This technical drawing, issued by Nooter/Eriksen for construction, depicts a detailed schematic of Lower Casing Nozzle Penetrations for what appears to be an industrial boiler or Heat Recovery Steam Generator (HRSG) system. The drawing provides comprehensive technical specifications for nozzle locations, elevations, and positioning across multiple structural elements, labeled from sections 5-8 and 11-14. The document includes precise measurements, orientation details (left/right), and elevation information for each nozzle penetration, with annotations indicating specific design parameters and potential modifications.

The drawing is part of a technical package for Lakeland Electric's Unit No. 5 Spring Outage project, which involves complex HRSG infrastructure work. The drawing number 25-1300-5031 and the technical specificity suggest this is a critical component of a larger industrial maintenance and upgrade project. The level of detail indicates a high-precision engineering approach, with multiple nozzle penetrations carefully mapped to ensure proper integration and performance of the industrial boiler system. The document is stamped "Issued for Construction" and includes technical review stamps, suggesting it is a finalized engineering specification for implementation during the upcoming maintenance outage.

View the file

Other files

File Type Posted
Unit_5_Spring_2025_Outage_Contractor_Services_(Addendum_#6_Revision).pdf PDF
ATTACH_31_997003-CB-015_HP_Superheater_2_Back_Lower_Gas_Baffles.pdf PDF
ATTACH_30_997003-CB-014_HP_Superheater_3_Middle_Lower_Gas_Baffles.pdf PDF
ATTACH_29_997003-CB-013_Reheater_2_Front_Lower_Gas_Baffles.pdf PDF
ATTACH_28_997002-CA-11_Fabric_Expansion_Belt_for_12_Inch_Nozzle_and_997002-CA-012_PAcking_Gland_for_16_inch_Nozzle.pdf PDF
ATTACH_27_25-1300-4081_Fabric_Expansion_Belt_for_14_inch_Nozzle.pdf PDF
ATTACH_26_25-1300-4080_Fabric_Expansion_Belt_for_10_inch_nozzle.pdf PDF
City_of_Lakeland_Terms_-_2024.docx DOCX document
2025-RFP-002_Mandatory_Pre-Bid_Attendance_List.pdf PDF
ATTACH_09_25-1300-4069_NE_Field_Joint_Details_at_Floor.pdf PDF
ATTACH_06_25-1300-4028_NE_Floor_Field_Seam_Liners.pdf PDF
ATTACH_15_25-1301-4022_HP_Remote_Steam_Drum_Internal_Davit_and_Details.pdf PDF
ATTACH_24_Bundle_Layout_Plan_View_Color.pdf PDF
ATTACH_17_25-1313-4121_NORFLEX_HRSG_Outlet_EJ.pdf PDF
ATTACH_02_25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
ATTACH_20_997000_SH_E1_NEPIPINGDATA.pdf PDF
ATTACH_08_25-1300-4068_NE_Floor_Liner_Layout.pdf PDF
ATTACH_23_Bundle_Layout_Elevation_View_Color.pdf PDF
ATTACH_05_2024-REQ-343_Break_out_pricing.pdf PDF
ATTACH_01_25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
ATTACH_19_25-1317-5060_NE_INTERCONNECT_PIPING_SH_2.pdf PDF
ATTACH_18_25-1317-5059_NE_INTERCONNECT_PIPING_SH_1.pdf PDF
ATTACH_05_25-1300-4027_NE_Wall_Field_Seam_Liners.pdf PDF
ATTACH_13_25-1300-4100_NE_HP_Evaporator_Floor_Panel_COLS_7_to_8.pdf PDF
ATTACH_07_25-1300-4064_NE_Plan_View.pdf PDF
ATTACH_16_25-1313-4120_NORFLEX_Stack_Inlet_EJ.pdf PDF
ATTACH_11_25-1300-4087_NE_HP_EVAP_Casing_Assembly_Diagram_COL_7_to_8.pdf PDF
ATTACH_03_25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
ATTACH_12_25-1300-4099_NE__Reheater_#1_&_HPSH_#1_Floor_Panel_COLS_6_to_7.pdf PDF
ATTACH_10_25-1300-4072_NE_Field_Corner_Angles.pdf PDF
ATTACH_22_2020031140-GA-100_10-HPDSHSPOOL.pdf PDF
ATTACH_21_2020031140-GA-007_10-HPDSHSPOOL.pdf PDF
ATTACH_04_25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Indemnification_2025_Contractor.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .