Section M (A0006).docx
DOCX document 70 KB Posted
- Attached to
- MDA IT Operations & Engineering Solutions (MIOES) - CANCELED Federal contract opportunity
- Solicitation number
- HQ0857-MIOES-ZA
- Issued by
- DOD Missile Defense Agency
View the file
Other files for this federal contract opportunity
Show all 50
MDA IT Operations & Engineering Solutions (MIOES) - CANCELED has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section M – Evaluation Factors for Award Table of Contents
| M.1 | Provisions Incorporated Full Text | M-3 |
| M.2 | Source Selection | M-3 |
| M.2.1 | Basis for Contract Award | M-3 |
| M.2.2 | General Considerations for Award and Offeror Responsibility | M-3 |
| M.2.3 | Award Terms | M-4 |
| M.2.4 | Number of Contracts to be Awarded | M-4 |
| M.2.5 | Incorporation of Proposal into the Contract | M-4 |
| M.3 | Evaluation Factors, subfactors and Relative Order of Importance | M-4 |
| M.3.1 | Evaluation Factors and Subfactors | M-4 |
| M.3.2 | Relative Order of Importance of Factors and Subfactors | M-4 |
| M.4 | Technical Evaluation Definitions and Ratings | M-5 |
| M.4.1 | Strengths, Uncertainties, Weaknesses, Significant Weaknesses and Deficiencies | M-5 |
| M.4.2 | Evaluation Methodology 1: Combined Technical / Risk Rating | M-5 |
| M.4.3 | Evaluation Methodology 2: Separate Technical / Risk Rating | M-6 |
| M.4.3.1 | Technical Rating | M-6 |
| M.4.3.2 | Technical Risk Rating | M-6 |
| M.5 | Factor / Subfactor Evaluation | M-6 |
| M.5.1 | Factor 1: Technical Approach | M-6 |
| M.5.1.1 | Subfactor 1a: Organization | M-6 |
| M.5.1.2 | Subfactor 1b: IRES Mission Execution | M-7 |
| M.5.1.3 | Subfactor 1c: Small Business Participation and Commitment Plan | M-7 |
| M.5.2 | Factor 2: Contractor Performance Work Statements (CPWS) | M-7 |
| M.5.2.1 | Subfactor 2a: IRES Systems Engineering and Program Integration (SE&PI) Approach, SOO and Basis of Estimate (BOE) | M-8 |
| M.5.2.2 | Subfactor 2b: Enterprise Information Technology Services (EITS) Approach, SOO and BOE | M-8 |
| M.5.2.3 | Subfactor 2c: Facilities Engineering and Operations (FE&O) Approach, SOO and BOE | M-9 |
| M.5.3 | Factor 3: Cost / Price | M-9 |
| M.5.3.1 | General | M-9 |
| M.5.3.2 | Reasonableness | M-9 |
| M.5.3.3 | Realism | M-9 |
| M.5.3.4 | Total Evaluated Price | M-10 |
| M.5.4 | Factor 4: Acceptable / Unacceptable Factors | M-11 |
| M.5.4.1 | Subfactor 4a: Transition Approach, SOO and BOE | M-11 |
| M.5.4.2 | Subfactor 4b: Past Performance | M-11 |
List of Tables
| Exhibit M-1. Evaluation Factors, Subfactors and Evaluation Ratings | M-4 |
| Exhibit M-2. Definition of Strength, Uncertainty, Weakness, Significant Weakness and Deficiency | M-5 |
| Exhibit M-3. Combined Technical / Risk Ratings and Definitions | M-5 |
| Exhibit M-4. Technical Ratings and Definitions | M-6 |
| Exhibit M-5. Technical Risk Ratings and Definitions | M-6 |
| Exhibit M-6. Acceptable / Unacceptable Ratings and Definitions | M-11 |
| Exhibit M-7. Past Performance Evaluation Ratings and Definitions | M-11 |
| Exhibit M-8. Recency Ratings and Definitions | M-12 |
| Exhibit M-9. Relevancy Ratings and Definitions | M-13 |
| Exhibit M-10. Quality Ratings and Definitions | M-13 |
| Exhibit M-11. Small Business Utilization Ratings and Definitions | M-14 |
H95001-15-R-0001-0006 Page M-1 of M-14
IRES Solicitation, Section M
| M.1 | Provisions Incorporated Full Text |
| 52.217-5 | EVALUATION OF OPTIONS (JUL 1990) |
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement and award term periods. This applies to options under FAR clause 52.217-8, Option to Extend Services. Evaluation of options under FAR 52.217-8 will be accomplished by using 50% of the future estimated price for the Year 8 ordering period (last award term period) to determine the price for a 6-month option period. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
| M.2 | Source Selection |
| M.2.1 | Basis for Contract Award |
| M.2.1.1 | The source selection will be conducted using the best value tradeoff process described in FAR 15.101-1 and the source selection procedures identified in FAR Subpart 15.3, as supplemented by DFARS Subpart 215.3. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose proposal represents the best value, based upon an integrated assessment of the evaluation factors and subfactors in the solicitation. Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, to be eligible for award. Failure to comply with the solicitation requirements may result in an unfavorable proposal evaluation or the offeror being ineligible for award of the contract. |
| M.2.1.2 | The Government will select for award the most advantageous proposal representing the best value to the Government based upon an integrated assessment of Factor 1 [Technical Approach], Factor 2 [Contractor Performance Work Statements (CPWS)] and Factor 3 [Cost / Price]. Although price is a substantial factor in source selection, award may be made to a higher rated, higher priced offeror where the source selection authority reasonably determines that the superiority of Factors 1 and 2 from the higher priced offeror outweighs the price differential [Factor 3]. Transition [subfactor 4a] and Past Performance [subfactor 4b] will be evaluated as Acceptable or Unacceptable. Proposals assessed as Unacceptable in subfactor 4a or subfactor 4b are not eligible for award. The selection decision will document tradeoffs between Factors 1, 2 and 3 for offerors in the competitive range receiving Acceptable ratings for subfactors 4a and 4b. |
| M.2.2 | General Considerations for Award and Offeror Responsibility |
Information submitted in Volumes 1 (Contract Documentation, Part 1) and 5 (Contract Documentation, Part 2) of the proposal will be reviewed by the Government for compliance with the solicitation and will also be used, along with any other information available to the Government, to determine an offeror’s responsibility consistent with the requirements of FAR 9.104.
M.2.3 Award Terms The Government will evaluate offers for award purposes by adding the total price for all award terms to the total price for the basic requirement and options (see FAR 52.217-5 above). Evaluation of award terms will not obligate the Government to execute the award terms.
M.2.4 Number of Contracts to be Awarded Reference paragraphs (c)(4), (f)(5), and (f)(6) of FAR 52.215-1, the Government intends to award a single contract for all of the Integrated Research and Development for Enterprise Solutions requirements; however, the government reserves the right to make no award at all.
M.2.5 Incorporation of Proposal into the Contract Exhibit L-2 identifies the elements of the proposal that will be incorporated into the contract and task order awards. When the proposal offers a level of service or performance that exceeds the solicitation requirements or Government’s expectations and provides benefit to the Government, those specific elements of the proposal may also be incorporated into the awarded contract and / or task orders.
| M.3 | Evaluation Factors, subfactors and Relative Order of Importance |
| M.3.1 | Evaluation Factors and Subfactors |
The evaluation factors, subfactors and evaluation ratings identified in Exhibit M-1 will be used to evaluate each proposal. Subfactor ratings will not be rolled up to a single factor rating.
Exhibit M-1. Evaluation Factors, Subfactors and Evaluation Ratings
| Factor |
| Subfactor |
| Evaluation Ratings |
Factor 1: Technical Approach
| Subfactor 1a: Organization |
| Methodology 1: Combined Technical / Risk Ratings |
Subfactor 1b: IRES Mission Execution
Subfactor 1c: Small Business Participation and Commitment Plan
Factor 2: Contractor Performance Work Statements
| Subfactor 2a: IRES Systems Engineering and Program Integration |
| Methodology 2: Technical Rating and Risk Rating |
Subfactor 2b: Enterprise Information Technology Services
Subfactor 2c: Facilities Engineering and Operations
| Factor 3: | Cost / Price | |
| Total Evaluated Price | $_______ | |
| Reasonable: | Yes / No | |
| Realistic: | Yes / No |
Factor 4: Acceptable / Unacceptable Criteria
| Subfactor 4a: Transition Contractor Performance Work Statements |
| Acceptable / Unacceptable |
Subfactor 4b: Past Performance
| M.3.2 | Relative Order of Importance of Factors and Subfactors |
| M.3.2.1 | The relative importance of Factors 1, 2 and 3 are equal. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price. |
| M.3.2.2 | Within Factor 1, subfactor 1a and subfactor 1b are equal, and each is significantly more important than subfactor 1c. |
| M.3.2.3 | Within Factor 2, the subfactors, in descending order of importance, are: subfactor 2a, subfactor 2b, and subfactor 2c. |
| M.3.2.4 | Proposals assessed as Unacceptable in subfactor 4a or subfactor 4b are not eligible for award. The selection decision will document tradeoffs between Factors 1, 2 and 3 for offerors in the competitive range receiving Acceptable ratings for subfactors 4a and 4b. |
| M.4 | Technical Evaluation Definitions and Ratings |
| M.4.1 | Strengths, Uncertainties, Weaknesses, Significant Weaknesses and Deficiencies |
Each proposal will be evaluated against the solicitation factors and subfactors established in the solicitation. The technical rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal, as defined in Exhibit M-2. Evaluator comments identified as an ‘uncertainty’ will be clarified during discussions and re-assessed as a strength, weakness, significant weakness, deficiency or removed as a comment.
Exhibit M-2. Definition of Strength, Uncertainty, Weakness, Significant Weakness and Deficiency
| Rating |
| Definition |
| Strength |
| Strength is an aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. |
| Uncertainty |
| Uncertainty is a doubt regarding whether an aspect of the proposal meets a material performance or capability requirement. |
| Weakness |
| Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. |
| Significant Weakness |
| Significant weakness in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. |
| Deficiency |
| Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. |
Reference DoD Source Selection Procedures (March 4, 2011) and MDA 5013.06-M
M.4.2 Evaluation Methodology 1: Combined Technical / Risk Rating The combined technical / risk rating includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. Combined technical / risk evaluations shall utilize the combined technical / risk ratings listed in Exhibit M-3.
Exhibit M-3. Combined Technical / Risk Ratings and Definitions
| Rating |
| Color |
| Description |
| Outstanding |
| Blue |
| Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. |
| Good |
| Purple |
| Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. |
| Acceptable |
| Green |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate. |
| Marginal |
| Yellow |
| Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. |
| Unacceptable |
| Red |
| Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable. |
Reference DoD Source Selection Procedures (March 4, 2011) and MDA 5013.06-M
M.4.3 Evaluation Methodology 2: Separate Technical / Risk Rating The offeror’s technical solution will be rated separately from the risk associated with the technical approach.
M.4.3.1 Technical Rating The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. Technical evaluations shall utilize the ratings listed in Exhibit M-4.
Exhibit M-4. Technical Ratings and Definitions
| Rating |
| Color |
| Description |
| Outstanding |
| Blue |
| Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. The proposal contains multiple strengths and no deficiencies. |
| Good |
| Purple |
| Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains at least one strength and no deficiencies. |
| Acceptable |
| Green |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Proposal has no deficiencies. |
| Marginal |
| Yellow |
| Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. |
| Unacceptable |
| Red |
| Proposal does not meet requirements and contains one or more deficiencies and is unawardable. |
Reference DoD Source Selection Procedures (March 4, 2011) and MDA 5013.06-M
M.4.3.2 Technical Risk Rating The risk rating considers the risk associated with the technical approach in meeting the requirement. Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Technical risk evaluations shall utilize the ratings listed in Exhibit M-5.
