Attach 8 - CSI Bid Form Template.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Job Order Contract (JOC) Multi-Award IDIQ
- Solicitation number
- AOCACB24R0002
- Issued by
-
Architect of the Capitol
About this file
This document is a bid pricing form template for a Job Order Contract (JOC) construction acquisition from the Architect of the Capitol (AOC). The JOC is a multi-award, indefinite-delivery, indefinite-quantity (IDIQ) contract to perform a variety of maintenance, repair, alteration, and new construction projects within the United States Capitol Complex and outlying facilities. The template includes line items for different construction trade divisions, as well as general conditions and markups. Bidders are instructed to provide pricing information for the base contract line items (CLINs) as well as any owner-provided options and contractor-suggested alternates. Unit rates are also requested for changes. The template appears to be a comprehensive tool for submitting a detailed, line-item construction bid in response to the AOC's solicitation number AOCACB24R0002 for the JOC IDIQ contract.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 AOC - JOC Contract Bid Pricing Form
| Bidder Name | CEG |
| IDIQ Number | |
| RFP# | |
| Project Name / Number | |
| Instructions: | |
| 1) Enter Data in cells highlighted "GREEN" | |
| 2) Cells highlighted "GREY" will calculate automatically |
| BID SUMMARY | ||
| TOTAL | ||
| CLIN'S | Descriptions will auto load from CLIN detail below | |
| CLIN 1 | Add scope description - CLIN 1 | $ - 0 |
| CLIN 2 | Add scope description - CLIN 2 | $ - 0 |
| CLIN 3 | Add scope description - CLIN 3 | $ - 0 |
| CLIN 4 | Add scope description - CLIN 4 | $ - 0 |
TOTAL CLIN's $ - 0
| OPTIONS AND ALTERNATES | ||
| Owner Options / Alternates | ||
| Option / Alternate 1 | $ - 0 | |
| Option / Alternate 2 | $ - 0 | |
| Option / Alternate 3 | $ - 0 |
| Contractor Suggested Options /Alternates | ||
| Option / Alternate 1 - Add description | $ - 0 | |
| Option / Alternate 2 - Add Description | $ - 0 | |
| Option / Alternate 3 - Add Description | $ - 0 |
| Unit Rates - See detail below | |||||
| BID DETAIL | |||||
| Subcontcontractor and self performed work - by CLIN: | |||||
| CLIN 1 | Add scope description - CLIN 1 | ||||
| Masterformat Divisions of Work | Material | Labor | Subtotal | Total | |
| Division 00 - Procurement and Contracting Requirements | $ - 0 | $ - 0 | |||
| Division 01 - General Requirements | $ - 0 | $ - 0 | |||
| Division 02 - Existing Conditions | $ - 0 | $ - 0 | |||
| Division 03 - Concrete | $ - 0 | $ - 0 | |||
| Division 04 - Masonry | $ - 0 | $ - 0 | |||
| Division 05 - Metals | $ - 0 | $ - 0 | |||
| Division 06 - Wood, Plastics, Composites | $ - 0 | $ - 0 | |||
| Division 07 - Thermal and Moisture Protection | $ - 0 | $ - 0 | |||
| Division 08 - Openings | $ - 0 | $ - 0 | |||
| Division 09 - Finishes | $ - 0 | $ - 0 | |||
| Division 10 - Specialties | $ - 0 | $ - 0 | |||
| Division 11 - Equipment | $ - 0 | $ - 0 | |||
| Division 12 - Furnishings | $ - 0 | $ - 0 | |||
| Division 13 - Special Construction | $ - 0 | $ - 0 | |||
| Division 14 - Conveying Equipment | $ - 0 | $ - 0 | |||
| Division 21 - Fire Suppression | $ - 0 | $ - 0 | |||
| Division 22 - Plumbing | $ - 0 | $ - 0 | |||
| Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) | $ - 0 | $ - 0 | |||
| Division 25 - Integrated Automation | $ - 0 | $ - 0 | |||
| Division 26 - Electrical | $ - 0 | $ - 0 | |||
| Division 27 - Communications | $ - 0 | $ - 0 | |||
| Division 28 - Electronic Safety and Security | $ - 0 | $ - 0 | |||
| Division 31 - Earthwork | $ - 0 | $ - 0 | |||
| Division 32 - Exterior Improvements | $ - 0 | $ - 0 | |||
| Division 33 - Utilities | $ - 0 | $ - 0 | |||
| Division 34 - Transportation | $ - 0 | $ - 0 | |||
| Division 35 - Waterway and Marine Construction | $ - 0 | $ - 0 | |||
| Division 40 - Process Integration | $ - 0 | $ - 0 | |||
| Division 41 - Material Processing and Handling Equipment | $ - 0 | $ - 0 | |||
| Division 42 - Process Heating, Cooling, and Drying Equipment | $ - 0 | $ - 0 | |||
| Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | $ - 0 | $ - 0 | |||
| Division 44 - Pollution and Waste Control Equipment | $ - 0 | $ - 0 | |||
| Division 45 - Industry-Specific Manufacturing Equipment | $ - 0 | $ - 0 | |||
| Division 46 - Water and Wastewater Equipment | $ - 0 | $ - 0 | |||
| Division 48 - Electrical Power Generation | $ - 0 | $ - 0 | |||
| Subtotal - Sub-contractor and Self Performed Trades | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| General Contractor | Compounds off of Cell G51 above | Enter % Per Contract | D x E | ||
| Overheads as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Insurance as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Subtotal - General Contractor Markups | $ - 0 | ||||
| $ - 0 | |||||
| General Conditions and General Requirements Detail | Unit Rate* | UOM | Total Duration | Total | |
| CLIN 1 | *Unit rates will be used for Changes | ||||
| 1 Project Manager | Day | $ - 0 | |||
| 2 Site Superintendent | Day | $ - 0 | |||
| 3 Site Safety and Health Officer | Day | $ - 0 | |||
| 4 Quality Constrol Mangager | Day | $ - 0 | |||
| 5 Project Administration | Day | $ - 0 | |||
| 6 Office Trailer | Day | $ - 0 | |||
| 7 Utilities | Day | $ - 0 | |||
| 8 Telephone(s) | Day | $ - 0 | |||
| 9 Computer, Printers, Software Licences | Day | $ - 0 | |||
| 10 Security & Alarm System | Day | $ - 0 | |||
| 11 Office Equipment and Supplies | Day | $ - 0 | |||
| 12 Reproduction | Day | $ - 0 | |||
| 13 Drinking Water | Day | $ - 0 | |||
| 14 Vehicles, Gas, Permits & Maintenance | Day | $ - 0 | |||
| 15 Dumpsters & Garage Disposal | Day | $ - 0 | |||
| 16 Barracades & Traffic Control Devices | Day | $ - 0 | |||
| 17 Temporary Lighting | Day | $ - 0 | |||
| 18 Mobilization and Demobilization | Day | $ - 0 | |||
| 19 Construction Fencing | Day | $ - 0 | |||
| 20 Portable Toilets | Day | $ - 0 | |||
| 21 Records drawings | Day | $ - 0 | |||
| GRAND TOTAL - General Conditions & General Requirements | $ - 0 |
Profit $ - 0 0% $ - 0
Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0
| SUBTOTAL - GC MARK-UPS | $ - 0 | ||||
| GRAND TOTAL - CLIN 1 | $ - 0 | ||||
| Subcontcontractor and self performed work - by CLIN: | |||||
| CLIN 2 | Add scope description - CLIN 2 | ||||
| Masterformat Divisions of Work | Material | Labor | Subtotal | Total | |
| Division 00 - Procurement and Contracting Requirements | $ - 0 | $ - 0 | |||
| Division 01 - General Requirements | $ - 0 | $ - 0 | |||
| Division 02 - Existing Conditions | $ - 0 | $ - 0 | |||
| Division 03 - Concrete | $ - 0 | $ - 0 | |||
| Division 04 - Masonry | $ - 0 | $ - 0 | |||
| Division 05 - Metals | $ - 0 | $ - 0 | |||
| Division 06 - Wood, Plastics, Composites | $ - 0 | $ - 0 | |||
| Division 07 - Thermal and Moisture Protection | $ - 0 | $ - 0 | |||
| Division 08 - Openings | $ - 0 | $ - 0 | |||
| Division 09 - Finishes | $ - 0 | $ - 0 | |||
| Division 10 - Specialties | $ - 0 | $ - 0 | |||
| Division 11 - Equipment | $ - 0 | $ - 0 | |||
| Division 12 - Furnishings | $ - 0 | $ - 0 | |||
| Division 13 - Special Construction | $ - 0 | $ - 0 | |||
| Division 14 - Conveying Equipment | $ - 0 | $ - 0 | |||
| Division 21 - Fire Suppression | $ - 0 | $ - 0 | |||
| Division 22 - Plumbing | $ - 0 | $ - 0 | |||
| Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) | $ - 0 | $ - 0 | |||
| Division 25 - Integrated Automation | $ - 0 | $ - 0 | |||
| Division 26 - Electrical | $ - 0 | $ - 0 | |||
| Division 27 - Communications | $ - 0 | $ - 0 | |||
| Division 28 - Electronic Safety and Security | $ - 0 | $ - 0 | |||
| Division 31 - Earthwork | $ - 0 | $ - 0 | |||
| Division 32 - Exterior Improvements | $ - 0 | $ - 0 | |||
| Division 33 - Utilities | $ - 0 | $ - 0 | |||
| Division 34 - Transportation | $ - 0 | $ - 0 | |||
| Division 35 - Waterway and Marine Construction | $ - 0 | $ - 0 | |||
| Division 40 - Process Integration | $ - 0 | $ - 0 | |||
| Division 41 - Material Processing and Handling Equipment | $ - 0 | $ - 0 | |||
| Division 42 - Process Heating, Cooling, and Drying Equipment | $ - 0 | $ - 0 | |||
| Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | $ - 0 | $ - 0 | |||
| Division 44 - Pollution and Waste Control Equipment | $ - 0 | $ - 0 | |||
| Division 45 - Industry-Specific Manufacturing Equipment | $ - 0 | $ - 0 | |||
| Division 46 - Water and Wastewater Equipment | $ - 0 | $ - 0 | |||
| Division 48 - Electrical Power Generation | $ - 0 | $ - 0 | |||
| Subtotal - Sub-contractor and Self Performed Trades | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| General Contractor | Compounds off of Cell G51 above | Enter % Per Contract | D x E | ||
| Overheads as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Insurance as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Subtotal - General Contractor Markups | $ - 0 | ||||
| $ - 0 | |||||
| General Conditions and General Requirements Detail | Unit Rate* | UOM | Total Duration | Total | |
| CLIN 2 | *Unit rates will be used for Changes | ||||
| 1 Project Manager | Day | $ - 0 | |||
| 2 Site Superintendent | Day | $ - 0 | |||
| 3 Site Safety and Health Officer | Day | $ - 0 | |||
| 4 Quality Constrol Mangager | Day | $ - 0 | |||
| 5 Project Administration | Day | $ - 0 | |||
| 6 Office Trailer | Day | $ - 0 | |||
| 7 Utilities | Day | $ - 0 | |||
| 8 Telephone(s) | Day | $ - 0 | |||
| 9 Computer, Printers, Software Licences | Day | $ - 0 | |||
| 10 Security & Alarm System | Day | $ - 0 | |||
| 11 Office Equipment and Supplies | Day | $ - 0 | |||
| 12 Reproduction | Day | $ - 0 | |||
| 13 Drinking Water | Day | $ - 0 | |||
| 14 Vehicles, Gas, Permits & Maintenance | Day | $ - 0 | |||
| 15 Dumpsters & Garage Disposal | Day | $ - 0 | |||
| 16 Barracades & Traffic Control Devices | Day | $ - 0 | |||
| 17 Temporary Lighting | Day | $ - 0 | |||
| 18 Mobilization and Demobilization | Day | $ - 0 | |||
| 19 Construction Fencing | Day | $ - 0 | |||
| 20 Portable Toilets | Day | $ - 0 | |||
| 21 Records drawings | Day | $ - 0 | |||
| GRAND TOTAL - General Conditions & General Requirements | $ - 0 |
Profit $ - 0 0% $ - 0
Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0
| SUBTOTAL - GC MARK-UPS | $ - 0 |
| GRAND TOTAL - CLIN 2 | $ - 0 |
| Subcontcontractor and self performed work - by CLIN: | |||||
| CLIN 3 | Add scope description - CLIN 3 | ||||
| Masterformat Divisions of Work | Material | Labor | Subtotal | Total | |
| Division 00 - Procurement and Contracting Requirements | $ - 0 | $ - 0 | |||
| Division 01 - General Requirements | $ - 0 | $ - 0 | |||
| Division 02 - Existing Conditions | $ - 0 | $ - 0 | |||
| Division 03 - Concrete | $ - 0 | $ - 0 | |||
| Division 04 - Masonry | $ - 0 | $ - 0 | |||
| Division 05 - Metals | $ - 0 | $ - 0 | |||
| Division 06 - Wood, Plastics, Composites | $ - 0 | $ - 0 | |||
| Division 07 - Thermal and Moisture Protection | $ - 0 | $ - 0 | |||
| Division 08 - Openings | $ - 0 | $ - 0 | |||
| Division 09 - Finishes | $ - 0 | $ - 0 | |||
| Division 10 - Specialties | $ - 0 | $ - 0 | |||
| Division 11 - Equipment | $ - 0 | $ - 0 | |||
| Division 12 - Furnishings | $ - 0 | $ - 0 | |||
| Division 13 - Special Construction | $ - 0 | $ - 0 | |||
| Division 14 - Conveying Equipment | $ - 0 | $ - 0 | |||
| Division 21 - Fire Suppression | $ - 0 | $ - 0 | |||
| Division 22 - Plumbing | $ - 0 | $ - 0 | |||
| Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) | $ - 0 | $ - 0 | |||
| Division 25 - Integrated Automation | $ - 0 | $ - 0 | |||
| Division 26 - Electrical | $ - 0 | $ - 0 | |||
| Division 27 - Communications | $ - 0 | $ - 0 | |||
| Division 28 - Electronic Safety and Security | $ - 0 | $ - 0 | |||
| Division 31 - Earthwork | $ - 0 | $ - 0 | |||
| Division 32 - Exterior Improvements | $ - 0 | $ - 0 | |||
| Division 33 - Utilities | $ - 0 | $ - 0 | |||
| Division 34 - Transportation | $ - 0 | $ - 0 | |||
| Division 35 - Waterway and Marine Construction | $ - 0 | $ - 0 | |||
| Division 40 - Process Integration | $ - 0 | $ - 0 | |||
| Division 41 - Material Processing and Handling Equipment | $ - 0 | $ - 0 | |||
| Division 42 - Process Heating, Cooling, and Drying Equipment | $ - 0 | $ - 0 | |||
| Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | $ - 0 | $ - 0 | |||
| Division 44 - Pollution and Waste Control Equipment | $ - 0 | $ - 0 | |||
| Division 45 - Industry-Specific Manufacturing Equipment | $ - 0 | $ - 0 | |||
| Division 46 - Water and Wastewater Equipment | $ - 0 | $ - 0 | |||
| Division 48 - Electrical Power Generation | $ - 0 | $ - 0 | |||
| Subtotal - Sub-contractor and Self Performed Trades | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| General Contractor | Compounds off of Cell G51 above | Enter % Per Contract | D x E | ||
| Overheads as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Insurance as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Subtotal - General Contractor Markups | $ - 0 | ||||
| $ - 0 | |||||
| General Conditions and General Requirements Detail | Unit Rate* | UOM | Total Duration | Total | |
| CLIN 3 | *Unit rates will be used for Changes | ||||
| 1 Project Manager | Day | $ - 0 | |||
| 2 Site Superintendent | Day | $ - 0 | |||
| 3 Site Safety and Health Officer | Day | $ - 0 | |||
| 4 Quality Constrol Mangager | Day | $ - 0 | |||
| 5 Project Administration | Day | $ - 0 | |||
| 6 Office Trailer | Day | $ - 0 | |||
| 7 Utilities | Day | $ - 0 | |||
| 8 Telephone(s) | Day | $ - 0 | |||
| 9 Computer, Printers, Software Licences | Day | $ - 0 | |||
| 10 Security & Alarm System | Day | $ - 0 | |||
| 11 Office Equipment and Supplies | Day | $ - 0 | |||
| 12 Reproduction | Day | $ - 0 | |||
| 13 Drinking Water | Day | $ - 0 | |||
| 14 Vehicles, Gas, Permits & Maintenance | Day | $ - 0 | |||
| 15 Dumpsters & Garage Disposal | Day | $ - 0 | |||
| 16 Barracades & Traffic Control Devices | Day | $ - 0 | |||
| 17 Temporary Lighting | Day | $ - 0 | |||
| 18 Mobilization and Demobilization | Day | $ - 0 | |||
| 19 Construction Fencing | Day | $ - 0 | |||
| 20 Portable Toilets | Day | $ - 0 | |||
| 21 Records drawings | Day | $ - 0 | |||
| GRAND TOTAL - General Conditions & General Requirements | $ - 0 |
Profit $ - 0 0% $ - 0
Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0
| SUBTOTAL - GC MARK-UPS | $ - 0 | ||||
| GRAND TOTAL - CLIN 3 | $ - 0 | ||||
| Subcontcontractor and self performed work - by CLIN: | |||||
| CLIN 4 | Add scope description - CLIN 4 | ||||
| Masterformat Divisions of Work | Material | Labor | Subtotal | Total | |
| Division 00 - Procurement and Contracting Requirements | $ - 0 | $ - 0 | |||
| Division 01 - General Requirements | $ - 0 | $ - 0 | |||
| Division 02 - Existing Conditions | $ - 0 | $ - 0 | |||
| Division 03 - Concrete | $ - 0 | $ - 0 | |||
| Division 04 - Masonry | $ - 0 | $ - 0 | |||
| Division 05 - Metals | $ - 0 | $ - 0 | |||
| Division 06 - Wood, Plastics, Composites | $ - 0 | $ - 0 | |||
| Division 07 - Thermal and Moisture Protection | $ - 0 | $ - 0 | |||
| Division 08 - Openings | $ - 0 | $ - 0 | |||
| Division 09 - Finishes | $ - 0 | $ - 0 | |||
| Division 10 - Specialties | $ - 0 | $ - 0 | |||
| Division 11 - Equipment | $ - 0 | $ - 0 | |||
| Division 12 - Furnishings | $ - 0 | $ - 0 | |||
| Division 13 - Special Construction | $ - 0 | $ - 0 | |||
| Division 14 - Conveying Equipment | $ - 0 | $ - 0 | |||
| Division 21 - Fire Suppression | $ - 0 | $ - 0 | |||
| Division 22 - Plumbing | $ - 0 | $ - 0 | |||
| Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) | $ - 0 | $ - 0 | |||
| Division 25 - Integrated Automation | $ - 0 | $ - 0 | |||
| Division 26 - Electrical | $ - 0 | $ - 0 | |||
| Division 27 - Communications | $ - 0 | $ - 0 | |||
| Division 28 - Electronic Safety and Security | $ - 0 | $ - 0 | |||
| Division 31 - Earthwork | $ - 0 | $ - 0 | |||
| Division 32 - Exterior Improvements | $ - 0 | $ - 0 | |||
| Division 33 - Utilities | $ - 0 | $ - 0 | |||
| Division 34 - Transportation | $ - 0 | $ - 0 | |||
| Division 35 - Waterway and Marine Construction | $ - 0 | $ - 0 | |||
| Division 40 - Process Integration | $ - 0 | $ - 0 | |||
| Division 41 - Material Processing and Handling Equipment | $ - 0 | $ - 0 | |||
| Division 42 - Process Heating, Cooling, and Drying Equipment | $ - 0 | $ - 0 | |||
| Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | $ - 0 | $ - 0 | |||
| Division 44 - Pollution and Waste Control Equipment | $ - 0 | $ - 0 | |||
| Division 45 - Industry-Specific Manufacturing Equipment | $ - 0 | $ - 0 | |||
| Division 46 - Water and Wastewater Equipment | $ - 0 | $ - 0 | |||
| Division 48 - Electrical Power Generation | $ - 0 | $ - 0 | |||
| Subtotal - Sub-contractor and Self Performed Trades | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| General Contractor | Compounds off of Cell G51 above | Enter % Per Contract | D x E | ||
| Overheads as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Insurance as % of Construction Cost | $ - 0 | 0% | $ - 0 | ||
| Subtotal - General Contractor Markups | $ - 0 | ||||
| $ - 0 | |||||
| General Conditions and General Requirements Detail | Unit Rate* | UOM | Total Duration | Total | |
| CLIN 4 | *Unit rates will be used for Changes | ||||
| 1 Project Manager | Day | $ - 0 | |||
| 2 Site Superintendent | Day | $ - 0 | |||
| 3 Site Safety and Health Officer | Day | $ - 0 | |||
| 4 Quality Constrol Mangager | Day | $ - 0 | |||
| 5 Project Administration | Day | $ - 0 | |||
| 6 Office Trailer | Day | $ - 0 | |||
| 7 Utilities | Day | $ - 0 | |||
| 8 Telephone(s) | Day | $ - 0 | |||
| 9 Computer, Printers, Software Licences | Day | $ - 0 | |||
| 10 Security & Alarm System | Day | $ - 0 | |||
| 11 Office Equipment and Supplies | Day | $ - 0 | |||
| 12 Reproduction | Day | $ - 0 | |||
| 13 Drinking Water | Day | $ - 0 | |||
| 14 Vehicles, Gas, Permits & Maintenance | Day | $ - 0 | |||
| 15 Dumpsters & Garage Disposal | Day | $ - 0 | |||
| 16 Barracades & Traffic Control Devices | Day | $ - 0 | |||
| 17 Temporary Lighting | Day | $ - 0 | |||
| 18 Mobilization and Demobilization | Day | $ - 0 | |||
| 19 Construction Fencing | Day | $ - 0 | |||
| 20 Portable Toilets | Day | $ - 0 | |||
| 21 Records drawings | Day | $ - 0 | |||
| GRAND TOTAL - General Conditions & General Requirements | $ - 0 |
Profit $ - 0 0% $ - 0
Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0
| SUBTOTAL - GC MARK-UPS | $ - 0 | ||
| GRAND TOTAL - CLIN 4 | $ - 0 | ||
| OPTIONS & ALTERNATES | |||
| Column D - Enter Sub/self performed totals including Subcontractor Mark-ups for each Option / Alternate | |||
| Column E - Enter GC Mark-ups (including General Conditions and General Requirements) for each Option / Alternate | |||
| Owner Options / Alternates | Subs/Trades Sub-Total | GC Mark Ups Total | Total Owner Option/Alternate |
| Option / Alternate 1 | $ - 0 | ||
| Option / Alternate 2 | $ - 0 | ||
| Option / Alternate 3 | $ - 0 |
| Contractor Suggested Options /Alternates | Subs/Trades Sub-Total | GC Mark Ups Total | Total Contractor Suggested Option/Alternate |
| Option / Alternate 1 - Add description | $ - 0 | ||
| Option / Alternate 2 - Add Description | $ - 0 | ||
| Option / Alternate 3 - Add Description | $ - 0 |
| UNIT PRICES | Unit Rate* | UOM | Qty | Total | |
| 1 | add description | $ - 0 | |||
| 2 | add description | $ - 0 | |||
| 3 | add description | $ - 0 | |||
| 4 | add description | $ - 0 | |||
| 5 | add description (copy and paste last line to add additional rows as needed) | $ - 0 | |||
| Notes | |||||
| * Fully burdened rates (all sub and GC mark-ups included) |
AOC JOC Bid Template as of 1/26/2024