ATTACH_30_997003-CB-014_HP_Superheater_3_Middle_Lower_Gas_Baffles.pdf

PDF 203 KB Posted

Attached to
Unit 5 Spring 2025 Outage Contractor Services
Solicitation number
2025-RFP-002
Issued by
Sangamon County, Florida

About this file

This document is a technical engineering drawing for a Lower Baffle Arrangement, specifically for an HP Superheater #3 Middle Lower Gas Baffle system, issued for construction by what appears to be a power generation engineering firm. The detailed schematic provides a comprehensive bill of materials and technical specifications for a complex industrial boiler component, showing precise measurements, positioning, and structural details across multiple sections. The drawing includes a detailed top-level view showing multiple baffle sections, a specific detail item (Item 140), and a lower baffle arrangement diagram with flow direction indicators.

The technical drawing is part of a larger project documentation set for Lakeland Electric's Unit No. 5 Spring Outage, scheduled from February 22nd to May 5th, 2025. While the image itself is a technical specification drawing, it relates to a broader Request for Proposal (RFP) seeking qualified boiler and HRSG (Heat Recovery Steam Generator) contractors capable of performing specialized welding and maintenance work on industrial power generation equipment. The drawing specifically illustrates the intricate design of gas baffles, which are critical components in optimizing heat transfer and efficiency in power generation systems, and represents a small but crucial part of the overall infrastructure modification and maintenance project.

View the file

Other files

File Type Posted
Unit_5_Spring_2025_Outage_Contractor_Services_(Addendum_#6_Revision).pdf PDF
ATTACH_26_25-1300-4080_Fabric_Expansion_Belt_for_10_inch_nozzle.pdf PDF
ATTACH_27_25-1300-4081_Fabric_Expansion_Belt_for_14_inch_Nozzle.pdf PDF
ATTACH_29_997003-CB-013_Reheater_2_Front_Lower_Gas_Baffles.pdf PDF
ATTACH_28_997002-CA-11_Fabric_Expansion_Belt_for_12_Inch_Nozzle_and_997002-CA-012_PAcking_Gland_for_16_inch_Nozzle.pdf PDF
ATTACH_31_997003-CB-015_HP_Superheater_2_Back_Lower_Gas_Baffles.pdf PDF
City_of_Lakeland_Terms_-_2024.docx DOCX document
2025-RFP-002_Mandatory_Pre-Bid_Attendance_List.pdf PDF
ATTACH_09_25-1300-4069_NE_Field_Joint_Details_at_Floor.pdf PDF
ATTACH_06_25-1300-4028_NE_Floor_Field_Seam_Liners.pdf PDF
ATTACH_15_25-1301-4022_HP_Remote_Steam_Drum_Internal_Davit_and_Details.pdf PDF
ATTACH_24_Bundle_Layout_Plan_View_Color.pdf PDF
ATTACH_17_25-1313-4121_NORFLEX_HRSG_Outlet_EJ.pdf PDF
ATTACH_02_25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
ATTACH_14_25-1300-5031_NE_Nozzle_Penetrations_COLS_5_to_8_and_11_to_14.pdf PDF
ATTACH_20_997000_SH_E1_NEPIPINGDATA.pdf PDF
ATTACH_08_25-1300-4068_NE_Floor_Liner_Layout.pdf PDF
ATTACH_23_Bundle_Layout_Elevation_View_Color.pdf PDF
ATTACH_05_2024-REQ-343_Break_out_pricing.pdf PDF
ATTACH_01_25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
ATTACH_19_25-1317-5060_NE_INTERCONNECT_PIPING_SH_2.pdf PDF
ATTACH_18_25-1317-5059_NE_INTERCONNECT_PIPING_SH_1.pdf PDF
ATTACH_05_25-1300-4027_NE_Wall_Field_Seam_Liners.pdf PDF
ATTACH_13_25-1300-4100_NE_HP_Evaporator_Floor_Panel_COLS_7_to_8.pdf PDF
ATTACH_07_25-1300-4064_NE_Plan_View.pdf PDF
ATTACH_16_25-1313-4120_NORFLEX_Stack_Inlet_EJ.pdf PDF
ATTACH_11_25-1300-4087_NE_HP_EVAP_Casing_Assembly_Diagram_COL_7_to_8.pdf PDF
ATTACH_03_25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
ATTACH_12_25-1300-4099_NE__Reheater_#1_&_HPSH_#1_Floor_Panel_COLS_6_to_7.pdf PDF
ATTACH_10_25-1300-4072_NE_Field_Corner_Angles.pdf PDF
ATTACH_22_2020031140-GA-100_10-HPDSHSPOOL.pdf PDF
ATTACH_21_2020031140-GA-007_10-HPDSHSPOOL.pdf PDF
ATTACH_04_25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Indemnification_2025_Contractor.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .