ATTACH_20_997000_SH_E1_NEPIPINGDATA.pdf

PDF 124 KB Posted

Attached to
Unit 5 Spring 2025 Outage Contractor Services
Solicitation number
2025-RFP-002
Issued by
Sangamon County, Florida

About this file

This document is a Piping Job Data Sheet from Nooter/Eriksen for a Siemens Westinghouse project at the Lakeland Project site in Lakeland, Florida. The document details technical specifications for high-pressure (HP) piping components, including pipe sizes ranging from 2 to 20 inches, with various design pressures (2090-3175 psig), temperatures (655-1090°F), and ANSI classes (1500-2500). The piping specifications cover multiple system components such as main steam outlets, HP drum outlets, HP downcomer, headers, riser pipes, and spray water lines, all using materials like SA-335 P91 and SA-106B.

The job data sheet reflects four revisions, with the most recent being on 8/11/00, indicating modifications to design pressures and customer requests. The document is part of Job No. 997000, Sheet E1, and includes technical details for a complex industrial piping system, likely related to a power generation or industrial facility. The revision history suggests ongoing technical refinements and collaborative engineering work between Nooter/Eriksen and Siemens Westinghouse, with annotations from different engineering personnel tracking the document's evolution.

View the file

Other files

File Type Posted
Unit_5_Spring_2025_Outage_Contractor_Services_(Addendum_#6_Revision).pdf PDF
ATTACH_28_997002-CA-11_Fabric_Expansion_Belt_for_12_Inch_Nozzle_and_997002-CA-012_PAcking_Gland_for_16_inch_Nozzle.pdf PDF
ATTACH_31_997003-CB-015_HP_Superheater_2_Back_Lower_Gas_Baffles.pdf PDF
ATTACH_27_25-1300-4081_Fabric_Expansion_Belt_for_14_inch_Nozzle.pdf PDF
ATTACH_29_997003-CB-013_Reheater_2_Front_Lower_Gas_Baffles.pdf PDF
ATTACH_26_25-1300-4080_Fabric_Expansion_Belt_for_10_inch_nozzle.pdf PDF
ATTACH_30_997003-CB-014_HP_Superheater_3_Middle_Lower_Gas_Baffles.pdf PDF
City_of_Lakeland_Terms_-_2024.docx DOCX document
2025-RFP-002_Mandatory_Pre-Bid_Attendance_List.pdf PDF
ATTACH_09_25-1300-4069_NE_Field_Joint_Details_at_Floor.pdf PDF
ATTACH_06_25-1300-4028_NE_Floor_Field_Seam_Liners.pdf PDF
ATTACH_15_25-1301-4022_HP_Remote_Steam_Drum_Internal_Davit_and_Details.pdf PDF
ATTACH_24_Bundle_Layout_Plan_View_Color.pdf PDF
ATTACH_17_25-1313-4121_NORFLEX_HRSG_Outlet_EJ.pdf PDF
ATTACH_02_25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
ATTACH_14_25-1300-5031_NE_Nozzle_Penetrations_COLS_5_to_8_and_11_to_14.pdf PDF
ATTACH_08_25-1300-4068_NE_Floor_Liner_Layout.pdf PDF
ATTACH_23_Bundle_Layout_Elevation_View_Color.pdf PDF
ATTACH_05_2024-REQ-343_Break_out_pricing.pdf PDF
ATTACH_01_25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
ATTACH_19_25-1317-5060_NE_INTERCONNECT_PIPING_SH_2.pdf PDF
ATTACH_18_25-1317-5059_NE_INTERCONNECT_PIPING_SH_1.pdf PDF
ATTACH_05_25-1300-4027_NE_Wall_Field_Seam_Liners.pdf PDF
ATTACH_13_25-1300-4100_NE_HP_Evaporator_Floor_Panel_COLS_7_to_8.pdf PDF
ATTACH_07_25-1300-4064_NE_Plan_View.pdf PDF
ATTACH_16_25-1313-4120_NORFLEX_Stack_Inlet_EJ.pdf PDF
ATTACH_11_25-1300-4087_NE_HP_EVAP_Casing_Assembly_Diagram_COL_7_to_8.pdf PDF
ATTACH_03_25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
ATTACH_12_25-1300-4099_NE__Reheater_#1_&_HPSH_#1_Floor_Panel_COLS_6_to_7.pdf PDF
ATTACH_10_25-1300-4072_NE_Field_Corner_Angles.pdf PDF
ATTACH_22_2020031140-GA-100_10-HPDSHSPOOL.pdf PDF
ATTACH_21_2020031140-GA-007_10-HPDSHSPOOL.pdf PDF
ATTACH_04_25-1300-4006_NE_HRSG_Plan_View.pdf PDF
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Indemnification_2025_Contractor.doc DOC document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .