Attach_10_MunLgt_Insurance_Requirements.docx

DOCX document 16 KB Posted

Attached to
Munitions Storage: Replace Lighting Systems Federal contract opportunity
Solicitation number
W50S8F-24-B-A010
Issued by
Department of the Army National Guard

About this file

This document outlines insurance requirements for a federal construction contract solicitation. The solicitation requires various types of insurance including workers compensation of $100,000, comprehensive general liability of $500,000 per occurrence for bodily injury, comprehensive automobile liability of $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage, and aircraft public and passenger liability. Before commencing work, the contractor must certify in writing that the required insurance has been obtained, and policies must contain an endorsement that any cancellation or material change will not take effect for the period prescribed by state law or 30 days after notice is given to the contracting officer, whichever is longer. The contractor must maintain proof of insurance and provide copies to the contracting officer upon request, including for any subcontractors.

The related federal contract opportunity is to demolish and remove existing exterior and interior lighting systems and install new lighting at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The 100% small business set-aside solicitation requires demolition of exterior site lighting, poles, and exterior building lighting, and provision and installation of new exterior and interior munitions bunker facility lighting. The magnitude of construction is between $500,000 to $1 million. Bid, payment, and performance bonds are required for all proposals and contracts over $150,000. Bidders must interpret documents to resolve any discrepancies and bring deficiencies to the attention of the contracting officer prior to submitting a bid.

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage: Replace Lighting Systems, newest first.
File Type Posted
W50S8F-24-B-A010_MunLgt_Bid_Open_Sign-In_Sheet.pdf PDF
W50S8F-24-B-A010_MunLgt_OF1419_KO_Signed.pdf PDF
W50S8F-24-B-A010_MunLgt_BidOpen_PPT.pdf PDF
MunLgt_Section_J_List_of_Attachments_REV_02_20240326.xlsx XLSX spreadsheet
Solicitation Amendment W50S8F24BA0100002 SF 30_signed by KO.pdf PDF
Attach 17 MunLgt Final Q and Answer Log 20240328.pdf PDF
Attach_08_REV01_DOL_Wage_Rate_NJ20240024_MOD_02_20240308.pdf PDF
Solicitation Amendment 01- W50S8F24BA0100001 SF 30-signed by KO.pdf PDF
MunLgt_Section_J_List_of_Attachments_REV_01_20240320.xlsx XLSX spreadsheet
Attach_16_MunLgt_Pre-Bid_Sign-In_Record_20240320.pdf PDF
Attach_15_MunLgt_Pre-Bid_Conf_PPT_20240320.pdf PDF
MunLgt Solicitation Q and A Log w Attachment 20240314.pdf PDF
Attach_03_MunLgt_Section_L_Instructions_to_Offerors-8 Mar.pdf PDF
MunLgt_SF1442_Solicitation_Form_20240307.pdf PDF
MunLgt_Section_J_List_of_Attachments_20240305.xlsx XLSX spreadsheet
Attach_03_MunLgt_Section_L_Instructions_to_Offerors.pdf PDF
Attach_06_MunLgt_Drawings.pdf PDF
Attach_14_MunLgt_52.219-14_Limitations_on_Subcontracting_(DEVIATION 2021-O0008).pdf PDF
Attach_08_DOL_Wage_Rate_NJ20240024_MOD_01_20240126.pdf PDF
Attach_11_MunLgt_EMS_Commitment_Statement.pdf PDF
Attach_01_MunLgt_Bid_Break-Out.pdf PDF
Attach_04_MunLgt_SOW_20240119.pdf PDF
Attach_05_MunLgt_Project_Specifications_Redacted.pdf PDF
Attach_02_MunLgt_Notes_General.pdf PDF
Attach_07_MunLgt_Submittal Register_FINAL_20231026.xlsx XLSX spreadsheet
Attach_09_Project_Mng_Software_Pricing_2024.pdf PDF
Attach_12_MunLgt_OPSEC.pdf PDF
Attach_13_MunLgt_177FW_Vicinity_Maps.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W50S8F-21-B-0001

ATTACHMENT 08

INSURANCE - MINIMUM AMOUNTS

1.1. Reference Contract Clause titled, “Insurance -Work on a Government Installation (FAR 52.228-5). Types and minimum amounts are as follows:

TYPE AMOUNTS

Workmen’s Compensation $100,000 (see paragraph 1.2, below)

Comprehensive General Liability $500,000 per occurrence for bodily injury

Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage

(If applicable)$200,000 per person and $500,000 per occurrence
Aircraft Public and Passengerfor bodily injury, other than passenger
Liabilityliability and $200,000 per occurrence for
property damage; coverage for passenger
liability bodily injury shall be at least$200,000 multiplied by the number of seats
$200,000 multiplied by the number of seats or
passengers, whichever is greater

1.2. Except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.

1.3. Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained.

1.4. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

1.5. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

File details come from the government source that posted it. Updated .