Attach L-03 - OCI Disclosure Form v2.0 (Extended).pdf

PDF 462 KB Posted

Attached to
MDA IT Operations & Engineering Solutions (MIOES) - CANCELED Federal contract opportunity
Solicitation number
HQ0857-MIOES-ZA
Issued by
DOD Missile Defense Agency

View the file

Other files for this federal contract opportunity

Other files attached to MDA IT Operations & Engineering Solutions (MIOES) - CANCELED, newest first.
File Type Posted
MIOES TO Phase-in Schedule (Preliminary).pptx PPTX presentation
MIOES_IRES PWS -- Enterprise IT (12.20 RFI).pdf PDF
MIOES CLIN Structure RFI 12.20.2024.pdf PDF
MIOES Virtual Industry Brief Schedule.pdf PDF
MIOES Cybersecurity PWS DRFP Inc3.pdf PDF
MIOES DRFP Inc1 CONSOLIDATED QandAs.xlsx XLSX spreadsheet
MIOES Industry Day Overview and Instructions.docx DOCX document
MIOES Section L DRFP Inc2 Rev1.docx DOCX document
Attachment L-6 MIOES Evaluation Scenarios DRFP Inc2.docx DOCX document
MIOES Section M DRFP Inc2.docx DOCX document
Attachment L-3 OCI Analysis Disclosure Form DRFP Inc2.pdf PDF
MIOES LCAT Table DRFP Inc2.xlsx XLSX spreadsheet
MIOES Basic IDIQ PWS 24 June DRAFT RFP.pdf PDF
QA_DRFP_Inc1_MIOES.xlsx XLSX spreadsheet
MIOES Phase-In Task Order PWS 14 June DRAFT RFP.pdf PDF
MIOES Basic IDIQ PWS 14 June DRAFT RFP.pdf PDF
MIOES Acquisition Strategy Summary - 14 June DRAFT RFP.pdf PDF
MIOES Industry Monthly Chargeback Showback - May.pptx PPTX presentation
MIOES Industry Monthly CSSP - June.pptx PPTX presentation
22F5900_PWS.pdf PDF
18F8002_PWS.pdf PDF
23F8700_PWS.pdf PDF
23F1500_PWS.pdf PDF
MIOES SE Overview (15 Feb 24).pptx PPTX presentation
22F8900_PWS.pdf PDF
23F3100_PWS.pdf PDF
23F8600_PWS.pdf PDF
23F7300_PWS.pdf PDF
MIOES OCI Guiding Principles (Final).pdf PDF
20230405-MIOES_Industry_Day_POC.xlsx XLSX spreadsheet
20230103-MIOES_Industry_Day_POC-1.xlsx XLSX spreadsheet
20230103-MIOES_Industry_Day_POC.xlsx XLSX spreadsheet
Attachment J-01 - IRES Contract SOO (A0005).docx DOCX document
Attachment J-04 - DD254.pdf PDF
Attach L-10 - IRES SEPI SOO (A0006).docx DOCX document
Attach L-17 - Tool App Questionnaire (A0005).docx DOCX document
Section L (A0008).docx DOCX document
Attachment J-02 - IRES WBS and CSDR.pdf PDF
Attach L-02 - Team List.docx DOCX document
Attach L-05 - Consent Letter.docx DOCX document
Attach L-07 - PPQ (A0001).docx DOCX document
Attach L-14 - Cost Price WB 1 (A0001).xlsx XLSX spreadsheet
Attachment J-03 - IRES Labor Category Descriptions.xlsx XLSX spreadsheet
Exhibit A - MDA Mandatory CDRLs.docx DOCX document
Exhibit B - IRES CDRLs.docx DOCX document
Attach L-06 - Client Authorization Letter.docx DOCX document
Attach L-11 - EITS SOO (A0005).docx DOCX document
Attach L-12 - FEO SOO (A0005).docx DOCX document
Attach L-16 - Cost Price WB 3 (A0003).xlsx XLSX spreadsheet
Section M (A0006).docx DOCX document
Show all 50

MDA IT Operations & Engineering Solutions (MIOES) - CANCELED has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H95001-15-R-0001 Attachment L-03

OCI ANALYSIS/DISCLOSURE FORM v2.0 Integrated Research & Development for Enterprise Solutions (IRES) Contract

Part 1: Contractor Data

1. Contractor Name

2. CAGE Code

3. Point of Contact

4. IRES Prime or Sub

5. Type of work to be performed on IRES

6. Affiliates

Part 2: Contractor’s Other MDA- or BMD-related Work

7. Prime Contract Number

8. Prime Contract Title

9. Gov’t Contracting Officer

10. Period of Performance

11. Prime or Sub and

Description of Work Performed

12. Relationship to or interaction with the work identified in Block 5

Part 3: Contractor’s OCI Analysis

13. Does Actual OCI exist? Yes No

14. Does Potential OCI exist? Yes No

15. Summary of actual / potential OCI or why there is no potential OCI

Part 4: Name of Responsible Company Official

16. Typed Name and Title

17. Contact Information

18. Date

H95001-15-R-0001 Attachment L-03

INSTRUCTIONS FOR COMPLETING OCI ANALYSIS/DISCLOSURE FORM

Responses to any items may reference attached documents as necessary.

Part 1: Contractor Data

Blocks 1and 2: Enter Contractor name and CAGE code. The “contractor” for purposes of this form could be the offeror, subcontractor, or affiliate of either

Block 3: Enter the name, telephone number, and email address of the contractor point of contact that is most knowledgeable of both the IRES work to be performed in Part 1 as well as the work performed under the contract identified in Part 2.

Blocks 4 and 5 Identify whether the Contractor identified in Block 1 is a prime or subcontractor on IRES. Describe the work to be performed on the IRES contract, including the primary IRES high level objective(s) (HLOs).

Block 6: Provide a list of all affiliates of the contractor named in Block 1.

Part 2: Contractor’s Other MDA- or BMDS-related Work

Block 7: Enter the MDA or BMDS-related prime contract number and task order number and subcontract number (if applicable).

Block 8: Enter the prime contract or task order title.

Block 9: Enter the name, telephone number, and email address of the prime contract’s

Government Contracting Officer.

Block 10: Enter the period of performance of the contract or subcontract.

Block 11: Specify if the Contractor is the prime or subcontractor with regard to Block 7.

Provide a brief, but specific, narrative summary of the work performed on the contract. Specify if the work includes: providing systems engineering and technical direction, preparing specifications or work statements, providing evaluation services, obtaining access to proprietary information, or providing systems engineering and technical assistance, as defined in FAR 9.5 and DFARS 209.5.

Block 12: Enter a brief, but specific, narrative summary of any known or anticipated relationship or interaction between this contract and the IRES contract or the Joint National Integration Research and Development Contract (JRDC); if none, so state.

Identify all non-public IRES acquisition information accessed or obtained. Be as specific as possible in terms of describing what information/documents were accessed and for what purpose you had access; if none, so state.

Part 3: Contractor’s OCI Analysis Blocks 13 and 14: Place an "X" in the appropriate response (yes or no).

Block 15: Enter a summary of the actual or potential OCI, considering the following types:

(a) impaired objectivity, (2) biased ground rules, (3) unequal access to information;

and (4) Systems Engineering and Technical Assistance (SETA) (reference L.6.3.4).

Provide any current OCI restrictions, mitigation plans, or OCI advisory letters involving this contract that may impact IRES. Describe the actions planned to avoid, neutralize, or mitigate actual or potential OCI identified. If no potential OCI exists, briefly summarize why.

Part 4: Name of Responsible Company Official Blocks 16 – 18: Provide the name, title, and contact information of the company official with responsibility for and/or authority to discuss and commit the company on matters relating to OCI issues. Please also provide the date the form was completed.

1 Contractor Name:
2 CAGE Code:
3 Point of Contact:
4 IRES Prime or Sub:
5 Type of work to be performed on IRES:
6 Affiliates:
7 Prime Contract Number:
8 Prime Contract Title:
9 Govt Contracting Officer:
10 Period of Performance:
11 Prime or Sub and Description of Work Performed:
12 Relationship to or interaction with the work identified in Block 5:
15 Summary of actual potential OCI or why there is no potential OCI:
16 Typed Name and Title:
17 Contact Information:
18 Date:
Actual OCI Yes: Off
Actual OCI No: Off
Potential OCI Yes: Off
Potential OCI No: Off

File details come from the government source that posted it. Updated .