Exhibit M-5. Technical Risk Ratings and Definitions
| Rating |
| Description |
| Low |
| Has little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties. |
| Moderate |
| Can potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties. |
| High |
| Is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring. |
Reference DoD Source Selection Procedures (March 4, 2011) and MDA 5013.06-M; Colors may be used for presentation purposes.
| M.5 | Factor / Subfactor Evaluation |
| M.5.1 | Factor 1: Technical Approach |
The Government will evaluate the offeror’s overall technical and management capability.
| M.5.1.1 | Subfactor 1a: Organization |
| M.5.1.1.1 | The Government will evaluate the extent to which the proposal demonstrates an understanding of and a sound and effective approach to: |
a. Implementing an organization to execute multiple stakeholder / customer missions as identified in the IRES Contract SOO (solicitation Attachment J-01);
b. Managing partners, subcontractors and suppliers, and evolving the organization as new opportunities and requirements are identified over the course of the contract; and
c. Developing, standardizing, deploying and improving processes.
| M.5.1.1.2 | Subfactor 1a will receive a combined technical / risk rating described in Exhibit M.3. |
| M.5.1.2 | Subfactor 1b: IRES Mission Execution |
| M.5.1.2.1 | Considering the challenges described in Enclosure 1 (High Level Objectives and Capabilities Descriptions and Legacy Requirements) of solicitation Attachment J-01 (IRES Contract Statement of Objectives), the Government will evaluate the extent to which the proposal demonstrates an understanding of and a sound and effective approach to: |
a. Performing systems engineering;
b. Maintaining an acceptable cybersecurity posture;
c. Conducting risk management;
d. Maintaining currency; and
e. Performing software engineering and modeling and simulation.
| M.5.1.2.2 | Subfactor 1b will receive a combined technical / risk rating described in Exhibit M-3. |
| M.5.1.3 | Subfactor 1c: Small Business Participation and Commitment Plan |
| M.5.1.3.1 | The Government will evaluate the extent to which the plan demonstrates an understanding of and a sound and effective approach to: |
a. Addressing all elements of Section L.8.1.3.2.
b. Executing to the proposed goals. Offeror’s proposed goals must meet, at a minimum, the Government’s small business participation goals identified in Exhibit L-4. (Notes: Increasing small business participation and commitment goals alone will not result in higher ratings. Because this is an indefinite delivery, indefinite quantity contract, the extent to which small business firms are specifically identified in the proposal is significantly less important than the approach to executing to the proposed goals.)
| M.5.1.3.2 | Subfactor 1c will receive a combined technical / risk rating described in Exhibit M-3. |
| M.5.2 | Factor 2: Contractor Performance Work Statements (CPWS) |
The Government will evaluate the offeror’s proposed approach provided in the narrative, CPWS and BOE, as captured in the CPWS, to delivering products and services at specified performance thresholds, and the use / incorporation of tools, innovative processes and automation (as appropriate), to achieve stated outcomes.
| M.5.2.1 | Subfactor 2a: IRES Systems Engineering and Program Integration (SE&PI) Approach, SOO and Basis of Estimate (BOE) |
| M.5.2.1.1 | The Government will evaluate the extent to which the proposed approach and CPWS embodies the desired attributes of both the IRES Contract SOO and the SE&PI SOO, and demonstrates an understanding of and a sound and effective approach to: |
a. Conducting efficient administration of the SE&PI task order;
b. Delivering an overarching, program-wide systems engineering program;
c. Providing program integration; and
d. Providing continuity of services for transition of products and services from IRES to the follow-on contractor.
| M.5.2.1.2 | The Government will evaluate the extent to which the proposed staffing is sufficient (both quantity and skill mix) to successfully execute the work described in the SOO and is consistent with the corresponding CPWS. |
| M.5.2.1.3 | Subfactor 2a will receive the separate technical and risk ratings described in Exhibits M-4 and M-5. |
| M.5.2.2 | Subfactor 2b: Enterprise Information Technology Services (EITS) Approach, SOO and BOE |
| M.5.2.2.1 | The Government will evaluate the extent to which the proposed approach and CPWS embodies the desired attributes of the IRES Contract SOO, the SE&PI SOO, and the EITS SOO and demonstrates an understanding of and a sound and effective approach to: |
a. Conducting efficient administration of the EITS task order;
b. Managing the portfolio of Enterprise IT Services;
c. Providing a cohesive cyber security service in an ever-changing RDT&E environment;
d. Delivering private cloud-based data center services;
e. Providing reliable and efficient customer support services;
f. Maintaining and sustain delivery of critical network services;
g. Providing full-lifecycle application administration services;
h. Providing telephony services inclusive of Defense Red Switch Network (DRSN) voice services; and
i. Delivering IT capability, provisioning and integrating emergent requirements.
| M.5.2.2.2 | The Government will evaluate the extent to which the proposed staffing is sufficient (both quantity and skill mix) to successfully execute the work described in the SOO and is consistent with the corresponding CPWS. |
| M.5.2.2.3 | Subfactor 2b will receive the separate technical and risk ratings described in Exhibits M-4 and M-5. |
| M.5.2.3 | Subfactor 2c: Facilities Engineering and Operations (FE&O) Approach, SOO and BOE |
| M.5.2.3.1 | The Government will evaluate the extent to which the proposed approach and CPWS embodies the desired attributes of the IRES Contract SOO, the SE&PI SOO, and the FE&O SOO, and demonstrates an understanding of and a sound and effective approach to: |
a. Conducting efficient administration of the FE&O task order;
b. Executing facilities engineering requirements; and
c. Executing facilities operations and maintenance requirements.
| M.5.2.3.2 | The Government will evaluate the extent to which the proposed staffing is sufficient (both quantity and skill mix) to successfully execute the work described in the SOO and is consistent with the corresponding CPWS. |
| M.5.2.3.3 | Subfactor 2c will receive the separate technical and risk ratings described in Exhibits M-4 and M-5. |
| M.5.3 | Factor 3: Cost / Price |
| M.5.3.1 | General |
The cost/price evaluation assesses each offeror’s proposed cost / price for reasonableness and realism. The burden of proof for cost / price reasonableness and realism rests with the offeror. An assessment that the proposal is not reasonable or realistic may result in the offer being considered unacceptable for award. The Government will evaluate each offeror’s proposal using one or more of the techniques described in FAR 15.404. Information in the proposal and information obtained from other sources such as DCAA, DCMA, as well as information obtained or provided by the evaluation teams may be considered under the cost / price factor.
M.5.3.2 Reasonableness A cost is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.
| M.5.3.3 | Realism |
| M.5.3.3.1 | Cost realism analysis is the process of independently reviewing and evaluating specific elements of each offeror’s proposed cost estimate to determine whether the estimated proposed cost elements are realistic for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the unique methods of performance and materials described in the offeror’s technical proposal. |
| M.5.3.3.2 | The result of the cost realism analysis on the fixed-price-incentive portions of the total proposed price may be used in the assessment of performance risk and the responsibility determination, but will not result in an adjustment to the proposed price. However, the proposed ceiling price for Task 4000, as well as the ceiling price associated with the fixed-price-incentive portions of the Future Estimated Price and Option Clause 52.217-8, will be used in the total evaluated price calculation. |
| M.5.3.3.3 | The result of cost realism analysis on the cost-reimbursement portions of the proposed cost is a probable cost. The probable cost may differ from the proposed cost and will reflect the Government’s best estimate of the cost that is most likely to result from the offeror’s proposal. Probable cost will be used to determine the best value. The probable cost is determined by adjusting each offeror’s proposed cost to reflect any additions or reductions in cost elements to realistic levels based on the results of the cost realism analysis. |
M.5.3.3.4 The SSEB’s cost realism analysis on the cost-reimbursement portions of the proposed price will result in three probable cost components that will be used in the total evaluated price calculation.
· Task Orders 2000 and 3000 Probable Cost / Price: The first probable cost / price component is the result of a realism analysis of Task Orders 2000 and 3000, including the proposed direct labor hours, direct and indirect rates utilized to develop all proposed burdened labor rates (BLRs), as well as offeror identified other direct costs (ODCs) and applicable burdens (see RFP Section L.8.2.1.4.2(2)). The probable costs will also include the solicitation specified ODCs, plus applicable burdens. The proposed target fee and the proposed award fee pool will also be included in the probable cost of Tasks 2000 and 3000.
· Future Estimated Probable Cost / Price (cost-reimbursement portions): The second probable cost / price component is the result of a realism analysis of the Future Estimated Probable Cost / Price, including the proposed BLRs for all labor categories for the total anticipated contract ordering period. The probable cost / price is calculated by applying the realistic / probable BLRs to the Government labor hours specified in the solicitation. This probable cost will also include the solicitation specified ODCs, plus applicable burdens, as well as the proposed target fee and award fee pool. This probable cost / price ensures that BLRs for all labor categories, in all years, are included in the cost / price evaluation.
· Option Clause 52.217-8 Probable Cost / Price (cost-reimbursement portions): The third probable cost / price component is the result of a realism analysis of the Option to Extend Services in accordance with FAR Clause 52.217-8. Consistent with paragraph M.1, the probable cost / price will be calculated by using 50% of the Future Estimated Probable Cost / Price (cost-reimbursement portions) for the Year 8 ordering period.
M.5.3.4 Total Evaluated Price The total evaluated price will be used to determine best value. The total evaluated price will be calculated using the following components:
Task Order 2000: Systems Engineering and Program Integration Probable Cost / Price Task Order 3000: Enterprise Information Technology Services Probable Cost / Price Task Order 4000: Facilities Engineering and Operations Ceiling Price Future Estimated Probable Cost / Price - Cost-Reimbursement Portions Future Estimated Ceiling Price - Fixed-Price-Incentive Portions Option Clause 52.217-8 Probable Cost / Price - Cost-Reimbursement Portions Option Clause 52.217-8 Ceiling Price - Fixed-Price-Incentive Portions Total Evaluated Price To promote competition, the price of the Transition [Task Order 1000] will not be included in the total evaluated price for the purpose of making the best value tradeoff decision; but it will be evaluated for reasonableness and realism.
M.5.4 Factor 4: Acceptable / Unacceptable Factors Subfactors 4a and 4b will be evaluated on an Acceptable / Unacceptable basis using the rating at Exhibits M-6 and M-7 respectively.
| M.5.4.1 | Subfactor 4a: Transition Approach, SOO and BOE |
| M.5.4.1.1 | The Government will evaluate whether or not the proposal demonstrates an understanding of and a sound and effective approach to: |
a. Conducting efficient administration of the Transition task order;
b. Executing task order negotiations; and
c. Capturing and documenting transition lessons learned.
| M.5.4.1.2 | The Government will evaluate whether or not the proposed staffing is sufficient (both quantity and skill mix) to successfully execute the work described in the SOO and is consistent with the corresponding CPWS. |
| M.5.4.1.3 | Subfactor 4a will receive an acceptable / unacceptable rating as defined in Exhibit M-6. |
Exhibit M-6. Acceptable / Unacceptable Ratings and Definitions
| Rating |
| Description |
| Acceptable |
| Proposal clearly meets the minimum requirements of the solicitation. |
| Unacceptable |
| Proposal does not clearly meet the minimum requirements of the solicitation. |
Reference DoD Source Selection Procedures (March 4, 2011); Colors may be used for presentation purposes.
| M.5.4.2 | Subfactor 4b: Past Performance |
| M.5.4.2.1 | The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror's demonstrated recent and relevant record of performance in supplying products and services that met the contract’s requirements. Based on an integrated assessment of recency, relevancy, quality, and small business utilization, the Government will assign a single, overall past performance rating as defined in Exhibit M-7. |
Exhibit M-7. Past Performance Evaluation Ratings and Definitions
| Rating |
| Description |
| Acceptable |
| Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.) |
| Unacceptable |
| Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will successfully perform the required effort. |
Reference DoD Source Selection Procedures (March 4, 2011); Colors may be used for presentation purposes.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of Acceptability / Unacceptability, “Unknown” shall be considered “Acceptable.”
| M.5.4.2.2 | When determining the overall past performance rating, the Government will consider the relevancy and quality of past performance efforts individually and in the aggregate. To be considered acceptable, the offeror must have a satisfactory small business utilization rating and demonstrate recent, relevant past performance with an overall satisfactory quality rating that, in the aggregate, covers all IRES HLOs, transition, and the prime contractor management considerations identified in M.5.5.2.2 (all items identified in columns AB-AJ of the Contract Data Matrix at Attachment L-04). |
| M.5.4.2.3 | The evaluation will take into account past performance information regarding the offeror, subsidiaries, and major subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. Past performance regarding predecessor companies will be considered the same as past performance information of the current company. |
| M.5.4.2.4 | In conducting this assessment, the government reserves the right to use data provided by the offeror and data obtained from other sources. |
| M.5.5.1 | Recency of Past Performance |
An assessment of each past performance effort will be made to determine if it is recent. If any part of the contract performance falls within the defined timeframe, the contract in its entirety will be considered in the past performance evaluation. Past performance efforts that are not recent will not be evaluated. Exhibit M-8 defines the recency ratings.
Exhibit M-8. Recency Ratings and Definitions
| Rating |
| Definition |
| Recent (R) |
| January 1, 2012 through December 31, 2015. |
| Not Recent (NR) |
| The contract does not meet the definition of ‘Recent’ |
Note: Colors may be used for presentation purposes
| M.5.5.2 | Relevancy of Past Performance |
| M.5.5.2.1 | Each recent, past performance effort will be assessed for relevancy. This area demonstrates the depth and breadth of relevant experience of the offeror, including subsidiaries and major subcontractors. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, subsidiaries, and /or major subcontractors whose contract is being reviewed and evaluated. Exhibit M-9 defines the relevancy ratings. The Government is not bound by the offeror’s opinion regarding relevancy. |
Exhibit M-9. Relevancy Ratings and Definitions
| Rating |
| Definition |
| Relevant (R) |
| Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant (NR) |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
Note: Colors may be used for presentation purposes.
M.5.5.2.2 For each past performance effort, “similar scope and magnitude of effort and complexities” is described as follows:
MANAGEMENT: Prime contractor’s experience in managing: 1) complex (e.g., multiple task orders, multiple customers, dependent and independent schedules, etc.) cost-reimbursement or fixed-price-incentive contracts; and 2) teams similar in size / composition of the team proposed; or TECHNICAL: The past performance effort involved performance similar to some of the magnitude, effort, and / or complexities this solicitation requires for any or all of the IRES HLOs or transition. Relevant past performance does not require specific experience in the BMDS domain; rather, provisioning of services related to operational support and testing environments, regardless of domain, will be considered.
| M.5.5.3 | Quality of Past Performance |
| M.5.5.3.1 | The Government will conduct an evaluation of the offeror’s recent and relevant performance history in order to assess the offeror’s quality of performance on past contracts. This assessment will not change the existing record or history of the offeror’s past performance; rather, the evaluation process will review information from customers on how well the offeror performed on those past contracts. Based on its evaluation, the Government will assign a Performance Assessment Quality Rating as defined Exhibit M-10. |
Exhibit M-10. Quality Ratings and Definitions
| Rating |
| Definition |
| Satisfactory (S) |
| Performance met contractual requirements. Performance contained some minor problems for which corrective actions taken by the offeror appeared to be or were effective. |
| Not Satisfactory (NS) |
| Performance did not meet contractual requirements. Performance contained problem(s) for which corrective actions taken were not timely or were ineffective. |
Note: Colors may be used for presentation purposes.
| M.5.5.4 | Small Business Utilization |
| M.5.5.4.1 | The Government will evaluate each offeror’s past performance record to assess its utilization of small businesses and its past performance in achieving small business subcontracting goals established in prior individual subcontracting plans. For offerors participating in the DoD Comprehensive Subcontracting Test Program, the Government will evaluate each contract’s small business utilization contribution to comprehensive subcontracting plan goals. Evaluation will include an assessment of the contractor's initiatives to assist, promote, and utilize small businesses in the performance of recent contracts. |
| M.5.5.4.2 | The Government will assess small business utilization to determine if past performance is satisfactory or unsatisfactory, as defined in Exhibit M-11. |
Exhibit M-11. Small Business Utilization Ratings and Definitions
| Rating |
| Definition |
| Satisfactory (S) |
| Demonstrated a good-faith effort to meet or exceed all goals, objectives established in subcontracting plans, and successful small business utilization in the performance of the recent and relevant contracts. |
| Not Satisfactory (NS) |
| Failed to demonstrate a good-faith effort to meet all goals, objectives established in subcontracting plans, and successful small business utilization in the performance of the recent and relevant contracts. |
Note: Colors may be used for presentation purposes.
IRES Solicitation, Section M