Attach 8 - CSI Bid Form Template.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Job Order Contract (JOC) Multi-Award IDIQ
Solicitation number
AOCACB24R0002
Issued by

About this file

This federal contract opportunity notice is for a Job Order Contract (JOC) Multi-Award IDIQ solicitation issued by the Architect of the Capitol. The JOC is a multiple award indefinite delivery indefinite quantity construction contract to perform a variety of projects at United States Capitol Complex sites and outlying facilities in the District of Columbia, Maryland and Virginia. Work may include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving, earthwork, historical preservation and restoration. Projects may also involve design/build work or new construction of buildings and facilities. The solicitation number is AOCACB24R0002 and the Sample Project Non-Disclosure Agreement must be requested to view additional details.

View the file

Other files

File Type Posted
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
AOCACB24R0002 A04.pdf PDF
Attach 22 - A04 RFIs AOCACB24R0002 JOC.pdf PDF
AOCACB24R0002 A03.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
Attach 20 - Subconsultant List.xlsx XLSX spreadsheet
Attach 3 - Evaluation Criteria.pdf PDF
Attach 1 - Section C - Statement of Work (SOW).pdf PDF
Attach 21 - A03 RFIs AOCACB24R0002 JOC.pdf PDF
Attach 19 - A02 RFIs AOCACB24R0002 JOC.pdf PDF
Attach 19 - A02 RFIs AOCACB24R0002 JOC.pdf PDF
Attach 8 - CSI Bid Form Template.xlsx XLSX spreadsheet
AOCACB24R0002 A02.pdf PDF
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Subconsultant List (draft).xlsx XLSX spreadsheet
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
AOCACB24R0002 A01.pdf PDF
Attach 9 - AOC Design Standards_Dec 2018.pdf PDF
Attach 18 - Sample Certificate of Insurance (COI).pdf PDF
Attach 6 - Safety Program Performance Questionnaire.docx DOCX document
Attach 11 - AOC BIM Guide_Dec 2014.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
Attach 16 - Employee Rights under the Davis-Bacon.pdf PDF
Attach 5 - Sample Project.docx DOCX document
Attach 1 - Section C - Statement of Work (SOW).pdf PDF
Attach 10 - A-E Design Manual_Dec 2013.pdf PDF
Attach 7 - Past Performance Questionnaire.rtf RTF text file
Attach 15 - USCP Vehicle Delivery Procedure Guide.pdf PDF
Attach 13 - Order 7-4 Information Technology Security.pdf PDF
Attach 14 - USCP Request for Criminal History.pdf PDF
Attach 3 - Evaluation Criteria.pdf PDF
AOCACB24R0002.pdf PDF
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Attach 4 - Division 01 JOC Specs.pdf PDF
Attach 12 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 AOC - JOC Contract Bid Pricing Form

Bidder Name
IDIQ Number
RFP#
Project Name / Number
Instructions:
1) Enter Data in cells highlighted "GREEN"
2) Cells highlighted "GREY" will calculate automatically
BID SUMMARY
TOTAL
CLIN'SDescriptions will auto load from CLIN detail below
CLIN 1Add scope description - CLIN 1$ - 0
CLIN 2Add scope description - CLIN 2$ - 0
CLIN 3Add scope description - CLIN 3$ - 0
CLIN 4Add scope description - CLIN 4$ - 0

TOTAL CLIN's $ - 0

General Conditions $ - 0

TOTAL GENERAL CONDITIONS $ - 0

TOTAL BASE SCOPE $ - 0

OPTIONS AND ALTERNATES
Owner Options / Alternates
Option / Alternate 1$ - 0
Option / Alternate 2$ - 0
Option / Alternate 3$ - 0
Contractor Suggested Options /Alternates
Option / Alternate 1 - Add description$ - 0
Option / Alternate 2 - Add Description$ - 0
Option / Alternate 3 - Add Description$ - 0
Unit Rates - See detail below
BID DETAIL
Subcontcontractor and self performed work - by CLIN:
CLIN 1Add scope description - CLIN 1
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Home Office Overhead as % of Construction Cost$ - 0$ - 0
Field Office Overhead as % of Construction Cost$ - 0$ - 0
Insurance as % of Construction Cost$ - 0$ - 0
Profit$ - 0$ - 0
Compounded excluding Profit
Bond as % of Construction Cost - excluding profit$ - 0$ - 0
SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 1$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 2Add scope description - CLIN 2
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Home Office Overhead as % of Construction Cost$ - 0$ - 0
Field Office Overhead as % of Construction Cost$ - 0$ - 0
Insurance as % of Construction Cost$ - 0$ - 0
Profit$ - 0$ - 0
Compounded excluding Profit
Bond as % of Construction Cost - excluding profit$ - 0$ - 0
SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 2$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 3Add scope description - CLIN 3
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Home Office Overhead as % of Construction Cost$ - 0$ - 0
Field Office Overhead as % of Construction Cost$ - 0$ - 0
Insurance as % of Construction Cost$ - 0$ - 0
Profit$ - 0$ - 0
Compounded excluding Profit
Bond as % of Construction Cost - excluding profit$ - 0$ - 0
SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 3$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 4Add scope description - CLIN 4
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Home Office Overhead as % of Construction Cost$ - 0$ - 0
Field Office Overhead as % of Construction Cost$ - 0$ - 0
Insurance as % of Construction Cost$ - 0$ - 0
Profit$ - 0$ - 0
Compounded excluding Profit
Bond as % of Construction Cost - excluding profit$ - 0$ - 0
SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 4$ - 0
Field Office Overhead Detail (Reference Change Clause AOC52.243.1 Changes Supplement May 2022)Unit Rate*UOMTotal DurationTotal
Complete for Change Proposals
1 Project ManagerDay$ - 0
2 Site SuperintendentDay$ - 0
3 Site Safety and Health OfficerDay$ - 0
4 Quality Constrol MangagerDay$ - 0
5 Project AdministrationDay$ - 0
6 Office TrailerDay$ - 0
7 UtilitiesDay$ - 0
8 Telephone(s)Day$ - 0
9 Computer, Printers, Software LicencesDay$ - 0
10 Security & Alarm SystemDay$ - 0
11 Office Equipment and SuppliesDay$ - 0
12 ReproductionDay$ - 0
13 Drinking WaterDay$ - 0
14 Vehicles, Gas, Permits & MaintenanceDay$ - 0
15 Dumpsters & Garage DisposalDay$ - 0
16 Barracades & Traffic Control DevicesDay$ - 0
17 Temporary LightingDay$ - 0
18 Mobilization and DemobilizationDay$ - 0
19 Construction FencingDay$ - 0
20 Portable ToiletsDay$ - 0
21 Records drawingsDay$ - 0
GRAND TOTAL - General Conditions$ - 0
OPTIONS & ALTERNATES
Enter Sub/self performed totals and GC Mark-up totals for each Option / Alternate
Owner Options / AlternatesSubs/Trades Sub-TotalGC Mark Ups TotalTotal Owner Option/Alternate
Option / Alternate 1$ - 0
Option / Alternate 2$ - 0
Option / Alternate 3$ - 0
Contractor Suggested Options /AlternatesSubs/Trades Sub-TotalGC Mark Ups TotalTotal Contractor Suggested Option/Alternate
Option / Alternate 1 - Add description$ - 0
Option / Alternate 2 - Add Description$ - 0
Option / Alternate 3 - Add Description$ - 0
UNIT PRICESUnit Rate*UOMQtyTotal
1add description$ - 0
2add description$ - 0
3add description$ - 0
4add description$ - 0
5add description (copy and paste last line to add additional rows as needed)$ - 0
Notes
* Fully burdened rates (all sub and GC mark-ups included)

AOC JOC Bid Template as of 1/26/2024

File details come from the government source that posted it. Updated .