Atta 1-6 Drawings_Non-WorkPlanLCS_TITLE.pdf
PDF 474 KB Posted
- Solicitation number
- W91QVN23R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CIC_W91QVN23R00XX.docx | DOCX document | |
| B08 W91QVN23R0026-0001.pdf | ||
| Combined QA.pdf | ||
| Atta 3 OfferBreakdownFormat_Redacted.pdf | ||
| Atta 3 OfferBreakdownFormat.pdf | ||
| B08 W91QVN23R0026.pdf | ||
| Atta 1-8 WarrantyList_Non-WorkPlanLCS_MECH.xlsx | XLSX spreadsheet | |
| Atta 1-3 Drawings_Non-WorkPlanLCS_ARCH.pdf | ||
| Atta 1-2 Drawings_Non-WorkPlanLCS_CIVIL.pdf | ||
| Atta 2-3 Appendix_WorkPlanLCSOMA.docx | DOCX document | |
| Atta 2-1 SOW_WorkPlanLCSOMA.docx | DOCX document | |
| Atta 2-2 Drawings_WorkPlanLCSOMA.pdf | ||
| Atta 1-4 Drawings_Non-WorkPlanLCS_ELEC.pdf | ||
| Atta 1-1 SOW_Non-WorkPlanLCS.docx | DOCX document | |
| Atta 1-7 WarrantyList_Non-WorkPlanLCS_ELEC.xlsx | XLSX spreadsheet | |
| Atta 1-5 Drawings_Non-WorkPlanLCS_MECH.pdf | ||
| Atta 1-9 WarrantyList_Non-WorkPlanLCS_ARCH.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
CIVIL
C - 1
M - 1
M - 2
M - 3
MECHANICAL
A - 1
A - 2
A - 3
ARCHITECTURAL
DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-1
A - 4
A - 5
A - 6
A - 7
A - 8
A - 9
M - 4
M - 7
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C - 2
C - 3
A - 10
A - 11
A - 12
M - 8
A - 13
A - 14
A - 15
A - 16
M - 9
M - 10
M - 11
M - 12
M - 13
M - 14
M - 15
M - 16
M - 17
M - 18
M - 19
M - 20
M - 21
M - 22
M - 23
M - 24
M - 25
M - 26
M - 27
M - 28
M - 29
SITE LAYOUT PLAN AND SCOPE OF WORK
A - 17
C - 4
T - 2
TITLE SHEET-1
TITLE SHEET-2
M - 30
M - 31
M - 32
M - 33
M - 34
M - 35
M - 36
M - 37
M - 38
TITLE SHEET-1
REMOVAL PLAN
C - 5
1ST FLOOR PLAN AND GENERAL NOTES
3RD FLOOR PLAN AND SCOPE OF WORK
2ND FLOOR PLAN AND SCOPE OF WORK
4TH FLOOR PLAN AND PICTURES
ELEVATIONS AND PICTURES
ELEVATIONS AND PICTURES
GENERAL SECTIONS AND DETAILS
EXT/INTERIOR WALL SECTIONS AND DETAILS
TYPICAL & PARTIAL PLANS AND ELEVATION
CABINET DETAILS AND NOTES
CLOSET DETAILS
MISC. DETAILS - 1
MISC. DETAILS - 2
INTERIOR/EXTERIOR FINISH SCHEDULE AND MATERIALS & COLOR SCHEDULE
DOOR/ WINDOW SCHEDULE, ELEVATIONS AND NOTES
SIGNAGES SCHEDULE
HARDWARE SCHEDULE AND DETAILS
LEGEND AND ABBREVIATIONS
M - 5
M - 6
EXISTING AND REMOVAL MECHANICAL PLAN
NEW HVAC PLAN FOR DOAU SYSTEM (1ST & 2ND FLOOR)
NEW HVAC PLAN FOR DOAU SYSTEM (3RD & 4TH FLOOR)
C - 6
C - 7
C - 8
SHADE SHELTER
MISC. DETAILS - 1
MISC. DETAILS - 1
MISC. DETAILS - 1
FUEL STORAGE TANK DETAILS
GENERAL NOTES AND SCOPE OF WORK
NEW H.V.A.C. PLAN (1ST FLOOR)
NEW H.V.A.C. PLAN (4TH FLOOR)
NEW H.V.A.C. PLAN (2ND & 3RD FLOOR)
MECHANICAL ROOM ENLARGED PARTIAL PLAN
EQUIPMENT SCHEDULES - 1
EQUIPMENT SCHEDULES - 2
NEW H.V.A.C. PIPING ISOMETRIC DIAGRAM
NEW H.V.A.C. & H.V.A.C. PIPING ENLARGED PARTIAL PLANS AND
NEW H.V.A.C. PIPING SCHEMATIC FLOW DIAGRAM - 1
NEW H.V.A.C. PIPING SCHEMATIC FLOW DIAGRAM - 2
NEW H.V.A.C. DUCT SCHEMATIC FLOW DIAGRAM
NEW PLUMBING PIPING PLAN (1ST FLOOR)
NEW PLUMBING PIPING PLAN (4TH FLOOR)
NEW PLUMBING PIPING PLAN (2ND & 3RD FLOOR)
NEW TYP MODULE PLUMBING ENLARGED PARTIAL PLANS
NEW LAUNDRY PLUMBING ENLARGED PARTIAL PLANS
TYP MODULE PLUMBING PIPING ISOMETRIC DIAGRAM
LAUNDRY RM. PLUMBING PIPING ISOMETRIC DIAGRAM
PLUMBING PIPING FLOW DIAGRAM
FIRE PROTECTION ENLARGED PARTIAL PLAN
NEW FIRE PROTECTION PIPING PLAN (1ST FLOOR) & MECH ROOM
NEW FIRE PROTECTION PIPING PLAN (2ND FLOOR)
NEW FIRE PROTECTION PIPING PLAN (3RD FLOOR)
NEW FIRE PROTECTION PIPING PLAN (4TH FLOOR)
MECH. CONTROLS - 1
MECH. CONTROLS - 2
MECH. CONTROLS - 3
MECH. CONTROLS - 4 & EXHAUST DUCT ISOMETRIC DIAGRAM(TYP.)
MECH. DETAILS - 1
MECH. DETAILS - 2
MECH. DETAILS - 3
MECH. DETAILS - 4
MECH. DETAILS - 5
MECH. DETAILS - 6
FIRE DEATILS
REPAIR BARRACKS
REPAIR BARRACKS
GENERAL NOTES
ELECTRICAL
E - 1
E - 2
E - 3
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-2
E - 4
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
TITLE SHEET-2
E - 5
E - 6
E - 7
E - 8
E - 9
E - 10
E - 11
E - 12
E - 13
E - 14
E - 15
E - 16
NEW 1ST & 2ND FL FIRE ALARM CONTROL/ MASS NOTIFICATION SYSTEM PLAN
NEW FIRE ALARM/ MASS NOTIFICATION SYSTEM DIAGRAM
EXIST PANELBOARD CONN. DIAGRAMS
NEW 1ST & 2ND FL TEL/CATV PLAN
E - 17
E - 18
EXIST/ NEW EXTERIOR POWER DISTRIBUTION PLAN
NEW 1ST & 2ND FLOOR LIGHTING PLAN
NEW 3RD & 4TH FLOOR LIGHTING PLAN
LIGHTING FIXTURE DETAILS
LIGHTING FIXTURE SCHEDULE
NEW 1ST & 2ND FL. POWER PLAN
NEW 3RD & 4TH FL. POWER PLAN
POWER PLAN
TYPICAL BEDROOM ELECTRICAL MODULE PLAN & NEW MECH.RM PARTIAL
SCHEDULE
EXIST/ NEW POWER ONE LINE DIAGRAM & NEW PANELBOARD "MDP" LOAD
NEW 3RD & 4TH FL FIRE ALARM CONTROL/ MASS NOTIFICATION SYSTEM PLAN
NEW 3RD & 4TH FL TEL/CATV PLAN
E - 19
NEW TELECOM SYSTEM DIAGRAM
NEW CATV SYSTEM DIAGRAM
1ST-4TH FL. CCTV PLAN AND PA SYSTEM REMOVAL PLAN
| Repair Barracks-T1 |
| Repair Barracks-T2 |
File details come from the government source that posted it. Updated .