SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO.

CIVIL

C - 1

M - 1

M - 2

M - 3

MECHANICAL

A - 1

A - 2

A - 3

ARCHITECTURAL

DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-1

A - 4

A - 5

A - 6

A - 7

A - 8

A - 9

M - 4

M - 7

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

C - 2

C - 3

A - 10

A - 11

A - 12

M - 8

A - 13

A - 14

A - 15

A - 16

M - 9

M - 10

M - 11

M - 12

M - 13

M - 14

M - 15

M - 16

M - 17

M - 18

M - 19

M - 20

M - 21

M - 22

M - 23

M - 24

M - 25

M - 26

M - 27

M - 28

M - 29

SITE LAYOUT PLAN AND SCOPE OF WORK

A - 17

C - 4

T - 2

TITLE SHEET-1

TITLE SHEET-2

M - 30

M - 31

M - 32

M - 33

M - 34

M - 35

M - 36

M - 37

M - 38

TITLE SHEET-1

REMOVAL PLAN

C - 5

1ST FLOOR PLAN AND GENERAL NOTES

3RD FLOOR PLAN AND SCOPE OF WORK

2ND FLOOR PLAN AND SCOPE OF WORK

4TH FLOOR PLAN AND PICTURES

ELEVATIONS AND PICTURES

ELEVATIONS AND PICTURES

GENERAL SECTIONS AND DETAILS

EXT/INTERIOR WALL SECTIONS AND DETAILS

TYPICAL & PARTIAL PLANS AND ELEVATION

CABINET DETAILS AND NOTES

CLOSET DETAILS

MISC. DETAILS - 1

MISC. DETAILS - 2

INTERIOR/EXTERIOR FINISH SCHEDULE AND MATERIALS & COLOR SCHEDULE

DOOR/ WINDOW SCHEDULE, ELEVATIONS AND NOTES

SIGNAGES SCHEDULE

HARDWARE SCHEDULE AND DETAILS

LEGEND AND ABBREVIATIONS

M - 5

M - 6

EXISTING AND REMOVAL MECHANICAL PLAN

NEW HVAC PLAN FOR DOAU SYSTEM (1ST & 2ND FLOOR)

NEW HVAC PLAN FOR DOAU SYSTEM (3RD & 4TH FLOOR)

C - 6

C - 7

C - 8

SHADE SHELTER

MISC. DETAILS - 1

MISC. DETAILS - 1

MISC. DETAILS - 1

FUEL STORAGE TANK DETAILS

GENERAL NOTES AND SCOPE OF WORK

NEW H.V.A.C. PLAN (1ST FLOOR)

NEW H.V.A.C. PLAN (4TH FLOOR)

NEW H.V.A.C. PLAN (2ND & 3RD FLOOR)

MECHANICAL ROOM ENLARGED PARTIAL PLAN

EQUIPMENT SCHEDULES - 1

EQUIPMENT SCHEDULES - 2

NEW H.V.A.C. PIPING ISOMETRIC DIAGRAM

NEW H.V.A.C. & H.V.A.C. PIPING ENLARGED PARTIAL PLANS AND

NEW H.V.A.C. PIPING SCHEMATIC FLOW DIAGRAM - 1

NEW H.V.A.C. PIPING SCHEMATIC FLOW DIAGRAM - 2

NEW H.V.A.C. DUCT SCHEMATIC FLOW DIAGRAM

NEW PLUMBING PIPING PLAN (1ST FLOOR)

NEW PLUMBING PIPING PLAN (4TH FLOOR)

NEW PLUMBING PIPING PLAN (2ND & 3RD FLOOR)

NEW TYP MODULE PLUMBING ENLARGED PARTIAL PLANS

NEW LAUNDRY PLUMBING ENLARGED PARTIAL PLANS

TYP MODULE PLUMBING PIPING ISOMETRIC DIAGRAM

LAUNDRY RM. PLUMBING PIPING ISOMETRIC DIAGRAM

PLUMBING PIPING FLOW DIAGRAM

FIRE PROTECTION ENLARGED PARTIAL PLAN

NEW FIRE PROTECTION PIPING PLAN (1ST FLOOR) & MECH ROOM

NEW FIRE PROTECTION PIPING PLAN (2ND FLOOR)

NEW FIRE PROTECTION PIPING PLAN (3RD FLOOR)

NEW FIRE PROTECTION PIPING PLAN (4TH FLOOR)

MECH. CONTROLS - 1

MECH. CONTROLS - 2

MECH. CONTROLS - 3

MECH. CONTROLS - 4 & EXHAUST DUCT ISOMETRIC DIAGRAM(TYP.)

MECH. DETAILS - 1

MECH. DETAILS - 2

MECH. DETAILS - 3

MECH. DETAILS - 4

MECH. DETAILS - 5

MECH. DETAILS - 6

FIRE DEATILS

REPAIR BARRACKS

REPAIR BARRACKS

GENERAL NOTES

ELECTRICAL

E - 1

E - 2

E - 3

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-2

E - 4

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

TITLE SHEET-2

E - 5

E - 6

E - 7

E - 8

E - 9

E - 10

E - 11

E - 12

E - 13

E - 14

E - 15

E - 16

NEW 1ST & 2ND FL FIRE ALARM CONTROL/ MASS NOTIFICATION SYSTEM PLAN

NEW FIRE ALARM/ MASS NOTIFICATION SYSTEM DIAGRAM

EXIST PANELBOARD CONN. DIAGRAMS

NEW 1ST & 2ND FL TEL/CATV PLAN

E - 17

E - 18

EXIST/ NEW EXTERIOR POWER DISTRIBUTION PLAN

NEW 1ST & 2ND FLOOR LIGHTING PLAN

NEW 3RD & 4TH FLOOR LIGHTING PLAN

LIGHTING FIXTURE DETAILS

LIGHTING FIXTURE SCHEDULE

NEW 1ST & 2ND FL. POWER PLAN

NEW 3RD & 4TH FL. POWER PLAN

POWER PLAN

TYPICAL BEDROOM ELECTRICAL MODULE PLAN & NEW MECH.RM PARTIAL

SCHEDULE

EXIST/ NEW POWER ONE LINE DIAGRAM & NEW PANELBOARD "MDP" LOAD

NEW 3RD & 4TH FL FIRE ALARM CONTROL/ MASS NOTIFICATION SYSTEM PLAN

NEW 3RD & 4TH FL TEL/CATV PLAN

E - 19

NEW TELECOM SYSTEM DIAGRAM

NEW CATV SYSTEM DIAGRAM

1ST-4TH FL. CCTV PLAN AND PA SYSTEM REMOVAL PLAN

Repair Barracks-T1
Repair Barracks-T2