Attach_07_MunLgt_Submittal Register_FINAL_20231026.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Munitions Storage: Replace Lighting Systems Federal contract opportunity
Solicitation number
W50S8F-24-B-A010
Issued by
Department of the Army National Guard

About this file

This solicitation is for a munitions storage lighting replacement project at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The contractor will demolish and remove existing exterior and interior lighting, including poles, bases, wiring, and wall packs as indicated on the demolition drawings. The contractor will then provide and install new exterior light fixtures, poles, concrete bases, wall mounted fixtures, electrical panels, and wiring to provide lighting in accordance with the project drawings. The contractor will also remove, replace, and provide interior lighting within the munitions bunker facilities as detailed on the interior lighting drawings. The total small business set-aside project has a magnitude between $500,000 and $1,000,000. Bidders must interpret the solicitation and attachments, including drawings, specifications, and statement of work to address all requirements. Bid, payment, and performance bonds are required for all proposals and contracts over $150,000.

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage: Replace Lighting Systems, newest first.
File Type Posted
W50S8F-24-B-A010_MunLgt_Bid_Open_Sign-In_Sheet.pdf PDF
W50S8F-24-B-A010_MunLgt_BidOpen_PPT.pdf PDF
W50S8F-24-B-A010_MunLgt_OF1419_KO_Signed.pdf PDF
Solicitation Amendment W50S8F24BA0100002 SF 30_signed by KO.pdf PDF
Attach 17 MunLgt Final Q and Answer Log 20240328.pdf PDF
Attach_08_REV01_DOL_Wage_Rate_NJ20240024_MOD_02_20240308.pdf PDF
MunLgt_Section_J_List_of_Attachments_REV_02_20240326.xlsx XLSX spreadsheet
Attach_15_MunLgt_Pre-Bid_Conf_PPT_20240320.pdf PDF
Solicitation Amendment 01- W50S8F24BA0100001 SF 30-signed by KO.pdf PDF
MunLgt_Section_J_List_of_Attachments_REV_01_20240320.xlsx XLSX spreadsheet
Attach_16_MunLgt_Pre-Bid_Sign-In_Record_20240320.pdf PDF
MunLgt Solicitation Q and A Log w Attachment 20240314.pdf PDF
Attach_03_MunLgt_Section_L_Instructions_to_Offerors-8 Mar.pdf PDF
Attach_02_MunLgt_Notes_General.pdf PDF
Attach_09_Project_Mng_Software_Pricing_2024.pdf PDF
Attach_12_MunLgt_OPSEC.pdf PDF
Attach_13_MunLgt_177FW_Vicinity_Maps.pdf PDF
MunLgt_SF1442_Solicitation_Form_20240307.pdf PDF
MunLgt_Section_J_List_of_Attachments_20240305.xlsx XLSX spreadsheet
Attach_03_MunLgt_Section_L_Instructions_to_Offerors.pdf PDF
Attach_06_MunLgt_Drawings.pdf PDF
Attach_14_MunLgt_52.219-14_Limitations_on_Subcontracting_(DEVIATION 2021-O0008).pdf PDF
Attach_01_MunLgt_Bid_Break-Out.pdf PDF
Attach_04_MunLgt_SOW_20240119.pdf PDF
Attach_05_MunLgt_Project_Specifications_Redacted.pdf PDF
Attach_08_DOL_Wage_Rate_NJ20240024_MOD_01_20240126.pdf PDF
Attach_10_MunLgt_Insurance_Requirements.docx DOCX document
Attach_11_MunLgt_EMS_Commitment_Statement.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSRepair MUNS LightingAQRC162004
TO BE COMPLETED BY PROJECT ENGINEERContractorTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIREDDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SUBMITTAL NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMFGR'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATION INSTRUCTIONPERFORMANCE TEST REPORTOTHERSUBMISSION DATEDATE CONTRACTOR NOTIFIED
ALL SUBMITTALS SHALL BE SUBMITTED THROUGH PROJECT MANAGEMENT SOFTWARE PER THE SOWAPPROVEDDISAPPROVED
1Job Specific Safety PlanxPrior to NTP being issued1
2Job Specific Quality Control PlanxPrior to NTP being issued2
3AF 3064 (or equivalent)– Project SchedulexPrior to NTP being issued3
4AF 3065 – Progress ReportxPrior to NTP being issued4
5Key Personnel LetterxPrior to NTP being issued5
6MSDS Sheets as requiredx6
7Type A Light Fixture per LED Lighting Fixture Schedulexxxxx7
8Type F Light Fixture per LED Lighting Fixture Schedulexxxxx8
9Type C Light Fixture per LED Lighting Fixture Schedulexxxxx9
10Type J Light Fixture per LED Lighting Fixture Schedulexxxxx10
11NEMA 3R Light Switch for type Cxxxxx11
12Photocellsxxxxx12
13Surface Mounted Switchxxxxx13
143/4" GRS Conduit, electrical boxes, and other associated componentsxxxxx14
15#12, #10, #8, #6 and other associated wiringxxxxx15
16Lighting Control Systemxxxxx16
17Light Polesxxxxx17
18Light Pole Basesxxxxx18
Munitions Admin Electrical Rm Lay-Out SketchxxSheet ES103 GN 4
19Other submittals as required by Specifications or Drawingsxxxxx19
20Site Area Restoration Materialsxxxxx20
21Field Test ReportsxNLT 5 Days from date of test21
22Close-out Documents - Electronic copies onlyPrior to Final Acceptance & Payment22
23Contractor Warranties3Prior to Final Acceptance & Payment23
24Record Drawings3Prior to Final Acceptance & Payment24
25O&M Manual3333Prior to Final Acceptance & Payment25
26Maintenance Summary Forms3Prior to Final Acceptance & Payment26
27DD 1354 Worksheet1Prior to Final Acceptance & Payment27

File details come from the government source that posted it. Updated .