ATTACH_22_2020031140-GA-100_10-HPDSHSPOOL.pdf

PDF 57 KB Posted

Attached to
Unit 5 Spring 2025 Outage Contractor Services
Solicitation number
2025-RFP-002
Issued by
Sangamon County, Florida

About this file

This is a General Arrangement drawing for a Desuperheater Spool Replacement project for Lakeland Electric's McIntosh #5 Combined Cycle Power Plant located in Lakeland, Florida. The technical drawing, prepared by Nooter/Eriksen Inc., details the replacement of an existing desuperheater spool with a new configuration, specifically showing precise measurements, pipe specifications, and welding details for a 10" Schedule 160 pipe system. The drawing is dated April 22, 2021, and includes specific technical annotations such as material specifications (SA-335 P91), weld types (CJP - Complete Joint Penetration), and dimensional references for the new and existing desuperheater components.

The technical drawing provides a detailed schematic for infrastructure modification, indicating a specialized engineering approach to power generation equipment maintenance. The drawing references additional detailed information on Sheet 2020031140-GA-007 and follows AWS (American Welding Society) weld symbol standards. Material specifications include high-temperature alloy components like SA-182 F91 and SA-335 P91, suggesting this is a critical infrastructure upgrade requiring precise engineering tolerances and specialized materials capable of withstanding high-temperature and high-pressure industrial environments.

View the file

Other files

File Type Posted
Unit_5_Spring_2025_Outage_Contractor_Services_(Addendum_#6_Revision).pdf PDF
ATTACH_27_25-1300-4081_Fabric_Expansion_Belt_for_14_inch_Nozzle.pdf PDF
ATTACH_29_997003-CB-013_Reheater_2_Front_Lower_Gas_Baffles.pdf PDF
ATTACH_26_25-1300-4080_Fabric_Expansion_Belt_for_10_inch_nozzle.pdf PDF
ATTACH_30_997003-CB-014_HP_Superheater_3_Middle_Lower_Gas_Baffles.pdf PDF
ATTACH_28_997002-CA-11_Fabric_Expansion_Belt_for_12_Inch_Nozzle_and_997002-CA-012_PAcking_Gland_for_16_inch_Nozzle.pdf PDF
ATTACH_31_997003-CB-015_HP_Superheater_2_Back_Lower_Gas_Baffles.pdf PDF
City_of_Lakeland_Terms_-_2024.docx DOCX document
2025-RFP-002_Mandatory_Pre-Bid_Attendance_List.pdf PDF
ATTACH_09_25-1300-4069_NE_Field_Joint_Details_at_Floor.pdf PDF
ATTACH_06_25-1300-4028_NE_Floor_Field_Seam_Liners.pdf PDF
ATTACH_15_25-1301-4022_HP_Remote_Steam_Drum_Internal_Davit_and_Details.pdf PDF
ATTACH_24_Bundle_Layout_Plan_View_Color.pdf PDF
ATTACH_17_25-1313-4121_NORFLEX_HRSG_Outlet_EJ.pdf PDF
ATTACH_02_25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
ATTACH_14_25-1300-5031_NE_Nozzle_Penetrations_COLS_5_to_8_and_11_to_14.pdf PDF
ATTACH_20_997000_SH_E1_NEPIPINGDATA.pdf PDF
ATTACH_08_25-1300-4068_NE_Floor_Liner_Layout.pdf PDF
ATTACH_23_Bundle_Layout_Elevation_View_Color.pdf PDF
ATTACH_05_2024-REQ-343_Break_out_pricing.pdf PDF
ATTACH_01_25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
ATTACH_19_25-1317-5060_NE_INTERCONNECT_PIPING_SH_2.pdf PDF
ATTACH_18_25-1317-5059_NE_INTERCONNECT_PIPING_SH_1.pdf PDF
ATTACH_05_25-1300-4027_NE_Wall_Field_Seam_Liners.pdf PDF
ATTACH_13_25-1300-4100_NE_HP_Evaporator_Floor_Panel_COLS_7_to_8.pdf PDF
ATTACH_07_25-1300-4064_NE_Plan_View.pdf PDF
ATTACH_16_25-1313-4120_NORFLEX_Stack_Inlet_EJ.pdf PDF
ATTACH_11_25-1300-4087_NE_HP_EVAP_Casing_Assembly_Diagram_COL_7_to_8.pdf PDF
ATTACH_03_25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
ATTACH_12_25-1300-4099_NE__Reheater_#1_&_HPSH_#1_Floor_Panel_COLS_6_to_7.pdf PDF
ATTACH_10_25-1300-4072_NE_Field_Corner_Angles.pdf PDF
ATTACH_21_2020031140-GA-007_10-HPDSHSPOOL.pdf PDF
ATTACH_04_25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Indemnification_2025_Contractor.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020031140-GA-100 A

GENERAL ARRAGEMENT

DESUPERHEATER SPOOL REPLACEMENT

1"

6'-8" EXISTING DESUPERHEATER OVERALL

6'-2" NEW DESUPERHEATER OVERALL 4"

T I

A

S O

C K

O L

E T

T

E

A

S O

C K

O L

E T

2"

6"

1'-0"

H

P

A

C O

U P

L E

T

C L

(SA-182 F91)

3" CL2500 HEAVY BARREL (R.F.)

EXISTING 2" CL2500 (LWN)

EXISTING 2" CL2500 (LWN)

R

E F

(REF)

8"

(REF)

6" 1'-1"

DSH SPOOL

CUT LINE FOR EXISTING

DSH SPOOL

CUT LINE FOR EXISTING

A JMD *****-*** INITIAL RELEASE

X

JMD

(SA-335 P91)

EXISTING 10" SCH. 160 PIPE

(SA-335 P91)

EXISTING 10" SCH. 160 PIPE

CJP

TYP

6'-0" NEW DESUPERHEATER LINER

FOR DESUPERHEATER DETAILS

SEE SHEET 2020031140-GA-007

1 2 3 4 5 6 7 8 9 10 11 12

B

C

D

E

F

G

A

DATE REVISION BY CHK

DWN

CHK

PM

PE

SE

TE

REV

IN NO WAY APPLIES TO DESIGN AND FEATURES WHICH ARE OUR CUSTOMER'S PROPERTY.

INC. AND MUST NOT BE COPIED OR REPRODUCED WITHOUT PERMISSION. THE FOREGOING

HOW, AND ALL NEW OR PATENTABLE FEATURES ARE THE PROPERTY OF NOOTER/ERIKSEN

THIS DRAWING HAS BEEN FURNISHED BY NOOTER/ERIKSEN INC.: THE INFORMATION KNOW

DRAWING NUMBER

REV FE

PROJECT: RELEASE DATE:

NOOTER/ERIKSENNE

WELD SYMBOLS ARE PER AWS A2.4 LATEST EDITION

JOB NO. CODE SHT

PLANT SITE: LAKELAND, FL

PROJECT: MCINTOSH #5 COMBINED CYCLE

OWNER: CITY OF LAKELAND

LAKELAND

Lakeland.dgn 2020031140ga100 4/22/2021 2:42:50 PM

File details come from the government source that posted it. Updated .