": The contractor shall extend and specify (i.e., include additional WBS elements determined by the contractor) in order to provide additional insight into the contractor's technical approach or design. The additional WBS elements shall be developed in accordance with the WBS guidelines included in MIL-STD-881F (or latest version).
ii. The contractor may extend any WBS element in accordance with guidelines included in MIL-STD-881F (or latest version). Any changes to WBS, Order/Lot, End Item, and/or Period of Performance must be reported to the government prior to submission or immediately, with revised CSDR Plan, must be approved by the CSDR Plan approval authority.
b. SUBMISSION EVENTS & DATES
1. Deliverable Preparation Instructions by AS OF and DUE Dates: All CSDR deliverable “AS OF DATE[S]” and “DUE DATE[S]” listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:
i. All “DUE DATE” requirements are equal to the “AS OF DATE” plus 60 calendar days. If the calculated “DUE DATE” does not fall on a regular business day, the “DUE DATE” will be the next regular business day on the contractor’s accounting calendar.
ii. “Final” Submission Events must meet both of the following two conditions:

Condition 1: The final end item(s) has been delivered and accepted by the government (e.g., as evidenced by a completed DD-250) or higher tier contractor in the case of a subcontractor, and

Condition 2: 95% or more of all ATD costs associated with the Subtotal, G&A and FCCOM have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Item 4 of Data Group B) associated with the contract Subtotal, G&A, FCCOM and UB.

iii. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract.
c. COST & HOUR REPORT (FLEXFILE)
1. The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794.
2. The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
3. WBS Definitions & Remarks (Data Group C) must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The WBS Definitions & Remarks shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. WBS Definitions & Remarks shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.
CWBS Element Dictionary - The contractor shall provide an entry for all CWBS elements.

The contractor shall provide at least the following information for each CWBS element:

1) Summary description of the scope of work paragraph(s), control account(s), work package(s), or task order(s) reported awarded on the contract as of the reports as of date.

2) Listing of which scope of work paragraph(s), control account(s), work package(s), or task order(s) are mapped to each CWBS element.

3) Summary identification of the functional resources (e.g., engineering, logistics) to be applied to complete the scope of work paragraph(s), control account(s), work package(s), or task order(s) mapped to each CWBS element.

4) Explanation of nonrecurring costs associated with the CWBS element.

5) Explanation of recurring costs associated with the CWBS element.

6) Identify if the scope of work paragraph(s), control account(s), work package(s), or task order(s) reported in the CWBS element are completed by the contractor or subcontractor(s).

7) Explanation of any allocations utilized to collect and report costs associated with the CWBS element.

4. The reporting entity must maintain and update WBS Definitions & Remarks throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Definitions.
5. For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in WBS Definitions & Remarks that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.
6. Order/Lot: Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.
7. End Items: Block 17 of this CSDR Plan is meant to capture the discrete hardware end items that are DD-250'ed, ordered, procured, or exercised (as applicable) on the contract. If an End Item is DD-250'ed, ordered, procured, or exercised (as applicable) on the contract but is not listed in block 17, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the End Item utilized on the contract. The CSDR Plan will be updated to include the appropriate End Item name in block 17, after report submission, if required.
i. End Item ID 1: The "Common" end item tag shall be used to report costs and hours which are not incurred or directly attributable to an individual end item. For example, overarching program management costs and hours that are required, independent of the type or quantity of end items on contract would be tagged against the “Common” end item. Common hardware (i.e., identical/homogeneous part numbers) procured and integrated into multiple end items shall utilize the end item tag for the prime product they were integrated onto and shall not be tagged with the “Common” end item.
8. The contractor shall utilize and include the following mappings from its accounting system to the Actual Cost-Hour Data tags:
i. {To be determined during the CSDR Readiness Review based on contractor's accounting system} = Tag1
ii. {To be determined during the CSDR Readiness Review based on contractor's accounting system} = Tag2
iii. {To be determined during the CSDR Readiness Review based on contractor's accounting system} = Tag3
d. QUANTITY DATA REPORT **DELETE if a QDR is not required by the CSDR Plan**
1. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.
2. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for hardware-related content across the following WBS elements: Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.
e. MAINTENANCE & REPAIR PARTS DATA REPORT **DELETE if a M/R is not required by the CSDR Plan**
1. Indicate in the Repair remarks whether the reported repair costs include the cost of the labor hours reported in the Maintenance data, if applicable.
2. Maintenance Event and/or Repair Parts data should indicate if the source system(s) used to populate the report’s cost/hours differs from the system(s) used to populate the FlexFile.
3. Provide a general remark describing the logic of work order/maintenance event numbering, if applicable. Ex: The first X letters/numbers are the DoDAAC of the originating site, the last X digits represent the sequence of the work order, children work orders contain the parent numbering plus additional digits at the end, etc.
4. Maintenance Event and/or Repair Parts data should include a remark indicating if costs and/or hours are based on actuals for each event or if they are based on averages/established metrics.
f. TECHNICAL DATA REPORT **DELETE if a TDR is not required by the CSDR Plan**
1. Include only UNCLASSIFIED/CUI information in Technical Data Report deliverables submitted to CADE. Notify the Government if any values associated with the Technical Parameter Requirements are classified.
g. RESOURCE DISTRIBUTION TABLE (RDT)
1. Submissions of the Resource Distribution Table (RDT) are required under the following conditions:
i. An RDT shall be delivered no later than seven calendar days before the “CSDR Readiness Review”. Prepare this submission of the RDT, in accordance with the RDT Instructions on the CADE website, at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the “CSDR Readiness Review” in order to identify which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to CADE and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.
ii. The contractor must notify the government program office immediately of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to CADE but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).
h. RELATIONSHIP/USE OF COST ACCOUNTING STANDARDS (CAS) **DELETE if CAS is not applicable**
1. The contractor shall follow the accounting procedures specified in its latest approved CAS Disclosure Statement and with any clauses or requirements included in the contract. As part of the CSDR Readiness Review, the contractor shall identify any aspect(s) of its latest approved CAS Disclosure Statement which preclude or inhibit compliance with this CSDR Plan. The contractor shall identify any deviations from its CAS disclosure statement it intends to utilize to prepare CSDR submissions.
2. The contractor shall provide a description of significant accounting systems or CAS changes and how those changes effect the latest CSDR deliverable or the ability to compare CSDR deliverables provided before/after the accounting system/CAS revision. The contractor shall provide the description within the submission remarks of the FlexFile deliverable.
i. CSDR READINESS REVIEW
1. The contractor shall host a CSDR-RR at the contractor’s facility where CSDRs are prepared with the Government’s Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the CSDR-RR is to review the contract’s CSDR requirements and assess how the Contractor’s accounting system satisfies the CSDR requirements found in DODM 5000.04 and this CSDR Plan. Reference the CADE website for instructions and additional information: https://cade.osd.mil/policy/csdr-timeline
2. The contractor and CWIPT will also review the initial submission of the "Resource Distribution Table (RDT)", in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to Cost Assessment Data Enterprise (CADE), and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.
3. The CSDR-RR shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor. This meeting has an anticipated duration of one business day.
l. CONTRACT-SPECIFIC REMARKS **DELETE if not applicable**
1. <insert contract-specific remarks>
DD FORM 2794 (PAGE 4), REMARKS, MAY 2024 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
WD1Work Directive 1C-FRP, O&S
WD2Work Directive 2C-FRP, O&S
WD3..nWork Directive 3….nC-FRP, O&S
17. END ITEMS
a. IDb. NAME
1Common
2AMPV/M113 Common
3AMPV Mission Command (MCmd)
4AMPV General Purpose
5AMPV Mortar Carrier (MC)
6AMPV Medical Evacuation (ME)
7AMPV Medical Treatment (MT)
8AMPV Mission Command (MCmd), AMPV General Purpose
9AMPV Mission Command (MCmd), AMPV Mortar Carrier (MC)
10AMPV Mission Command (MCmd), AMPV Medical Evacuation (ME)
11AMPV Mission Command (MCmd), AMPV Medical Treatment (MT)
12AMPV General Purpose, AMPV Mortar Carrier (MC)
13AMPV General Purpose, AMPV Medical Evacuation (ME)
14AMPV General Purpose, AMPV Medical Treatment (MT)
15AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME)
16AMPV Mortar Carrier (MC), AMPV Medical Treatment (MT)
17AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
18AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Mortar Carrier (MC)
19AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Medical Evacuation (ME)
20AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Medical Treatment (MT)
21AMPV Mission Command (MCmd), AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME)
22AMPV Mission Command (MCmd), AMPV Mortar Carrier (MC), AMPV Medical Treatment (MT)
23AMPV Mission Command (MCmd), AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
24AMPV General Purpose, AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME)
25AMPV General Purpose, AMPV Mortar Carrier (MC), AMPV Medical Treatment (MT)
26AMPV General Purpose, AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
27AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
28AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME)
29AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Mortar Carrier (MC), AMPV Medical Treatment (MT)
30AMPV Mission Command (MCmd), AMPV General Purpose, AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
31AMPV Mission Command (MCmd), AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
32AMPV General Purpose, AMPV Mortar Carrier (MC), AMPV Medical Evacuation (ME), AMPV Medical Treatment (MT)
33M113A3 (Armored Personnel Carrier)
34M1068A3 (Command Post Carrier SICPS)
35M577A3 (Command Post Carrier)
36M1064A3 (Mortar Carrier)
37M113A3 (Armored Personnel Carrier), M1068A3 (Command Post Carrier SICPS)
38M113A3 (Armored Personnel Carrier), M577A3 (Command Post Carrier)
39M113A3 (Armored Personnel Carrier), M1064A3 (Mortar Carrier)
40M1068A3 (Command Post Carrier SICPS), M577A3 (Command Post Carrier)
41M1068A3 (Command Post Carrier SICPS), M1064A3 (Mortar Carrier)
42M577A3 (Command Post Carrier), M1064A3 (Mortar Carrier)
43M113A3 (Armored Personnel Carrier), M1068A3 (Command Post Carrier SICPS), M577A3 (Command Post Carrier)
44M113A3 (Armored Personnel Carrier), M1068A3 (Command Post Carrier SICPS), M1064A3 (Mortar Carrier)
45M113A3 (Armored Personnel Carrier), M577A3 (Command Post Carrier), M1064A3 (Mortar Carrier)
46M1068A3 (Command Post Carrier SICPS), M577A3 (Command Post Carrier), M1064A3 (Mortar Carrier)
47Bradley/MLRS Common
48Bradley M2A4
49Bradley M7A4
50Bradley M2A3
51Bradley M2A2 ODSSA
52Bradley M7BFIST SA
53Bradley M3A3 BFIST W/FS3
54Bradley M2A4E1
55MLRS
56Bradley M2A4, Bradley M7A4
57Bradley M2A4, Bradley M2A3
58Bradley M2A4, Bradley M2A2 ODSSA
59Bradley M2A4, Bradley M7BFIST SA
60Bradley M2A4, Bradley M3A3 BFIST w/FS3
61Bradley M2A4, Bradley M2A4E1
62Bradley M2A4, MLRS
63Bradley M7A4, Bradley M2A3
64Bradley M7A4, Bradley M2A2 ODSSA
65Bradley M7A4, Bradley M7BFIST SA
66Bradley M7A4, Bradley M3A3 BFIST w/FS3
67Bradley M7A4, Bradley M2A4E1
68Bradley M7A4, MLRS
69Bradley M2A3, Bradley M2A2 ODSSA
70Bradley M2A3, Bradley M7BFIST SA
71Bradley M2A3, Bradley M3A3 BFIST w/FS3
72Bradley M2A3, Bradley M2A4E1
73Bradley M2A3, MLRS
74Bradley M2A2 ODSSA, Bradley M7BFIST SA
75Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
76Bradley M2A2 ODSSA, Bradley M2A4E1
77Bradley M2A2 ODSSA, MLRS
78Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
79Bradley M7BFIST SA, Bradley M2A4E1
80Bradley M7BFIST SA, MLRS
81Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
82Bradley M3A3 BFIST w/FS3, MLRS
83Bradley M2A4E1, MLRS
84Bradley M2A4, Bradley M7A4, Bradley M2A3
85Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA
86Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA
87Bradley M2A4, Bradley M7A4, Bradley M3A3 BFIST w/FS3
88Bradley M2A4, Bradley M7A4, Bradley M2A4E1
89Bradley M2A4, Bradley M7A4, MLRS
90Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA
91Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA
92Bradley M2A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3
93Bradley M2A4, Bradley M2A3, Bradley M2A4E1
94Bradley M2A4, Bradley M2A3, MLRS
95Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA
96Bradley M2A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
97Bradley M2A4, Bradley M2A2 ODSSA, Bradley M2A4E1
98Bradley M2A4, Bradley M2A2 ODSSA, MLRS
99Bradley M2A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
100Bradley M2A4, Bradley M7BFIST SA, Bradley M2A4E1
101Bradley M2A4, Bradley M7BFIST SA, MLRS
102Bradley M2A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
103Bradley M2A4, Bradley M3A3 BFIST w/FS3, MLRS
104Bradley M2A4, Bradley M2A4E1, MLRS
105Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA
106Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA
107Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3
108Bradley M7A4, Bradley M2A3, Bradley M2A4E1
109Bradley M7A4, Bradley M2A3, MLRS
110Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA
111Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
112Bradley M7A4, Bradley M2A2 ODSSA, Bradley M2A4E1
113Bradley M7A4, Bradley M2A2 ODSSA, MLRS
114Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
115Bradley M7A4, Bradley M7BFIST SA, Bradley M2A4E1
116Bradley M7A4, Bradley M7BFIST SA, MLRS
117Bradley M7A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
118Bradley M7A4, Bradley M3A3 BFIST w/FS3, MLRS
119Bradley M7A4, Bradley M2A4E1, MLRS
120Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA
121Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
122Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1
123Bradley M2A3, Bradley M2A2 ODSSA, MLRS
124Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
125Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1
126Bradley M2A3, Bradley M7BFIST SA, MLRS
127Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
128Bradley M2A3, Bradley M3A3 BFIST w/FS3, MLRS
129Bradley M2A3, Bradley M2A4E1, MLRS
130Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
131Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
132Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
133Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
134Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
135Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
136Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
137Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
138Bradley M7BFIST SA, Bradley M2A4E1, MLRS
139Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
140Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA
141Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA
142Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3
143Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A4E1
144Bradley M2A4, Bradley M7A4, Bradley M2A3, MLRS
145Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA
146Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
147Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M2A4E1
148Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, MLRS
149Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
150Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M2A4E1
151Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, MLRS
152Bradley M2A4, Bradley M7A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
153Bradley M2A4, Bradley M7A4, Bradley M3A3 BFIST w/FS3, MLRS
154Bradley M2A4, Bradley M7A4, Bradley M2A4E1, MLRS
155Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA
156Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
157Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1
158Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, MLRS
159Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
160Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1
161Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, MLRS
162Bradley M2A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
163Bradley M2A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, MLRS
164Bradley M2A4, Bradley M2A3, Bradley M2A4E1, MLRS
165Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
166Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
167Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
168Bradley M2A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
169Bradley M2A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
170Bradley M2A4, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
171Bradley M2A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
172Bradley M2A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
173Bradley M2A4, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
174Bradley M2A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
175Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA
176Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
177Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1
178Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, MLRS
179Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
180Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1
181Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, MLRS
182Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
183Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, MLRS
184Bradley M7A4, Bradley M2A3, Bradley M2A4E1, MLRS
185Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
186Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
187Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
188Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
189Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
190Bradley M7A4, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
191Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
192Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
193Bradley M7A4, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
194Bradley M7A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
195Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
196Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
197Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
198Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
199Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
200Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
201Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
202Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
203Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
204Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
205Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
206Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
207Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
208Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
209Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
210Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA
211Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3
212Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1
213Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, MLRS
214Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
215Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1
216Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, MLRS
217Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
218Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, MLRS
219Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A4E1, MLRS
220Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
221Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
222Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
223Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
224Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
225Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
226Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
227Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
228Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
229Bradley M2A4, Bradley M7A4, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
230Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
231Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
232Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
233Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
234Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
235Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
236Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
237Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
238Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
239Bradley M2A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
240Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
241Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
242Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
243Bradley M2A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
244Bradley M2A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
245Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
246Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
247Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
248Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
249Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
250Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
251Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
252Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
253Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
254Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
255Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
256Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
257Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
258Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
259Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
260Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
261Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
262Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
263Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
264Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
265Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
266Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3
267Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1
268Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, MLRS
269Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
270Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, MLRS
271Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M2A4E1, MLRS
272Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
273Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
274Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
275Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
276Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
277Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
278Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
279Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
280Bradley M2A4, Bradley M7A4, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
281Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
282Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
283Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
284Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
285Bradley M2A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
286Bradley M2A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
287Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
288Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
289Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
290Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
291Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
292Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
293Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
294Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1
295Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, MLRS
296Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M2A4E1, MLRS
297Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
298Bradley M2A4, Bradley M7A4, Bradley M2A3, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
299Bradley M2A4, Bradley M7A4, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
300Bradley M2A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
301Bradley M7A4, Bradley M2A3, Bradley M2A2 ODSSA, Bradley M7BFIST SA, Bradley M3A3 BFIST w/FS3, Bradley M2A4E1, MLRS
302M88 FoV Common
303M88 FoV M88A1
304M88 FoV M88A2
305M88 FoV M88A1, M88 FoV M88A2
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT/SUBLOT REPORTING
(X if applicable)d. UNIT SEQUENCING

(X if applicable)

DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, MAY 2024

File details come from the government source that posted it. Updated .