ATTACH_14_25-1300-5031_NE_Nozzle_Penetrations_COLS_5_to_8_and_11_to_14.pdf
PDF 180 KB Posted
- Attached to
- Unit 5 Spring 2025 Outage Contractor Services
- Solicitation number
- 2025-RFP-002
- Issued by
- Sangamon County, Florida
About this file
This technical drawing, issued by Nooter/Eriksen for construction, depicts a detailed schematic of Lower Casing Nozzle Penetrations for what appears to be an industrial boiler or Heat Recovery Steam Generator (HRSG) system. The drawing provides comprehensive technical specifications for nozzle locations, elevations, and positioning across multiple structural elements, labeled from sections 5-8 and 11-14. The document includes precise measurements, orientation details (left/right), and elevation information for each nozzle penetration, with annotations indicating specific design parameters and potential modifications.
The drawing is part of a technical package for Lakeland Electric's Unit No. 5 Spring Outage project, which involves complex HRSG infrastructure work. The drawing number 25-1300-5031 and the technical specificity suggest this is a critical component of a larger industrial maintenance and upgrade project. The level of detail indicates a high-precision engineering approach, with multiple nozzle penetrations carefully mapped to ensure proper integration and performance of the industrial boiler system. The document is stamped "Issued for Construction" and includes technical review stamps, suggesting it is a finalized engineering specification for implementation during the upcoming maintenance outage.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .