ATTACH_05_25-1300-4027_NE_Wall_Field_Seam_Liners.pdf

PDF 302 KB Posted

Attached to
Unit 5 Spring 2025 Outage Contractor Services
Solicitation number
2025-RFP-002
Issued by
Sangamon County, Florida

About this file

This document is a technical drawing from Nooter/Eriksen for Lakeland Electric, specifically a detailed engineering drawing (Lakeland E & W DWG. 25-1300-4027) containing multiple complex structural and field seam liner diagrams. The image shows numerous technical schematics with precise measurements, annotations, and structural details, including multiple view perspectives of what appear to be industrial boiler or heat recovery steam generator (HRSG) component configurations. The drawing includes a comprehensive bill of materials on the right side of the document and contains multiple technical notes and specifications for each structural element.

The technical drawing provides intricate engineering specifications likely related to the upcoming Lakeland Electric Unit No. 5 Spring Outage scheduled from February 22nd to May 5th, 2025. The level of detail suggests these are critical technical specifications for welding, fabrication, and installation of complex industrial boiler components, specifically focusing on field seam liners and associated structural elements. The document appears to be part of a larger technical package supporting the Request for Proposal (RFP) for boiler and HRSG contractors, which requires precise engineering documentation to demonstrate technical capabilities for performing specialized code welds on thin-wall HRSG tubes and heavy wall P91 piping.

View the file

Other files

File Type Posted
Unit_5_Spring_2025_Outage_Contractor_Services_(Addendum_#6_Revision).pdf PDF
ATTACH_27_25-1300-4081_Fabric_Expansion_Belt_for_14_inch_Nozzle.pdf PDF
ATTACH_29_997003-CB-013_Reheater_2_Front_Lower_Gas_Baffles.pdf PDF
ATTACH_26_25-1300-4080_Fabric_Expansion_Belt_for_10_inch_nozzle.pdf PDF
ATTACH_30_997003-CB-014_HP_Superheater_3_Middle_Lower_Gas_Baffles.pdf PDF
ATTACH_28_997002-CA-11_Fabric_Expansion_Belt_for_12_Inch_Nozzle_and_997002-CA-012_PAcking_Gland_for_16_inch_Nozzle.pdf PDF
ATTACH_31_997003-CB-015_HP_Superheater_2_Back_Lower_Gas_Baffles.pdf PDF
City_of_Lakeland_Terms_-_2024.docx DOCX document
2025-RFP-002_Mandatory_Pre-Bid_Attendance_List.pdf PDF
ATTACH_09_25-1300-4069_NE_Field_Joint_Details_at_Floor.pdf PDF
ATTACH_06_25-1300-4028_NE_Floor_Field_Seam_Liners.pdf PDF
ATTACH_15_25-1301-4022_HP_Remote_Steam_Drum_Internal_Davit_and_Details.pdf PDF
ATTACH_24_Bundle_Layout_Plan_View_Color.pdf PDF
ATTACH_17_25-1313-4121_NORFLEX_HRSG_Outlet_EJ.pdf PDF
ATTACH_02_25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
ATTACH_14_25-1300-5031_NE_Nozzle_Penetrations_COLS_5_to_8_and_11_to_14.pdf PDF
ATTACH_20_997000_SH_E1_NEPIPINGDATA.pdf PDF
ATTACH_08_25-1300-4068_NE_Floor_Liner_Layout.pdf PDF
ATTACH_23_Bundle_Layout_Elevation_View_Color.pdf PDF
ATTACH_05_2024-REQ-343_Break_out_pricing.pdf PDF
ATTACH_01_25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
ATTACH_19_25-1317-5060_NE_INTERCONNECT_PIPING_SH_2.pdf PDF
ATTACH_18_25-1317-5059_NE_INTERCONNECT_PIPING_SH_1.pdf PDF
ATTACH_13_25-1300-4100_NE_HP_Evaporator_Floor_Panel_COLS_7_to_8.pdf PDF
ATTACH_07_25-1300-4064_NE_Plan_View.pdf PDF
ATTACH_16_25-1313-4120_NORFLEX_Stack_Inlet_EJ.pdf PDF
ATTACH_11_25-1300-4087_NE_HP_EVAP_Casing_Assembly_Diagram_COL_7_to_8.pdf PDF
ATTACH_03_25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
ATTACH_12_25-1300-4099_NE__Reheater_#1_&_HPSH_#1_Floor_Panel_COLS_6_to_7.pdf PDF
ATTACH_10_25-1300-4072_NE_Field_Corner_Angles.pdf PDF
ATTACH_22_2020031140-GA-100_10-HPDSHSPOOL.pdf PDF
ATTACH_21_2020031140-GA-007_10-HPDSHSPOOL.pdf PDF
ATTACH_04_25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Indemnification_2025_Contractor.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .