Attach 8 - CSI Bid Form Template.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Job Order Contract (JOC) Multi-Award IDIQ
Solicitation number
AOCACB24R0002
Issued by

About this file

This document is a bid pricing form template for a Job Order Contract (JOC) construction acquisition from the Architect of the Capitol (AOC). The JOC is a multi-award, indefinite-delivery, indefinite-quantity (IDIQ) contract to perform a variety of maintenance, repair, alteration, and new construction projects within the United States Capitol Complex and outlying facilities. The template includes line items for different construction trade divisions, as well as general conditions and markups. Bidders are instructed to provide pricing information for the base contract line items (CLINs) as well as any owner-provided options and contractor-suggested alternates. Unit rates are also requested for changes. The template appears to be a comprehensive tool for submitting a detailed, line-item construction bid in response to the AOC's solicitation number AOCACB24R0002 for the JOC IDIQ contract.

View the file

Other files

File Type Posted
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
AOCACB24R0002 A04.pdf PDF
Attach 22 - A04 RFIs AOCACB24R0002 JOC.pdf PDF
AOCACB24R0002 A03.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
Attach 20 - Subconsultant List.xlsx XLSX spreadsheet
Attach 3 - Evaluation Criteria.pdf PDF
Attach 1 - Section C - Statement of Work (SOW).pdf PDF
Attach 21 - A03 RFIs AOCACB24R0002 JOC.pdf PDF
Attach 19 - A02 RFIs AOCACB24R0002 JOC.pdf PDF
Attach 19 - A02 RFIs AOCACB24R0002 JOC.pdf PDF
AOCACB24R0002 A02.pdf PDF
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Subconsultant List (draft).xlsx XLSX spreadsheet
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
AOCACB24R0002 A01.pdf PDF
Attach 9 - AOC Design Standards_Dec 2018.pdf PDF
Attach 18 - Sample Certificate of Insurance (COI).pdf PDF
Attach 6 - Safety Program Performance Questionnaire.docx DOCX document
Attach 11 - AOC BIM Guide_Dec 2014.pdf PDF
Attach 2 - Instructions to Offerors.pdf PDF
Attach 16 - Employee Rights under the Davis-Bacon.pdf PDF
Attach 5 - Sample Project.docx DOCX document
Attach 8 - CSI Bid Form Template.xlsx XLSX spreadsheet
Attach 1 - Section C - Statement of Work (SOW).pdf PDF
Attach 10 - A-E Design Manual_Dec 2013.pdf PDF
Attach 7 - Past Performance Questionnaire.rtf RTF text file
Attach 15 - USCP Vehicle Delivery Procedure Guide.pdf PDF
Attach 13 - Order 7-4 Information Technology Security.pdf PDF
Attach 14 - USCP Request for Criminal History.pdf PDF
Attach 3 - Evaluation Criteria.pdf PDF
AOCACB24R0002.pdf PDF
Attach 17 - Davis-Bacon Act Wage Determination.pdf PDF
Attach 4 - Division 01 JOC Specs.pdf PDF
Attach 12 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 AOC - JOC Contract Bid Pricing Form

Bidder NameCEG
IDIQ Number
RFP#
Project Name / Number
Instructions:
1) Enter Data in cells highlighted "GREEN"
2) Cells highlighted "GREY" will calculate automatically
BID SUMMARY
TOTAL
CLIN'SDescriptions will auto load from CLIN detail below
CLIN 1Add scope description - CLIN 1$ - 0
CLIN 2Add scope description - CLIN 2$ - 0
CLIN 3Add scope description - CLIN 3$ - 0
CLIN 4Add scope description - CLIN 4$ - 0

TOTAL CLIN's $ - 0

OPTIONS AND ALTERNATES
Owner Options / Alternates
Option / Alternate 1$ - 0
Option / Alternate 2$ - 0
Option / Alternate 3$ - 0
Contractor Suggested Options /Alternates
Option / Alternate 1 - Add description$ - 0
Option / Alternate 2 - Add Description$ - 0
Option / Alternate 3 - Add Description$ - 0
Unit Rates - See detail below
BID DETAIL
Subcontcontractor and self performed work - by CLIN:
CLIN 1Add scope description - CLIN 1
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Overheads as % of Construction Cost$ - 00%$ - 0
Insurance as % of Construction Cost$ - 00%$ - 0
Subtotal - General Contractor Markups$ - 0
$ - 0
General Conditions and General Requirements DetailUnit Rate*UOMTotal DurationTotal
CLIN 1*Unit rates will be used for Changes
1 Project ManagerDay$ - 0
2 Site SuperintendentDay$ - 0
3 Site Safety and Health OfficerDay$ - 0
4 Quality Constrol MangagerDay$ - 0
5 Project AdministrationDay$ - 0
6 Office TrailerDay$ - 0
7 UtilitiesDay$ - 0
8 Telephone(s)Day$ - 0
9 Computer, Printers, Software LicencesDay$ - 0
10 Security & Alarm SystemDay$ - 0
11 Office Equipment and SuppliesDay$ - 0
12 ReproductionDay$ - 0
13 Drinking WaterDay$ - 0
14 Vehicles, Gas, Permits & MaintenanceDay$ - 0
15 Dumpsters & Garage DisposalDay$ - 0
16 Barracades & Traffic Control DevicesDay$ - 0
17 Temporary LightingDay$ - 0
18 Mobilization and DemobilizationDay$ - 0
19 Construction FencingDay$ - 0
20 Portable ToiletsDay$ - 0
21 Records drawingsDay$ - 0
GRAND TOTAL - General Conditions & General Requirements$ - 0

Profit $ - 0 0% $ - 0

Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0

SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 1$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 2Add scope description - CLIN 2
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Overheads as % of Construction Cost$ - 00%$ - 0
Insurance as % of Construction Cost$ - 00%$ - 0
Subtotal - General Contractor Markups$ - 0
$ - 0
General Conditions and General Requirements DetailUnit Rate*UOMTotal DurationTotal
CLIN 2*Unit rates will be used for Changes
1 Project ManagerDay$ - 0
2 Site SuperintendentDay$ - 0
3 Site Safety and Health OfficerDay$ - 0
4 Quality Constrol MangagerDay$ - 0
5 Project AdministrationDay$ - 0
6 Office TrailerDay$ - 0
7 UtilitiesDay$ - 0
8 Telephone(s)Day$ - 0
9 Computer, Printers, Software LicencesDay$ - 0
10 Security & Alarm SystemDay$ - 0
11 Office Equipment and SuppliesDay$ - 0
12 ReproductionDay$ - 0
13 Drinking WaterDay$ - 0
14 Vehicles, Gas, Permits & MaintenanceDay$ - 0
15 Dumpsters & Garage DisposalDay$ - 0
16 Barracades & Traffic Control DevicesDay$ - 0
17 Temporary LightingDay$ - 0
18 Mobilization and DemobilizationDay$ - 0
19 Construction FencingDay$ - 0
20 Portable ToiletsDay$ - 0
21 Records drawingsDay$ - 0
GRAND TOTAL - General Conditions & General Requirements$ - 0

Profit $ - 0 0% $ - 0

Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0

SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 2$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 3Add scope description - CLIN 3
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Overheads as % of Construction Cost$ - 00%$ - 0
Insurance as % of Construction Cost$ - 00%$ - 0
Subtotal - General Contractor Markups$ - 0
$ - 0
General Conditions and General Requirements DetailUnit Rate*UOMTotal DurationTotal
CLIN 3*Unit rates will be used for Changes
1 Project ManagerDay$ - 0
2 Site SuperintendentDay$ - 0
3 Site Safety and Health OfficerDay$ - 0
4 Quality Constrol MangagerDay$ - 0
5 Project AdministrationDay$ - 0
6 Office TrailerDay$ - 0
7 UtilitiesDay$ - 0
8 Telephone(s)Day$ - 0
9 Computer, Printers, Software LicencesDay$ - 0
10 Security & Alarm SystemDay$ - 0
11 Office Equipment and SuppliesDay$ - 0
12 ReproductionDay$ - 0
13 Drinking WaterDay$ - 0
14 Vehicles, Gas, Permits & MaintenanceDay$ - 0
15 Dumpsters & Garage DisposalDay$ - 0
16 Barracades & Traffic Control DevicesDay$ - 0
17 Temporary LightingDay$ - 0
18 Mobilization and DemobilizationDay$ - 0
19 Construction FencingDay$ - 0
20 Portable ToiletsDay$ - 0
21 Records drawingsDay$ - 0
GRAND TOTAL - General Conditions & General Requirements$ - 0

Profit $ - 0 0% $ - 0

Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0

SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 3$ - 0
Subcontcontractor and self performed work - by CLIN:
CLIN 4Add scope description - CLIN 4
Masterformat Divisions of WorkMaterialLaborSubtotalTotal
Division 00 - Procurement and Contracting Requirements$ - 0$ - 0
Division 01 - General Requirements$ - 0$ - 0
Division 02 - Existing Conditions$ - 0$ - 0
Division 03 - Concrete$ - 0$ - 0
Division 04 - Masonry$ - 0$ - 0
Division 05 - Metals$ - 0$ - 0
Division 06 - Wood, Plastics, Composites$ - 0$ - 0
Division 07 - Thermal and Moisture Protection$ - 0$ - 0
Division 08 - Openings$ - 0$ - 0
Division 09 - Finishes$ - 0$ - 0
Division 10 - Specialties$ - 0$ - 0
Division 11 - Equipment$ - 0$ - 0
Division 12 - Furnishings$ - 0$ - 0
Division 13 - Special Construction$ - 0$ - 0
Division 14 - Conveying Equipment$ - 0$ - 0
Division 21 - Fire Suppression$ - 0$ - 0
Division 22 - Plumbing$ - 0$ - 0
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Division 25 - Integrated Automation$ - 0$ - 0
Division 26 - Electrical$ - 0$ - 0
Division 27 - Communications$ - 0$ - 0
Division 28 - Electronic Safety and Security$ - 0$ - 0
Division 31 - Earthwork$ - 0$ - 0
Division 32 - Exterior Improvements$ - 0$ - 0
Division 33 - Utilities$ - 0$ - 0
Division 34 - Transportation$ - 0$ - 0
Division 35 - Waterway and Marine Construction$ - 0$ - 0
Division 40 - Process Integration$ - 0$ - 0
Division 41 - Material Processing and Handling Equipment$ - 0$ - 0
Division 42 - Process Heating, Cooling, and Drying Equipment$ - 0$ - 0
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment$ - 0$ - 0
Division 44 - Pollution and Waste Control Equipment$ - 0$ - 0
Division 45 - Industry-Specific Manufacturing Equipment$ - 0$ - 0
Division 46 - Water and Wastewater Equipment$ - 0$ - 0
Division 48 - Electrical Power Generation$ - 0$ - 0
Subtotal - Sub-contractor and Self Performed Trades$ - 0$ - 0$ - 0$ - 0
General ContractorCompounds off of Cell G51 aboveEnter % Per ContractD x E
Overheads as % of Construction Cost$ - 00%$ - 0
Insurance as % of Construction Cost$ - 00%$ - 0
Subtotal - General Contractor Markups$ - 0
$ - 0
General Conditions and General Requirements DetailUnit Rate*UOMTotal DurationTotal
CLIN 4*Unit rates will be used for Changes
1 Project ManagerDay$ - 0
2 Site SuperintendentDay$ - 0
3 Site Safety and Health OfficerDay$ - 0
4 Quality Constrol MangagerDay$ - 0
5 Project AdministrationDay$ - 0
6 Office TrailerDay$ - 0
7 UtilitiesDay$ - 0
8 Telephone(s)Day$ - 0
9 Computer, Printers, Software LicencesDay$ - 0
10 Security & Alarm SystemDay$ - 0
11 Office Equipment and SuppliesDay$ - 0
12 ReproductionDay$ - 0
13 Drinking WaterDay$ - 0
14 Vehicles, Gas, Permits & MaintenanceDay$ - 0
15 Dumpsters & Garage DisposalDay$ - 0
16 Barracades & Traffic Control DevicesDay$ - 0
17 Temporary LightingDay$ - 0
18 Mobilization and DemobilizationDay$ - 0
19 Construction FencingDay$ - 0
20 Portable ToiletsDay$ - 0
21 Records drawingsDay$ - 0
GRAND TOTAL - General Conditions & General Requirements$ - 0

Profit $ - 0 0% $ - 0

Bond as % of Construction Cost - excluding profit $ - 0 0% $ - 0

SUBTOTAL - GC MARK-UPS$ - 0
GRAND TOTAL - CLIN 4$ - 0
OPTIONS & ALTERNATES
Column D - Enter Sub/self performed totals including Subcontractor Mark-ups for each Option / Alternate
Column E - Enter GC Mark-ups (including General Conditions and General Requirements) for each Option / Alternate
Owner Options / AlternatesSubs/Trades Sub-TotalGC Mark Ups TotalTotal Owner Option/Alternate
Option / Alternate 1$ - 0
Option / Alternate 2$ - 0
Option / Alternate 3$ - 0
Contractor Suggested Options /AlternatesSubs/Trades Sub-TotalGC Mark Ups TotalTotal Contractor Suggested Option/Alternate
Option / Alternate 1 - Add description$ - 0
Option / Alternate 2 - Add Description$ - 0
Option / Alternate 3 - Add Description$ - 0
UNIT PRICESUnit Rate*UOMQtyTotal
1add description$ - 0
2add description$ - 0
3add description$ - 0
4add description$ - 0
5add description (copy and paste last line to add additional rows as needed)$ - 0
Notes
* Fully burdened rates (all sub and GC mark-ups included)

AOC JOC Bid Template as of 1/26/2024