Atta 2-3 Appendix_WorkPlanLCSOMA.docx
DOCX document 37 KB Posted
- Solicitation number
- W91QVN23R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CIC_W91QVN23R00XX.docx | DOCX document | |
| B08 W91QVN23R0026-0001.pdf | ||
| Combined QA.pdf | ||
| Atta 3 OfferBreakdownFormat_Redacted.pdf | ||
| Atta 3 OfferBreakdownFormat.pdf | ||
| Atta 1-6 Drawings_Non-WorkPlanLCS_TITLE.pdf | ||
| B08 W91QVN23R0026.pdf | ||
| Atta 1-8 WarrantyList_Non-WorkPlanLCS_MECH.xlsx | XLSX spreadsheet | |
| Atta 1-3 Drawings_Non-WorkPlanLCS_ARCH.pdf | ||
| Atta 1-2 Drawings_Non-WorkPlanLCS_CIVIL.pdf | ||
| Atta 2-1 SOW_WorkPlanLCSOMA.docx | DOCX document | |
| Atta 2-2 Drawings_WorkPlanLCSOMA.pdf | ||
| Atta 1-4 Drawings_Non-WorkPlanLCS_ELEC.pdf | ||
| Atta 1-1 SOW_Non-WorkPlanLCS.docx | DOCX document | |
| Atta 1-7 WarrantyList_Non-WorkPlanLCS_ELEC.xlsx | XLSX spreadsheet | |
| Atta 1-5 Drawings_Non-WorkPlanLCS_MECH.pdf | ||
| Atta 1-9 WarrantyList_Non-WorkPlanLCS_ARCH.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
PROJECT NO TITLE LOCATION
H20-10054-2J Construct Pre-Engineered Metal LSA at FOS (Work Plan) Camp Carroll*
GENERAL: The work shall conform to the standard detail drawings (dated 30 November 2015, issued by the Department of the Army, Installation Management Agency, Korea Region Office and located USFK’s Web Page http://www.usfk.mil/Resources/Contracting-with-USFK), all of which form a part of the specifications.
Drawing No. Ref. No. Sheet No. Description Date
D-22-20 R-1 1 of 1 Title Sheet 13 Jun 22
" C - 1 1 of 59 Location Plan "
" C - 2 2 of 59 Site Layout Plan "
" AE001 3 of 59 Abbreviations, Material Indications & Symbols "
| " | AE002 | 4 of 59 | Scope of Works, | |
| Structural General Notes, General Notes | " |
" AE101 5 of 59 1st/2nd Floor Plan & Roof Plan "
" AE201 6 of 59 Elevations "
" AE301 7 of 59 Cross Sections "
| " | AE401 | 8 of 59 | 1st & 2nd Floor Wall Section | |
| & Wall Partition Type Key Plans | " |
" AE402 9 of 59 Exterior Wall Sections "
" AE403 10 of 59 Interior Wall Sections "
" AE404 11 of 59 Stair-1 Section "
" AE405 12 of 59 Interior Wall Partition Type Details-1 "
" AE406 13 of 59 Interior Wall Partition Type Details-2 "
" AE501 14 of 59 Ceiling Details-1 "
" AE502 15 of 59 Ceiling Details-2 "
A-1 Drawing No. Ref. No. Sheet No. Description Date
D-22-20 AE503 16 of 59 Misc. Details-1 13 Jun 22
" AE504 17 of 59 Misc. Details-2 "
" AE601 18 of 59 Ext/ Int Finish Schedule "
" AE602 19 of 59 Material Color Schedule, Roof Details (Typical) "
" AE603 20 of 59 Signage Plan & Schedule "
" AE604 21 of 59 Signage Details "
| " | AE605 | 22 of 59 | Door/ Window Types, | |
| Schedule & Hardware Schedule | " |
| " | AE606 | 23 of 59 | Door/ Window Types, | |
| Schedule & Hardware Schedule | " |
" S-001 24 of 59 General Notes, Design Data and Typical Details "
" SF101 25 of 59 Foundation and Ground Plan "
" SF102 26 of 59 2nd Floor Framing Plan "
" SF103 27 of 59 Roof Framing Plan "
" SF104 28 of 59 Purlin Layout & Wind Load Data "
" S-301 29 of 59 Cross Section-1 "
" S-302 30 of 59 Cross Section-2 "
" S-303 31 of 59 Cross Section-3 "
" S-401 32 of 59 Stair 1 & 2 Plans "
" S-402 33 of 59 Stair-1 Enlarged Section "
" S-403 34 of 59 Stair-2 Enlarged Section "
" S-404 35 of 59 Enlarged Section at Base "
" S-501 36 of 59 Slab / Base and Pier Details "
" S-502 37 of 59 Steel Connection Details "
" S-503 38 of 59 Foundation / Pad and Joint Details "
A-2 Drawing No. Ref. No. Sheet No. Description Date
D-22-20 S-504 39 of 59 Stair Details 13 Jun 22
" M - 1 40 of 59 Legend and Abbreviations "
" M - 2 41 of 59 Equipment Schedule "
" M - 3 42 of 59 General Notes and Scope of Work "
" M - 4 43 of 59 HVAC Piping Plan "
" M - 5 44 of 59 HVAC Duct Plan "
" M - 6 45 of 59 Refgerant Piping Isometric Diagram "
" M - 7 46 of 59 Control Diagram "
" M - 8 47 of 59 Detail Drawings - 1 "
" M - 9 48 of 59 Detail Drawings - 2 "
" M - 10 49 of 59 Detail Drawings - 3 "
" M - 11 50 of 59 Detail Drawings - 4 "
" M - 12 51 of 59 Fire Protection Piping Plan "
" E - 1 52 of 59 Legend, Notes and Scope of Work "
" E - 2 53 of 59 Lighting and Power Plan "
" E - 3 54 of 59 HVAC Power Plan and Lighting Fixture Schedule "
| " | E - 4 | 55 of 59 | Communication System Plan, | |
| One Line Diagram and | ||||
| Lightning Protection System Plan | " |
| " | E - 5 | 56 of 59 | Fire Alarm & Mass Notification System Plan, | |
| One Line Diagram and Notes | " |
" E - 6 57 of 59 Panel Schedule "PA" and "PB" "
| " | E - 7 | 58 of 59 | Power Single Line Diagram and | |
| Panel Schedule "MDP" | " |
" E - 8 59 of 59 Electrical Site Plan "
A-3
SECTION 16711-1
File details come from the government source that posted it. Updated .