Attach_06_MunLgt_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Munitions Storage: Replace Lighting Systems Federal contract opportunity
- Solicitation number
- W50S8F-24-B-A010
- Issued by
- Department of the Army National Guard
About this file
This solicitation package includes drawings and specifications for a lighting systems replacement project at a National Guard facility. The project scope involves demolishing existing exterior and interior munitions bunker lighting, and installing new exterior site lighting including poles, wall packs, electrical panels and wiring. Interior work includes replacing and providing new lighting in munitions bunkers. The total small business set-aside contract valued between $500,000 to $1 million will be awarded following sealed bid procedures. Bidders must submit payment and performance bonds for proposals over $150,000. The work location is the 177th Fighter Wing in Egg Harbor Township, New Jersey.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET &
DRAWING INDEX
GI001
DSTH
1031221893N Typewritten Text
XXXXXXXXXX 162004
1031221893N Polygon
1031221893N Typewritten Text REV 01 - Updated Project Number 1/31/2024
1031221893N Callout Project Number updated to AQRC 162004. This change is effective for all sheets.
KES 20240131
ELECTRICAL
ABBREVIATIONS, LEGENDS,
NOTES & SYMBOLS.
E-001
LIBTH
1031221893N Typewritten Text Government Drawing Comments:
(added 20240130):
1. All references to “Engineer”; Owner’s Representative; Owner; Agent for the Owner; Construction Manager shall be interpreted to read as the “Contracting Officer.”
| 2. | All references to specific trade contractors shall be interpreted to read as the, “General Contractor”. |
| 2.1. | i.e: sheet E-001 General Electrical Demolition Notes: Note 6 – “Electrical Contractor shall be responsible for…” shall be interpreted to read as, “General Contractor shall be responsible for…” |
| 2.2. | This is Prime GC contract and not a multiple GC contract. As such, the Government only has privity of contract with the General Contractor. The Government is not responsible for division of work between trades. |
3. B3 Submission - Not for Construction comments in the lower right of each sheet shall be ingnored. Drawings shall be considered 100% Issued for Construction (IFC) Drawings.
1031221893N Polygon
1031221893N Typewritten Text REV 01 - Added Government Comments 1/31/2024
1031221893N Callout
REVISION 01
kes 20240131
SITE LIGHTING DEMOLITION
ED101
DRLB
1031221893N Oval
1031221893N Callout
REVISION 01:
FOUR KEYED NOTES CIRCLED SHALL READ KEYED NOTE 6.
KEYED NOTE 8 ON SHEET ED-101 DOES NOT EXIST.
kes 20240131
1031221893N Typewritten Text REV 01 - Corrected reference to Keyed notes. 1/31/2024
1031221893N Polygon
SITE LIGHTING
(ROADWAY, WALKWAY AND BUILDING)
ES101
LIBLIB
PHASE 1APHASE 1B
SITE LIGHTING
(MUNITIONS BUNKERS)
ES102
PHASE 2B
PHASE 2A
PHASE 2B
PHASE 2A
ELECTRICAL
SITE LIGHTING
(PERIMETER FENCE SECURITY)
ES103
KEYPLAN
TYPICAL MUNITION BUNKER
LIGHTING PLANS
EL101
DRLB
(PHASE 1B)
(PHASE 1A)(PHASE 1A)
DETAILS
E-501
DRLB
| GI001 |
| GI001 |
| GI001 |
| E-001 |
| E-001 |
| E-001 |
| ED101 |
| ED101 |
| ED101 |
| ES101 |
| ES101 |
| ES101 |
| ES102 |
| ES102 |
| ES102 |
| ES103 |
| ES103 |
| ES103 |
| EL101 |
| EL101 |
| E-501 |
| E-501 |
| E-501 |
| 2024-03-01T16:29:51-0500 | |
| SHERRY.KIRK.EDWARD.1031221893 |
File details come from the government source that posted it. Updated .